M67001-18-Q-1314_Amendment_02.pdf.docx
DOCX document 30 KB Posted
- Attached to
- AUDIO VISUAL EQUIPMENT UPGRADE Federal contract opportunity
- Solicitation number
- M67001-18-Q-1314
- Issued by
- United States Marine Corps
About this file
Amendment to answer questions and extend offer due date.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| M67001-18-Q-1314_Amendment_01.pdf | ||
| RFQ_M67001-18-Q-1314.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
M6700118Q1314
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
QUESTIONS AND ANSWERS
RFQ M67001-18-Q-1314
Questions and Answers
Question #1
Answer #1 Who is responsible for the electrical power disconnect for the front projector screens and disconnect/reconnect for the back screens?
The Vendor, this is a turn-key project.
Question #2
Answer #2 Does the customer want the two back screens and projectors to be turned on/off separately from the front projectors?
Yes. All controls should be through the Touch Screen. There should be manual/failsafe capabilities to raise/lower all screens in the event of Touch Screen malfunctions.
Question #3
Answer #3 Does the audio need to be separated - PC/DVD vs Microphones? Example PC audio playing and lapel mic can be on or off?
Yes, that is correct.
Question #4
Answer #4 Will the PC being provided by the government have two video cards?
Yes.
Question #5
Answer #5 Who's responsibility will it be to deliver all equipment being de-installed? Approximately how many miles from installation location is the building the equipment has to be delivered to?
The vendor is responsible. Approximately 10 - 15 Miles.
Question #6
Answer #6 Is Maintenance and support required on a monthly basis?
Yes, as stated in the Solicitation (5.7.1).
Question #7
Answer #7 Emergency Maintenance- what is the response time? Does this have a technician on-site time?
As stated in the solicitation (5.7.2), The contractor shall be on-site to repair malfunctioning and/or non-functioning equipment within four (4) business hours of being notified.
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 12-Sep-2018 10:00 AM to 14-Sep-2018 10:00 AM.
(End of Summary of Changes) image1.wmf