LR Streambank Stabilization Bid Package Documents.pdf
PDF 433 KB Posted
- Attached to
- Lower Reedy Streambank Stabilization RFB
- Solicitation number
- 144733
- Issued by
- Greenville County, South Carolina
About this file
Lower Reedy WRRF Streambank Stabilization Bid Package Summary
This is a bid package document for the Lower Reedy Water Reclamation and Reuse Facility (WRRF) Streambank Stabilization Project issued by Renewable Water Resources (ReWa), a special purpose district in South Carolina. The project involves restoration and stabilization of an eroded streambank section along the Reedy River adjacent to existing sanitary sewer infrastructure. Work scope includes removal of existing structures and debris, installation of approximately 196 linear feet of boulder toe protection and 74 linear feet of boulder vanes, earthwork excavation totaling 500 cubic yards, comprehensive grading, coir matting installation covering 563 square yards, and revegetation of disturbed areas through permanent seeding and riparian seed mix application across approximately 0.21 acres of clearing and grubbing. The project is structured as a lump sum bid with a 120 consecutive calendar day completion timeline from the Notice to Proceed. Bidders must acknowledge receipt of all addenda and certify independent bid preparation without collusion.
The bid package imposes several compliance and regulatory requirements as conditions of submission. Bidders must execute multiple mandatory forms including Notice and Claim Procedures Acknowledgement, South Carolina Illegal Immigration Reform Act compliance certification requiring E-Verify participation, State Revolving Fund (SRF) requirements compliance if applicable, and Statement of Compliance with S.C. Code 12-8-550 addressing South Carolina residency and tax liability. All bids must include sales tax and applicable fees within the lump sum price. Contractors must comply with federal authorities applicable to SRF-funded projects, including Davis-Bacon Act requirements, American Iron and Steel provisions, Equal Employment Opportunity Executive Order 11246, and procurement prohibitions under the Clean Air Act and Clean Water Act. Bidders are required to identify major equipment items, self-performed work by specialty for streambank restoration and planting, and all subcontractors representing 3% or greater of the base bid amount with their respective license numbers. The contract includes liquidated damages provisions plus any consent order fines imposed by regulatory authorities for contractor delay. All communications with ReWa must occur through formal written channels with the Director of Business Services or Purchasing Department; unauthorized contact with ReWa employees is grounds for bid disqualification or contract termination.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Lower Reedy WRRF Streambank Stabilization RFB 080426.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
00230
NOTICE REGARDING CONTRACTUAL OBLIGATIONS AND CONTACT WITH
OWNER’S EMPLOYEES
A Contractor submitting a Bid for this Project must have a Contractor’s representative sign all of the forms listed below. Said Contractor’s representative must be authorized to legally bind the Contractor. These forms are considered an indispensable part of the Contract and the omission of one or more of these forms in the Bid package shall be grounds for disqualifying the Bid as non-responsive.
1. Notice and Claim Procedures Acknowledgement Form
2. South Carolina Illegal Immigration Reform Act
3. Compliance with State Revolving Fund Requirements (if applicable)
4. Compliance with ARRA Buy American Requirements (if applicable)
5. Statement of Compliance with SC Code 12-8-550
Further, Renewable Water Resources (“ReWa”) seeks to ensure the integrity of the completive procurement process as required by South Carolina Code Section 11-35-50. Toward that end, it is a violation of both state law and ReWa policy for a ReWa employee to discuss the terms and conditions of any pending procurement contract, including the terms and conditions upon which an award of the contract shall be made, with a prospective offeror, Bidder, contractor, or subcontractor (“a Prospective Offeror”). ReWa may have discussions with a Prospective Offeror only to clarify the terms of a request for proposal or an invitation to Bid and then only as authorized by the Chief Executive Officer or his delegate, the ReWa Director of Business Services.
Any requests for interpretation of the Contract Documents must be directed to the ReWa Director of Business Services as a formal request for interpretation as detailed in Paragraphs 6 and 7 of the Information for Bidders. Any questions regarding the project must be directed to ReWa’s Purchasing Department. All communications with Prospective Offerors will occur only in writing and will be preserved. Please be aware that any communications with Owner may be publicly published.
Should ReWa become aware that a Prospective Offeror engaged in communications outside of the formal channels provided in these Contract Documents, it shall be grounds for the disqualification of that Prospective Offeror’s Bid in accordance with Owner’s Procurement Code. If Owner becomes aware of such unauthorized contact after the signing of the Contract, it shall be grounds for immediate termination of the Contract, for cause. Such termination shall be treated as though Contractor had ceased all work as of the day that ReWa became aware of the unauthorized contact.
By signing below, the Prospective Contractor represents that it has read the above disclosure, understands its terms, and assents to the provisions contained herein. Prospective Contractor realizes that unauthorized contact can lead to the disqualification of the Bid, or the termination of the Contract.
[SIGNATURE PAGE FOLLOWS]
Read and understood:
Name of Prospective Contractor
Sign:
Print Name:
Title:
Signed this, the _____ day of _______________, 20_____.
Notice and Claim Procedure Acknowledgment Form
(To be returned with the Bid)
We, the Contractor (Bidder) and Contractor’s/Bidder’s project manager acknowledge that we have read and understand the contract document sections about claims procedures, notice requirements for changes, including, but not limited to damage claims, extras, time extensions, etc. and have read and understand the claim procedure and agree to abide by these formal requirements. Further, that we understand failure to follow requirements will result in a complete loss of the claim.
Name of Contractor
If above signature is not that of the Project Manager:
Title: Project Manager
00240
Compliance with State Revolving Fund Requirements
If this box is checked, this Project may be funded in whole or in part with federal funds through the State Revolving Fund (“SRF”)
Guide to Federal Requirements for Federally-Designated SRF Projects
There are a number of federal laws, executive orders and government-wide policies that apply to projects and activities receiving federal financial assistance, regardless of whether the statute authorizing the assistance makes them applicable. Since federal capitalization grant money was used to seed the State Revolving Fund (SRF) program, any money received through the SRF program is subject to federal authorities. As an example, the environmental evaluation section, covered in the Preliminary Engineering Report (PER) guide, stems from environmental authorities, such as, the Endangered Species Act and Wild and Scenic Rivers Act. In addition, there are social policy and economic authorities that must be complied with in order to receive funding through the SRF program. These authorities include:
► Uniform Relocation and Real Property Acquisition Act, Pub. L. 91-646, as amended ► Women’s and Minority Business Enterprise, Executive Orders 11625, 12138 and 12432 ► Section 129 of the Small Business Administration Reauthorization and Amendment Act of 1988, Pub. L. 100-590 ► Equal Employment Opportunity, Executive Order 11246 ► Debarment and Suspension, Executive Order 12549 ► Procurement Prohibitions under Section 306 of the Clean Air Act and Section 508 of the Clean Water Act, including Executive Order 11738, Administration of the Clean Air Act and the Federal Water Pollution Control Act with Respect to Federal Contracts, Grants, or Loans ► “American Iron and Steel” Provisions ► Davis-Bacon and Related Acts
This guide discusses, in more detail, the requirements of the federal authorities that apply to SRF projects and explains the actions required of the Project Sponsor, in order to obtain funding from the SRF program. All forms referred to in the text below are found in Attachment B, and on the SRF forms page, https://des.sc.gov/programs/bureau-water/state-revolving-fund-srf-program/srf-forms
Bidder agrees to comply with these requirements. By signing below, Bidder understands that a failure to agree to and follow these requirements shall be grounds for rejection of the Bid or termination of the agreement between the Contractor and the Owner, for cause.
https://des.sc.gov/programs/bureau-water/state-revolving-fund-srf-program/srf-forms https://des.sc.gov/programs/bureau-water/state-revolving-fund-srf-program/srf-forms
00240
00250
South Carolina Illegal Immigration Reform Act
On June 4th, 2008, Governor Mark Sanford signed into law the South Carolina Illegal Immigration Reform Act (the “Act”), 2008 Act No. 280. Section 3 of this Act added Chapter 14 to Title 8 of the South Carolina Code of Laws. Titled "Unauthorized Aliens and Public Employment," this new Chapter contains the Act’s primary restrictions regarding contracts between private businesses and governmental entities. According to the Act’s title, Chapter 14 was added in order “to require contractors or subcontractors who contract with public employers for the physical performance of services to register and participate in the federal work authorization program or otherwise verify employees, to define terms, to establish deadlines for compliance by public employers, contractors, and subcontractors, to require that the provisions of the chapter are enforceable without regard to race, religion, gender, ethnicity, or national origin, and to authorize the director of the State Budget and Control Board to prescribe forms and promulgate rules necessary to administer the act and publish the rules and regulations on the Board's website.”
Verification Requirements In addition to completing and maintaining the federal employment eligibility verification form, more commonly known as the Form I-9, all South Carolina employers must within three business days after employing a new employee verify the employee’s work authorization through the E-Verify federal work authorization program administered by the U.S. Department of Homeland Security and the Social Security Administration.
Employers shall no longer confirm a new employee’s employment authorization with a driver’s license or state identification card.
In addition, the Contractor must require agreement from its subcontractors, and through the subcontractors, the sub-subcontractors, to register and participate in the federal verification of the employment authorization of all new employees. The Act allows contractors to comply with the Act by agreeing to employ only workers whose work authorization has been verified through the E-Verify federal work authorization program administered by the U.S. Department of Homeland Security and the Social Security Administration. To enroll in E-Verify, go to www.dhs.gov/e-verify.
By signing its Bid or proposal, Contractor certifies that it will comply with the applicable requirements of Title 8, Chapter 14 of the South Carolina Code of Laws and agrees to provide to the Owner, upon request, any documentation required to establish either: (a) that Title 8, Chapter 14 is inapplicable both to Contractor and its subcontractors or sub-subcontractors; or (b) that Contractor and its subcontractors or sub-subcontractors are in compliance with Title 8, Chapter 14.
Pursuant to South Carolina Code Section 8-14-60, "A person who knowingly makes or files any false, fictitious, or fraudulent document, statement, or report pursuant to this chapter is guilty of a felony, and, upon conviction, must be fined within the discretion of the court or imprisoned for not more than five years, or both." Contractor agrees to include in any contracts with its subcontractors language requiring its subcontractors to (a) comply with the applicable requirements of Title 8, Chapter 14, and (b) include in their contracts with the sub subcontractors language requiring the sub-subcontractors to comply with the applicable requirements of Title 8, Chapter 14.
The South Carolina Department of Labor, Licensing and Regulation has also posted information on its website regarding implementation of the South Carolina Illegal Immigration Reform Act.
(http://www.llr.state.sc.us/immigration). Additional information on this topic is available from LLR's Office of Immigrant Worker Compliance.
(http://www.llr.state.sc.us/Immigration/index.asp?file=ContactUs.htm).
http://www.dhs.gov/e-verify http://www.llr.state.sc.us/immigration http://www.llr.state.sc.us/Immigration/index.asp?file=ContactUs.htm
Information about the E-Verify Program is available on the internet from the Department of Homeland Security's U.S. Citizenship and Immigration Services. (http://www.uscis.gov/e-verify).
Bidder agrees to comply with these requirements. By signing below, Bidder understands that a failure to agree to and follow these requirements shall be grounds for rejection of the Bid or termination of the agreement between the Contractor and the Owner, for cause.
Print Name:
http://www.uscis.gov/e-verify
STATEMENT OF COMPLIANCE WITH S.C. CODE § 12-8-550
(Contractor must complete one of the two following statements)
I, ____________________, on behalf of and as authorized by ____________________, Contractor, represent that Contractor is a ____________________2 organized and existing under the laws of the State of South Carolina. Contractor warrants that it is a South Carolina resident for purposes of S.C. Code Ann. § 12-8-550 (as amended.
-OR-
I, ____________________, on behalf of and as authorized by ____________________, Contractor, represent that Contractor is a ____________________3 organized and existing under the laws of the State of ____________________. Contractor has read and understands the requirements of S.C. Code §§ 12-8-
550 and 12-8-560. Contractor has registered with the Secretary of State or the Department of Revenue and by that registration has agreed to be subject to the jurisdiction of the department and the courts of this
State to determine its South Carolina tax liability, including withholding and estimated taxes, together with any related interest and penalties. Contractor has assured payment to the South Carolina Tax
Commission through compliance with one of the waivers provided in S.C. Code § 12-8-560(B).
[SIGNATURE PAGE FOLLOWS]
2 Insert type of business (corporation, limited liability company, partnership, sole-proprietorship).
3 Insert type of business (corporation, limited liability company, partnership, sole-proprietorship).
Contractor:
Signature
Address:
By:
Date:
(CORPORATE SEAL)
SWORN to and subscribed before me this day of , 2026
(L.S.)
Notary Public for the State of
My Commission Expires:
First Attest
Name:
Second Attest
Name:
00 31 00
BID
FOR CONSTRUCTION OF
Lower Reedy WRRF Streambank Stabilization Project
FOR
RENEWABLE WATER RESOURCES
BID SCHEDULE, BID SUMMARY, TABULATION OF MAJOR EQUIPMENT ITEMS
SELECTED SUBCONTRACTORS
Bid of (hereinafter called “Bidder”), a 4 organized and existing under the laws of the State of , to the Renewable Water Resources, a special purpose district organized and existing under the laws of the State of South Carolina (hereinafter called “Owner”).
In compliance with your Advertisement for Bids, Bidder hereby proposes to perform all Work5 for the Lower Reedy WRRF Streambank Stabilization Project in strict accordance with the Contract Documents, within the time set forth therein, and at the prices stated below.
By submission of this Bid, each Bidder certifies, and in the case of a joint Bid, each party thereto certifies as to his own organization, that this Bid has been arrived at independently, without consultation, communication, or agreement as to any matter relating to this Bid with any other Bidder or with any competitor.
Bidder hereby agrees to commence Work under this contract on a date to be specified in the Notice to Proceed and to fully complete the Project within 120 consecutive calendar days thereafter. Bidder represents that the Bidder has reviewed the provisions and amounts set forth as liquidated damages and agrees that under this Contract that sum is just and reasonable and the Bidder agrees to pay as liquidated damages the sums as provided in Section 3.4.1 of the Contract between Owner and Contractor, plus any consent order fines imposed by appropriate regulatory authority which are incurred by reason of the Contractor’s delay in performance of the contract.
Bidder acknowledges receipt of the following Addenda:
(If Addenda have been issued, they MUST be listed herein).
Bidder hereby agrees that preference will be given to domestic construction material and further agrees to require subcontractors, material men, and suppliers to also give preference to domestic construction material.
4 Insert type of business. (e.g. sole proprietorship, partnership, corporation, limited liability company).
5 Capitalized terms make reference to terms more fully defined in the Contract, which follows.
00 31 13
BID SCHEDULE
The Bidder acknowledges that the Bid submitted herewith is based upon the materials and articles specified by the Engineer and shown in the Tabulation of Major Equipment Items.
The Bidder agrees to perform all work described in the Contract Documents for the following Lump Sum or Unit Prices including all labor, materials, equipment sales, and other applicable taxes and fees.
NOTE: Bids shall include sales tax and all other applicable taxes and fees.
Major Equipment Items: In connection with major items of equipment to be furnished and installed on this Project, as described in the Specifications, if any, the undersigned shall agree to the following provisions.
That the Bid stated hereinbefore shall include the furnishing and installing of all Items of Major Equipment of the manufacturers or suppliers listed in the following “Tabulation of Major Equipment Items.”
That the equipment listed within the “Tabulation of Major Equipment Items” is of the named acceptable manufacturer or an equal substitute as defined in the Information for Bidders.
That the installed price stated in the Bid on all sub-items includes the preparation and submission to the Engineer by the undersigned of detailed drawings showing all modifications (if any) of the Contract Drawings necessary to accommodate any substitute equipment. Should a substitute unit be selected, all redesign costs required to accommodate such equipment shall be included within the installed cost by the Contractor.
That the installed cost stated in the Bid on all sub-items includes a complete operating installation, including the furnishing and installing of any and all changes or additions in structures, piping, buildings, mechanical and electrical work, accessories, controls, etc., necessary to accommodate the equipment.
That if awarded a Contract on this project, all Items of Major Equipment be guaranteed by the undersigned and his Surety to meet the performance requirements of the Contract specification and General Conditions of Contract and will not affect the ability or efficiency of other systems or equipment to perform their intended purpose.
A list of Major Items must be shown on the attached sheets.
BID SCHEDULE
Ardurra Group, Inc.
55 Beattie Place, Suite 200
SC License (C00177)
Greenville, SC 29601
Phone (864) 990-0180
BID TAB Date: 7/7/2026
Project: (ReWa) Renewable Water Resources Lower Reedy WRRF Streambank Stabilization
Client: Renewable Water Resouces (ReWa) Total
(All Phases)
WKD # 20240043.00.WK
Pay Item No. Description QTY UNIT UNIT PRICE COST
1 Mobilization 1 LS
2 Erosion and Sediment Control 1 LS
3 Clearing and Grubbing 0.21 AC
4 Remove and Dispose of Existing Sanitary Sewer Structure 1 EA
5 Remove and Dispose of Existing Drainage Structure 1 EA
6 Construction Entrance 1 EA
7 Earthwork, Excavation, Unsuitable Materials, and Backfill Materials 500 CY
8 Comprehensive Grading 1 LS
9 Furnish Materials and Install Boulder Toe Protection 196 LF
10 Furnish Materials and Install Boulder Vane 74 LF
11 Coir Matting 563 SY
12 Permanent Seeding, Fertilizing, and Mulching 0.09 AC
13 Riparian Seed Mix and Mulching 0.12 AC
SIGNATURE OF COMPANY OFFICER DATE
ReWa Lower Reedy WRRF Streambank Stabilization is a lump sum bid. The line items and quantities provided are for bidder informational purpose only.
TOTAL BID PRICE (LUMP SUM)
BID SUMMARY
The Total Bid for all Work is and___/100 ($__________._____) dollars.
Name of Prospective Contractor
Sign: (SEAL)
Its:
Signed this, the _____ day of _______________, 20_____. If the Bidder is a Corporation or Address: Limited Liability Company, the seal of the business must be impressed above.
South Carolina General Contractor’s License Number
Witnesses (the above signature must be witnessed by two individuals).
00313
LIST OF MAJOR EQUIPMENT ITEMS
EQUIPMENT SYSTEM MANUFACTURER/SUPPLIER
00314
LIST OF SELF-PERFORMED WORK BY SPECIALTY
Portion of the Work as identified vital to the Project by Owner and Engineer;
Please Type Bidder’s Name on each of the specified lines, indicating whether all, part or none of this Portion of the Work is to be Self-Performed. Examples:
– Site Work; XYZ Inc. self-performing all
– Underground Piping; XYZ Inc. self-performing none
– Concrete; XYZ Inc. self-performing part
(1) Portion of the Work: Streambank Restoration
(2) Portion of the Work: Planting
(3) Portion of the Work: Other
Bidder Name:
Bidder License Number: __________________________________
Signed:
By:
Dated:
00314
LIST OF SELECTED SUBCONTRACTORS
List Subcontractors’ information by specialty for all portions of subcontracted Work where by specialty the subcontracted amount is equal to or greater than 3% of the base Bid amount.
Identify the Subcontractor, if any, for any specialty areas identified below as vital to the Project by Owner and Engineer. Please Type Subcontractor’s information on the specified line if all or part of this Portion of the Work is to be subcontracted.
(1) Portion of the Work: Streambank Restoration
Subcontractor:
Address of Subcontractor:
Subcontractor’s License Number
(2) Portion of the Work: Planting
Subcontractor:
Address of Subcontractor:
Subcontractor’s License Number
(3) Portion of the Work:
Subcontractor:
Address of Subcontractor:
Subcontractor’s License Number
00320
Bidder Name:
Bidder License Number: __________________________________
Signed:
By:
Dated:
| Lower Reedy WRRF Streambank Stabilization RFB 071426 26 |
| Lower Reedy WRRF Streambank Stabilization RFB 071426 27 |
| Lower Reedy WRRF Streambank Stabilization RFB 071426 28 |
| Lower Reedy WRRF Streambank Stabilization RFB 071426 29 |
| Lower Reedy WRRF Streambank Stabilization RFB 071426 30 |
| Lower Reedy WRRF Streambank Stabilization RFB 071426 31 |
| Lower Reedy WRRF Streambank Stabilization RFB 071426 32 |
| Lower Reedy WRRF Streambank Stabilization RFB 071426 33 |
| Lower Reedy WRRF Streambank Stabilization RFB 071426 34 |
| Lower Reedy WRRF Streambank Stabilization RFB 071426 35 |
| Lower Reedy WRRF Streambank Stabilization RFB 071426 36 |
| Lower Reedy WRRF Streambank Stabilization RFB 071426 37 |
| Lower Reedy WRRF Streambank Stabilization RFB 071426 38 |
| Lower Reedy WRRF Streambank Stabilization RFB 071426 39 |
| Lower Reedy WRRF Streambank Stabilization RFB 071426 40 |
| Lower Reedy WRRF Streambank Stabilization RFB 071426 41 |
| Lower Reedy WRRF Streambank Stabilization RFB 071426 42 |
| Lower Reedy WRRF Streambank Stabilization RFB 071426 43 |