M67001-18-Q-1314_Amendment_02.pdf.docx

DOCX document 30 KB Posted

Attached to
AUDIO VISUAL EQUIPMENT UPGRADE
Solicitation number
M67001-18-Q-1314
Issued by

About this file

Amendment to answer questions and extend offer due date.

View the file

Other files

File Type Posted
M67001-18-Q-1314_Amendment_01.pdf PDF
RFQ_M67001-18-Q-1314.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

M6700118Q1314

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

QUESTIONS AND ANSWERS

RFQ M67001-18-Q-1314

Questions and Answers

Question #1

Answer #1 Who is responsible for the electrical power disconnect for the front projector screens and disconnect/reconnect for the back screens?

The Vendor, this is a turn-key project.

Question #2

Answer #2 Does the customer want the two back screens and projectors to be turned on/off separately from the front projectors?

Yes. All controls should be through the Touch Screen. There should be manual/failsafe capabilities to raise/lower all screens in the event of Touch Screen malfunctions.

Question #3

Answer #3 Does the audio need to be separated - PC/DVD vs Microphones? Example PC audio playing and lapel mic can be on or off?

Yes, that is correct.

Question #4

Answer #4 Will the PC being provided by the government have two video cards?

Yes.

Question #5

Answer #5 Who's responsibility will it be to deliver all equipment being de-installed? Approximately how many miles from installation location is the building the equipment has to be delivered to?

The vendor is responsible. Approximately 10 - 15 Miles.

Question #6

Answer #6 Is Maintenance and support required on a monthly basis?

Yes, as stated in the Solicitation (5.7.1).

Question #7

Answer #7 Emergency Maintenance- what is the response time? Does this have a technician on-site time?

As stated in the solicitation (5.7.2), The contractor shall be on-site to repair malfunctioning and/or non-functioning equipment within four (4) business hours of being notified.

SECTION SF 1449 - CONTINUATION SHEET

SOLICITATION/CONTRACT FORM

The required response date/time has changed from 12-Sep-2018 10:00 AM to 14-Sep-2018 10:00 AM.