Last_RFP_with_evaluation_metrics.docx
DOCX document 82 KB Posted
- Attached to
- Electrical Testing Services State and local contract opportunity
- Solicitation number
- 2024-RFP-756
- Issued by
- Pierce County, Washington
About this file
This is a Request for Proposal (RFP) #20-070 issued by Pierce County Procurement and Contract Services for Electrical Testing Services. The county is seeking a licensed contractor to perform comprehensive electrical testing and maintenance services at various county-owned facilities, including the Chambers Creek Regional Wastewater Treatment Plant, Environmental Services Building, and Sewer and Traffic Operations Center. The primary scope involves systematic electrical equipment testing and inspection of over 300 electrical components across multiple locations, including transformers, air switches, circuit breakers, cables, and batteries. The initial contract term is two years with three potential one-year automatic renewals, with proposals due on November 19, 2020, and an estimated contract execution approximately eight weeks after the due date.
Pricing for the contract is structured with two line items: 1,000 hours of field technician services for basic electrical testing and program development at an hourly rate, and 50 hours of unscheduled call-out services for troubleshooting and testing. The contractor will be responsible for all mobilization, equipment, and safety gear, with materials reimbursed at cost plus 15%. Invoicing must be completed within 30 days of work completion, and the county will not reimburse administrative support, estimating, or transportation costs. Evaluation of proposals will be based on 20 points for capacity and availability, 20 points for qualifications and experience, and 60 points for pricing, with the county reserving the right to negotiate contract details and select the most advantageous proposal.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| Electrical_Testing_Services_(Addendum_#2_Revision).pdf | ||
| Electrical_Testing_Services_(Addendum_#2_Revision).pdf | ||
| Electrical_Testing_Services_-_Required_Pricing_Form.xlsx | XLSX spreadsheet | |
| Electrical_Testing_Services_-_Required_Pricing_Form.xlsx | XLSX spreadsheet | |
| Electrical_Testing_Sample_Contract.pdf | ||
| Electrical_Testing_Sample_Contract.pdf | ||
| SAMPLE__E-Verify_Declaration_(1).pdf | ||
| SAMPLE__E-Verify_Declaration_(1).pdf | ||
| 2024-RFP-756_Electrical_Testing.docx | DOCX document | |
| 2024-RFP-756_Electrical_Testing.docx | DOCX document | |
| Last_RFP_with_evaluation_metrics.docx | DOCX document |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PIERCE COUNTY REQUEST FOR PROPOSAL
NUMBER #20-070
ELECTRICAL TESTING SERVICES
PROPOSAL DUE DATE/TIME: Thursday November 19, 2020, 4:00 PM via Procureware:
Pierce County Procurement & Contract Services
RFP ISSUED BY:
Pierce County Procurement and Contract Services Attention: Andrew Robson, Senior Buyer pcpurchasing@piercecountywa.gov 253-798-7456
TABLE OF CONTENTS
| RFP HOLDER’S LIST | 3 |
| PROCUREMENT DOCUMENTS | 3 |
| PROCUREMENT QUESTIONS | 3 |
| EXPECTED TERM OF RESULTING AGREEMENT | 3 |
| TIMELINES/SCHEDULE | 3 |
| GENERAL INFORMATION | 4 |
| DESCRIPTION OF PROJECT | 4 |
| SCOPE OF WORK | 10 |
| PRICING FORM | 12 |
| SUBMITTAL CHECKLIST | 12 |
| COUNTY’S EVALUATION OF PROPOSALS | 13 |
| REQUIRED SIGNATURE PAGE FOR PROPOSAL | 14 |
| ATTACHMENT A – SAMPLE PERSONAL SERVICE AGREEMENT | 15 |
rfp holder’s list All interested potential proposers must email the procurement contact on the front page of this RFP to request to be put on the Holder’s list for this procurement in order to receive RFP addenda and additional procurement updates. By requesting to be placed on the Holders list, firms will automatically be notified when new documents or changes relating to this procurement occurs.
PROCUREMENT QUESTIONS
All questions must be submitted within the Pierce County ProcureWare software, under the Clarifications Tab not later than seven days prior to bid opening. Proposers must be registered in the ProcureWare software in order to submit questions. Instructions for Pierce County ProcureWare registration.
Expected term of resulting agreement The expected term of the initial contract will be two (2) years with, three one (1) year automatic renewals.
timelines/schedule
| TIME |
| DATE |
| Question must be submitted, in writing, to the contact listed above |
| 4:00 PM |
| November 12, 2020 |
| Proposals must be received by the Purchasing Department |
| 4:00 PM |
| November 19, 2020 |
| Proposals will be evaluated and, if multiple proposers are deemed highly qualified, interviews may be held with the top proposers |
| Approximately three weeks after due date |
| Estimated date of notice of intention to negotiate a contract with the selected proposer |
| Approximately six weeks after due date |
| Estimated date of contract execution. |
| Approximately eight weeks after due date |
general information The Pierce County Department of Planning and Public Works provides a wide variety of public services:
| • | Building Safety and Inspection. |
| • | Development Engineering. |
| • | Resource Management. |
| • | Long Range and Current Planning. |
| • | Road Design and Construction. |
| • | Road Maintenance and Operations. |
| • | Ferry and Airport Services. |
| • | Sewer Systems and Wastewater Treatment. |
| • | Solid Waste and Recycling Management. |
| • | Public Use Facilities. |
| • | Surface Water Management. |
The Department's website is a valuable resource for information about the many services that the Planning and Public Works Department provides. Please access the website at https://www.piercecountywa.org description of SERVICES The purpose of this RFP is to secure the services of a Licensed Contractor to perform the necessary electrical testing services for Pierce County. This work will be performed at various locations within Pierce County. Other Sites and/or Divisions may be added throughout the life of the contract. These services must be performed by persons qualified and licensed.
We expect to receive a systematic, assured program to provide and guarantee proper inspections and testing of County owned equipment and/or systems, including a method to maintain documentation of inspections and testing. All electrical testing services must be performed in accordance with the most current national Standards and Specifications and utilize the International Electrical Testing Association (NETA), the American National Standards Institute (ANSI), best practices and applicable standards. The selected Contractor will be expected to use professional judgment and expertise to recommend appropriate inspection and testing for all County equipment as part of such program, and submitted proposals should identify the Proposer’s ability, including experience and capacity, to meet that expectation.
As part of the scope of work, the selected Contractor will develop and share with the County a detailed summary of appropriate maintenance and testing for all equipment (per location) in order to establish a systematic maintenance program based on current national standards from ANSI and NETA, together with a method to maintain documentation of that maintenance program. Any other industry best practices should be outlined and included.
Primary service locations (see addresses in the equipment list section) are the Chambers Creek Regional Wastewater Treatment Plant, the Sewer and Traffic Operations Center, the Environmental Services Building, outlaying Pump Stations and other Pierce County locations as needed.
The County does not guarantee utilization through any resulting contract. The solicitation may provide estimates of utilization solely to help proposers prepare their proposal and does not serve as a guarantee of usage. Sites and/or equipment may be added or deleted throughout the life of the contract.
All contractor employees are required to sign in when entering Pierce County property and sign out upon departure.
COUNTY OWNED EQUIPMENT LIST
The following is a list of currently owned Pierce County equipment that we intend to have tested on a interval schedule, testing equipment every 1-3 years. Changes may be made based on current industry standards throughout the life of the resulting contract.
Areas P06-P21, Area 23-26 Located at the Pierce County Regional Wastewater Treatment Plant 10311 Chambers Creek Road West University Place, WA 98467
Area P06 - UV EQUIPMENT
| A. | Two (2) Cutler Hammer Air Switches (Outside) |
| B. | Two (2) 15 KV 2000 KVA Liquid Filled Transformers |
| C. | Three (3) DSII-620 Cutler Hammer Power Breakers |
| D. | Two (2) DSII-616 Cutler Hammer Power Breakers |
| E. | Four (4) SPBNH-416C Cutler Hammer Switches |
Area P07 - SECONDARY TREATMENT BUILDING
A. Three (3) HMDLB3800T33W Allen Bradley 480VAC Breakers model 255P174H03C (MCC’s 071, 072, and 073.)
B. One (1) ASCO 208 Volt ATS
Area P08 – BIOSOLIDS BUILDING
| A. | Two (2) EATON 1500 KVA Liquid Filled Transformers |
| B. | Two (2) 15 KV EATON 150 VCP Breakers with SEL-751A Relay (Outside) |
| C. | Three (3) EATON 480VAC Breaker Number Magnum DS-3200AF, 3200AT |
| D. | Eleven (11) EATON 480VAC Breaker Number Magnum DS-800AF, 300-800AT |
| E. | Eight (8) CHMDLB3800T33W Allen Bradley 480VAC Breakers |
| F. | One (1) ASCO 208 Volt ATS |
G. One (1) EATON ATS 400A (Building Essential Power)
Area P11- BLOWER BUILDING
| A. | Two (2) EATON 2000 KVA Liquid Filled Transformers |
| B. | Two (2) 15 KV EATON 150 VCP Breakers with SEL-751A Relays (Outside) |
| C. | Three (3) EATON 480VAC Breaker Number Magnum DS-3200AF, 3200AT |
| D. | Four (4) EATON 480VAC Breaker Number Magnum DS-1600AF, 1600AT |
| E. | Seven (7) EATON 480VAC Breaker Number Magnum DS-800AF, 400- 800AT |
| F. | Seven (7) 15 KV EATON 150 VCP Breakers with Three (3) SEL-751 Relays, and Four (4) SEL-700G Relays - (Inside) |
G. Ninety-Two (92)-ALCAD XHP80 Batteries (Inside-Switchgear Power) H. Two (2) ASCO 480 Volt ATS I. Three (3) Allen Bradley 800A Breakers
Area P12 – ADMINISTRATION BUILDING
| A. | Two (2) EATON 750 KVA Liquid Filled Transformers |
| B. | Two (2) EATON 15 KV Fused Air Switches – Type MVS (Outside) |
| C. | Three (3) EATON 480VAC Breaker Number Magnum DS-1600AF, 1200AT |
| D. | Eight (8) EATON 480VAC Breaker Number Magnum DS-800AF, 080-800AT |
Area P13- SOUTH MAINTENANCE BUILDING
A. One (1) CH/EATON 600 Amp 480 Volt Breaker
Area P14 – SERVICE ENTRANCE BUILDING
| A. | Nine (9) 15 KV EATON 150 VCP Breakers (Inside)– Two (2) with SEL-351 Relays, and Seven (7) with SEL-751A Relays |
| B. | Ninety-Two (92)-ALCAD XHP80 Batteries (Inside-Switchgear Power) |
| C. | One (1) EATON ATS – 400A (Building Essential Power) |
Area P16 - FERTILIZER MANUFACTURING FACILITY
| A. | One (1) Cutler Hammer PA155992-001 15KV Transformer |
| B. | Six (6) Cutler Hammer 480VAC model 4135029739 Breaker (Outside) |
| C. | Four (4) Allen Bradley 480VAC model ND312T33W Breaker |
| D. | One (1) Cutler Hammer 15 KV model PM04A109 Switch (Outside) |
Area P18 – RDT BUILDING
A. Three (3) EATON Breakers - 800A- (2) NGH308036EC & (1) NGH308032EC B. One (1) EATON ATS – 225A (Building Essential Power)
Area P20 – AERATION BASIN CONTROL BUILDING
| A. | Four (4) EATON 2000 KVA Liquid Filled Transformers |
| B. | Four (4) 15 KV EATON 150 VCP Breakers with SEL-751A Relays (Outside) |
| C. | Six (6) EATON 480VAC Breaker Number Magnum DS-3200AF, 3200AT |
| D. | Two (2) EATON 480VAC Breaker Number Magnum DS-1600AF, 1200AT |
E. Fourteen (14) EATON 480VAC Breaker Number Magnum DS-800AF, 480AT F. Nine (9) 15 KV EATON 150 VCP Breakers with SEL-751A Relays (Inside) G. Ninety-Two (92)-ALCAD XHP80 Batteries ((Inside-Switchgear Power) H. One (1) EATON ATS -600A (Building Essential Power)
Area P21 – RECLAIMED WATER BUILDING
| A. | Two (2) EATON 2000 KVA Liquid Filled Transformers |
| B. | Two (2) EATON 15 KV Fused Air Switches – Type MVS – 600A (Outside) |
| C. | Three (3) EATON 480VAC Breaker Number Magnum DS-3200AF, 3000AT |
| D. | Two (2) EATON 480VAC Breaker Number Magnum DS-2000AF, 1600AT |
E. Two (2) EATON 480VAC Breaker Number Magnum DS-800AF, 800AT F. One (1) EATON ATS -400A (Building Essential Power)
Area 23 – DIGESTER CONTROL BUILDING
| A. | Two (2) EATON 1500 KVA Liquid Filled Transformers |
| B. | Two (2) 15 KV EATON 150 VCP Breakers with SEL-751A Relays (Outside) |
| C. | Three (3) EATON 480VAC Breaker Number Magnum DS-3200AF, 2000AT |
| D. | Four (4) EATON 480VAC Breaker Number Magnum DS-1600AF, 1600AT |
E. Two (2) EATON 480VAC Breaker Number Magnum DS-800AF, 800AT F. One (1) EATON ATS -225A (Building Essential Power)
Area 24 – PROCESS CONTROL LAB BUILDING
| A. | One (1) EATON Breaker – HD 65 K -400A |
| B. | One (1) EATON 9390 Powerware UPS with associated batteries. |
| C. | One EATON Pow-R-Line Manual Bypass Switch with Three (3) KD |
35K 350A Breakers
Area 25 – WAREHOUSE/ADMIN BUILDIN
A. One (1) EATON Breaker – HDML 800A Breaker
Area 26-VARIOUS PLANT LOCATIONS-15 KV SECTIONALIZING CABINETS
| A. | P14EDSSJB_011 - Numerous 15 kV underground cables |
| B. | P14EDSSJB_012 - Numerous 15 kV underground cables |
| C. | P20EDSSJB_021 - Numerous 15 kV underground cables |
| D. | P20EDSSJB_022 - Numerous 15 kV underground cables |
| E. | P03EDSSJB_021 - Numerous 15 kV underground cables |
| F. | P03EDSSJB_022 - Numerous 15 kV underground cables |
| G. | P03EDSSJB_031 - Numerous 15 kV underground cables |
| H. | P03EDSSJB_032 – Numerous 15 kV underground cables |
| I. | P12EDSSJB_013 - Numerous 15 kV underground cables |
| J. | P12EDSSJB-014 - Numerous 15 kV underground cables |
| K. | P13EDSSJB_991 - Numerous 15 kV underground cables |
| L. | P13EDSSJB_992 - Numerous 15 kV underground cables |
| M. | P16EDSSJB_023 - Numerous 15 kV underground cables |
| N. | P16EDSSJB_024 - Numerous 15 kV underground cables |
| O. | P14EDSSGH011 to P20EDSSGH021- 15 kV cables |
| P. | P14EDSSGH012 to P20EDSSGH022 – 15 kV cables |
| Q. | P20EDSSGH021 to P11EDSSGH111 – 15 kV cables |
| R. | P20EDSSGH022 to P11EDSSGH112 – 15 kV cables |
| S. | P11EDSDCB001 to P30EDSEPG001 – 15 kV cables |
Note: All EATON VCP 150 Breakers have integral racking motor assemblies.
ENVIRONMENTAL SERVICES BUILDING;
Located at 9850 64th Street West, University Place, WA 98467.
| A. | One (1) Main Service Entrance switchboard, including all breakers, meters, current transformers and ground fault system |
| B. | Twelve (12) Panel boards including all 90 amp or larger molded case circuit breakers |
| C. | Four (4) Dry Type Transformers |
| D. | Two (2) Manual Transfer Switches |
SEWER AND TRAFFIC OPERATIONS FACILITY (STOP)
Located at 9200 122nd Street East, Puyallup, WA 98373.
| A. | Two-2500 AT Masterpact breakers |
| B. | Two- Square D 480v 2500 AF, type NW25H, GFI-Tie in breakers |
| C. | One-2500AT Powerpact MCC Breaker |
| D. | One G.E.480v, 250AF, RecordPlus MCC breaker |
| E. | Six G.E.480v, 125A, RecordPlus MCC breaker |
| F. | One Square D 480v, 2500AF GFI |
| G. | Six GE 208v, 225AF Spectra RMS, MCC breakers |
| H. | Six GE 208v, 400 AF Spectra RMS, MCC breakers |
| I. | Six GE 480v, 225AF Spectra RMS, MCC breakers |
| J. | Four GE 480v, 250AF Spectra RMS, MCC breakers |
| K. | Six GE 480v, 400AF Spectra RMS, MCC breakers |
| L. | Six GE 480v, 600AF Spectra RMS, MCC breakers |
| M. | One GE 480v, 1200AF Spectra RMS, MCC breakers |
C100 Northwest Landing Pump Station
Located at 2759 Wharf Road, DuPont, WA 98327
| A. | Eight Square D 480V, Type LHP36400MT, 400-amp breakers |
| B. | Ten Square D 480 V, Type MP08H1, 800-amp breakers |
| C. | Three Square D 480 V, Type MP16H1, 1600-amp Tie breakers |
| D. | Four Merlin 480 V, Type JSJ600 N, 600-amp breakers |
C181 Hemlock Ponds
Located at 11919 144th Street East, Puyallup, WA 98374
| A. | Four Cutler Hammer 480 V, type HKD3400F, adjustable breakers |
| B. | Two Merlin Gerin 480 V, type CK800N, 800-amp breakers |
| C. | One Cutler Hammer 480 V, type CHSPB100 breaker |
Cascadia WWTP
Located 16802 Cascadia Blvd.
Main Electrical MCC Room #303
A. Fifteen Eaton 480V, 15A breakers B. Two Eaton 480V, 20A breakers C. Six Eaton 480V, 30A breakers D. Eleven Eaton 480V, 50A breakers E. Seven Eaton 480V, 100A breakers F. Four Eaton 480V, 125A breakers G. Four Eaton 480V, 150A breakers H. One Eaton 120/208V, 250A breaker I. Five Eaton 480V, 400A breakers J. Four Eaton 480V, 1600AF/1000AT Magnum DS MDS 616 K. Three Eaton 480V, 4000AF/4000AT Magnum DS MDS 840 L. Five Distribution/Lighting panels M. Two 480-120/208V, Dry Type Transformers N. One 480V, 400A ATS
Mechanical Room
A. One Eaton 120/208V, 400A breaker
Mechanical Room #14
A. One Eaton 120/208V, 400A Panel B. One 480-120/208 Dry Type Transformer
Shop #101
A. Eaton 120/208V, 225A Panel Generator
A. One Square-D 480V, 1600AF/1000AT Powerpack RL 1600 B. One Square-D 120/240V, 100A Panelboard
C053 Lake City
Located 8803 ½ 116th St SW
MCC
A. One Westinghouse 480V, KB3250F AT 250A breaker B. Four Westinghouse 480V, MCP03150R AT 15A breakers C. Five Cutler Hammer 480V, HFC3015 15A FT breakers D. One Westinghouse 480V, MCP0358R 7A AT breaker E. One Cutler Hammer 480V, HFB30, FT 30A breaker F. One Cutler Hammer 480V, HFC3125 FT 125A breaker
C049 Avondale
Located 6608 Avondale Rd
MCC
A. One Westinghouse 480V, KB3175F AT 175A breaker B. Four Westinghouse 480V, MCP03150R AT 15A breakers C. Five Cutler Hammer 480V, HFC3015 15A FT breakers D. One Westinghouse 480V, MCP0358R 7A AT breaker E. One Cutler Hammer 480V, HFB30, FT 30A breaker F. One Cutler Hammer 480V, HFC3070 FT 70A breaker The result of this RFP will be the award and negotiation of a Personal Services Agreement (PSA).
SCOPE OF WORK
General
Contractor shall comply with all federal, state and local regulations when performing any work under the resulting contract.
The following scope of work is intended as an example of the types of required work. All work shall be performed in accordance with the latest NETA, ANSI, IEEE and/or other applicable standards and best practices.
Proposals should include a summary of the contractor’s resources and experience to develop and update a systematic testing and inspection program and to update such a plan should standards or equipment change.
The selected contractor will be expected to use professional judgement and expertise to recommend appropriate inspection and testing for all County equipment, and the proposal should identify the Proposer’s ability, including experience and capacity, to meet that expectation.
Services will follow the established systematic maintenance plan, we anticipate services will include but not be limited to:
TRANSFORMERS - LIQUID FILLED
Visual and mechanical inspection
· Inspect for physical damage.
· Verify proper auxiliary device operations such as fans, pumps, sudden pressure device, indicators, tap changer and gas pressurization system.
· Check all levels in tank and bushings for proper level.
· Notify Piece County staff if cleaning is required.
Electrical tests
· Insulation resistance tests shall be performed winding and winding to ground.
· A turn ratio test shall be performed between windings at set tap positions.
· Insulating oil shall be sampled in accordance with ASTM D-923. Sample shall be laboratory tested for:
| a. | Dielectric strength |
| b. | Acid neutralization number |
| c. | Interfacial tension |
| d. | Color |
| e. | P.M. water (Karl Fisher) |
· Gas-in-oil testing using the gas chromatograph. The following elements shall be reported and evaluated:
| a. | Hydrogen (H2) |
| b. | Nitrogen (N2) |
| c. | Carbon Dioxide |
| d. | Carbon Monoxide |
| e. | Acetylene |
| f. | Ethane |
| g. | Methane |
AIR SWITCHES - MEDIUM VOLTAGE
Visual and mechanical inspection
· Inspect for physical damage and report any findings to Pierce County Staff.
· Notify Piece County staff if cleaning or lubrication is required.
· Perform mechanical operator tests in accordance with manufacturer’s instructions.
· Check blade alignment and arc interrupter operation.
· Check fuse linkage and element for proper holder and current rating.
· Check key interlocks for safe operation and proper key distribution.
Electrical tests
· Perform insulation resistance test on each phase to ground and from each phase to each other phase.
· Perform contact resistance test across each switch blade.
LARGE FRAME CIRCUIT BREAKER
Visual, mechanical and electrical tests
· Notify Piece County staff if any repairs are required.
· Notify Piece County staff if retrofitting of breakers is required.
HIGH VOLTAGE CABLES
Cable testing
· Test cable insulation for any insulation break-down using online Positive Discharge Testing. (Non-Destructive)
BATTERY TESTING
· Test batteries per manufacturers recommended test procedures.
MISCELLANEOUS SERVICE
Reports
· Submit written report stating condition of all equipment tested, including results of all oil samples, upon completion of project.
PROPOSAL PRICING and INVOICING:
All mobilization, demobilization, travel time, labor, equipment, tools, and safety gear to perform the work outlined in these specifications shall be furnished by the successful proposer and shall be included in calculating your hourly prices. Lump sum pricing for each location may be established in advanced if based on the hourly prices and pre-approved by Pierce County. The County has licensed maintenance electricians on site to assist with any work required to perform testing.
All Firms, Vendors, Contractors, Sub-contractors and employees of said, are required to follow the Construction Restart COVID-19 Job Site Requirements issued by the Governor under his Phased approach to opening the State. Subsequent State-issued guidelines and procedures must be followed as issued.
Materials and lab fees required for performance of the work, excluding materials and supplies necessary to operate and maintain test equipment, shall be reimbursed at cost plus 15% and be considered full compensation for materials and lab fees.
The material used to perform the work shall be recorded as the work is performed. To support charges for materials, the successful proposer shall provide the County with valid copies of vendor invoices. If invoices are not available for materials from the successful proposers’ stocks, the proposer shall certify actual costs (at a reasonable level). Once approved, the prices will be utilized in the calculation for reimbursement for materials. Invoicing for each job must be completed no later than 30 days after completion of work.
The successful proposer will be reimbursed for labor (other than administrative support) dedicated solely to the particular job and only for the hours worked at the Pierce County facility job site. The proposer will not be reimbursed for estimating and executing work orders, mobilization, demobilization or transportation to and from the job site. Those costs should be included in the appropriate items in the pricing form.
The County does not provide a waste site for debris and/or materials. The successful proposer shall dispose of all waste properly at the designated solid waste disposal facility. Contractor will leave the work site in a clean and orderly condition each day.
Pricing Form Please include this form with your proposal
Quantities listed estimates for pricing evaluation only. The quantities shown in the Pricing Form are for estimates and are stated only for comparison purposes. Pierce County does not guarantee those estimates. Payment will be made on the basis of the actual quantities of each item of Work completed in accordance with the Contract requirements.
| Item No. |
| Estimated Quantities |
| Description |
| Unit Price; per Hour |
| Total |
| 1. |
| 1000 hours |
| Field Technician Services; Basic electrical testing services and development of systematic testing and inspection program. |
| $ |
| 2. |
| 50 hours |
| Field Technician Services; Un-scheduled call out for troubleshooting and testing. |
| $ |
| TOTAL PROPOSAL (not including Sales Tax): | |
| $ |
submittal checklist For proposals to be considered the following should be included in your submittal:
Name, local address, email address and phone number of the firm making the proposal.
The names and number of years the firm has been in business under current or previous names or additional assumed business names. Please include a list of key personnel, along with their qualifications and related electrical testing certifications.
A document that outlines your approach to this work, to include how you will develop and update, as needed, a systematic, assured testing and inspection program of County owned equipment and/or systems. Please include a list of company owned testing equipment to be used for this work.
Complete pricing for item 1 and 2 on the pricing form which shall include labor, equipment and mobilization/demobilization charges per hour for the services specified.
References listing customers with contracts for similar services or volume requirements.
If needed, any additional services or procedures of benefit to the County not specifically required by this Request for Proposal, which the Contractor offers to provide.
A separate page containing any statement outlining any proposed exceptions to the County's requirements or requested clarifications to the requirements or a statement stating N/A.
Required Signature Page for Proposal and all Addendum(s) with a legally binding signature.
(1) electronic copy, in pdf format, of the complete proposal.
COUNTY’S EVALUATION OF PROPOSALS
Evaluation Criteria:
Matters relating to qualification to meet the County's needs will receive highest priority in evaluation. Matters relating to the means of meeting those needs described in the proposal will be considered secondary. Actual prices will be used in select successful offerors, and pricing methods and flexibility offered by a proposer for use in negotiation of a resulting contract may be considered in evaluation. Best and final offers may be requested. After a proposal is selected, the County expects to negotiate the details of work to be performed based upon the proposal and the County's needs and appropriate pricing of selected tasks. If negotiations fail for any reason, including price, the County may choose to negotiate with other vendors to obtain an appropriate contract for needed services.
Proposers will be evaluated on the following criteria:
| # points |
| Criteria |
| Submittal requirements |
| 20 |
| Capacity & Availability – Does the vendor have the facilities, equipment, resources, and capability to provide timely services to meet the County’s needs. |
| Proposal describing how the vendor will provide the services listed in the RFP. See submittal checklist above for specific details. |
| 20 |
| Qualifications & Experience – Does the vendor have demonstrated knowledge in this line of work? Do they have past performance under a similar scope of service? How do the qualifications of the vendor and key staff meet the County’s needs? |
| Description of qualifications. Names and roles of key personnel assigned to the contract. References may be submitted with proposal or may be required prior to award. See submittal checklist above for specific details. |
| 60 |
| Price – Pricing must be appropriate and competitive. |
| Complete pricing for bid items. |
Reserved Rights and Procedures:
G. Pierce County expressly reserves the following rights:
a. To waive any and/or all irregularities in the proposals submitted.
b. To reject any or all proposals or portions thereof.
c. To base awards with due regard to quality of services, experience, compliance with specifications, and other such factors as may be necessary in the circumstances.
d. To make the award to any vendor or combination of vendors whose proposal(s), in the opinion of the County, is in the best interest of the County.
H. Pierce County may return unopened any proposal or modification received after the hour and date specified.
REQUIRED SIGNATURE PAGE FOR PROPOSAL
I, the undersigned, having carefully examined the Request for Proposals, propose to furnish services in accordance therewith as set forth in the attached proposal.
I further agree that this proposal will remain in effect for not less than sixty (60) calendar days from the date that proposals are due, and that this proposal may not be withdrawn or modified during that time.
I hereby certify that this proposal is genuine and not a sham or collusive proposal, or made in the interests or on behalf of any person not therein named; and I have not directly or indirectly induced or solicited any Contractor or supplier on the above work to put in a sham proposal or any person or corporation to refrain from submitting a proposal; and that I have not in any manner sought by collusion to secure to myself an advantage over any other contractor(s) or person(s).
In order to induce the County to consider this proposal, the proposer irrevocably waives any existing rights which it may have, by contract or otherwise, to require another person or corporation to refrain from submitting a proposal to or performing work or providing supplies to Pierce County, and proposer further promises that it will not in the future directly or indirectly induce or solicit any person or corporation to refrain from submitting a bid or proposal to or from performing work or providing supplies to Pierce County.
ADDENDA: Firm acknowledges receipt of add addenda through number Firm Name:
Signature:
Printed Name and Title:
Firm Address:
Email: Phone Number:
MAIN CONTACT INFORMATION, if different than named above:
Printed Name and Title:
Email: Phone Number:
ATTACHMENT A – SAMPLE PERSONAL SERVICE AGREEMENT
**Attached – next page** image1.jpg