M67001-18-Q-1314_Amendment_02.pdf.docx

DOCX document 30 KB Posted

Attached to
AUDIO VISUAL EQUIPMENT UPGRADE Federal contract opportunity
Solicitation number
M67001-18-Q-1314
Issued by
United States Marine Corps

About this file

Amendment to answer questions and extend offer due date.

View the file

Other files for this federal contract opportunity

Other files attached to AUDIO VISUAL EQUIPMENT UPGRADE, newest first.
File Type Posted
M67001-18-Q-1314_Amendment_01.pdf PDF
RFQ_M67001-18-Q-1314.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

M6700118Q1314

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

QUESTIONS AND ANSWERS

RFQ M67001-18-Q-1314

Questions and Answers

Question #1

Answer #1 Who is responsible for the electrical power disconnect for the front projector screens and disconnect/reconnect for the back screens?

The Vendor, this is a turn-key project.

Question #2

Answer #2 Does the customer want the two back screens and projectors to be turned on/off separately from the front projectors?

Yes. All controls should be through the Touch Screen. There should be manual/failsafe capabilities to raise/lower all screens in the event of Touch Screen malfunctions.

Question #3

Answer #3 Does the audio need to be separated - PC/DVD vs Microphones? Example PC audio playing and lapel mic can be on or off?

Yes, that is correct.

Question #4

Answer #4 Will the PC being provided by the government have two video cards?

Yes.

Question #5

Answer #5 Who's responsibility will it be to deliver all equipment being de-installed? Approximately how many miles from installation location is the building the equipment has to be delivered to?

The vendor is responsible. Approximately 10 - 15 Miles.

Question #6

Answer #6 Is Maintenance and support required on a monthly basis?

Yes, as stated in the Solicitation (5.7.1).

Question #7

Answer #7 Emergency Maintenance- what is the response time? Does this have a technician on-site time?

As stated in the solicitation (5.7.2), The contractor shall be on-site to repair malfunctioning and/or non-functioning equipment within four (4) business hours of being notified.

SECTION SF 1449 - CONTINUATION SHEET

SOLICITATION/CONTRACT FORM

The required response date/time has changed from 12-Sep-2018 10:00 AM to 14-Sep-2018 10:00 AM.

(End of Summary of Changes) image1.wmf