Liquidating_Damages_Memo_EM_Solar_Inverter_Replacement.pdf
PDF 65 KB Posted
- Attached to
- East Metro Solar Inverter Replacement
- Solicitation number
- RFP 126DE001
- Issued by
- Arapahoe County, Colorado
About this file
This is a liquidated damages memorandum from the Regional Transportation District in Denver, Colorado, regarding the East Metro Solar Inverter Replacement project. The RTD is seeking qualified solar energy suppliers and installers to design, supply, and install four solar inverters that are currently out of service on the roof of the East Metro Bus Facility located at 14100 E. Colfax Avenue in Aurora, Colorado. The project involves replacing inverters on an existing photovoltaic system, with design drawings and photographs of the original system provided as exhibits to the solicitation.
The liquidated damages rate for this project has been established at $180 per day for each day the project exceeds the period of performance. This damages clause applies to any contractor delays beyond the scheduled completion date and represents the predetermined compensation owed to the RTD for project delays. The memorandum was prepared by Abhishek Phanse, Electrical Engineer IV, and directed to Bethany Swank, Procurement Specialist II, on April 22, 2026.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Regional Transportation District 1660 Blake Street, Denver CO 80202 rtd-denver.com
To: Bethany Swank – Procurement Specialist II
From: Abhishek Phanse – Electrical Engineer IV
Date: April 22, 2026
Subject: Liquidated Damages, East Metro – Solar Inverter Replacement
The appropriate liquidated damages are $180 per day that the project exceeds the period of performance.