Summary of Logansport High School Gym HVAC Renovation Specifications

This is a specification document for a construction project issued by the DeSoto Parish School Board in Louisiana, prepared by consulting engineers Aillet, Fenner, Jolly & McClelland, Inc. The project involves the removal of existing air handling units, ductwork, piping, and controls, with installation of new packaged rooftop air conditioning units, ductwork, hydronic piping, building management systems, electrical work, and structural modifications at Logansport High School in DeSoto Parish, Louisiana. The mandatory pre-bid conference is scheduled for October 20, 2026 at 10:00 AM at the jobsite. Bids must be submitted on a lump-sum basis no later than 2:00 PM on November 10, 2026 to the DeSoto Parish School Board office in Mansfield, Louisiana. The contract time limit for completion is 180 calendar days from the date of the Notice to Proceed, with work scheduled to occur around regular building use, requiring cooling outages only when outdoor temperatures are below 55 degrees Fahrenheit or during non-operational hours. Electrical outages are restricted to 12 midnight to 6 A.M. and must be approved in advance. The project includes one alternate for custom logo and text on non-metal ducts.

Bid security in the amount of five percent of the total bid amount, including all alternates, is required in the form of a certified check, cashier's check, or bid bond from a surety company listed on the U.S. Department of the Treasury's approved bonding companies list. Only Louisiana-licensed contractors meeting qualification requirements are eligible to bid. The apparent low bidder must submit a non-collusion affidavit within ten days of bid award and shall submit subcontractor lists and manufacturer data within three days of bid opening for Owner review and approval. The Owner reserves the right to reject any or all bids and to award the contract based on lowest responsive and responsible bidder consideration, including evaluation of bidder qualifications and subcontractor experience. Preference is given to materials, supplies, and firms domiciled in Louisiana per state law. No specific funding sources or contract amounts are stated in the specifications; rather, bidders are required to determine project costs based on the scope of work outlined in the drawings and contract documents.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPECIFICATIONS

LOGANSPORT HIGH SCHOOL - GYM HVAC RENOVATION

17228 LA-5

LOGANSPORT, LA 71049

DESOTO PARISH SCHOOL BOARD

Project No: CP 2627D103

Prepared by

Aillet, Fenner, Jolly & McClelland, Inc.

Consulting Engineers

3003 Knight Street, Suite 120 Shreveport, Louisiana 71105

AFJMc Project #26-073

September 17, 2026

17228 LA-5, LOGANSPORT, LA 71049

DPSB PROJECT NO. CP 2627D103

AFJMC #26-073

TABLE OF CONTENTS

TOC-i

GENERAL DOCUMENTS

000002 SEALS AND CERTIFICATIONS

000003 SCHEDULE OF DRAWINGS

DIVISION 00 – BIDDING AND CONTRACT REQUIREMENTS

000020 INVITATION FOR BIDS

000100 INSTRUCTION TO BIDDERS

000310 LOUISIANA UNIFORM PUBLIC WORK BID FORM

000320 CORPORATE RESOLUTION FORM

000325 NON-COLLUSION AFFIDAVIT

000330 BID BOND

000700 GENERAL CONDITIONS (A201-2017)

DIVISION 01 – GENERAL REQUIREMENTS

010100 SUMMARY OF THE WORK

010450 CUTTING AND PATCHING

010900 DEFINITIONS AND STANDARDS

012000 PROJECT MEETINGS

012300 ALTERNATES

013000 SUBMITTALS

015000 TEMPORARY FACILITIES

016000 MATERIAL AND EQUIPMENT

017000 PROJECT CLOSEOUT

DIVISION 02 – SITE CONSTRUCTION

023000 EARTHWORK

024119 SELECTIVE DEMOLITION

029200 LAWNS

TOC-ii

DIVISION 03 – CONCRETE

033000 CAST-IN-PLACE CONCRETE

DIVISION 04 NOT USED

DIVISION 05 – METALS

051200 STRUCTURAL STEEL

055000 METAL FABRICATIONS

DIVISION 06 - NOT USED

DIVISION 07 – THERMAL AND MOISTURE PROTECTION

076200 SHEET METAL FLASHING AND TRIM

079200 JOINT SEALANTS

SECTION 08 – NOT USED

DIVISION 09 – FINISHES

095113 ACOUSTICAL CEILINGS

099100 PAINTING

DIVISION 10 THROUGH 22 – NOT USED

DIVISION 23 – HEATING, VENTILATING, AND AIR CONDITIONING

230000 GENERAL PROVISIONS

230500 BASIC MECHANICAL MATERIALS AND METHODS

230529 HANGERS AND SUPPORTS

230593 TESTING, ADJUSTING AND BALANCING

230713 DUCT INSULATION

230923 BUILDING MANAGEMENT AND CONTROL SYSTEMS

233000 DUCTWORK ACCESSORIES

233113 METAL DUCTS

233716 NON-METAL DUCTS

234320 AIR PURIFICATION SYSTEM

237416 PACKAGED ROOFTOP UNITS

TOC-iii

DIVISION 26 - ELECTRICAL

260000 GENERAL PROVISIONS

260500 BASIC ELECTRICAL MATERIALS AND METHODS

260526 GROUNDING & BONDING

260529 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

260533 RACEWAYS AND BOXES

260553 IDENTIFICATION FOR ELECTRICAL SYSTEMS

262416 PANELBOARDS

262816 DISCONNECT SWITCHES

264313 SURGE PROTECTIVE DEVICES

DIVISION 31 – EARTHWORK

316329 DRILLED CONCRETE SHAFTS AND PIERS

SEALS

Specification Divisions/Sections prepared under my responsible supervision:

DIVISION 00 BIDDING AND CONTRACT DOCUMENTS

DIVISION 01 GENERAL REQUIREMENTS

DIVISION 02 SITE CONSTRUCTION

DIVISION 07 THERMAL AND MOISTURE PROTECTION

DIVISION 09 FINISHES

DIVISION 23 MECHANICAL

DIVISION 26 ELECTRICAL

MICHAEL S. MIDDLETON, P.E.

MECHANICAL ENGINEER– LA LICENSE 27979

Specification Divisions/Sections prepared under my responsible supervision:

DIVISION 03 CONCRETE

DIVISION 05 METALS

DIVISION 31 EARTHWORK

MATTHEW J. WALLACE, P.E.

STRUCTURAL ENGINEER – LA LICENSE 25922

09/17/26

9/17/26

SCHEDULE OF DRAWINGS

NUMBER TITLE

SCHEDULE OF DRAWINGS 000003

CS COVER SHEET

ME0.01 MECHANICAL & ELECTRICAL GENERAL NOTES, LEGEND AND SCHEDULES

MED1.01 MECHANICAL & ELECTRICAL DEMOLITION FLOOR PLAN

ME1.01 MECHANICAL & ELECTRICAL RENOVATION FLOOR PLAN

ME2.01 MECHANICAL DETAILS

S1.01 STRUCTURAL GENERAL NOTES, PLATFORM PLANS AND DETAILS

LHS HVAC Renovation

INVITATION FOR BIDS

From The Owner:

Desoto Parish School Board 399 Jenkins St., Mansfield, LA 71052 Superintendent, Clay Corley

And The Engineer:

3003 Knight Street, Suite 120 Shreveport, Louisiana 71105

Your firm is invited to submit a bid for the following project:

DESCRIPTION OF PROJECT:

The project will consist of removal of air handling units, ductwork, piping and controls and installation of packaged air conditioning units, ductwork, hydronic piping, controls, electrical and structural work

DOCUMENTS:

Complete Bidding Documents for this project are available in electronic form without charge and without deposit from https://bidnetdirect.com/louisiana/desotoparishschoolboard. Questions about this procedure shall be directed to the Architect at:

Aillet, Fenner, Jolly & McClelland, Inc.

Consulting Engineers 3003 Knight Street, Suite 120 Shreveport, Louisiana 71105 Telephone: (318)425-7452 E-mail: mmiddleton@afjmc.com

000020-1 https://bidnetdirect.com/louisiana/desotoparishschoolboard mailto:derryl@didierarch.com

LHS HVAC Renovation

MANDATORY PRE-BID CONFERENCE:

10:00 AM October 20, 2026 held at the jobsite. Refer to Instructions to Bidders.

TYPE OF BID:

Bids will be on a lump-sum basis. Segregated bids will not be accepted.

TIME LIMIT:

The time limit for the completion of this work will be 180 calendar days from the date of the Notice of Proceed. Work to be completed around regular building use.

BID OPENING:

Bids to be submitted no later than 2:00PM Tuesday November 10 th, 2026 at the following location:

DeSoto Parish School Board 399 Jenkins Street Mansfield, LA 71052

000020-2

Instructions to Bidders 000100 Page 1 of 7

INSTRUCTIONS TO BIDDERS

1.1 CROSS REFERENCE TO PRIMARY STATEMENTS. Definitions, requirements, and limitations affecting the bidding are contained in the various contract documents and are not necessarily repeated in these instructions.

1.2 QUALIFICATION OF BIDDERS. Bidders may be required to submit evidence that they have practical knowledge of the particular task bid upon, and that they have the financial resources to complete the proposed scope in entirety.

In determining the Bidder's qualifications, the following factors will be considered:

contracts previously completed by the Bidder and whether the Bidder (a) maintains a permanent place of business, (b) has adequate plant and equipment to do the task properly and expeditiously, (c) has the financial resources to meet all obligations incidental to the task, and (d) has appropriate technical experience.

Preference will be given to bidders domiciled in Louisiana as stated in Louisiana Public

Contract Law (38:2281).

Each Bidder may be required to show that he has completed similar work and that there are no just claims pending against such work. No Bid will be accepted from a Bidder who is engaged on any contract which would impair his ability to perform or finance his work.

1.3 LOUISIANA LICENSE REQUIREMENTS. Only Bids of Contractors licensed under

LSA R.S. - 37:2150 et seq., will be considered. Licensing is supervised by the Louisiana

Licensing Board for Contractors, 7434 Perkins Road, Baton Rouge, Louisiana.

Contractors desiring to bid shall submit with their Bids evidence that they hold a valid

Building Construction license in Louisiana.

1.4 FAMILIARIZATION WITH THE WORK. Before submitting his Bid, each prospective

Bidder shall familiarize himself with the scope of the task, the sites where the proposed improvements are to be performed, local labor conditions and all laws, regulations and other factors affecting performance of the work. He shall carefully correlate his observations with requirements of the Contract Documents and otherwise satisfy himself of the expense and difficulties attending performance of the Work. The submission of a

Bid will constitute a representation of compliance by the Bidder. There will be no financial adjustment justification for lack of such familiarization. Additionally, evidence of having the lack of familiarization could result in contract termination or substantial financial impacts to the contractor due to liquidated damages or other variables.

1.4.1 Site Conditions. Each Bidder shall visit the sites of the Work and completely inform himself relative to construction hazards and procedure, the availability of lands, the character and quantity of surface and subsurface materials, and utilities to be encountered, the arrangement and condition of existing structures and facilities, the procedure necessary for maintenance of uninterrupted operation of existing facilities, the

Instructions to Bidders 000100 Page 2 of 7 character of construction equipment and facilities needed for performance of the Work, and facilities for transportation, handling, and storage of materials and equipment. All such factors shall be properly investigated and considered in the preparation of the Bid.

1.4.2 Access to the Sites. The project is to be constructed within Stonewall, LA. Contractors and Suppliers wishing to inspect the various sites may do so at their convenience.

1.5 INTERPRETATIONS. The Drawings have been prepared by Aillet, Fenner, Jolly &

McClelland, Inc, Consulting Engineers, 3003 Knight St, Suite 120, Shreveport, LA

71105, Telephone: 318-425-7452 who is hereinafter called ARCHITECT and who is to act as OWNER's representative, assume all duties and responsibilities and have the rights and authority assigned to ARCHITECT in the Contract Documents in connection with completion of the Work in accordance with the Contract Documents. All questions about the meaning or intent of the Specifications and Contract Documents shall be submitted to the Architect in writing. Replies will be issued by Addenda mailed or delivered to all parties recorded by Engineer as having received the bidding documents. Addenda will be issued at least 72 hours, (3 working days, excluding weekends and holidays) prior to the time stated for opening bids. Questions received less than five (5) working days prior to the date for opening Bids will not be answered. Only answers furnished by formal written Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect.

1.6 TAXES AND PERMITS. In accordance with Louisiana laws, relative to the Public Bid

Law, certain purchases of material and supplies by certain Contractors and

Subcontractors awarded public works Contracts by a public entity are exempt from local and state taxes on public works contracts by public entities. Enclosed herein is form entitled Designation of Construction Contractor as Agent of Government Entity and

Exemption Certificate indicating the Designation of Agency as Desoto Parish School

Board for the period of construction outlined in Contract. This designation of agency form when properly executed by both the Contractor and the government entity, (Desoto

Parish School Board) for the construction period.

1.7 BID SECURITY. The amount of bid security is stated in the Invitation. The required security must be in the form of a certified or bank cashier's check or a bid bond. The bid bond must be executed by a surety meeting the requirements set forth in the General

Conditions and Supplementary Conditions. Bid bond must have attached appropriate and satisfactory Power of Attorney. The bond shall also be countersigned by a person who is under contract with the Surety Company or Bond Issuer as a Licensed Agent in this State and who is residing in the State. Refer to R.S. 38:2218

The bid security shall be made payable without condition to the Owner. The bid security may be retained by and shall be forfeited to the Owner as liquidated damages if the Bid is accepted and a contract based thereon is awarded and the Bidder should fail to enter into a contract in the form prescribed, with legally responsible sureties, within fifteen (15) days after such award is made by Owner.

Instructions to Bidders 000100 Page 3 of 7

1.8 RETURN OF BID SECURITY. The bid security of the successful Bidder will be retained until he has executed the Agreement and furnished the required Contract

Security, whereupon checks furnished as bid security will be returned; if he fails to execute and deliver the Agreement and furnish the required Contract Security within fifteen (15) days of the Notice of Award, Owner may annul the Notice of Award and the bid security of that Bidder will be forfeited. The bid security of any Bidder whom Owner believes 'to have a reasonable chance of receiving the award' may be retained by Owner until the seventh day after the executed Agreement is delivered by Owner to Contractor and the required Contract Security is furnished but not to exceed thirty (30) days after the

Bid opening. Checks furnished as bid security by other Bidders will be returned within five (5) days of the Bid opening.

1.9 CONTRACT TIME. The Contract Time is an essential part of the contract and it may be necessary for each Bidder to satisfy Owner of his ability to complete the Work within the time set forth in the Bid Form. Provisions for delays, liquidated damages, and extensions of time are set forth in the General and Supplementary Conditions.

The Contractor is responsible for equipment and material delivery. A time extension to the Contract duration will not be allowed for late material or equipment delivery.

1.10 SUBCONTRACTORS AND SUPPLIERS. Within three (3) days after Bids are opened, the apparent low Bidder, and any other Bidder so requested, shall submit a list of all

Subcontractors and Suppliers he expects to use in the Work and to submit manufacturer's data on selected equipment, if requested by Owner.

1.10.1 Subcontractor Qualification. Particular consideration will be given to the qualifications of each Subcontractor proposed. An experience statement with pertinent information as to similar projects and other evidence of qualification shall be furnished for each named

Subcontractor, as requested by the Owner or Engineer. If Owner or Engineer, after due investigation has reasonable objection to any proposed Subcontractor, he may, before giving Notice of Award, request the apparent low Bidder to submit an acceptable substitute without an increase in his Bid. If the apparent low Bidder declines to make substitution, he will not thereby sacrifice his bid security. Any Subcontractor so listed and to whom Owner or Engineer does not make written objection prior to the giving of the Notice of Award will be deemed acceptable to the Owner and Engineer.

Contractor shall not be required to employ any Subcontractor against whom he has reasonable objection.

The use of Subcontractors listed by the Bidder and accepted by Owner prior to Notice of

Award will be required in the performance of the Work.

1.10.2 Suppliers. The list of Subcontractors shall also include the suppliers of the principal items of materials and equipment the Bidder expects to use in the Work unless such suppliers or manufacturers are named in the Bid.

Instructions to Bidders 000100 Page 4 of 7

1.10.3 Manufacturer's Data. The list of Subcontractors submitted as provided herein shall be accompanied by two prints or copies of data on equipment and materials to be furnished by each supplier or manufacturer. Data so submitted shall illustrate the physical characteristics of the equipment and materials to be furnished. Although the drawings and specifications submitted prior to the Notice of Award need not be complete, they must contain sufficient detail for Engineer to determine whether the materials and equipment will conform to the Contract Documents.

The Contract Documents will take precedence over any nonconforming data submitted.

Any Bid specifically conditioned upon furnishing equipment or materials which are not responsive to the Contract Documents will not be considered.

1.11 BIDS.

1.11.1 Bid Form. The Bid Form is bound within the Contract Documents. Bid forms must be completed in ink or typed.

Bids by corporations must be executed in the corporate name by a president or vice-president (or other corporate officer) accompanied by evidence of authority to sign. The state of incorporation shall be shown below the corporate name. Bids by partnerships must be executed in the partnership name and signed by a partner; title and the official address of the partnership must be shown below the signature. Bids by joint ventures shall be signed by each participant in the joint venture or by an authorized agent of each participant.

The names of all persons signing must also be legibly printed below the signature. A Bid by a person who affixes to his signature the word "president", "secretary", "agent", or other designation without disclosing his principal may be held to be liable for the Bid.

All project pertinent blank spaces in the Bid Form shall be filled in. N/A shall be filled in spaces not applicable to this project. Bids received without all such items completed will be considered as a nonresponsive Bid.

The Bid shall contain an acknowledgement of receipt of all Addenda, the numbers and dates of which shall be filled in on the Bid Form.

No alterations in the Bids, or in the printed forms therein, by erasures, interpolations, or otherwise will be acceptable unless each such alteration is signed or initialed by the

Bidder. If initialed, Owner may require the Bidder to clarify any alteration so initialed.

In addition to paper bids, electronic bids and electronic bid bonds for the project will be downloaded by the Desoto Parish School Board. Electronic bids and electronic bid bonds must be submitted through https://www.bidnetdirect.com/louisiana/desotoparishschoolboard https://www.bidnetdirect.com/louisiana/desotoparishschoolboard

Instructions to Bidders 000100 Page 5 of 7 prior to the electronic bidding deadline. Beginning at 2:00 PM (CST) on November 10, 2026, all bids will be downloaded. No bids are accepted after 2:00 PM (CST) on

November 10, 2026.

1.11.2 Affidavit. Low bidders shall provide Non-Collusion Affidavit within 10 days of bid award.

1.11.3 Submission of Bids. The bid shall consist of the Bid Form and the other documents that are required to be submitted along with the Bid Form.

Each Bid and accompanying data shall be enclosed in a sealed opaque envelope or wrapping, addressed to:

DeSoto Parish School Board

399 Jenkins St.

Mansfield, LA 71052 and identified on the outside with the Bidder's name, Louisiana Contractor License

Number and the words "LHS GYM HVAC RENOVATION".

If the Bid is sent by mail, the sealed envelope shall be enclosed in a separate mailing envelope with the notation "BID ENCLOSED" on the face thereof.

Bids shall be deposited at the designated location prior to the time and date for receipt of

Bids indicated in the Invitation for Bids, or the modified time and date indicated by

Addendum. Bids received after the time and date for receipt of Bids will be returned unopened.

Bidder shall assume full responsibility for timely delivery at the location designated for receipt of Bids.

Oral, telephone, or telegraph Bids are invalid and will not receive consideration.

No Bidder may submit more than one Bid. Multiple Bids under different names will not be accepted from one firm or association.

1.11.4 Modification and Withdrawal of Bids. Bids may be modified or withdrawn by an appropriate document duly executed (in the manner that a Bid must be executed) and delivered to the place where Bids are to be submitted at any time prior to the opening of

Bids.

1.11.5 Bids to Remain Open. All Bids shall remain open for 45 days after the day of the Bid opening. Owner shall release Bids and return bid securities as specified in Section 1.8 under "Return of Bid Security".

1.12 AWARD OF CONTRACT. Owner shall award a contract to the Bidder who, in Owner's judgment, is the lowest responsive, responsible Bidder. Owner reserves the right to reject

Instructions to Bidders 000100 Page 6 of 7 any or all Bids, to award the contract by sections, to waive informalities, and to reject nonconforming, nonresponsive, or conditional Bids.

In evaluating Bids, Owner shall consider the qualifications of the Bidders, whether or not the Bids comply with the prescribed requirements, and alternatives and unit prices if requested in the Bid Form. Owner may consider the qualifications and experience of

Subcontractors and other persons and organizations (including those who are to furnish the principal items of material or equipment) and may reject the Bid of any Bidder who does not pass any such evaluation to Owner's satisfaction.

The evaluation of manufacturer's data, when required to be submitted with the Bid or submitted upon request prior to the Notice of Award, shall include the following information at a minimum for consideration:

• Full name and address of manufacturer.

• Manufacturer's engineering or technical representative contact, including telephone number and email addresses.

• Manufacturers' service facilities and availability of qualified field service personnel.

• Manufacture's contact information for the local sales information.

• The name (model, series number, etc.) of the product(s) that are to be listed.

• Manufacture's inventory on-hand and demand capacity.

• Manufacturer's installation requirements and procedures, related engineering specifications, training, required certifications.

• Manufacture's operating cost, maintenance upkeep schedule, life expectancy, and any warranty or other service included for the product listed.

• Experience and performance record of the manufacturer and specific products listed.

• Manufacture's Cut sheet(s) I engineering details of products listed.

• A cost / benefit analysis compared to similar and common product from a different manufacturer.

If the contract is awarded, Owner shall give the apparent successful Bidder a Notice of

Award within thirty (30) days after the date of the Bid opening.

1.13 EXECUTION OF THE AGREEMENT. The Contractor shall be furnished four (4) copies of the Agreement, including insurance certificates, and other Contract Documents bound therewith. Within fifteen (15) days of Notice of Award, Contractor shall execute the Agreement, insert executed copies of the required bonds and power of attorney and submit all copies to Owner. The date of contract on the Agreement and Bond forms shall be left blank for filling in by Owner. The certification date on the power of attorney also shall be left blank for filling in by Owner.

Owner shall execute all copies, insert the date of contract on the Agreement, Bonds, and power of attorney, and return all copies to Engineer for review and distribution.

Instructions to Bidders 000100 Page 7 of 7

Once all contract documents have been executed, the Contractor shall be furnished one

(1) set of original documents. The Owner shall have one (1) set of these documents recorded in the office of the Recorder of Mortgages in the jurisdiction where the work is to be performed.

1.14 COPIES OF CONTRACT DOCUMENTS. Copies of the drawings and specifications for use in preparing Bids may be obtained from:

or

3003 Knight Street, Suite 120 Shreveport, Louisiana 71105 Telephone: (318)425-7452 E-mail: mmiddleton@afjmc.com

The Contractor to whom a contract is awarded will be responsible for obtaining two (2) working copies of the specifications and the drawings, together with all Addenda thereto.

LOCAL MATERIAL AND FIRMS. By statutory authority, preference is hereby given to materials, supplies, and provisions produced, manufactured, or grown in Louisiana, quality being equal to articles offered by competitors outside of the State (LSA R.S. - 38:2252), and preference is hereby given to firms doing business in the State of Louisiana (LSA R.S.

- 38:2253).

mailto:derryl@didierarch.com

00300-LOUISIANA UNIFORM PUBLIC WORK BID FORM

TO: Desoto Parish School Board BID FOR: LHS High School-Gym HVAC Renovation

399 Jenkins St., Mansfield, LA 71052 CP 2627D103

The undersigned bidder hereby declares and represents that she/has) has carefully examined and understands the Bidding Documents,

b) has not received, relied on, or based his bid on any verbal instructions contrary to the Bidding Documents or any addenda, c) has personally inspected and is familiar with the project site, and hereby proposes to provide all labor, materials, tools, appliances and facilities as required to perform, in a workmanlike manner, all work and services for the construction and completion of the referenced project, all in strict accordance with the Bidding Documents prepared by: Aillet, Fenner, Jolly & McClelland, Inc,, dated 09-17-26.

Bidders must acknowledge all addenda. The Bidder acknowledges receipt of the following ADDENDA: (Enter the number the Designer has assigned to each of the addenda that the Bidder is acknowledging) -------------------------------------------------------- -- .

TOTAL BASE BID: For all work required by the Bidding Documents (including any and all unit prices designated "Base Bid" * but not alternates) the sum of:

Dollars ($ )

ALTERNATES: For any and all work required by the Bidding Documents for Alternates including any and all unit prices designated as alternates in the unit price description.

Alternate No. 1 (All work associated with custom logo and/or text on non-metal ducts) for the lump sum of:

. Dollars ($ )

Alternate No. 2 (Owner to provide description of alternate and state whether add or deduct) for the lump sum of:

NIA . Dollars ($ NIA )

Alternate No. 3 (Owner to provide description of alternate and state whether add or deduct) for the lump sum of:

NIA Dollars ($ NIA )

NAME OF BIDDER:

ADDRESS OF BIDDER: B

LOUISIANA CONTRACTOR'S LICENSE NUMBER:

NAME OF AUTHORIZED SIGNATORY OF BIDDER:

TITLE OF AUTHORIZED SIGNATORY OF BIDDER:

SIGNATURE OF AUTHORIZED SIGNATORY OF BIDDER **:----------------------------------------------------

DATE:

THE FOLLOWING ITEMS ARE TO BE INCLUDED WITH THE SUBMISSION OF THIS LOUISIANA UNIFORM PUBLIC WORK

BID FORM:

* The Unit Price Form shall be used if the contract includes unit prices. Otherwise it is not required and need not be included with the form. The number of unit prices that may be included is not limited and additional sheets may be included if needed.

** A CORPORATE RESOLUTION OR WRITTEN EVIDENCE of the authority of the person signing the bid for the public work as prescribed by LA R.S. 38:2212(B)(5).

BID SECURITY in the form of a bid bond, certified check or cashier's check as prescribed by LA RS 38:2218.A is attached to and made a part of this bid.

BID FORM 000310 - Page 1 of 1

RESOLUTION AUTHORIZING SUBMISSION OF QUOTE, SIGNATURE OF

QUOTE AND SIGNATURE OF CONTRACT

BE IT RESOLVED by the Board of Directors of , a

Corporation organized and existing under the laws of the State of , and domiciled in the City of ; that

President of the Corporation and/or of the Corporation, be, and are hereby authorized and empowered to submit quotes and to execute any and all contracts of whatever kind on behalf of the Corporation and to do all things necessary in the premises.

CERTIFICATE

I, , Secretary of do hereby certify that the foregoing resolution is a true and exact copy unanimously adopted by the Board of

Directors of said corporation at a meeting thereof legally held on the day of

20 ; that said resolution is duly entered into the records of said corporation; that it has not been rescinded or modified; and that it is now in full force and effect.

IN TESTIMONY WHEREOF, I have hereunto set my hand and the seal of said corporation this day of , 20 .

(Secretary)

Division 0, Resolution 000320 - Page 1 of 1

000325 - Page 1 of 2

BIDDER'S NON-COLLUSION AFFIDAVIT

(TO BE PROVIDED WITHIN 10 DAYS OF BID AWARD BY APPARENT LOW BIDDER)

STATE OF LOUISIANA

PARISH OF DESOTO

BEFORE ME, the undersigned authority, personally came and appeared who after being by me duly sworn, deposed and said that he is the fully authorized of

(Herein after referred to as "BIDDER") the party who submitted a quote for LHS which quote was received by Desoto Parish School Board on and said affiant further said:

(1) That bidder employed no person, corporation, firm, asocial, or other organization, either directly or indirectly, to secure public contract under which he received payment, other than persons regularly employed by the affiant whose services in connection with the construction, alteration, or demolition of the public building or project or in securing the public contract were in the regular course of their duties for bidder, and

(2) That no part of the contract price received by bidder was paid or will be paid to any person, corporation, firm, association, or other organization for soliciting the contract, other than the payment of their normal compensation to persons regularly employed by the affiant whose services in connection with the construction, alteration, or demolition of the public building or project were in the regular course of their duties for bidder.

(3) Said bidder is genuine and the bidder has not colluded, conspired or agreed directly or indirectly with any other bidder to offer a sham or collusive quote.

(4) Said bidder has not in any manner directly or indirectly agreed with any other person to fix the quote price of affiant or any other bidder, or to fix any overhead profit or cost element of said quote price, of that of any other bidder, or to induce any other person to refrain from bidding.

(5) Said quote is not intended to secure an unfair advantage of benefit from Desoto Parish, Louisiana or in favor of any persons interested in the proposed contract.

(6) All statements contained in said quote are true and correct.

000325 - Page 2 of 2

(7) Neither affiant nor any member of his company has divulged information regarding said quote or any data relative thereto to any person, firm, or corporation.

By:

(Signature)

(Type or Print Name)

(Type or Print Title)

SUBSCRIBED AND SWORN TO BEFORE ME THIS DAY OF

, 20 .

Notary Public

000330 - Page 1 of 1

BID BOND FORM

Date:

KNOW ALL MEN BY THESE PRESENTS:

That of , as

Principal, and , as Surety, are held and firmly bound unto the (Obligee), in the full and just sum of five (5%) percent of the total amount of this quote, including all alternates, lawful money of the United States, for payment of which sum, well and truly be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally firmly by these presents.

Surety represents that it is listed on the current U. S. Department of the Treasury Financial

Management Service list of approved bonding companies as approved for an amount equal to or greater that the amount for which it obligates itself in this instrument or that it is a Louisiana domiciled insurance company with at least an A - rating in the latest printing of the A. M. Bests Key Rating

Guide. If surety qualifies by virtue of its Best's listing, the Bond amount may not exceed ten percent of policyholders' surplus as shown in the latest A. M. Best's Key Rating Guide.

Surety further represents that it is licensed to do business in the State of Louisiana and that this Bond is signed by surety's agent or attorney-in-fact. This Bid Bond is accompanied by appropriate power of attorney.

THE CONDITION OF THIS OBLIGATION IS SUCH that, whereas said Principal is herewith submitting its proposal to the Obligee on a Contract for:

NOW, THEREFORE, if the said Contract be awarded to the Principal and the Principal shall, within such time as may be specified, enter into the Contract in writing and give a good and sufficient bond to secure the performance of the terms and conditions of the Contract with surety acceptable to the Obligee, then this obligation shall be void; otherwise this obligation shall become due and payable.

PRINCIPAL (BIDDER) SURETY

BY: BY:

AUTHORIZED OFFICER-OWNER-PARTNER AGENT OR ATTORNEY-IN-FACT(SEAL)

szc Typewritten Text Desoto Parish School Board Clay Corley, Superintendent 399 Jenkins Street Mansfield, LA 71052 szc Typewritten Text Aillet, Fenner, Jolly & McClelland, Inc.

3003 Knight Street, Suite 120 Shreveport, Louisiana 71105 szc Typewritten Text Logansport High School - Gym HVAC Renovation

17228 LA-5

Logansport, LA 71049 DPSB Project No. CP 2627D103

SUMMARY OF WORK 010100-1

SECTION 010100 - SUMMARY OF THE WORK

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of Contract, including General and Supplementary Conditions and other Division 1 Specification Sections, apply to work of this Section.

1.2 PROJECT/WORK IDENTIFICATION

A. General: Project name is "LOGANSPORT HIGH SCHOOL - GYM HVAC RENOVATION, DPSB PROJECT

NO: CP 2627D103 AFJMC PROJECT NO. 26-073" as shown on Contract Documents prepared by Aillet, Fenner, Jolly and McClelland, Inc. Drawings and Specifications are dated September 17, 2026.

B. Summary by References: Work of the contract can be summarized by references to the Contract, General Conditions, Supplementary Conditions, Specification Sections, Drawings, addenda and modifications to the contract documents issued as part of addenda subsequent to the initial printing of this project manual and including, but not necessarily limited to, printed material referenced by any of these. It is recognized that work of the Contract is also unavoidably affected or influenced by governing regulations, natural phenomenon, including weather conditions, and other forces outside the contract documents.

C. Abbreviated Written Summary: Briefly and without force and effect upon the contract documents, the work of the Contract can be summarized as follows:

1. The work includes removal of air handling units, ductwork, piping and controls and installation of packaged air conditioning units, ductwork, hydronic piping, controls, electrical and structural work.

D. Sequence of Work: Sequence work for minimum interruption of the Owner's operation. Cooling outages shall be limited to times when the outdoor temperature is less than 55 degrees F or when the facility is not in use. Electrical outages must be limited to the hours of 12 midnight to 6 A.M., must be for a minimum time, and must be approved in advance by the Owner, including holidays, if necessary.

1. Sequence work such that only one door to the gym is blocked at a time.

E. Utility Interruptions: Utility interruptions shall be held to a minimum and will be permitted only at times approved by the Owner. The Owner may require that any outages be during nights, weekends, holidays, etc. Provide any required overtime work at no additional cost to the Owner.

F. Completion Date: As required by Instructions to Bidders, the Contractor is required to fully complete construction of project within specified number of days. Contractor shall furnish sufficient forces, construction material and equipment, and work such hours, including weekend and night shifts as may be necessary to ensure that completion of project occurs by the contractual completion date. If, in the opinion of the Architect and Owner, Contractor falls behind progress schedule, Contractor shall take steps as may be necessary to improve his progress by such means as increasing number of men, number of shifts, days of work, and/or

SUMMARY OF WORK 010100-2

amount of construction plant, all without additional cost to Owner. If access to building is required at other than normal building hours, Contractor shall make arrangements with Owner.

1.3 CONTRACTOR USE OF PREMISES

A. General: The Contractor shall limit his use of the premises to the work indicated, so as to allow for Owner occupancy with minimum interruptions.

B. Use of the Site: Confine operations at the site to the areas permitted under the Contract.

Portions of the site beyond areas on which work is indicated are not to be disturbed. Conform to site rules and regulations affecting the work while engaged in project construction.

C. Keep existing driveways and entrances serving the premises clear and available to the Owner and his employees at all times. Do not use these areas for parking or storage of materials.

D. Do not unreasonably encumber the site with materials or equipment. Confine stockpiling of materials and location of storage sheds to the areas approved by Owner. If additional storage is necessary, obtain and pay for such storage off-site. The Owner will not make payments for materials stored off-site unless they are stored in a licensed, bonded and insured warehouse facility.

E. Lock automotive type vehicles, such as passenger cars and trucks and other mechanized or motorized construction equipment, when parked and unattended, so as to prevent unauthorized use. Do not leave such vehicles or equipment unattended with the motor running or the ignition key in place.

F. Use of existing toilets within the buildings by the Contractor and his personnel or sub-contractors will not be permitted. The Contractor shall provide portable toilet facilities. The toilet shall be located where directed by the school principal and shall remain locked when not in use.

G. Do not store materials and equipment on Gymnasium floor. Protect the existing wood floor at all times from work. Repair and refinish any damaged portions of the Gymnasium floor to previous condition.

H. The Desoto Parish School Board will remove computer equipment and Teacher property from work areas. The contractor shall tag and move all remaining furniture and other items from work areas as required to complete the project. At project closeout the contractor shall move all items back to their original location. Contractor shall not be required to move computer equipment and/or Teacher property back to their original location.

I. All existing plumbing fixtures, including floor drains, shall be protected from demolition and construction debris. At project closeout all fixture drains shall be cleaned and restored to proper operation. In addition all plumbing vents receiving A/C condensate shall be cleaned and restored to proper operation.

J. Remove all demolition debris from work areas daily and sweep broom clean. Place refuse in contractor’s dumpster.

K. Remove all packaging (boxes, pallets, plastic wrap etc.) from new equipment and materials and place in contractor provided dumpster or remove from site daily.

L. The Owner and/or Architect/Engineer will visit the site weekly. The Owner and/or

Architect/Engineer will notify the contractor, by a warning, in writing, of any areas not in compliance with the requirements for a clean construction site. The owner reserves the right to

SUMMARY OF WORK 010100-3

obtain the services of cleaning contractors, whose cost of services shall be deducted from the contract amount in the event the contractor does not comply with Owner/Architect/Engineer’s warnings.

M. General Requirements: Observe no smoking/tobacco rules. All personnel must wear shirts.

N. Asbestos: No asbestos-containing materials have been identified on items that are indicated to be disturbed. If asbestos-containing materials are encountered, comply with the following:

1. Upon encountering any previously unidentified materials which he suspects may contain asbestos, the Contractor shall immediately cease all work in the immediate vicinity of the suspected materials and notify the Designer and the Owner. The Owner shall retain consultants to identify the suspected materials. Upon identification, the Owner reserves the right to contract separately for the removal, or require the Contractor to remove said materials in accordance with the following provision. In any case, the work shall be performed by a licensed and certified Abatement Contractor.

2. The Louisiana Department of Environmental Quality (D.E.Q.) has issued the Louisiana Emission Standards for Hazardous Air Pollutants. Where asbestos is encountered in a project, the Contractor shall comply with all laws and ordinances pertaining to asbestos handling and abatement, including the latest revision of LAC 33:111, Chapter 25, Subchapter F, Emission Standards for Hazardous Air Pollutants, LAC 33:111, Chapter 27, Asbestos Containing Materials in Schools and Public Buildings and LAC 33:111, Chapter 51, Subchapter M, Section 5151, Emission Standards for Asbestos.

3. Notification should be addressed to:

Asbestos Coordinator Louisiana Department of Environmental Quality Air Quality Division Post Office Box 82135 Baton Rouge, Louisiana 70884-2135

4. If the Owner chooses to remove any previously unidentified materials by utilizing different Contractors, the Contractor shall cooperate fully with the Owner's consultants and asbestos abatement Contractor permitting them full access to the project, and shall not resume work in the vicinity of the suspected materials until advised by the Designer and the Owner that it is safe to do so.

5. Refer to Article 7 of the Supplementary Conditions if the Contractor is required to do this work.

1.4 OWNER OCCUPANCY

A. Full Owner Occupancy: The Owner will occupy the site during the entire period of construction.

Cooperate fully with the Owner and his representative during construction operations to minimize conflicts and to facilitate Owner usage. Perform the work so as not to interfere with the Owner's operations.

PART 2 - PRODUCTS (Not applicable)

PART 3 - EXECUTION (Not applicable)

END OF SECTION 010100

CUTTING AND PATCHING 010450-1

SECTION 010450 - CUTTING AND PATCHING

and other Division 1 Specification Sections, apply to this Section.

1.2 SUMMARY

A. This Section specifies administrative and procedural requirements for cutting and patching.

B. Refer to other Sections for specific requirements and limitations applicable to cutting and patching individual parts of the Work.

1. Requirements of this Section apply to mechanical and electrical installations. Refer to Division 23 and Division 26 Sections for other requirements and limitations applicable to cutting and patching mechanical and electrical installations.

C. Demolition of selected portions of the building for alterations is included in Division 1 Section 024119, "Selective Demolition."

1.3 SUBMITTALS

A. Cutting and Patching Proposal: Where approval of procedures for cutting and patching is required before proceeding, submit a proposal describing procedures well in advance of the time cutting and patching will be performed and request approval to proceed. Include the following information, as applicable, in the proposal:

1. Describe the extent of cutting and patching required and how it is to be performed;

indicate why it cannot be avoided.

2. Describe anticipated results in terms of changes to existing construction; include changes to structural elements and operating components as well as changes in the building's appearance and other significant visual elements.

3. List products to be used and firms or entities that will perform Work.

4. Indicate dates when cutting and patching is to be performed.

5. List utilities that will be disturbed or affected, including those that will be relocated and those that will be temporarily out-of-service. Indicate how long service will be disrupted.

6. Where cutting and patching involves addition of reinforcement to structural elements, submit details and engineering calculations to show how reinforcement is integrated with the original structure.

7. Approval by the Architect to proceed with cutting and patching does not waive the Architect's right to later require complete removal and replacement of a part of the Work found to be unsatisfactory.

1.4 QUALITY ASSURANCE

CUTTING AND PATCHING 010450-2

A. Requirements for Structural Work: Do not cut and patch structural elements in a manner that would reduce their load-carrying capacity or load-deflection ratio.

1. Foundation construction.

2. Bearing and retaining wall.

3. Structural concrete.

4. Structural steel.

5. Lintels.

6. Timber and primary wood framing.

7. Structural decking.

8. Stair systems.

9. Miscellaneous structural metals.

10. Exterior curtain wall construction.

11. Equipment supports.

12. Piping, ductwork, vessels and equipment.

13. Structural systems of special construction in Division 11 Sections.

B. Operational and Safety Limitations: Do not cut and patch operating elements or safety related components in a manner that would result in reducing their capacity to perform as intended, or result in increased maintenance, or decreased operational life or safety.

1. Obtain approval of the cutting and patching proposal before cutting and patching the following operating elements or safety related systems:

a. Shoring, bracing, and sheeting.

b. Primary operational systems and equipment.

c. Air or smoke barriers.

d. Water, moisture, or vapor barriers.

e. Membranes and flashings.

f. Fire protection systems.

g. Noise and vibration control elements and systems.

h. Control systems.

i. Communication systems.

j. Conveying systems.

k. Electrical wiring systems.

l. Special construction specified by Division 13 Sections.

C. Visual Requirements: Do not cut and patch construction exposed on the exterior or in occupied spaces, in a manner that would, in the Engineer's opinion, reduce the building's aesthetic qualities, or result in visual evidence of cutting and patching. Remove and replace work cut and patched in a visually unsatisfactory manner.

PART 2 - PRODUCTS

2.1 MATERIALS

A. Use materials that are identical to existing materials. If identical materials are not available or cannot be used where exposed surfaces are involved, use materials that match existing adjacent surfaces to the fullest extent possible with regard to visual effect. Use materials whose installed performance will equal or surpass that of existing materials.

PART 3 - EXECUTION

CUTTING AND PATCHING 010450-3

3.1 INSPECTION

A. Before cutting existing surfaces examine surfaces to be cut and patched and conditions under which cutting and patching is to be performed. Take corrective action before proceeding, if unsafe or unsatisfactory conditions are encountered.

1. Before proceeding, meet at the site with parties involved in cutting and patching, including mechanical and electrical trades. Review areas of potential interference and conflict. Coordinate procedures and resolve potential conflicts before proceeding.

3.2 PREPARATION

A. Temporary Support: Provide temporary support of Work to be cut.

B. Protection: Protect existing construction during cutting and patching to prevent damage.

Provide protection from adverse weather conditions for portions of the Project that might be exposed during cutting and patching operations.

C. Avoid interference with use of adjoining areas or interruption of free passage to adjoining areas.

D. Take all precautions necessary to avoid cutting existing pipe, conduit or ductwork serving the building, but scheduled to be removed or relocated until provisions have been made to bypass them.

3.3 PERFORMANCE

A. General: Employ skilled workmen to perform cutting and patching. Proceed with cutting and patching at the earliest feasible time and complete without delay.

1. Cut existing construction to provide for installation of other components or performance of other construction activities and the subsequent fitting and patching required to restore surfaces to their original condition.

B. Cutting: Cut existing construction using methods least likely to damage elements to be retained or adjoining construction. Where possible review proposed procedures with the original installer; comply with the original installer's recommendations.

1. In general, where cutting is required use hand or small power tools designed for sawing or grinding, not hammering and chopping. Cut holes and slots neatly to size required with minimum disturbance of adjacent surfaces. Temporarily cover openings when not in use.

2. To avoid marring existing finished surfaces, cut or drill from the exposed or finished side into concealed surfaces.

3. Cut through concrete and masonry using a cutting machine such as carborundum saw or diamond core drill.

4. Comply with requirements of applicable Sections of Division-1 where cutting and patching requires excavating and backfilling.

5. By-pass utility services such as pipe or conduit, before cutting, where services are shown or required to be removed, relocated or abandoned. Cut-off pipe or conduit in walls or partitions to be removed. Cap, valve or plug and seal the remaining portion of pipe or

CUTTING AND PATCHING 010450-4

conduit to prevent entrance of moisture or other foreign matter after by-passing and cutting.

C. Patching: Patch with durable seams that are as invisible as possible. Comply with specified tolerances.

1. Where feasible, inspect and test patched areas to demonstrate integrity of the installation.

2. Restore exposed finishes of patched areas and extend finish restoration into retained adjoining construction in a manner that will eliminate evidence of patching and refinishing.

3. Where removal of walls or partitions extends one finished area into another, patch and repair floor and wall surfaces in the new space to provide an even surface of uniform color and appearance. Remove existing floor and wall coverings and replace with new materials, if necessary to achieve uniform color and appearance.

a. Where patching occurs in a smooth painted surface, extend final paint coat over entire unbroken containing the patch, after the patched area has received primer and second coat.

4. Patch, repair or rehang existing ceilings as necessary to provide an even plane surface of uniform appearance.

3.4 CLEANING

A. Thoroughly clean areas and spaces where cutting and patching is performed or used as access. Remove completely paint, mortar, oils, putty and items of similar nature. Thoroughly clean piping, conduit and similar features before painting or other finishing is applied. Restore damaged pipe covering to its original condition.

END OF SECTION 010450

DEFINITIONS AND STANDARDS 010900-1

SECTION 010900 - DEFINITIONS AND STANDARDS

1.2 DESCRIPTION OF REQUIREMENTS

A. General: This section specifies procedural and administrative requirements for compliance with governing regulations and codes and standards imposed upon the work. These requirements include obtaining permits, licenses, inspections, releases, and similar documentation, as well as payments, statements, and similar requirements associated with regulations, codes, and standards.

B. The term "Regulations" is defined to include laws, statutes, ordinances, and lawful orders issued by governing authorities, as well as those rules, conventions, and agreements within the construction industry which effectively control the performance of the work regardless of whether they are lawfully imposed by governing authority or not.

1.3 DEFINITIONS

A. General Explanation: Certain terms used in Contract Documents are defined in this Article.

Definitions and explanations contained in this Section are not necessarily complete, but are general for the work to extent that they are not stated more explicitly in another element of the Contract Documents.

B. General Requirements: Provisions and requirements of other Division 1 Sections apply to the entire work of the Contract and, where so indicated, to other elements which are included in the project.

C. Indicated: The term "indicated" is a cross-reference to graphic…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .