Sol_L15PS00226_Amd_000001.pdf

PDF 88 KB Posted

Attached to
Honcho Slide Culvert Replacement Federal contract opportunity
Solicitation number
L15PS00226
Issued by
Department of the Interior Bureau of Land Management Oregon-Washington

About this file

L15PS00226

View the file

Other files for this federal contract opportunity

Other files attached to Honcho Slide Culvert Replacement, newest first.
File Type Posted
Sol_L15PS00226_Amd_000004.pdf PDF
L15PS00226_Amendment_No._4_Attachment_1.pdf PDF
Sol_L15PS00226_Amd_000003.pdf PDF
Amendment_No._2_Attachment_2.pdf PDF
Sol_L15PS00226_Amd_000002.pdf PDF
Amendment_No._2_Attachment_1.pdf PDF
Attch_2-_Specifications.pdf PDF
L15PS00226_Honcho_Slide.pdf PDF
Attch_3-_Drawings.pdf PDF
Sol_L15PS00226.pdf PDF
Attch_1-_Wage_Determ_OR150001.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

L15PS00226

x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

LHA

PORTLAND OR 97204

1220 SW 3rd Avenue, 12th Floor

BLM OR-ST OFC PROC MGMT BR(OR952)

04/09/2015000001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

04/01/2015

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

HONCHO SLIDE CULVERT REPLACEMENT,COOS COUNTY, BLM COOS BAY DISTRICT, OREGON.

This amendment is issued for the following changes:

1. SECTION L- INSTRUCTIONS, CONDITIONS, AND NOTICES TO BIDDERS

Section L.2.0 Public Bid Opening: Delete paragraph and replace with the following:

A public bid opening will be held at the solicitation closing April 30, 2015 at 11:00 am pacific time stated on the solicitation form, as amended, at the Bureau of Land Management located at 1220 SW 3rd Avenue, ground floor, conference room 3.

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Constance B Hampton

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 3

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

L15PS00226/000001

2. SECTION G - CONTRACT ADMINISTRATION DATA

Request for Information

Questions (Q) and Answers (A)

Q: We would like for the BLM to waive the AWS

D1.1 welding specification (listed below) as it has no relevance in the culvert welding industry.

AWS D1.1 is a structural steel and bridge welding specification where weld failure has catastrophic results.

Section 02640-1.03 B. Welder Qualifications: As a minimum, the welder shall meet the qualifications for: Electrodes up to and including E 70XX according to AWS D1.1, Section 5: Steel thickness

1/16 to 1/2 inch; fillet, groove, flare; or meet code qualifications for structural plate.

Section 02640-2.03 D. Fabrication drawings shall show proposed welding sequences which clearly differentiate shop welds and fields welds. Welds shall be in accordance with AWS D1.1 accomplished with AWS E 70XX electrodes.

A: Contract Specifications Section 02640 is updated as follows:

Section 02640 Part 1.03 B.: Delete the paragraph and replace with "Welded connections for coupling flanges and retention sills: Fabricate surfaces and edges to be welded smooth, uniform, clean, and free of defects that would adversely affect the quality of the weld. Cracking or loose plate which occurs within a one-year period of final acceptance that results in a evidence of crack shall be remedied at the Contractor's expense."

2. Section 02640 Part 2.03 D.: Delete last sentence "Welds shall be in accordance with AWS

D1.1 accomplished with AWS E 70XX electrodes."

The Offeror shall acknowledge the amendment by one of the methods provided in block 11 and

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

3 3

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

L15PS00226/000001

return the acknowledgement as instructed.

Period of Performance: 07/01/2015 to 11/13/2015

00010 HONCHO CREEK CULVERT REPAIR

HONCHO CREEK CULVERT REPAIR

Requisition No: 0040194247

FOB: Destination

00020 SLIDE CREEK CULVERT REPAIR

SLIDE CREEK CULVERT REPAIR

Requisition No: 0040194247

FOB: Destination

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

File details come from the government source that posted it. Updated .