This is a Cost Proposal form (Exhibit 10-H2) from the Local Assistance Procedures Manual used by the State of California for on-call and as-needed construction engineering and inspection contracts. The form is designed for consultants and subconsultants to submit detailed cost proposals for architectural and related professional services requested by the City of Pasadena, which seeks to establish a pool of up to five on-call architectural consultants. The form accommodates multiple personnel classifications across various experience levels, including Project Managers, Engineers, Inspectors, Claims Engineers, Land Surveyors, and Technicians, with billing rates applicable for straight time, overtime at 1.5x, and overtime at 2x rates. The cost proposal template allows for multiple contract terms with effective dates, specific hourly rates, and percentage or dollar increases over the contract period. The document does not specify response deadlines, site visit requirements, or award dates, as it functions as a standardized cost documentation template rather than a solicitation notice.

The pricing structure requires consultants to provide hourly billing rates calculated using the formula: billing rate equals actual hourly rate multiplied by (1 plus Indirect Cost Rate) multiplied by (1 plus Fee), with indirect cost rates updated annually according to the consultant's accounting period and cognizant agency approval. The form requires documentation of Other Direct Costs (ODC) including mileage, vehicle rental, equipment rental, supplies, permits, plan sheets, and testing expenses, each supported by competitive pricing and appropriate documentation. The proposal must comply with Generally Accepted Accounting Principles (GAAP), Federal cost principles under Title 23 United States Code Section 112, and Code of Federal Regulations Parts 31, 172, and 9904. Subconsultants must submit their own cost proposals, and mark-ups are not permitted. All costs must be certified by a consultant or subconsultant representative at the Vice President level or Chief Financial Officer equivalent and retained in project files for compliance verification. Costs noncompliant with federal and state requirements are not eligible for reimbursement.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Local Assistance Procedures Manual EXHIBIT 10-H2 Cost Proposal

EXHIBIT 10-H2 COST PROPOSAL Page 1 of3

SPECIFIC RATE OF COMPENSATION (USE FOR ON-CALL OR AS-NEEDED CONTRACTS)

(CONSTRUCTION ENGINEERING AND INSPECTION CONTRACTS)

Note: Mark-ups are Not Allowed

Consultant _________________ _ D Prime Consultant D Subconsultant D 2nd Tier Subconsultant

Project No. _________ _ Contract No.

Participation Amount $ ________ _ Date

For Combined Rate Fringe Benefit% + General &Administrative% = Combined ICR%

OR

For Home Office Rate

Fringe Benefit % + General &Administrative% = Home Office ICR%

For Field Office Rate Frinqe Benefit % + General &Administrative% = Field Office ICR%

= Fee %

BILLING INFORMATION CALCULATION INFORMATION

Name/Job Title/Classification 1 Hourly Billing Rates2

Straight3 OT(1.5x) OT(2x) Effective Date of Hourly Rate

From To Actual or Avg.

Hourly Rate4

% or$ Increase

Hourly Range -for Classifications Only

John Doe - Project Manager* Civil Engineer II

$0.00 $0.00 $0.00

$0.00 $0.00 $0.00

$0.00 $0.00 $0.00

01/01/2016 01/01/2017 01/01/2018

12/31/2016 12/31/2017 12/31/2018

$0.00 $0.00 $0.00

0.0% 0.0%

Not Applicable

Sue Jones- Construction Engineeri1nspector Engineer I

$0.00 $0.00 $0.00

$0.00 $0.00 $0.00

$0.00 $0.00 $0.00

01/01/2016 01/01/2017 01/01/2018

12/31/2016 12/31/2017 12/31/2018

$0.00 $0.00 $0.00

0.0% 0.0%

Not Applicable

Buddy Black - Claims Engineer Engineer Ill

Land Surveyor **

$0.00 $0.00 $0.00

$0.00 $0.00 $0.00

$0.00 $0.00 $0.00

$0.00 $0.00 $0.00

$0.00 $0.00 $0.00

$0.00 $0.00 $0.00

01/01/2016 01/01/2017 01/01/2018

01/01/2016 01/01/2017 01/01/2018

12/31/2016 12/31/2017 12/31/2018

12/31/2016 12/31/2017 12/31/2018

$0.00 $0.00 $0.00

$0.00 $0.00 $0.00

0.0% 0.0%

0.0% 0.0%

Not Applicable

$00-$00 $00-$00 $00-$00

Technician $0.00 $0.00 $0.00

$0.00 $0.00 $0.00

$0.00 $0.00 $0.00

01/01/2016 01/01/2017 01/01/2018

12/31/2016 12/31/2017 12/31/2018

$0.00 $0.00 $0.00

0.0% 0.0%

$00-$00 $00-$00 $00-$00

(Add pages as necessary)

January 2020

NOTES:

1. Key personnel must be marked with an asterisk (*) and employees that are subject to prevailing wage requirements must be marked with two asterisks (**).All costs must comply with the Federal cost principles. Subconsultants will provide their own cost proposals.

2. The cost proposal format shall not be amended.

3. Billing rate= actual hourly rate * (1 + ICR) * (1 + Fee). Indirect cost rates shall be updated on an annual basis in accordance with the consultants annual accounting period and established by a cognizant agency or accepted by Caltrans. All costs must comply with the Federal cost principles for reimbursement.

4. For named employees and key personnel enter the actual hourly rate. For classifications only, enter the Average Hourly Rate for that classification.

EXHIBIT 10-H2 COST PROPOSAL Page2ot3

SPECIFIC RATE OF COMPENSATION (USE FOR ON-CALL OR AS-NEEDED CONTRACTS)

(CONSTRUCTION ENGINEERING AND INSPECTION CONTRACTS)

Consultant __________________ _ □ Prime Consultant □ Subconsultant

Project No. __________ _ Contract No.

Date ________ _

SCHEDULE OF OTHER DIRECT COST ITEMS (Add additional pages as necessary) Description of Item Quantity Unit Unit Cost Total

Subconsultant 1:

Subconsultant 2:

Subconsultant 3:

Subconsultant 4:

Subconsultant 5:

Note: Add additional pages if necessary.

NOTES:

1. List other direct cost items with estimated costs. These costs should be competitive in their respective industries and supported with appropriate documentation.

2. Proposed ODC items should be consistently billed regardless of client and contract type.

3. Items when incurred for the same purpose, in like circumstance, should not be included in any indirect cost pool or in the overhead rate.

4. Items such as special tooling, will be reimbursed at actual cost with supporting documentation (invoice).

5. Items listed above that would be considered "tools of the trade" are not reimbursable as other direct cost

6. Travel related costs should be pre-approved by the contracting agency and shall not exceed current State Department of Personnel Administration rules.

7. If mileage is claimed, the rate should be properly supported by the consultant's calculation of their actual costs for company vehicles. In addition, the miles claimed should be supported by mileage logs.

8. If a consultant proposes rental costs for a vehicle, the company must demonstrate that this is its standard procedure for all of their contracts and that they do not own any vehicles that could be used for the same purpose.

9. The cost proposal format shall not be amended. All costs must comply with the Federal cost principles.

10. Add additional pages if necessary.

11. Subconsultants must provide their own cost proposals.

EXHIBIT 10-H2 COST PROPOSAL Page 3 of 3

Certification of Direct Costs:

I, the undersigned, certify to the best of my knowledge and belief that all direct costs identified on the cost proposal(s) in this contract are actual, reasonable, allowable, and allocable to the contract in accordance with the contract terms and the following requirements:

7. Generally Accepted Accounting Principles (GAAP)

8. Terms and conditions of the contract

9. Title 23 United States Code Section 112 - Letting of Contracts

10. 48 Code of Federal Regulations Part 31 - Contract Cost Principles and Procedures

11. 23 Code of Federal Regulations Part 172 - Procurement, Management, and Administration of Engineering and Design Related Service

12. 48 Code of Federal Regulations Part 9904 - Cost Accounting Standards Board (when applicable)

All costs must be applied consistently and fair1y to all contracts. All documentation of compliance must be retained in the project files and be in compliance with applicable federal and state requirements.

Costs that are noncompliant with the federal and state requirements are not eligible for reimbursement.

Prime Consultant or Subconsultant Certifying:

Name: ______________ _ Title*: ______________ _

Signature: _____________ _ Date of Certification (mm/dd/yyyy):

Email: ______________ _ Phone Number: ___________ _

Address: ________________________________ _

* An individual executive or financial officer of the consultant's or subconsultant's organization at a level no lower than a Vice President or a Chief Financial Officer, or equivalent, who has authority to represent the financial information utilized to establish the cost proposal for the contract.

List services the consultant is providing under the proposed contract:

January 2020 https://www.gpo.gov/fdsys/pkg/USCODE-2011-title23/pdf/USCODE-2011-title23-chap1-sec112.pdf http://www.ecfr.gov/cgi-bin/text-idx?SID=7d7984e723af183358e1cb797a78877f&mc=true&node=sp48.1.31.31_12&rgn=div6 http://www.ecfr.gov/cgi-bin/text-idx?rgn=div5&node=23:1.0.1.2.3 https://www.gpo.gov/fdsys/pkg/CFR-2010-title48-vol7/xml/CFR-2010-title48-vol7-part9904.xml

C2:
PC2: Off
Sc2: Off
2TS2: Off
H2PN2:
CN2:
PA2:
D2:
H2I1: Mileage Costs
H2I6: Vehicle
H2I2: Equipment Rental and Supplies
H2I3: Permit Fees
H2I4: Plan Sheets
H2I5: Test
C3:
CN3:
H2Q1:
H2U1:
H2UC1:
H2T1: 0
H2Q2:
H2U2:
H2UC2:
H2T2: 0
H2Q3:
H2U3:
H2UC3:
H2T3: 0
H2Q4:
H2U4:
H2UC4:
H2T4: 0
H2Q5:
H2U5:
H2UC5:
H2T5: 0
H2Q6:
H2U6:
H2UC6:
H2T6: 0
H2S1:
H2SC1:
H2S2:
H2SC2:
H2S3:
H2SC3:
H2S4:
H2SC4:
H2S5:
H2SC5:
D3:
H2PN3:
PC3: Off
Sc3: Off
T2: 0
N2:
PN2:
Email2:
DOC2:
Addr2:
LS2:

File details come from the government source that posted it. Updated .