Sol_L15PS00286.pdf
PDF 316 KB Posted
- Attached to
- Ft Yukon Aviation Fuel Dispensing Station
- Solicitation number
- L15PS00286
About this file
L15PS00286
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_L15PS00286_Amd_000003.pdf | ||
| SOWv2.doc | DOC document | |
| exhibit8.pdf | ||
| exhibit7.pdf | ||
| Sol_L15PS00286_Amd_000002.pdf | ||
| exhibit9.pdf | ||
| top_of_tanks.pdf | ||
| Sol_L15PS00286_Amd_000001.pdf | ||
| Fuel_stands.pdf | ||
| Wages.pdf | ||
| SOW-FYU_Aviation_Fuel_System.doc | DOC document | |
| Invasive_plants.pdf | ||
| aerial_photo_ft_yukon.pdf | ||
| fuel_tanks.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
CALL:
FOR
SEALED BID (IFB)
NEGOTIATED (RFP)
0040203158
BLM AK-FINANCIAL SVCS SEC(AK9F3)
P.O. Box 35005
1544 GAFNEY ROAD
FT WAINWRIGHT AK 99703-0005
LAF
Christopher Taylor
PO Box 35005 Fort Wainwright, AK 99703 cetaylor@blm.gov
103/31/2015
L15PS00286
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
The Bureau of Land Management, Alaska Fire Service, intends to award a contract for installation of underground fuel lines to 3 fueling points from 2 above ground, double-walled, fuel tanks. The work will take place at the Bureau of Land Management aircraft ramp at the Fort Yukon airport starting on Lot 2 and progressing to the 2 helipads south of the two fuel tanks, and one fuel point Northwest of the fuel tanks. See attachments for project details.
This award will be awarded on best value to the Government.
This project is set aside for small business vendors under the North American
Industry Classification (NAICS) Code 424710, Petroleum Bulk Stations and Terminals, with size standard of 100 employees or less.
Offerors shall periodically check for amendments and other changes to the solicitation documents. This service is provided for convenience only and does not serve as a guaranteed notification. Views/offerors are ultimately responsible for reviewing this site for all information relevant to this solicitation.
Vendors must be registered with System for Award Management (SAM) found at
Continued ...
11. The Contractor shall begin performance
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and is not required.is, b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
d. Offers providing less than
12b. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in Item 12b.)
5 0 calendar days and complete it within ________________ ________________ calendar days after receiving
04/30/2015
NSN 7540-01-155-3212
x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________
STANDARD FORM 1442 (Rev. 4-85)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
CODE FACILITY CODE
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
OFFER (Must be fully completed by offeror)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document and return (Contractor is not required to sign this document.)
Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.
No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE
BY
2PAGE OF
Christopher Taylor
28. NEGOTIATED AGREEMENT 29. AWARD
Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
STANDARD FORM 1442 (REV. 4-85) BACK
Continued...
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
3 17
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
L15PS00286
www.sam.gov to be considered eligible for award;
however, it is not necessary to register through
FedConnect.net to access any documents. The
System for Award Management (SAM)is the official
U.S. Government system that consolidated the capabilities of CCR/FedReg, ORCA and EPLS. There is no fee to register for this site.
Questions concerning this requirement can be directed to Christopher Taylor @ 9073565783 or cetaylor@blm.gov.
Delivery: 09/30/2015
Delivery Location Code: 0004276140
BLM-AK ALASKA FIRE SERVICE*
1544 GAFFNEY RD
PO BOX 35005
FT. WAINWRIGHT AK 99703-0005 US
FOB: Destination
00010 Purchase and install all applicable parts needed to complete an aviation fuel dispensing system at
Ft Yukon.
Period of Performance: 03/12/2015 to 09/30/2015
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
Section B - Supplies or Services/Prices Section C - Description/Specifications Section E - Inspection and Acceptance E.1 9.1510.301 INSPECTION August 1999 E.2 9.1510.302 ACCEPTANCE August 1999 Section F - Deliveries or Performance F.1 52.252-2 Clauses Incorporated by Reference. (FEB 1998) F.2 52.211-10 Commencement, Prosecution, and Completion of Work. (APR 1984)
F.3 1452.211-71 CONTRACT WORK HOURS (NOV 2007)
Section G - Contract Administration Data
G.1 PROCUREMENT OFFICE REPRESENTATIVE
G.2 1452.201-70 AUTHORITIES AND DELEGATIONS (SEPT 2011)
G.3 DESIGNATED GOVERNMENT OFFICE FOR SUBMITTING PROPER INVOICE
G.4 DOI ELECTRONIC INVOICING Electronic Invoicing and Payment Requirements – Invoice Processing Platform (IPP) (April 2013) Section H - Special Contract Requirements H.1 1452.204-70 Release of Claims (JUL 1996)
H.2 9.1510.016 FIRE DANGER SEASON
H.3 9.1510.017 DRAWINGS
H.4 9.1510.018 PRESERVATION OF HISTORICAL AND ARCHEOLOGICAL DATA
H.5 9.1510.304 PRE-WORK CONFERENCE
H.6 9.1510.305 NOTICE TO PROCEED
Section I - Contract Clauses I.1 52.252-2 Clauses Incorporated by Reference. (FEB 1998) I.2 52.225-9 Buy American Act - Construction Materials. (MAY 2014) I.3 52.228-13 Alternative Payment Protections. (JUL 2000) I.4 52.252-6 Authorized Deviations in Clauses. (APR 1984) I.5 1452.203-70 Restriction on Endorsements (JUL 1996) I.6 1452.225-70 Use of Foreign Construction Materials (JUL 1996) I.7 1452.228-70 Liability Insurance (JUL 1996) Section J - List of Documents, Exhibits and Other Attachments
Section B - Supplies or Services/Prices
B.1 SCHEDULE OF ITEMS
Line Item Description Est Qty Unit Unit Price Total Amount
10 Aviation Fuel dispensing System 1
TOTAL BID
PERFORMANCE TIME: 30 Calendar Days
ESTIMATED START WORK: June 1, 2015
BOND REQUIREMENTS: This project requires no bid guarantee (FAR 52.228-1); 100% payment bond or payment protection and 100% performance bond.
MAGNITUDE OF PROJECT: Between $25,000-$100,000.
PRICING MUST BE SUBMITTED ON THIS SCHEDULE
Section C - Description/Specifications
C1.0 SCOPE OF WORK
DESCRIPTION: Provide an underground piping system for dispensing, pumping, and testing of Jet-A aviation fuels at the Alaska Fire Service Ft Yukon Fire Station, located in Ft Yukon, Alaska.
The Ft Yukon fire station requires a safe and secure aviation fueling operation. Fuels are currently stored in two above ground double walled self contained Fireguard storage tanks (see attached exhibit # 3) which currently serve a temporary fuel stand. The entire work area is covered by D-1 gravel.
REQUIREMENTS: Supply and install all applicable parts to assemble a complete self contained aviation dispensing system. The new system shall service three fuel stands with underground piping. The system shall provide a means to recirculate fuels in both tanks as well as recirculate the entire system. Attached exhibit # 2 shows an aerial photo of the work area. The following requirements must be met:
- System must be compliant to all State and Federal rules and regulations regarding spill prevention, containment, monitoring, and safety
- Transfer fuel from tank to tank (see attached exhibit # 3)
- Service three fuel points (see attached exhibit # 4)
- Approximately 850 feet of double walled self-contained piping to be buried that shall be sized to produce 30-50 GPM at the dispensing nozzles (see attached exhibit # 4)
- Tank pump(s) shall not exceed the 70 amp 120/240 single phase feeder
- Tank pump(s) shall be UL 79 compliant
- Tank pump(s) shall be sized to produce 30-50 GPM at the dispensing nozzles (see attached exhibit # 4) and be capable of extreme Alaska temperatures
- One transition sump/tub for a fuel stand (see attached exhibit # 4) to match piping
- Option of remote monitoring capable
- Isolation valves to close
- A dry break coupling on the recirculation line for each fuel dispensing station to allow for testing
- Shall make sure not to introduce seed from nonnative plants while burying the fuel line by keeping equipment out of adjacent areas of infestation (see attached exhibit #5), power washing all equipment at the point of origin, and keeping it from becoming contaminated during transport to the site.
- Shall immediately notify the Contracting Officer if petroleum contaminated soil is discovered
PERFORMANCE SPECIFICATIONS: Furnish all labor, materials, equipment, special tools, transportation and supervision of services required to install new lines/equipment.
Upon completion of installation, all products shall be cleaned and area shall be left in a clean and neat condition. Any defects in material and installation shall be repaired, and damaged products that cannot be satisfactorily repaired shall be replaced.
Work scheduling and times will be coordinated with the Contracting Officer or the designated Contracting Officer’s Representative (COR), hereinafter synonymous with COR.
All flammables and combustibles stored on-site must be kept in a Government-designated storage area and in a contractor-provided locker approved for flammables, which must be approved by the COR.
COMPLETION DATE: Work must be completed by 09/30/2015.
WARRANTY: All items to include material and workmanship must be covered by a minimum one-year warranty from the accepted date of installation. All piping materials must be covered by manufacturers warranty against defects. Warranty must cover the cost of all necessary parts and labor to replace any and all defective parts.
C2.0 CONTRACTOR FURNISHED ITEMS
C2.1 Provide all necessary personnel, supplies, materials, and equipment to perform the work.
C3.0 GOVERNMENT FURNISHED ITEMS
The government will provide the following:
C3.1 Two Fireguard above ground double walled self contained tanks C3.2 Three fuel dispensing stations (two of which have sumps/tubs) C3.4 Four rooms (one bed to a room) with a common shower and outhouse C3.5 Kitchen area without cook or food C3.6 Pick-up truck with driver C3.7 Fork lift and operator to move staged equipment (ie. fuel dispensing stations) C3.8 Electrician to “hook up” electricity to the pump(s)
C4.0 SCHEDULE
C4.1 Complete all work before 09/30/2015.
END
Section D - Packaging and Marking
D.1 Section Not Used.
Section E - Inspection and Acceptance
E.1 9.1510.301 INSPECTION August 1999
(a) Work will be subject to periodic inspections by the Government to assure satisfactory progress, to determine quantities or work performed for progress payment purposes, to be certain that work is being performed in accordance with contract specifications, and to determine if work corrections are necessary.
(b) Inspection in the form of a review of all required reports will be performed by the Contracting Officer’s Representative (COR). Accordingly, all reports, data, and documentation required by the contact will be submitted to the COR who will recommend approval/disapproval for acceptance purposes to the Contracting Officer.
(c) The Contractor shall notify the COR or the Project Inspector (PI) at least 3 days before the scheduled completion date, so the Government can schedule final inspection. The Contractor will not be granted a time extension to perform a work correction required as a result of a periodic or final inspection if such correction is necessary because of improper work by the Contractor. The Contractor or his authorized representative must be at the worksite at time of final inspection.
E.2 9.1510.302 ACCEPTANCE August 1999
Final inspection and acceptance of all items/services to be delivered under this contract shall be the responsibility of the Contracting Officer. Quality of work is subject to verification by the COR, the final payment to be withheld pending completion of any necessary rework by the Contractor.
Section F - Deliveries or Performance
F.1 52.252-2 Clauses Incorporated by Reference. (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this address: https://www.acquisition.gov/comp/far/index.html
(End of clause)
52.242-14 Suspension of Work. (APR 1984) https://www.acquisition.gov/comp/far/index.html
F.2 52.211-10 Commencement, Prosecution, and Completion of Work. (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 7 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 30 days after the date the contractor receives the notice to proceed. The time stated for completion shall include final cleanup of the premises.
(End of clause)
F.3 1452.211-71 CONTRACT WORK HOURS (NOV 2007)
The performance period established for this contract is based upon all work being conducted during regular working hours. Regular working hours are limited to the time between 0700-1800, Monday through Friday, excluding Government holidays. If the Contractor desires to carry on work outside regular hours, including Saturdays, Sundays, and Government holidays, a request must be submitted to the Contracting Officer Representative in sufficient time to allow satisfactory arrangements to be made by the Government for access to the work site and inspection.
(End of Clause)
Section G - Contract Administration Data
G.1 PROCUREMENT OFFICE REPRESENTATIVE
The Procurement Office Representative for this requirement is:
Christopher Taylor Bureau of Land Management PO Box 35005 Ft. Wainwright, AK 99703
Telephone: 907-356-5783
G.2 1452.201-70 AUTHORITIES AND DELEGATIONS (SEPT 2011)
(a) The Contracting Officer is the only individual authorized to enter into or terminate this contract, modify any term or condition of this contract, waive any requirement of this contract, or accept nonconforming work.
(b) The Contracting Officer will designate a Contracting Officer's Representative (COR) at time of award. The COR will be responsible for technical monitoring of the contractor's performance and deliveries. The COR will be appointed in writing, and a copy of the appointment will be furnished to the Contractor. Changes to this delegation will be made by written changes to the existing appointment or by issuance of a new appointment.
(c) The COR is not authorized to perform, formally or informally, any of the following actions:
(1) Promise, award, agree to award, or execute any contract, contract modification, or notice of intent that changes or may change this contract;
(2) Waive or agree to modification of the delivery schedule;
(3) Make any final decision on any contract matter subject to the Disputes Clause;
(4) Terminate, for any reason, the Contractor's right to proceed;
(5) Obligate in any way, the payment of money by the Government.
(d) The Contractor shall comply with the written or oral direction of the Contracting Officer or authorized representative(s) acting within the scope and authority of the appointment memorandum. The Contractor need not proceed with direction that it considers to have been issued without proper authority. The Contractor shall notify the Contracting Officer in writing, with as much detail as possible, when the COR has taken an action or has issued direction (written or oral) that the Contractor considers to exceed the COR's appointment, within 3 days of the occurrence. Unless otherwise provided in this contract, the Contractor assumes all costs, risks, liabilities, and consequences of performing any work it is directed to perform that falls within any of the categories defined in paragraph (c) prior to receipt of the Contracting Officer's response issued under paragraph (e) of this clause.
(e) The Contracting Officer shall respond in writing within 30 days to any notice made under paragraph (d) of this clause. A failure of the parties to agree upon the nature of a direction, or upon the contract action to be taken with respect thereto, shall be subject to the provisions of the Disputes clause of this contract.
(f) The Contractor shall provide copies of all correspondence to the Contracting Officer and the COR.
(g) Any action(s) taken by the Contractor, in response to any direction given by any person acting on behalf of the Government or any Government official other than the Contracting Officer or the COR acting within his or her appointment, shall be at the Contractor's risk.
(End of clause)
G.3 DESIGNATED GOVERNMENT OFFICE FOR SUBMITTING PROPER INVOICE
www.ipp.gov
G.4 DOI ELECTRONIC INVOICING Electronic Invoicing and Payment Requirements – Invoice Processing Platform (IPP) (April 2013)
Payment requests must be submitted electronically through the U. S. Department of the Treasury's Invoice Processing Platform System (IPP).
"Payment request" means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions - Commercial Items included in commercial item contracts. The IPP website address is:
https://www.ipp.gov.
Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice:
DI-137 Release of Claims and Vendor Generated Invoice must be submitted as an attachment in IPP.
The Contractor must use the IPP website to register, access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of Boston (FRBB) within 3 - 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email ippgroup@bos.frb.org or phone (866) 973-3131.
If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.
(End of Local Clause)
Section H - Special Contract Requirements
H.1 1452.204-70 Release of Claims (JUL 1996)
After completion of work and prior to final payment, the Contractor shall furnish the Contracting Officer with a release of claims against the United States relating to this contract. The Release of Claims form (DI-137) shall be used for this purpose. The form provides for exception of specified claims from operation of the release.
(End of clause)
H.2 9.1510.016 FIRE DANGER SEASON
If the COR allows the Contractor to continue work during periods of declared fire danger or season, the Contractor shall comply with all applicable state laws relating to fire prevention and with all special conditions of work as directed by the COR.
http://www.ipp.gov/ https://www.ipp.gov/
H.3 9.1510.017 DRAWINGS
(a) Typical Drawings. Any drawing titled typical are general only and dimensions of each structure will be fixed by the Contracting Officer to adapt the design to existing conditions at the structure location.
(b) Reduced Size Drawings. Any drawings identified as “REDUCED SIZE DRAWINGS” appearing in the solicitation are photographically reduced to size. Accordingly, measurements and dimensions should not be taken or be based on any numerical scales shown. Prospective bidders desiring to review a copy of the full size drawings may contact the Contracting Officer identified in the solicitation.
H.4 9.1510.018 PRESERVATION OF HISTORICAL AND ARCHEOLOGICAL DATA
a) Public Law 93-291, May 24, 1974, provides for the preservation of scientific, prehistorical, and archeological data (including relics and specimens) which might otherwise be lost due to alteration of the terrain as a result of any Federal construction project.
b) The Contractor agrees that should any contractor employee, in the performance of this contract, discover evidence of possible scientific, prehistorical, historical, or archeological data the contractor will notify the Contracting Officer immediately in writing giving the location and nature of the findings.
c) Where appropriate by reason of discovery, the Contracting Officer may order delays in the time of performance and/or changes in the work. If such delays and/or changes are ordered, the time of performance and contract price shall be adjusted in accordance with the applicable clauses in the Contract Clauses Section of this contract.
d) The Contractor agrees to insert this requirement in all subcontracts which involve the performance of work on the terrain of the site.
H.5 9.1510.304 PRE-WORK CONFERENCE
After award a pre-work conference shall be held between the Contractor and the COR. The date and time of the meeting shall be determined by the COR and the Contractor in consultation. Discussions relative to contract requirements and the specific responsibilities of each party will be conducted at this time.
H.6 9.1510.305 NOTICE TO PROCEED
After award of the contract, the COR will issue a written Notice to Proceed to the Contractor. Issuance of such notice may be delayed for a reasonable time if adverse soil, vegetative, or climatological conditions exist.
Section I - Contract Clauses
I.1 52.252-2 Clauses Incorporated by Reference. (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this address: https://www.acquisition.gov/comp/far/index.html
(End of clause) 52.202-1 Definitions. (NOV 2013)
52.203-3 Gratuities. (APR 1984)
52.203-5 Covenant Against Contingent Fees. (MAY 2014)
52.203-6 Restrictions on Subcontractor Sales to the Government. (SEP 2006)
52.203-7 Anti-Kickback Procedures. (MAY 2014)
52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity. (MAY 2014) https://www.acquisition.gov/comp/far/index.html
52.203-10 Price or Fee Adjustment for Illegal or Improper Activity. (MAY 2014)
52.203-12 Limitation on Payments to Influence Certain Federal Transactions. (OCT 2010)
52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper (May 2011)
52.204-13 System for Award Management Maintenance. (JUL 2013)
52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards. (JUL 2013)
52.209-6 Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (AUG 2013)
52.215-8 Order of Precedence - Uniform Contract Format. (OCT 1997)
52.219-6 Notice of Total Small Business Set-Aside. (NOV 2011)
52.219-14 Limitations on Subcontracting. (NOV 2011)
52.219-28 Post-Award Small Business Program Rerepresentation. (JUL 2013)
52.222-3 Convict Labor. (JUN 2003)
52.222-4 Contract Work Hours and Safety Standards Act - Overtime Compensation. (MAY 2014)
52.222-6 Construction Wage Requirements. (MAY 2014)
52.222-7 Withholding of Funds. (MAY 2014)
52.222-8 Payrolls and Basic Records. (MAY 2014)
52.222-9 Apprentices and Trainees. (JUL 2005)
52.222-10 Compliance with Copeland Act Requirements. (FEB 1988)
52.222-11 Subcontracts (Labor Standards). (MAY 2014)
52.222-12 Contract Termination - Debarment. (MAY 2014)
52.222-13 Compliance with Davis-Bacon and Related Act Regulations. (MAY 2014)
52.222-14 Disputes Concerning Labor Standards. (FEB 1988)
52.222-15 Certification of Eligibility. (MAY 2014)
52.222-21 Prohibition of Segregated Facilities. (FEB 1999)
52.222-26 Equal Opportunity. (MAR 2007)
52.222-27 Affirmative Action Compliance Requirements for Construction. (FEB 1999)
52.222-35 Equal Opportunity for Veterans. (JUL 2014)
52.222-36 Affirmative Action for Workers with Disabilities. (JUL 2014)
52.222-37 Employment Reports on Veterans (JUL 2014)
52.222-40 Notification of Employee Rights Under the National Labor Relations Act. (DEC 2010)
52.222-50 Combating Trafficking in Persons. (FEB 2009)
52.223-6 Drug-Free Workplace. (MAY 2001)
52.223-18 Contractor Policy to Ban Text Messaging While Driving. (AUG 2011)
52.228-2 Additional Bond Security. (OCT 1997)
52.228-11 Pledges of Assets. (JAN 2012)
52.228-14 Irrevocable Letter of Credit. (MAY 2014)
52.232-5 Payments under Fixed-Price Construction Contracts. (MAY 2014)
52.232-17 Interest (MAY 2014)
52.232-23 Assignment of Claims. (MAY 2014)
52.232-27 Prompt Payment For Construction Contracts. (MAY 2014)
52.232-39 Unenforceability of Unauthorized Obligations. (JUN 2013)
52.232-40 Providing Accelerated Payment to Small Business Subcontractors (DEC 2013)
52.233-1 Disputes. (MAY 2014)
52.233-3 Protest after Award. (AUG 1996)
52.233-4 Applicable Law for Breach of Contract Claim. (OCT 2004)
52.236-2 Differing Site Conditions. (APR 1984)
52.236-3 Site Investigation and Conditions Affecting the Work. (APR 1984)
52.236-5 Material and Workmanship. (APR 1984)
52.236-6 Superintendence by the Contractor. (APR 1984)
52.236-7 Permits and Responsibilities. (NOV 1991)
52.236-8 Other Contracts. (APR 1984)
52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements. (APR 1984)
52.236-10 Operations and Storage Areas. (APR 1984)
52.236-11 Use and Possession Prior to Completion. (APR 1984)
52.236-12 Cleaning Up. (APR 1984)
52.236-13 Accident Prevention. (NOV 1991)
52.236-14 Availability and Use of Utility Services. (APR 1984)
52.236-17 Layout of Work (APR 1984)
52.236-21 Specifications and Drawings for Construction. (FEB 1997)
52.236-26 Preconstruction Conference. (FEB 1995)
52.242-13 Bankruptcy. (JUL 1995)
52.243-4 Changes. (JUN 2007)
52.244-5 Competition in Subcontracting. (DEC 1996)
52.244-6 Subcontracts for Commercial Items. (MAY 2014)
52.246-12 Inspection of Construction. (APR 1996)
52.246-21 Warranty of Construction. (MAR 1994)
52.247-64 Preference for Privately Owned U.S.-Flag Commercial Vessels. (FEB 2006)
52.248-3 Value Engineering - Construction. (OCT 2010)
52.249-2 Termination for Convenience of the Government (Fixed-Price). (APR 2012) - Alternate I (SEP 1996)
52.249-10 Default (Fixed-Price Construction). (APR 1996)
52.253-1 Computer Generated Forms. (JAN 1991)
I.2 52.225-9 Buy American Act - Construction Materials. (MAY 2014)
(a) Definitions. As used in this clause--
“Commercially available off-the-shelf (COTS) item”—
(1) Means any item of supply (including construction material) that is—
(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.
“Component” means an article, material, or supply incorporated directly into a construction material.
“Construction material” means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
“Cost of components” means--
(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit.
Cost of components does not include any costs associated with the manufacture of the construction material.
“Domestic construction material” means—
(1) An unmanufactured construction material mined or produced in the United States;
(2) A construction material manufactured in the United States, if—
(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or
(ii) The construction material is a COTS item.
“Foreign construction material” means a construction material other than a domestic construction material.
“United States” means the 50 States, the District of Columbia, and outlying areas.
(b) Domestic preference.
(1) This clause implements the 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the component test of the Buy American statute is waived for construction material that is a COTS item. (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.
(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows: none
(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that
(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;
(ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or
(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.
(c) Request for determination of inapplicability of the Buy American statute.
(1)
(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including--
(A) A description of the foreign and domestic construction materials;
(B) Unit of measure;
(C) Quantity;
(D) Price;
(E) Time of delivery or availability;
(F) Location of the construction project;
(G) Name and address of the proposed supplier; and
(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.
(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.
(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).
(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.
(2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.
(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute.
(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:
Foreign and Domestic Construction Materials Price Comparison
Construction material description Unit of measure Quantity Price (dollars) *
Item 1
Foreign construction material
Domestic construction material
Item 2
Foreign construction material
Domestic construction material
[List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.]
[Include other applicable supporting information.]
[*Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).]
(End of Clause)
I.3 52.228-13 Alternative Payment Protections. (JUL 2000)
(a) The Contractor shall submit one of the following payment protections: Payment Bond and Irrevocable Letter of Credit
(b) The amount of the payment protection shall be 100 percent of the contract price.
(c) The submission of the payment protection is required within 7 days of contract award.
(d) The payment protection shall provide protection for the full contract performance period plus a one-year period.
(e) Except for escrow agreements and payment bonds, which provide their own protection procedures, the Contracting Officer is authorized to access funds under the payment protection when it has been alleged in writing by a supplier of labor or material that a nonpayment has occurred, and to withhold such funds pending resolution by administrative or judicial proceedings or mutual agreement of the parties.
(f) When a tripartite escrow agreement is used, the Contractor shall utilize only suppliers of labor and material that signed the escrow agreement.
(End of clause)
I.4 52.252-6 Authorized Deviations in Clauses. (APR 1984)
(a) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR Chapter 1) clause with an authorized deviation is indicated by the addition of “(DEVIATION)” after the date of the clause.
(b) The use in this solicitation or contract of any Department of the Interior Acquisition Regulation (48 CFR Chapter 1) clause with an authorized deviation is indicated by the addition of “(DEVIATION)” after the name of the regulation.
(End of clause)
I.5 1452.203-70 Restriction on Endorsements (JUL 1996)
The Contractor shall not refer to contracts awarded by the Department of the Interior in commercial advertising, as defined in FAR 31.205-1, in a manner which states or implies that the product or service provided is approved or endorsed by the Government, or is considered by the Government to be superior to other products or services. This restriction is intended to avoid the appearance of preference by the Government toward any product or service. The Contractor may request the Contracting Officer to make a determination as to the propriety of promotional material.
(End of clause)
I.6 1452.225-70 Use of Foreign Construction Materials (JUL 1996)
(a) The Government has determined that the Buy American Act is not applicable to the following construction materials because they are not mined, produced, or manufactured in the U.S. in sufficient quantities of a satisfactory quality:
(1) [ N/A ]
(2) [ ]
(3) [ ]
(b) Offers based on the use of foreign construction materials other than those listed in (a) above may be acceptable if the Government determines that U.S. construction material is not available, would be impracticable or constitute an unreasonable price. Please contact the contracting officer with questions or comments concerning non-availability or impracticability of U.S. material.
(c)(1) Offers based upon use of foreign construction material for cost savings will be considered reasonable if the cost of each foreign construction material, plus 6 percent, is less than the cost of each comparable U.S. construction material. The Contracting Officer shall compute the cost of each foreign construction material to include all delivery costs to the construction site, and any applicable duty (whether or not a duty-free entry certificate is issued.) This evaluation shall be made for each foreign construction material included in the offer, but not listed in subparagraph (a) above in this clause.
(2) Any contractor cost savings from post-award approval to substitute foreign construction material for U.S.
construction material shall be passed on to the Government.
(d)(1) This offer is based on the use of foreign construction material not listed in (a) above. For each foreign item proposed the offeror shall furnish the following information for the foreign material offered: item description, supplier, unit of measure, quantity, unit price, duty (even if a duty free certificate is issued), delivery costs, and total price and shall also identify information on a U.S. item comparable to the foreign item including: supplier, unit of measure, quantity, unit price, delivery costs and total price.
(2) If the Government rejects the use of foreign construction material listed under paragraph (d)(1) above, the Government will evaluate the Contractor's offer using the offeror's stated price for the comparable U.S.
construction material, and the offeror shall be required to furnish such domestic construction material at the
Contractor's originally offered price. In preaward situations, an offer which does not state a price for a comparable U.S. construction material will be rejected by the Government. In postaward situations an offer proposing foreign material which does not state the price for the comparable U.S. construction material will be rejected by the Government. The Contractor shall use comparable U.S. material for the project and any additional cost for the use of this U.S. material shall be absorbed by the Contractor.
(End of clause)
I.7 1452.228-70 Liability Insurance (JUL 1996)
(a) The Contractor shall procure and maintain during the term of this contract and any extension thereof liability insurance in form satisfactory to the Contracting Officer by an insurance company which is acceptable to the Contracting Officer.
The named insured parties under the policy shall be the Contractor and the United States of America. The amounts of the insurance shall be not less than as follows:
$300,000 each person
$500,000 each occurrence
$300,000 property damage
(b) Each policy shall have a certificate evidencing the insurance coverage. The insurance company shall provide an endorsement to notify the Contracting Officer 30 days prior to the effective date of cancellation or termination of the policy or certificate; or modification of the policy or certificate which may adversely affect the interest of the Government in such insurance. The certificate shall identify the contract number, the name and address of the Contracting Officer, as well as the insured, the policy number and a brief description of contract services to be performed. The contractor shall furnish the Contracting Officer with a copy of an acceptable insurance certificate prior to beginning the work.
*These amounts to be set by the Contracting Officer.
(End of clause)
Section J - List of Documents, Exhibits and Other Attachments
J.1
Attachment 1 – Statement of Work Attachment 2 – Aerial Photo of Work Area Attachment 3 – Fuel Tanks Attachment 4– Fuel Stands Attachment 5– Invasive Plants Attachment 6 – Davis Bacon Wage Determination
File details come from the government source that posted it. Updated .