This document is an amendment to a solicitation for the Hilfiker Wall Repairs Project at the Land Port of Entry in Sault Ste. Marie, Michigan. The project will address issues with the existing Hilfiker mechanically stabilized earth retaining wall, including bulging wire baskets, vertical and horizontal displacement, and an outward lean. The project will construct a new earth retention soil nail wall and re-slope the concrete parking area to fortify the wall and protect it from continued corrosion.
The estimated project value is between $1,000,000 and $5,000,000, and the procurement is set aside for small business concerns under NAICS code 236220 (Commercial and Institutional Building Construction). The performance period for on-site work is 120 calendar days from the Notice to Proceed. The solicitation requires contractors to provide an Environmental Product Declaration (EPD) for proposed low embodied carbon concrete and steel materials that meet Global Warming Potential (GWP) limits. The agency is also seeking expressions of interest from suppliers and manufacturers of low embodied carbon asphalt, concrete, glass, and steel materials to support this project.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Pre-Proposal Sign-in Sheet 7-9-24.pdf | ||
| Pre-Proposal Sign in Sheet 10-1-24.pdf | ||
| Hilfiker Wall Repairs Amendment 0002.pdf | ||
| Hilfiker Wall Repairs Amendment 0001.pdf | ||
| Attachment AMD0001 Hilfiker IRA Sustainability Factor Table dated 6.18.24.xlsx | XLSX spreadsheet | |
| RFP Pkt 47PF0024R0042.pdf | ||
| Past Performance Questionnaire.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
Description of Modification Continuation Page
... IRA-eligible material. Please see attached Description of Amendment.
The deadline for receipt of proposals remains unchanged. The proposal due date remains unchanged at November 8, 2024 at 4:00 PM Eastern.
Please submit proposals to Sherri Turner at sherri.turner@gsa.gov and Rebecca Schultz at rebecca.schultz@gsa.gov. Please acknowledge receipt of this and all amendments as indicated in block 11. This amendment does not constitute a notice to proceed nor shall it be considered a commitment on behalf of the Government. Failure to do so may result in rejection of your offer. If a proposal was submitted prior to this amendment, you shall acknowledge the amendments and shall submit a final proposal revision even if price has not changed from the original proposal.
47PF0024R0042/0003
Description of Amendment
47PF0024R0042, Amendment 0003, Hilfiker Wall Repair, Land Port of Entry, Sault Sainte Marie, MI
The purpose of Amendment 0003 is to answer Requests for Information (RFI’s) and incorporate the following changes:
II.D. Technical Proposal
Changes are provided in RED text:
Evaluation Factors:
1) Sustainability
Offerors shall complete the “IRA Sustainability Factor Table” attached to this solicitation by filling out the applicable IRA Limit they commit to meet for each IRA-Eligible Material. Based upon the offeror’s selection in the “IRA Limit Commitment” column, the associated Raw Score, a Preliminary Weighted Score, and the Preliminary Total Weighted Score will be automatically calculated.
In addition, for each IRA-Eligible Material identified in the IRA Sustainability Factor Table, offerors shall submit EPDs listing that material’s GWP. Such EPDs must meet the standards reflected in GSA’s IRA Low Embodied Carbon asphalt, concrete (and cement), glass and steel requirements (see Compliance Documentation criteria listed for each IRA-Eligible Material).
Raw Score Supplement Offerors will receive a supplemental 10 points on Raw Scores for each IRA-Eligible Material where the material’s submitted EPD reflects the lowest GWP value received in the competition for that material. For instance, where two offerors propose materials meeting the Top 20% Limit for glass, and Offeror A submits a glass EPD reflecting a GWP (Global Warming Potential) value lower than that reflected in Offeror B’s glass EPD, Offeror A and B will receive raw scores of 100 and 90 for that material, respectively. During evaluations, the Government will add Raw Score Supplements, if any, to offeror’s Preliminary Weighted Scores to calculate Final Weighted Scores. In the event of a tie for lowest-GWP values for a given material, those tied offerors will all receive the Raw Score Supplement for that material.
https://www.gsa.gov/system/files/Asphalt%20-%20GSA%20IRA%20Low%20Embodied%20Carbon%20Requirements%20%28Dec.%202023%29_508.pdf https://www.gsa.gov/system/files/Concrete%20-%20GSA%20IRA%20Low%20Embodied%20Carbon%20Requirements%20%28Dec.%202023%29_508.pdf https://www.gsa.gov/system/files/Glass%20-%20GSA%20IRA%20Low%20Embodied%20Carbon%20Requirements%20%28Dec.%202023%29_508.pdf https://www.gsa.gov/system/files/Steel%20-%20GSA%20IRA%20Low%20Embodied%20Carbon%20Requirements%20%28Dec.%202023%29_508.pdf
AMENDMENT 0003
REQUESTS FOR INFORMATION
Questions (Q) and Answers (A)
1. Q. At the pre-proposal conference for the Hilfiker Wall project in Sault Ste Marie, MI I believe you mentioned something about there being a IRA supplier map for EPD compliant materials. Are you able to share a link or send me this?
A. Here is the IRA website which I believe is open to the public.
https://sites.google.com/gsa.gov/irapmo/memos-guidance-legislation/guidance/le c-outreach?authuser=0
Here is the link to the LEC crosswalk which can help locate qualified material suppliers. for the IRA program.
https://drive.google.com/drive/u/0/folders/1fGv0YPeOsYZCAA9CkmLr43Vy8Js4k
UMW
2. Q. Please clarify the engineer’s expectation for the new facing walls. Are the Plaza Walls to be formed and cast in place concrete or constructed using pneumatically applied shotcrete? The current plans refer to both formed concrete as well as shotcrete construction of the walls.
A. Formed and Cast in place concrete is the expectation for the finished facing of the walls.
3. Q. Plan sheet C301, detail 1 Wall Section, note “Remove Corrosion Product From WWM Via Abrasive Media Blast Or Approved Equivalent”. Please clarify what this comment means in preparation of the existing mesh wall face and the extents of any preparation of the existing wire basket facing. Please provide a metal prep specification to the type/extent of media blasting to an industry standard.
A.This item has been removed and is no longer required. See Addendum 1 drawings.
https://sites.google.com/gsa.gov/irapmo/memos-guidance-legislation/guidance/lec-outreach?authuser=0 https://sites.google.com/gsa.gov/irapmo/memos-guidance-legislation/guidance/lec-outreach?authuser=0 https://drive.google.com/drive/u/0/folders/1fGv0YPeOsYZCAA9CkmLr43Vy8Js4kUMW https://drive.google.com/drive/u/0/folders/1fGv0YPeOsYZCAA9CkmLr43Vy8Js4kUMW
4. Q. Plan sheet C302, detail 3 Assumed (E) Concrete Pavement Section, could you please provide the MDOT Standard Plan R-45-C. This is not available with the rest of the standard plates on MDOT’s website.
A.See Addendum 1 drawings for revisions to concrete pavement.
5. Q. Plan sheet C301, detail 4 – Bottom of Facing. Please provide details on what is to happen when there is not enough space (1.23’ min. from most protruding mesh bulge) behind the existing curb and gutter. Based on our site visit photos there are several sections of the walls with conflicts. In addition, there is a conflict with an existing catch basin on the alignment – please clarify.
A.Remove and replace curb and gutter as required to install new wall facing footing. See Addendum 1 drawings for more information and for catch basins.
6. Q. The existing Hilfiker Wall facing is irregular vertically and horizontally along its alignment. Is the new wall to “straighten out” the horizontal alignment or is the contractor to best fit the wall as it weaves in and out on the horizontal?
A.Design intent is for the wall face to follow the alignment of the existing barrier wall above the Hilfiker Wall. This will result in non-uniform thickness of concrete in the new facing. In localized areas around soil nails where WWM bulges would require thicker concrete than would otherwise be necessary, WWM may be cut to allow for nail head clearances. The contractor shall ensure localized cutting of WWM, if any, does not result in instability of Hilfiker Wall until new concrete wall facing is installed and cured.
7. Q. Can the required full-time project coordinator have other duties?
A. Yes
8. Q. Is the Safety & Health Officer required to be on site full time? Can they have other duties?
A. They should be on site full time. They can have other duties
9. Q. Is the Waste Management Coordinator a full-time on-site person with dedicated duties?
A.They can have other duties. Does not need to be a dedicated individual.
A
B
C
D
E
F
A
B
C
D
E
F
DescriptionMark Date
Project No.
Date
Drawn
Checked
Scale
Sheet Title
Sheet No.C op yr ig ht
4.
A ll rig ht s r es er ve d.
N o pa rt of th is d oc um en t m ay b e re pr od uc ed in a ny fo rm o r b y an y m ea ns w ith ou t pe rm is si on fr om W is s, Ja nn ey , E ls tn er A ss oc ia te s, In c.
(W
JE
W
JE
d is cl ai m s a ny re sp on si bi lit y fo r i ts u na ut ho riz ed u se
Pl ot te d:
0/
/2
1:
P M b y
C ar ro ll, D on al d
F ile
N am e:
P
:\2
0\
.4 xx x\
.4
7.
H
SA
U
LT
S
TE
. M A
R
IE
B O
R D
ER
S
TA
TI
O N
C
D S
(D C
C )\D ra w in gs
\2
0.
.H
_S au lt St e, M ar ie
B or de r S ta tio n D ra w in gs
_R 2.
dw g
THIS SHEET PLOTS FULL SIZE
AT 24x36 (INCHES)
0 1/2" 1" 2"
G001
AS NOTED
1 05/22/24 LEC REQUIREMENTS
COVER SHEET &
GENERAL NOTES
2020.4797.H
Sault Ste. Marie Border Station
Retaining Wall Repairs 900 International Bridge
Plaza, Sault Ste. Marie, Michigan
U.S. General Services Administration
230 South Dearborn Street, 33rd Floor, Chicago, Illinois
Project
Client
Consultants
Headquarters & Laboratories: Northbrook, Illinois Atlanta | Austin | Boston | Chicago | Cleveland | Dallas | Denver | Detroit Honolulu | Houston | Los Angeles | Minneapolis | New Haven | New York
Philadelphia | Princeton | San Francisco | Seattle | South Florida | Washington, D.C.
Wiss, Janney, Elstner Associates, Inc.
3609 South Wadsworth Boulevard, Suite 400
Lakewood, Colorado 80235
303.914.4300 tel | 303.914.3000 fax www.wje.com
ENGINEERS
ARCHITECTS
MATERIALS SCIENTISTS
5 JANUARY, 2024
CRS/JW
DCC/DRH
Sault Ste. Marie Border Station Retaining Wall Repairs Project: Sault Ste. Marie
Border Station - Retaining Wall Repairs 900 International Bridge Plaza Sault Saint Marie, Michigan 49783
Client: U.S. .General Services Administration 230 South Dearborn Street, 33rd Floor Chicago, Illinois 60604
Engineer: Wiss, Janney, Elstner Associates, Inc.
3609 South Wadsworth Blvd, Suite 400 Lakewood, Colorado 80235
303.914.4300 tel | 303.914.3000 fax www.wje.com
N
1 SCALE: NTS
PROJECT MAP
TRUE
INDEX TO DRAWINGS:
G001 COVER SHEET & GENERAL NOTES
G002 GENERAL NOTES
C101 PLANS
C201 WALL ELEVATION
C202 WALL ELEVATION & CONCRETE
REPAIR DETAILS
C301 DETAILS
C302 DETAILS
ABBREVIATIONS:
B.O. BOTTOM OF
C.J. CONTROL JOINT
CL CENTERLINE
CLR CLEAR
CONC CONCRETE
CONT CONTINUOUS
E.J. EXPANSION JOINT
EL ELEVATION
(E) EXISTING
EQ EQUAL
FV FIELD VERIFY
HORIZ HORIZONTAL
LOC LOCATION
LF LINEAL FEET
MAX MAXIMUM
MBC MICHIGAN BUILDING CODE
MIN MINIMUM
MRCEB MICHIGAN REHABILITATION
CODE FOR EXISTING BUILDINGS
(N) NEW
NTS NOT TO SCALE
OC ON CENTER
PED PEDESTRIAN
PL PLATE
RE REFERENCE
REQ'D REQUIRED
S.O.G. SLAB-ON-GROUND
SIM SIMILAR
STA STATION
T.O. TOP OF
TYP TYPICAL
VERT VERTICAL
WWR WELDED WIRE REINFORCING
w/ WITH
GENERAL NOTES
THE WORK CONSISTS OF REPAIRS TO SELECT SITE RETAINING WALLS TO ADDRESS CONCERNS
WITH THE STABILITY OF THE EXPOSED WALL FACING AND TO ADDRESS POTENTIAL CORROSION OF THE BURIED STEEL REINFORCING ELEMENTS. REPAIRS CONSIST OF INSTALLATION OF NEW SOIL
NAILS INTO THE REINFORCED EARTH FILL AND APPLICATION OF NEW SHOTCRETE FACING TO
ENCASE THE EXISTING WALL FACE. AS PART OF THIS WORK SELECT AREAS OF PAVEMENT WILL BE
REMOVED AND REPLACED TO PROVIDE POSITIVE DRAINAGE ABOVE THE WALL, AND CONCRETE
REPAIRS MADE TO THE BARRIER WALL.
CONTRACTOR TO DEVELOP AND SUBMIT TO OWNER FOR REVIEW/APPROVAL AN MDOT
CONFORMING TRAFFIC CONTROL PLAN.
PROJECT DESCRIPTION
A. DRAWINGS AND ASSOCIATED SPECIFICATIONS (REFERRED TO IN GENERAL AS THE
CONSTRUCTION DOCUMENTS) APPLY ONLY TO THE SPECIFIC PROJECT IDENTIFIED IN
TITLEBLOCK, AND SHALL NOT BE USED FOR ANY OTHER PURPOSE WITHOUT SPECIFIC WRITTEN
CONSENT OF ENGINEER, ENGINEER'S SUB-CONSULTANTS, AND OWNER. ANY UNAUTHORIZED USE
OF ENGINEER'S WORK PRODUCT SHALL BE AT USER'S SOLE RISK AND USER SHALL INDEMNIFY
ENGINEER AGAINST ANY LIABILITY OR LEGAL EXPOSURE RELATED TO THE UNAUTHORIZED USE.
B. DRAWINGS AND SPECIFICATIONS ARE COMPLEMENTARY, ARE TO BE TAKEN AS A WHOLE, AND
SHOULD INCLUDE SUFFICIENT INFORMATION NECESSARY FOR THE EXECUTION AND COMPLETION
OF THE WORK IN A MANNER CONSISTENT WITH THE DESIGN INTENT. IN THE ABSENCE OF
EXPLICIT OR REASONABLY INFERABLE INFORMATION ON DRAWINGS OR IN SPECIFICATIONS,
PROMPTLY SEEK CLARIFICATION FROM ENGINEER AS A REQUEST FOR INFORMATION.
C. CONTRACTOR IS SOLELY RESPONSIBLE FOR INITIATING, MAINTAINING, AND SUPERVISING ALL
SAFETY PRECAUTIONS AND PROGRAMS IN CONNECTION WITH THE PERFORMANCE OF THE
WORK. ENGINEER HAS NO SUCH RESPONSIBILITIES BEYOND ITS OWN EMPLOYEES.
F. IN AN EMERGENCY AFFECTING SAFETY OF PERSONS OR PROPERTY, ACT TO PREVENT OR STOP
FURTHER DAMAGE, INJURY, OR LOSS.
G. IF A HAZARDOUS MATERIAL OR SUBSTANCE NOT ADDRESSED IN THE CONSTRUCTION
DOCUMENTS IS ENCOUNTERED, IMMEDIATELY STOP WORK IN AFFECTED AREA AND NOTIFY
OWNER AND ENGINEER OF THE CONDITION.
H. TEMPORARILY RELOCATE AND RESTORE EXISTING EQUIPMENT AND APPURTENANCES (WHETHER
OR NOT SHOWN ON THE DRAWINGS) THAT OBSTRUCT ACCESS TO PORTIONS OF THE WORK.
NOTIFY AND COORDINATE WITH OWNER PRIOR TO DOING SO.
I. DEVELOP, IMPLEMENT, ERECT, AND MAINTAIN SAFEGUARDS TO PREVENT DAMAGE, INJURY, OR
LOSS RESULTING FROM THE WORK TO (A) WORKERS, OCCUPANTS, PASSERS-BY, AND OTHER
PERSONS; (B) IN-PROGRESS WORK, MATERIALS, AND EQUIPMENT UNDER CARE, CUSTODY, AND
CONTROL OF THE CONTRACTOR (WHETHER ON OR OFF SITE); AND (C) OTHER PROPERTY AT THE
SITE OR ADJACENT THERETO NOT DESIGNATED AS PART OF THE WORK FOR REMOVAL,
RELOCATION, OR REPLACEMENT. IN THE EVENT OF DAMAGE, INJURY, OR LOSS, PROMPTLY
NOTIFY ENGINEER AND OWNER AND PRESENT PROPOSED REMEDY. ALL DAMAGE TO THESE
ELEMENTS MUST BE REPAIRED TO THE SATISFACTION OF THE OWNER.
J. PROMPTLY CORRECT WORK REJECTED BY ENGINEER OR FAILING TO CONFORM TO
REQUIREMENTS OF THE CONSTRUCTION DOCUMENTS. ASSOCIATED COSTS (INCLUDING
ADDITIONAL TESTING OR INSPECTIONS, COST OF UNCOVERING AND CORRECTION, AND
COMPENSATION FOR ENGINEER'S SERVICES AND EXPENSES MADE NECESSARY THEREBY) SHALL
BE THE CONTRACTOR'S RESPONSIBILITY.
K. DIMENSIONS, QUANTITIES, AND GEOMETRIES PROVIDED FOR EXISTING CONSTRUCTION ARE
BASED ON ORIGINAL DRAWINGS AND LIMITED FIELD DOCUMENTATION BY ENGINEER. FIELD
VERIFY APPLICABLE INFORMATION PRIOR TO SUBMITTING A BID, ORDERING MATERIALS, OR
OTHERWISE COMMITTING RESOURCES TO THE WORK. PROVIDED DIMENSIONS TAKE
PRECEDENCE OVER SCALED DIMENSIONS. DIMENSIONS OF THE NEW CONSTRUCTION SHALL BE
ADJUSTED AS NECESSARY TO FIT THE EXISTING CONDITIONS. THE ENGINEER SHALL BE NOTIFIED
IN WRITING OF ANY SIGNIFICANT DEVIATIONS FROM THE DIMENSIONS OR CONDITIONS SHOWN
ON THESE DRAWINGS THAT WOULD NEGATIVELY IMPACT THE DESIGN.
L. DRAWINGS ILLUSTRATE THE COMPLETED WORK WITH ELEMENTS IN THEIR FINAL INTENDED
POSITIONS. PROVIDE SHORING, BRACING, SUPPORT, AND SEQUENCE WORK AS REQUIRED TO
MAINTAIN THE STRUCTURAL INTEGRITY OF NEW OR EXISTING CONSTRUCTION DURING THE
WORK.
M. CONTRACTOR IS SOLELY RESPONSIBLE FOR, AND SHALL HAVE SOLE CONTROL OVER,
CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES, AND PROCEDURES, AND FOR
COORDINATING ALL PORTIONS OF THE WORK. ENGINEER HAS NO SUCH RESPONSIBILITIES.
SPECIFIC INSTRUCTION THAT MAY BE GIVEN IN CONSTRUCTION DOCUMENTS CONCERNING
CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES, OR PROCEDURES SHALL NOT
RELIEVE CONTRACTOR OF ITS RESPONSIBILITY FOR CONTROL AND COORDINATION.
L. PROVIDE LABOR, MATERIALS, EQUIPMENT, SUPERVISION, AND COORDINATION DIRECTLY AND
INCIDENTALLY NECESSARY TO PERFORM THE WORK IN ACCORDANCE WITH CONSTRUCTION
DOCUMENTS.
M. PROMPTLY REPORT TO ENGINEER AS A REQUEST FOR INFORMATION KNOWN OR SUSPECTED
ERRORS, INCONSISTENCIES, OR OMISSIONS WITHIN OR BETWEEN CONSTRUCTION DOCUMENTS,
AS WELL AS KNOWN OR SUSPECTED VARIANCE OF THE CONSTRUCTION DOCUMENTS FROM
EXISTING CONDITIONS. AWAIT DIRECTION FROM ENGINEER PRIOR TO PROCEEDING WITH WORK.
FOR BIDDING PURPOSES ONLY, AND UNLESS OTHERWISE DIRECTED BY ENGINEER, THE MORE
STRINGENT REQUIREMENT OR BETTER QUALITY SHALL TAKE PRECEDENCE AS DETERMINED BY
ENGINEER.
N. ACTIVITIES OR DUTIES OF ENGINEER, OR TESTS, INSPECTIONS, OR APPROVALS REQUIRED OR
PERFORMED BY THIRD PARTIES SHALL NOT RELIEVE CONTRACTOR OF ITS OBLIGATION TO
PERFORM THE WORK IN ACCORDANCE WITH CONSTRUCTION DOCUMENTS.
O. SECURE AND PAY FOR ALL PERMITS, FEES, LICENSES, AND INSPECTIONS BY GOVERNMENT
AGENCIES NECESSARY FOR PROPER AND COMPLIANT EXECUTION AND COMPLETION OF THE
WORK. CONTRACTOR SHALL BE PROPERLY LICENSED TO PERFORM THE SPECIFIED WORK.
P. COMPLY WITH AND GIVE NOTICES REQUIRED BY LAWS, STATUTES, ORDINANCES, CODES, RULES
AND REGULATIONS, AND LAWFUL ORDERS OF AUTHORITIES HAVING JURISDICTION APPLICABLE
TO THE WORK.
Q. THE WORK WILL BE PERFORMED AT AN OCCUPIED AND OPERATIONAL FACILITY. COORDINATE
CONSTRUCTION ACTIVITIES AND PROCEDURES WITH OWNER TO (A) MAINTAIN UNOBSTRUCTED
EXISTING MEANS OF EGRESS FROM FACILITY; (B) COMPLY WITH FACILITY'S EXISTING SECURITY
PROCEDURES AND REQUIREMENTS; AND (C) PROVIDE NOT LESS THAN 48 HOURS ADVANCE
NOTICE TO AND GAIN APPROVAL FROM OWNER PRIOR TO CONSTRUCTION ACTIVITIES THAT WILL
DISRUPT NORMAL USE OF FACILITY (INCLUDING EXCEPTIONAL NOISE AND/OR VIBRATIONS,
UNCONTROLLED DUST, OBTRUSIVE ODORS, OR INTERRUPTIONS OF UTILITIES). WORK NOT
COORDINATED AND APPROVED IN ADVANCE THAT DISRUPTS THE NORMAL USE OF THE FACILITY
MAY BE STOPPED UNTIL PROPER COORDINATION AND APPROVAL IS ACHIEVED. CONTRACTOR
SHALL BE RESPONSIBLE FOR ANY COSTS INCURRED AS A CONSEQUENCE OF STOPPAGE.
R. COORDINATE LOCATIONS OF ON-SITE STORAGE OF MATERIALS AND EQUIPMENT WITH OWNER SO
AS TO NOT UNREASONABLY ENCUMBER FACILITY OR SITE. DO NOT ALLOW CONSTRUCTION
MATERIALS, EQUIPMENT, OR PROCEDURES TO OVERLOAD OR EXCEED THE STRUCTURAL
CAPACITY OF EXISTING CONSTRUCTION TO REMAIN, PARTIALLY COMPLETED WORK, OR
COMPLETED WORK. MAKE INSPECTIONS AND/OR PERFORM ANALYSES AND TESTS NECESSARY
TO VERIFY THAT EXISTING ELEMENTS HAVE ADEQUATE CAPACITY TO SUPPORT PROPOSED
CONSTRUCTION LOADS.
PROJECT LOCATION:
SAULT STE. MARIE
BORDER STATION
W. PORTAGE AVE.
I-7 5 (
NORTH
I-7 5 (
SOUTH
SA
U
LT
S
TE
M
AR
IE
IN
TE
R N
AT
IO
N
AL
B R
ID
G
E
PECK ST.
EUREKA ST.
SHERIDAN DR.
CIRCLE DR.
M
ER
ID
IA
N S
T.
SO
UTH
S T.
ASHMUN
BAY
ST MARYS RIVER
DESIGN PROVISIONS
1. CODES AND STANDARDS
- 2015 MICHIGAN BUILDING CODE (MBC)
- 2015 MICHIGAN REHABILITATION CODE FOR EXISTING BUILDINGS (MRCEB)
- SOIL NAIL WALLS REFERENCE MANUAL, BY FEDERAL HIGHWAY ADMINISTRATION, FEBRUARY
2015 (FHWA GEC 007)
2. LIVE LOADS:
- 250 PSF SURCHARGE ABOVE RETAINING WALLS
3. SOIL PROPERTIES ASSUMED IN THE DESIGN ARE TAKEN FROM THE ORIGINAL RETAINING WALL
DRAWINGS BY MACINTOSH ENGINEERING, DATED MAY 28, 2003, AND THE CONDITION
EXPLORATION AND STUDY - EXTERIOR PLAZA CONCRETE AND HILFIKER WALL, BY NTH
CONSULTANTS, OCTOBER 2017. WJE HAS NOT INDEPENDENTLY VERIFIED THE ACCURACY OF THIS
DATA.
- PROPERTIES OF RETAINED SOILS:
- FINE TO MEDIUM SAND WITH TRACE SILT
- UNIT WEIGHT = 120 PCF
- FRICTION ANGLE = 32 DEGREES
- COHESION = 0 PSF
- PROPERTIES OF FOUNDATION SOILS:
- UNIT WEIGHT = 120 PCF
- FRICTION ANGLE = 34 DEGREES
- COHESION = 0 PSF
- ALLOWABLE BEARING PRESSURE GREATER THAN 3,500 PSF
MATERIAL GRADES
CONCRETE / SHOTCRETE
1. CONCRETE SHALL BE NORMAL WEIGHT CONCRETE WITH TYPE IL CEMENT CONFORMING TO ASTM
C595, AND AGGREGATE CONFORMING TO ASTM C33. CONCRETE SHALL BE MIXED,
PROPORTIONED, CONVEYED, AND PLACED IN ACCORDANCE WITH ACI-301 AND MBC CHAPTER 19.
MIX DESIGNS SHALL CONFORM TO THE FOLLOWING REQUIREMENTS:
2. REINFORCING BARS SHALL BE ASTM A615-GRADE 60, UNLESS NOTED OTHERWISE. BARS THAT
ARE TO BE FIELD BENT OR WELDED SHALL BE ASTM A706-GRADE 60.
3. ALL CONTINUOUSLY THREADED REINFORCING BARS FOR SOIL NAILS SHALL BE ASTM A615-GRADE
80. ALL COUPLERS SHALL DEVELOP 100% OF THE YIELD STRENGTH OF THE BAR.
4. GROUT FOR SOIL NAILS SHALL BE A NEAT CEMENT (TYPE IL ASTM C595 OR TYPE I/II ASTM C150)
GROUT WITH A MAXIMUM WATER TO CEMENT RATIO OF 0.45, AND ACHIEVE A MINIMUM 28 DAY
COMPRESSIVE STRENGTH OF 5,000 PSI PER ASTM C109 (AASHTO T106).
QUALITY ASSURANCE
1. SPECIAL INSPECTION SHALL BE PERFORMED FOR THE WORK INDICATED BELOW. SPECIAL
INSPECTION SHALL BE PERFORMED IN ACCORDANCE WITH SECTIONS 110 AND 1704 OF THE MBC.
A QUALIFIED TESTING AGENCY APPROVED & RETAINED BY THE OWNER SHALL PERFORM ALL
OTHER SPECIAL INSPECTION. THE SPECIAL INSPECTOR SHALL FURNISH COPIES OF ALL
INSPECTION RESULTS TO THE OWNER, ENGINEER, AND CONTRACTOR.
a. THE CONTRACTOR SHALL NOTIFY THE SPECIAL INSPECTOR THAT THE WORK IS READY FOR
INSPECTION AT LEAST 24 HOURS BEFORE SUCH INSPECTION IS TO OCCUR. ALL WORK
REQUIRING SPECIAL INSPECTION SHALL REMAIN ACCESSIBLE AND EXPOSED UNTIL IT HAS
BEEN OBSERVED AND INDICATED TO BE IN CONFORMANCE BY THE SPECIAL INSPECTOR. THE
CONTRACTOR SHALL MAINTAIN JOBSITE COPIES OF ALL REPORTS SUBMITTED BY THE SPECIAL
INSPECTOR.
b. SPECIAL INSPECTION OF THE FOLLOWING TYPES OF CONSTRUCTION IS REQUIRED:
- CONCRETE CONSTRUCTION PER TABLE 1705.3
- SOILS PER TABLE 1705.6
- SOIL NAILS PER TABLE 1705.8 & NOTES THIS
SHEET
SPECIAL INSPECTIONS REQUIRE BOTH CONTINUOUS AND PERIODIC SITE VISITS BASED ON THE
WORK PERFORMED. FOR THIS PROJECT, CONTINUOUS INSPECTIONS SHALL BE PERFORMED
THROUGHOUT THE DURATION OF THE WORK IN PROGRESS. PERIODIC INSPECTIONS SHALL BE
PERFORMED NO LESS THAN ONCE PER WEEK.
2. STRUCTURAL OBSERVATION SHALL BE PERFORMED BY WJE IN ACCORDANCE WITH SECTION
1704.6 OF THE MBC FOR THE FOLLOWING BUILDING ELEMENTS:
- CONCRETE
- SOIL NAIL INSTALLATION
a. THE CONTRACTOR SHALL PROVIDE WJE 96 HOUR (MINIMUM) NOTICE TO SCHEDULE
APPROPRIATE SITE VISITS FOR STRUCTURAL OBSERVATION.
CONCRETE CONSTRUCTION PROVISIONS
1. CONCRETE PROTECTION FOR REINFORCEMENT (COVER) SHALL BE AS FOLLOWS, U.N.O. ON THE
PLANS:
- CONCRETE CAST AGAINST AND PERMANENTLY EXPOSED TO EARTH: 3"
- CONCRETE EXPOSED TO EARTH OR WEATHER (#5 AND SMALLER): 1.5"
- CONCRETE EXPOSED TO EARTH OR WEATHER (#6 AND LARGER): 2"
2. DETAIL BARS IN ACCORDANCE WITH THE LATEST EDITIONS OF ACI 315 AND ACI 318.
3. NO SPLICES OF REINFORCEMENT SHALL BE MADE AND NO WELDING TO REINFORCING SHALL BE
PERMITTED EXCEPT AS DETAILED OR AUTHORIZED BY THE STRUCTURAL ENGINEER. LAP
SPLICES, WHERE PERMITTED, SHALL BE A MINIMUM OF 60 BAR DIAMETERS. WELDED WIRE MESH
SHALL BE LAPPED AT LEAST 6 INCHES.
4. PROVIDE ALL ACCESSORIES NECESSARY TO SUPPORT REINFORCING BARS AT POSITIONS
SHOWN ON THE PLANS.
5. CONCRETE SHALL NOT HAVE CONSTRUCTION JOINTS IN A HORIZONTAL PLANE. ANY STOP IN
CONCRETE WORK MUST BE MADE AT VERTICAL BULKHEADS CENTERED BETWEEN SOIL NAILS,
UNLESS OTHERWISE SHOWN. CONTRACTOR SHALL SUBMIT PROPOSED LOCATIONS OF
CONSTRUCTION JOINTS IF ALTERNATIVE LOCATIONS ARE DESIRED. ALL CONSTRUCTION JOINTS
SHALL BE AS DETAILED OR AS APPROVED BY THE ENGINEER.
6. SAWN JOINTS IN SLABS ON GROUND SHALL EXTEND OR MATCH EXISTING AND SHALL BE MADE AS
SOON AS POSSIBLE WITHOUT CAUSING DAMAGE TO THE SURFACE.
LOCATION 28 DAY
STRENGTH
MAXIMUM
W/C RATIO
SLUMP (IN) % AIR
ALL 5,000 0.40 5-7 RE: SPECS
LOAD STEP LOAD VALUE
1 AL
2 0.25 DL
3 0.50 DL
4 0.75 DL
5 1.00 DL
6 1.25 DL
1.50 DL (CREEP
TEST)
8 1.75 DL
9 2.00 DL
10 AL
LOAD STEP LOAD VALUE
1 AL
2 0.25 DL
3 0.50 DL
4 0.75 DL
5 1.00 DL
1.25 DL (CREEP
TEST)
7 1.50 DL
8 AL
GENERAL NOTES
SOIL NAIL PROVISIONS
SOIL NAIL INSTALLATION REQUIREMENTS
1. INSTALLATION TOLERANCES:
- WALL STATION AND ELEVATION: 3” IN ANY DIRECTION ON THE PLANE OF THE WALL
2. CONTRACTOR SHALL SUBMIT PROPOSED DRILLING AND GROUTING PROCEDURES TO ENGINEER
FOR REVIEW PRIOR TO MOBILIZATION ON SITE. THE CONTRACTOR IS RESPONSIBLE FOR
UTILIZING DRILLING AND GROUTING METHODS FOR ANTICIPATED GROUND CONDITIONS, THE
REQUIREMENTS OF THE DRAWINGS, AND THAT WILL NOT CAUSE DAMAGE TO THE STRUCTURE.
3. IMMEDIATELY AFTER COMPLETION OF DRILLING AND ACCEPTANCE BY INDEPENDENT TESTING AGENCY, THE REINFORCING SHALL BE INSTALLED AND NAIL SHALL BE GROUTED IN CONJUNCTION
WITH THE CONTRACTOR'S SUBMITTED INSTALLATION PLAN.
4. CONTRACTOR TO PREPARE AND SUBMIT TO ENGINEER FULL-LENGTH INSTALLATION RECORDS
FOR EACH SOIL NAIL INSTALLED. RECORD SHALL AT A MINIMUM INCLUDE: SOIL NAIL IDENTIFIER, DRILL HOLE DIAMETER, TOTAL LENGTH, DIP ANGLE, INSTALLATION DATE, START TIME OF
DRILLING AND GROUTING, TIME OF PILE COMPLETION, AND VOLUME OF GROUT PLACED IN NAIL.
SOIL NAIL VERIFICATION TESTING
1. CONTRACTOR SHALL INSTALL ONE PRE-PRODUCTION SACRIFICIAL VERIFICATION SOIL NAIL ON
THE WALL FACE USING THE SAME INSTALLATION METHODS INTENDED FOR USE IN THE
PRODUCTION NAILS. VERIFICATION TEST NAIL SHALL NOT BE TESTED UNTIL AT LEAST THREE DAYS AFTER INSTALLATION. LOCATE SACRIFICIAL NAIL A MINIMUM OF 2'-0" (HORIZONTAL AND
VERTICAL) FROM PRODUCTION NAIL LOCATIONS. SUBMIT PROPOSED TEST LOCATION TO OWNER
FOR REVIEW AND APPROVAL. CONTRACTOR SHALL BE RESPONSIBLE FOR DESIGNING REACTION
BLOCK FOR NAIL ON EXISTING WALL FACE.
2. VERIFICATION TEST FOR 12' LONG SOIL NAIL (6 FT BONDED LENGTH) SHALL BE PERFORMED IN
GENERAL CONFORMANCE WITH THE METHODS DESCRIBED IN CHAPTER 9 OF THE FHWA SOIL
NAIL WALLS REFERENCE MANUAL (FHWA GEC 007) PER THE FOLLOWING LOAD SEQUENCE. EACH
LOAD STEP SHALL BE HELD FOR AT LEAST 10 MINUTES, EXCEPT FOR LOAD STEP 7 (CREEP TEST), WHICH SHALL BE HELD FOR 60 MINUTES.
AL = ALIGNMENT LOAD
DL = DESIGN LOAD = 10PSI BOND STRESS OVER BONDED PORTION OF
SACRIFICIAL NAIL
3. TEST ACCEPTANCE CRITERIA ARE:
- PULLOUT DOES NOT OCCUR
- TOTAL MOVEMENT AT LOAD STEP 10 EXCEEDS 80 PERCENT OF THE THEORETICAL ELASTIC
ELONGATION OF THE UNBONDED LENGTH.
- MOVEMENT DURING THE CREEP PORTION OF THE TEST: 1)DOES NOT EXCEED 0.04 INCHES
BETWEEN THE 1 AND 10 MINUTE READINGS, 2) DOES NOT EXCEED 0.08 INCHES BETWEEN THE 6
AND 60 MINUTE READINGS, AND 3) IS LINEAR OR DECREASING THROUGHOUT THE LOAD-HOLD
PERIOD.
4. IF SACRIFICIAL NAIL FAILS TO MEET ANY OF THE ABOVE CRITERIA, THE TEST WILL BE
CONSIDERED TO HAVE FAILED. IF FAILURE OCCURS, AT NO ADDITIONAL COST TO THE OWNER, THE CONTRACTOR SHALL REVISE INSTALLATION METHODS AND REPEAT VERIFICATION TEST
UNTIL PASSING RESULTS ARE ACHIEVED.
SOIL NAIL PROOF TESTING
1. PROOF TESTING SHALL BE PERFORMED ON (4) SOIL NAILS AS CHOSEN BY THE ENGINEER DURING
CONSTRUCTION. (2) SOIL NAILS WILL BE TESTED ON EACH WALL. PROOF TESTS SHALL NOT BE
PERFORMED SOONER THAN 3 DAYS AFTER NAIL INSTALLATION.
2. PROOF TESTS SHALL BE PERFORMED IN GENERAL CONFORMANCE WITH THE METHODS
DESCRIBED IN CHAPTER 9 OF FHWA GEC 007 PER THE FOLLOWING LOAD SEQUENCE. EACH LOAD STEP SHALL BE HELD FOR UNTIL STABILIZED (AT LEAST 3 MINUTES), EXCEPT FOR LOAD STEP 6
(CREEP TEST), WHICH SHALL BE HELD FOR 60 MINUTES.
AL = ALIGNMENT LOAD
DL = DESIGN LOAD = 10 KIPS FOR Ln=12'
15 KIPS FOR Ln=15'
3. TEST ACCEPTANCE CRITERIA ARE:
- PULLOUT DOES NOT OCCUR
- MOVEMENT DURING THE CREEP PORTION OF THE TEST: 1)DOES NOT EXCEED 0.04 INCHES
BETWEEN THE 1 AND 10 MINUTE READINGS, 2) DOES NOT EXCEED 0.08 INCHES BETWEEN THE 6
AND 60 MINUTE READINGS, AND 3) IS LINEAR OR DECREASING THROUGHOUT THE LOAD-HOLD
PERIOD.
4. IF SOIL NAIL FAILS TO MEET ANY OF THE ABOVE CRITERIA, THE TEST WILL BE CONSIDERED TO HAVE FAILED. IF FAILURE OCCURS, AT NO ADDITIONAL COST TO THE OWNER, THE CONTRACTOR SHALL OFFER WRITTEN OPTION AS TO THE CAUSE OF THE FAILED TEST AND PROPOSE REVISED
INSTALLATION METHODS TO PROVIDE CONFORMING RESULTS. OWNER MAY ELECT TO REQUIRE A
NEW SACRIFICIAL VERIFICATION TEST USING THE REVISED INSTALLATION METHODS PRIOR TO
CONTINUING WITH INSTALLATION OF PRODUCTION NAILS.
A
B
C
D
E
F
A
B
C
D
E
F
DescriptionMark Date
Project No.
Date
Drawn
Checked
Scale
Sheet Title
Sheet No.C op yr ig ht
4.
A ll rig ht s r es er ve d.
N o pa rt of th is d oc um en t m ay b e re pr od uc ed in a ny fo rm o r b y an y m ea ns w ith ou t pe rm is si on fr om W is s, Ja nn ey , E ls tn er A ss oc ia te s, In c.
(W
JE
W
JE
d is cl ai m s a ny re sp on si bi lit y fo r i ts u na ut ho riz ed u se
Pl ot te d:
0/
/2
1:
P M b y
C ar ro ll, D on al d
F ile
N am e:
P
:\2
0\
.4 xx x\
.4
7.
H
SA
U
LT
S
TE
. M A
R
IE
B O
R D
ER
S
TA
TI
O N
C
D S
(D C
C )\D ra w in gs
\2
0.
.H
_S au lt St e, M ar ie
B or de r S ta tio n D ra w in gs
_R 2.
dw g
THIS SHEET PLOTS FULL SIZE
AT 24x36 (INCHES)
0 1/2" 1" 2"
G002
AS NOTED
GENERAL NOTES
2020.4797.H
Sault Ste. Marie Border Station
Retaining Wall Repairs 900 International Bridge
Plaza, Sault Ste. Marie, Michigan
U.S. General Services Administration
230 South Dearborn Street, 33rd Floor, Chicago, Illinois
Project
Client
Consultants
Headquarters & Laboratories: Northbrook, Illinois Atlanta | Austin | Boston | Chicago | Cleveland | Dallas | Denver | Detroit Honolulu | Houston | Los Angeles | Minneapolis | New Haven | New York
Philadelphia | Princeton | San Francisco | Seattle | South Florida | Washington, D.C.
Wiss, Janney, Elstner Associates, Inc.
3609 South Wadsworth Boulevard, Suite 400
Lakewood, Colorado 80235
303.914.4300 tel | 303.914.3000 fax www.wje.com
ENGINEERS
ARCHITECTS
MATERIALS SCIENTISTS
22 MAY, 2024
DRH
DCC
GENERAL NOTES
INFLATION REDUCTION ACT (IRA) MATERIAL AND SUBMITTAL
REQUIREMENTS
THIS PROJECT IS FUNDED BY THE INFLATION REDUCTION ACT (IRA), PUB. L. NO. 117-169, ENACTED AUGUST 2022. AS SUCH, THERE ARE SPECIFIC MATERIAL AND SUBMITTAL REQUIREMENTS FOR THIS PROJECT THAT ARE STIPULATED BY THE IRA FOR USE OF LOW EMBODIED CARBON (LEC) MATERIALS INCLUDING CONCRETE, CEMENT, ASPHALT, AND REINFORCING STEEL. SPECIFIC MATERIAL AND
SUBMITTAL REQUIREMENTS ARE INDICATED BELOW. SEE SPECIFICATION SECTION 01 33 00 -
SUBMITTAL PROCEDURES FOR ADDITIONAL INFORMATION.
THE CONTRACTOR SHALL SUBMIT GSA'S IRA POST AWARD ALLOCATION FORM, WITHIN 20 DAYS OF
CONTRACT AWARD.
SUBMITTAL REQUIREMENTS
PROVIDE UPDATED DATA CALLED FOR BY IRA D&C SUBMITTAL: CONTRACT REPORTING FORM
(CONSTRUCTION TEAM SECTION). SPECIFICALLY, FOR EACH IRA ELIGIBLE MATERIAL FURNISHED
UNDER THE CONTRACT, REPORT:
1. ENVIRONMENTAL PRODUCT DECLARATION (EPD) COMPLIANT WITH THE COMPLIANCE
DOCUMENTATION CRITERIA LISTED FOR EACH IRA-ELIGIBLE MATERIAL IN GSA'S ASPHALT,
CONCRETE (AND CEMENT), AND STEEL REQUIREMENTS;
2. EPD-REPORTED GWP, IN KILOGRAMS OF CARBON DIOXIDE EQUIVALENT (kgCO2e) PER UNIT OF
MATERIAL;
3. PRODUCT CATEGORY RULE (PCR) IDENTIFIED ON THE EPD;
4. IRA LIMIT COMMITMENT SPECIFIED IN THE CONTRACT;
5. TOTAL QUANTITY BEING INSTALLED (E.G., FROM BILL OF MATERIALS); AND
6. FOR CONCRETE, CEMENT, AND STEEL:
6.1. THE ENERGY STAR ENERGY PERFORMANCE SCORE(S) FOR PLANTS PRODUCING SUPPLY
CHAIN MATERIALS: CEMENT, AND STEEL FROM INTEGRATED STEEL MILLS;
6.2. THE MANUFACTURING PLANT NAME(S) AND LOCATION(S); AND
6.3. THE DATA PERIOD OF THE ENERGY PERFORMANCE SCORE(S) AT THE TIME OF PURCHASE.
PLEASE SEE "ENERGY STAR ENERGY PERFORMANCE SCORE EXPLAINED" THIS SHEET FOR
MORE INFORMATION.
PROVIDE A COMPLETED IRA D&C SUBMITTAL: CONTRACT REPORTING FORM REFLECTING ANY
NECESSARY UPDATES WITH EACH MONTHLY PAY APPLICATION.
LOW EMBODIED CARBON MATERIALS REQUIREMENTS
A. ACQUIRE AND INSTALL IRA-ELIGIBLE MATERIALS THAT ADHERE TO THE GLOBAL WARMING
POTENTIAL IRA LIMITS ESTABLISHED IN THE CONTRACT. IRA-ELIGIBLE MATERIALS SHALL BE
PURCHASED AND PROPERLY INSTALLED PER THE AGREEMENT, SCOPE OF WORK, DRAWINGS,
AND SPECIFICATIONS. UNLESS OTHERWISE SPECIFIED, ALL WORK REQUIRING USE OF MATERIALS WITH A CONTRACTUALLY-ESTABLISHED IRA LIMIT SHALL UTILIZE MATERIALS COMPLIANT WITH
THOSE LIMITS.
B. FOR EACH IRA-ELIGIBLE MATERIAL, THE CONTRACTOR SHALL PROVIDE SUBMITTALS OF
ENVIRONMENTAL PRODUCT DECLARATIONS (EPD) AND PRODUCT INFORMATION -- SEE DIVISION
ONE SPECIFICATION, SUBMITTAL PROCEDURES, 01 33 00.
C. IRA-ELIGIBLE MATERIAL SCOPE ITEM(S) SHALL BE INTEGRATED INTO THE PROJECT'S PHASING, SCHEDULING, REPORTING, AND SCOPE, TO SUPPORT OVERALL PROJECT GOALS.
D. LIMIT AREA OF DISTURBANCE OF WORK AREA FOR IRA-ELIGIBLE MATERIAL SCOPE ITEM(S) TO THE
MINIMUM PRACTICAL AREA. WORK AREA OR AREA OF DISTURBANCE SHALL BE RESTORED TO
PRE-PROJECT OR NEW CONDITION.
IRA MATERIAL REQUIREMENTS FOR STEEL
*GSA RECOGNIZES MERIT IN SEPARATE GWP LIMITS FOR INTEGRATED MILL AND ELECTRIC ARC FURNACE STEEL PRODUCTION METHODS IN THESE PRODUCT CATEGORIES. ONCE ADEQUATE DATA IS AVAILABLE (E.G., FROM EPDs), GSA PLANS TO DEVELOP AND ISSUE ONE OR MORE LIMITS FOR
MATERIALS MADE VIA INTEGRATED STEEL MILLS.
COMPLIANCE DOCUMENTATION FOR STEEL
1. A PRODUCT-SPECIFIC TYPE III (THIRD-PARTY VERIFIED) EPD THAT: (i) IS BASED ON PCRs USED TO
DEVELOP THESE LMIITS: UL'S PCR GUIDANCE FOR BUILDING-RELATED PRODUCTS AND SERVICES, PART B: DESIGNATED STEEL CONSTRUCTION EPD REQUIREMENTS (8/2020, VERSION 2.0) OR SCS
GLOBAL SERVICES' PCR FOR DESIGNATED STEEL CONSTRUCTION PRODUCTS (5/2015, VERSION
1.0); AND (ii) CONFORMS WITH ISO 14025 AND ISO 21930.
1.1. WHERE FEASIBLE, EPDs MUST ALSO RELY ON FACILITY-SPECIFIC DATA, INCLUDING FOR THE
SUPPLY CHAIN'S ASSOCIATED UNIT PROCESSES, SUCH AS FABRICATED STEEL'S UPSTREAM
STEEL MILL(S), RATHER THAN INDUSTRY OR MANUFACTURER AVERAGE DATA. IF AN EPD
CONTAINING FACILITY-SPECIFIC DATA FOR THE MATERIAL'S MOST GREENHOUSE-GAS
INTENSIVE PROCESSES ARE UNAVAILABLE, AN EPD WITHOUT SUCH DATA THAT MEETS
COMPLIANCE DOCUMENTATION CRITERIA (i) AND (ii) IS SUFFICIENT.
2. IF STEEL ORIGINATES FROM AN INTEGRATED STEEL MILL: ENERGY STAR PERFORMANCE SCORE
FOR SUPPLYING INTEGRATED STEEL MILL, THE MANUFACTURING PLANT NAME(S) AND
LOCATION(S), AND THE DATA PERIOD OF THE ENERGY PERFORMANCE SCORE(S) AT THE TIME OF
PURCHASE. PLEASE SEE "ENERGY STAR PERFORMANCE SCORE EXPLAINED" ON THIS SHEET FOR
MORE INFORMATION.
GSA IRA LIMITS FOR LOW EMBODIED CARBON STEEL - MAY 16, 2023
(EPD-REPORTED GWPs, IN KILOGRAMS OF CARBON DIOXIDE EQUIVALENT
PER METRIC TON - kgCO2E/t)
STEEL PRODUCT
CATEGORY TOP 20% LIMIT TOP 40% LIMIT BETTER THAN
AVERAGE LIMIT
REBAR (FABRICATED) 728 794 850
REBAR
(UNFABRICATED) 611 716 760
HOLLOW STRUCTURAL
SECTIONS
(FABRICATED)
1,778 1,854 1,898
HOLLOW STRUCTURAL
SECTIONS FROM
ELECTRIC ARC
FURNACES
(UNFABRICATED)
1,580 1,620 1,652
HOLLOW STRUCTURAL
SECTIONS FROM
INTEGRATED MILLS*
(UNFABRICATED)
TBD TBD TBD
HOT-ROLLED
SECTIONS
(FABRICATED)
1,022 1,128 1,163
HOT-ROLLED
SECTIONS
(UNFABRICATED)
686 713 869
COLD-FORMED AND
GALVANIZED (STUD,
TRACK, FRAMING, ETC.)
2,228 2,324 2,408
STRUCTURAL STEEL
PLATE FROM ELECTRIC
ARC FURNACES
(UNFABRICATED)
987 1,152 1,190
STRUCTURAL STEEL
PLATE FROM
INTEGRATED MILLS*
(UNFABRICATED)
TBD TBD TBD
IRA MATERIAL REQUIREMENTS FOR CONCRETE
WHERE PROVISION OF CONCRETE THAT QUALIFIES UNDER THESE GSA IRA LIMITS IS IMPRACTICAL, GSA'S IRA LIMITS FOR CEMENT MAY BE APPLIED TO THE CEMENT BEING USED IN THE CONCRETE MIX.
*"HIGH EARLY STRENGTH" IS CONCRETE THAT, THROUGH THE USE OF ADDITIONAL CEMENT,
HIGH-EARLY-STRENGTH CEMENT, OR ADMIXTURES, HAS ACCELERATED EARLY-AGE STRENGTH
DEVELOPMENT. HIGH EARLY STRENGTH CONCRETE PRODUCED USING ADDITIONAL CEMENT SHOULD BE AVOIDED WHERE POSSIBLE, DUE TO ITS HIGHER EMBODIED CARBON. AN AFFECTED PROJECT DELIVERY TEAM MUST OBTAIN WRITTEN APPROVAL FROM GSA'S IRA PMO ON WHETHER HIGH EARLY STRENGTH CONCRETE IS NECESSARY FOR TECHNICAL REASONS. THIS 30% ALLOWANCE REFLECTS
INPUT FROM BUILDING SUSTAINABILITY EXPERTS, GENERAL CONTRACTORS, ENGINEERS, AND
READY-MIX OR CEMENT PRODUCERS.
COMPLIANCE DOCUMENTATION FOR CONCRETE
1. A PRODUCT-SPECIFIC TYPE III (THIRD-PARTY VERIFIED) EPD THAT: (i) IS BASED ON PCRs USED TO
DEVELOP THESE LIMITS: NSF INTERNATIONAL'S PRODUCT CATEGORY RULE FOR CONCRETE
(8/2021, VERSION 2.1); AND (ii) CONFORMS WITH ISO 14025 AND ISO 21930.
1.1. WHERE FEASIBLE, EPDs MUST ALSO RELY ON FACILITY-SPECIFIC DATA, INCLUDING FOR THE
SUPPLY CHAIN'S ASSOCIATED UNIT PROCESSES, SUCH AS CONCRETE'S UPSTREAM CEMENT
PLANT, RATHER THAN INDUSTRY OR MANUFACTURER AVERAGE DATA. IF AN EPD CONTAINING
FACILITY-SPECIFIC DATA FOR THE MATERIAL'S MOST GREENHOUSE-GAS INTENSIVE
PROCESSES ARE UNAVAILABLE, AN EPD WITHOUT SUCH DATA THAT MEETS COMPLIANCE
DOCUMENTATION CRITERIA (i) AND (ii) IS SUFFICIENT.
2. ENERGY STAR ENERGY PERFORMANCE SCORE FOR SUPPLYING CEMENT PLANT, THE
MANUFACTURING PLANT NAME(S) AND LOCATION(S), AND THE DATA PERIOD OF THE ENERGY
PERFORMANCE SCORE(S) AT THE TIME OF PURCHASE. PLEASE SEE "ENERGY STAR
PERFORMANCE SCORE EXPLAINED" ON THIS SHEET FOR MORE INFORMATION.
IRA MATERIAL REQUIREMENTS FOR CEMENT
1. WHERE PROVISION OF CONCRETE THAT QUALIFIES UNDER THESE GSA IRA LIMITS IS PRACTICAL, GSA'S IRA LIMITS FOR LOW EMBODIED CONCRETE MUST BE USED.
2. WHERE PROVISION OF CONCRETE THAT QUALIFIES UNDER THESE GSA IRA LIMITS IS IMPRACTICAL, GSA'S IRA LIMITS FOR CEMENT MAY BE APPLIED TO THE CEMENT BEING USED IN THE CONCRETE
MIX.
2.1. A CONCRETE EPD ACCOUNTS FOR THE WHOLE MIX DESIGN, INCLUDING QUANTITATIVE
IMPACTS OF SPECIFIC CEMENTS, AGGREGATES, AND ADMIXTURES.
2.2. IF A CONCRETE EPD IS PROVIDED TO DEMONSTRATE COMPLIANCE, A CEMENT EPD DOES NOT
NEED TO BE SUBMITTED TO GSA. CEMENT IS AN INPUT INTO CONCRETE MIXES, AND ITS GWP
IS ACCOUNTED FOR IN THE CONCRETE EPD.
COMPLIANCE DOCUMENTATION FOR CEMENT
1. A PRODUCT-SPECIFIC TYPE III (THIRD-PARTY VERIFIED) EPD THAT: (i) IS BASED ON PCRs USED TO
DEVELOP THESE LMIITS: NSF INTERNATIONAL'S PRODUCT CATEGORY RULE FOR PORTLAND,
BLENDED, MASONRY, MORTAR, AND PLASTIC (STUCCO) CEMENTS (9/2021, VERSION 3.2; OR 5/2020, VERSION 3.0); AND (ii) CONFORMS WITH ISO 14025 AND ISO 21930.
1.1. WHERE FEASIBLE, EPDs MUST ALSO RELY ON FACILITY-SPECIFIC DATA, INCLUDING FOR THE
SUPPLY CHAIN'S ASSOCIATED UNIT PROCESSES, RATHER THAN INDUSTRY OR
MANUFACTURER AVERAGE DATA. IF AN EPD CONTAINING FACILITY-SPECIFIC DATA FOR THE
MATERIAL'S MOST GREENHOUSE-GAS INTENSIVE PROCESSES ARE UNAVAILABLE, AN EPD
WITHOUT SUCH DATA THAT MEETS COMPLIANCE DOCUMENTATION CRITERIA (i) AND (ii) IS
SUFFICIENT.
2. ENERGY STAR ENERGY PERFORMANCE SCORE FOR THE CEMENT PLANT, THE MANUFACTURING
PLANT NAME(S) AND LOCATION(S), AND THE DATA PERIOD OF THE ENERGY PERFORMANCE
SCORE(S) AT THE TIME OF PURCHASE. PLEASE SEE "ENERGY STAR PERFORMANCE SCORE
EXPLAINED" ON THIS SHEET FOR MORE INFORMATION.
IRA MATERIAL REQUIREMENTS FOR ASPHALT
COMPLIANCE DOCUMENTATION FOR ASPHALT
1. A PRODUCT-SPECIFIC TYPE III (THIRD-PARTY VERIFIED) EPD THAT: (i) IS BASED ON PCRs USED TO
DEVELOP THESE LMIITS: THE NATIONAL ASPHALT PAVING ASSOCIATION'S PRODUCT CATEGORY
RULE FOR ASPHALT MIXTURES, (4/2022, VERSION 2.0); AND (ii) CONFORMS WITH ISO 14025 AND ISO 21930.
1.1. WHERE FEASIBLE, EPDs MUST ALSO RELY ON FACILITY-SPECIFIC DATA, INCLUDING FOR THE
SUPPLY CHAIN'S ASSOCIATED UNIT PROCESSES, SUCH AS ASPHALT BINDER PRODUCTION,
RATHER THAN INDUSTRY OR MANUFACTURER AVERAGE DATA. IF AN EPD CONTAINING
FACILITY-SPECIFIC DATA FOR THE MATERIAL'S MOST GREENHOUSE-GAS INTENSIVE
PROCESSES ARE UNAVAILABLE, AN EPD WITHOUT SUCH DATA THAT MEETS COMPLIANCE
DOCUMENTATION CRITERIA (i) AND (ii) IS SUFFICIENT.
GSA IRA LIMITS FOR LOW EMBODIED CARBON CONCRETE - MAY 16, 2023
(EPD-REPORTED GWPs, IN KILOGRAMS OF CARBON DIOXIDE EQUIVALENT
PER CUBIC METER - kgCO2E/m3)
SPECIFIED CONCRETE
STRENGTH CLASS
(28-DAY COMPRESSIVE
STRENGTH [f'c] IN
POUNDS PER SQUARE
INCH)
TOP 20% LIMIT TOP 40% LIMIT BETTER THAN
AVERAGE LIMIT
5000 305 357 382
ADD 30% TO THESE NUMBERS FOR GWP LIMITS WHERE HIGH EARLY STRENGTH* CONCRETE MIXES
ARE REQUIRED FOR TECHNICAL REASONS.
GSA IRA LIMITS FOR LOW EMBODIED CARBON CEMENT - MAY 16, 2023 (EPD-REPORTED GWPs, IN KILOGRAMS OF CARBON DIOXIDE EQUIVALENT PER METRIC TON- kgCO2E/t)
TOP 20% LIMIT TOP 40% LIMIT BETTER THAN AVERAGE LIMIT
751 819 858
GSA IRA LIMITS FOR LOW EMBODIED CARBON ASPHALT - MAY 16, 2023 (EPD-REPORTED GWPs, IN KILOGRAMS OF CARBON DIOXIDE EQUIVALENT PER METRIC TON- kgCO2E/t)
TOP 20% LIMIT TOP 40% LIMIT BETTER THAN AVERAGE LIMIT
55.4 64.8 72
ENERGY STAR ENERGY PERFORMANCE SCORE EXPLAINED
A. ENERGY STAR ENERGY PERFORMANCE SCORES (EPS) SHOW HOW EFFICIENTLY A
MANUFACTURING PLANT USES ENERGY ON A 100-POINT SCALE. A SCORE OF 50 REFLECTS
AVERAGE PERFORMANCE, 1 SHOWS POOR PERFORMANCE, AND 100 REFLECTS HIGHEST
PERFORMANCE.
B. CONTRACTORS OBTAIN EPS'S BY REQUESTING PRODUCERS OF CEMENT, GLASS, ASPHALT MIX, AND STEEL (FROM INTEGRATED MILLS ONLY) TO PROVIDE THE SCORE. OR, CONTRACTORS MAY
REQUEST IT FROM MATERIAL SUPPLIERS (E.G., CONCRETE PRODUCERS).
C. MANUFACTURER'S OF CEMENT, GLASS, AND STEEL PRODUCE A PLANT'S SCORE BY INPUTTING 12
MONTHS OF ENERGY PRODUCTION DATA IN THE INDUSTRY-SPECIFIC ENERGY PERFORMANCE
INDICATOR (EPI) TOOL AVAILABLE AT WWW.ENERGYSTAR.GOV/EPIS. THE SCORE WILL SHOW ON
THE STATEMENT OF ENERGY PERFORMANCE SECTION OF THE EPI.
D. ENERGY PERFORMANCE SCORES CAN CURRENTLY BE PRODUCED FOR CEMENT, FLAT GLASS,
AND INTEGRATED STEEL MILLS. AN EPS FOR ASPHALT MIX PLANTS IS EXPECTED TO BE AVAILABLE BY SEPTEMBER 2023. EPA WILL NOTIFY GSA WHEN TO BEGIN REQUESTING ASPHALT MIX PLANT
SCORES.
SET T.O. CONC ELEV AT LEAST
42" BELOW T.O. GUARDRAIL
EXCEPT AT ENDS WHERE T.O.
CONC MUST MATCH (E)
ALIGN T.O. (N) SLAB WITH (E)
INTEGRAL TYPE B CURB,
VARY HEIGHT AS REQ'D
1" JOINT FILLER
(N) TYPE B2 CURB &
GUTTER, INCREASE
CURB HEIGHT AS REQ'D
DENOTES MDOT TYPE 'W'
SAWN CONTRACTION JOINT
IN (N) PAVING~RE: R-39-K ON
SHEET C302. USE EARLY
ENTRY SAWS AS REQUIRED
2% M
AX C
R
O
SS
SLO
PE N
O R
TH
O
F PAR
KIN
G
SPAC
ES
(N) CONC CURB
STOP, TYP OF 6
(N) TYPE E2 CURB,
SET T.O. CURB TO
MATCH (E) S.O.G.
& CURB
1" JOINT FILLER EA
END OF CURB
(N) PARKING
STRIPING
(N ) C
O N
C
PAVIN
G
; SEE
3/C
(N
) BITU
M
IN
O U
S PAVIN
G
TO
M
ATC
H (E), R
E: 2/C
302 FO
R
O R
IG
IN
AL AS-BU
ILT D
ETAIL
ALIGN T.O. (N) PAVEMENT
WITH T.O. (E)~TYP
(E) BITUMINOUS
PAVEMENT TO REMAIN
ALIGN T.O. (N)
SLAB WITH (E)
2" ISOLATION JOINT
WITH SEALANT AROUND
(E) COL, TYP OF 5
(N) 1" SQ. x 13" LONG PNA
DOWELS W/ CLIPS @ 12"
O.C., EMBED W/ EPOXY
TO EXISTING. INSTALL
AT MID DEPTH OF SLAB.
(N) 1" SQ. x 13" LONG PNA
DOWELS W/ CLIPS @ 12" O.C.,
EMBED W/ EPOXY TO
EXISTING. INSTALL AT MID
DEPTH OF SLAB.
DENOTES (N)
ELEVATION
CONTOUR
DENOTES (E)
ELEVATION CONTOUR
C302
TYP.
SAWCUT (E) CONC
(E) CANOPY FOUNDATION
TO REMAIN~TYP OF (7)
REMOVE (E) 10"(±) CONC PAVEMENT
AND CURBS AS SHOWN.
REMOVE (E) BITUMINOUS
PAVEMENT AS SHOWN
25'-0"
EDGE OF (E) CONC
CURB AND GUTTER
CUT EDGE APPROX
PARALLEL TO DRIVELANES
REMOVE (E) CONC
TO (E) JOINT
LOCATE SAWCUT
IN LINE W/ (E) CURB
95'-0"±
18'-0"±
REMOVE (E) CURB
AS SHOWN
(E) ELEVATION
CONTOUR
SAWCUT (E) BITUMINOUS
PAVEMENT AT PERIMETER
OR AREA TO BE REMOVED
ST
AR
T W
AL
L
PL
ST
A
0.
END W
ALL PL
STA 1+52.00
ST
AR
T W
AL
L
PR
ST
A 0+
0.
EN
D
W
AL
L
PR
ST
A
3+
.0
WALL PLAZA RIGHT (PR)
WALL PLAZA LEFT (PL)
'-0
" W
ID
E (M
IN
TR
AF
FI
C
L
AN
E
M
AI
N
TA
IN
REMOVE & REPLACE/
REINSTALL EXISTING CONC
BOLLARD AND STEEL GATE
FRAMING AS REQUIRED TO
MATCH (E)
DENOTES (E) CONC CONTROL
JOINT TO BE ROUTED & SEALED,
RE: 4/C302~TYP
DENOTES (E) CRACK IN
CONC TO BE ROUTED
& SEALED,RE: 4/C302~TYP
SEAL JOINT BETWEEN
WALL AND CONC PAVEMENT
PER 4/C302~TYP WALLS PR & PL
FOR BIDDING PURPOSES ASSUME
THE FOLLOWING REPAIR QUANTITIES
PER 4/C302:
- JOINT SEALANT : 320 LF
(NOT INCLUDING SLAB/WALL JOINT)
- CRACK REPAIR: 80 LF
M
AIN
TAIN
12'-0" W
ID
E (M
IN
TR
AFFIC
LAN
E
REMOVE (E) STEEL POST
AS REQUIRED
REMOVE & REPLACE APPROX
80 FT OF CURB AND GUTTER
FOR NEW FACING CONSTUCTION
@ CATCH BASIN
A
B
C
D
E
F
A
B
C
D
E
F
DescriptionMark Date
Project No.
Date
Drawn
Checked
Scale
Sheet Title
Sheet No.C op yr ig ht
4.
A ll rig ht s r es er ve d.
N o pa rt of th is d oc um en t m ay b e re pr od uc ed in a ny fo rm o r b y an y m ea ns w ith ou t pe rm is si on fr om W is s, Ja nn ey , E ls tn er A ss oc ia te s, In c.
(W
JE
W
JE
d is cl ai m s a ny re sp on si bi lit y fo r i ts u na ut ho riz ed u se
Pl ot te d:
0/
/2
1:
P M b y
C ar ro ll, D on al d
F ile
N am e:
P
:\2
0\
.4 xx x\
.4
7.
H
SA
U
LT
S
TE
. M A
R
IE
B O
R D
ER
S
TA
TI
O N
C
D S
(D C
C )\D ra w in gs
\2
0.
.H
_S au lt St e, M ar ie
B or de r S ta tio n D ra w in gs
_R 2.
dw g
THIS SHEET PLOTS FULL SIZE
AT 24x36 (INCHES)
0 1/2" 1" 2"
C101
AS NOTED
2 10/28/24 ADDENDUM 1
PLANS
2020.4797.H
Sault Ste. Marie Border Station
Retaining Wall Repairs 900 International Bridge
Plaza, Sault Ste. Marie, Michigan
U.S. General Services Administration
230 South Dearborn Street, 33rd Floor, Chicago, Illinois
Project
Client
Consultants
Headquarters & Laboratories: Northbrook, Illinois Atlanta | Austin | Boston | Chicago | Cleveland | Dallas | Denver | Detroit Honolulu | Houston | Los Angeles | Minneapolis | New Haven | New York
Philadelphia | Princeton | San Francisco | Seattle | South Florida | Washington, D.C.
Wiss, Janney, Elstner Associates, Inc.
3609 South Wadsworth Boulevard, Suite 400
Lakewood, Colorado 80235
303.914.4300 tel | 303.914.3000 fax www.wje.com
ENGINEERS
ARCHITECTS
MATERIALS SCIENTISTS
5 JANUARY, 2024
CRS/JW
DCC/DRH
1 SCALE: 1" = 20'
SITE PLAN
1. SITE PLAN TAKEN FROM SHEET V-1.0, BY MONUMENT ENGINEERING GROUP ASSOCIATES, INC., DATED AUGUST 16, 2017 WITH REVISIONS
THROUGH OCTOBER 13, 2017. VERIFY ALL DIMENSIONS IN THE FIELD PRIOR TO THE WORK.
N
2 SCALE: 1" = 10'
PAVEMENT DEMOLITION PLAN
1. SITE PLAN TAKEN FROM SHEET V-1.0, BY MONUMENT ENGINEERING GROUP ASSOCIATES, INC., DATED AUGUST 16, 2017 WITH REVISIONS
THROUGH OCTOBER 13, 2017. VERIFY ALL DIMENSIONS IN THE FIELD PRIOR TO THE WORK.
N
C101
C202
C201
C302
3 SCALE: 1" = 10'
PAVEMENT REPLACEMENT PLAN
1. SITE PLAN TAKEN FROM SHEET V-1.0, BY MONUMENT ENGINEERING GROUP ASSOCIATES, INC., DATED AUGUST 16, 2017 WITH REVISIONS
THROUGH OCTOBER 13, 2017. VERIFY ALL DIMENSIONS IN THE FIELD PRIOR TO THE WORK.
2. ALL PAVEMENT PAINTING AND SIGNAGE SHALL CONFORM TO CURRENT EDITION OF MICHIGAN MANUAL OF UNIFORM TRAFFIC CONTROL
DEVICES (MUTCD).
3. SUBGRADE PREPARATION BELOW NEW PAVEMENTS, AS WELL AS PAVEMENT MIX DESIGNS AND PLACEMENT METHODS SHALL CONFORM TO
STANDARD MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIFICATIONS UNLESS NOTED OTHERWISE.
N
C302
C101
C301
EN
D
W
AL
L
ST
A 3+
.0
EN
D
N
EW
C O
N C
F
AC
IN
G
ST
A
3+
.5
B.O. (N)
CONC FACING
T.O. (E) CONC
BARRIER WALLT.O. (E)
GUARDRAIL
E.
J.
DENOTES EXPANSION
JOINT IN (E) BARRIER
WALL, TYP.
C .J
C .J
. C .J
T.O. FTG = B.O. CURB
APPROX EL=643.00' V.I.F.
C .J
C .J
E.
J. C .J
C .J
C .J
INSTALL SEALANT AT (E) EXPANSION
JOINTS IN BARRIER WALL. CLEAN
ORGANIC MATTER FROM JOINT AND
REMOVE (E) JOINT FILLER MATERIAL
AS REQ'D, TYP ALL EXPANSION JOINTS
DENOTES EXTENT OF
NEW CONC FACING
CONTRACTOR TO INCLUDE ALLOWANCE
FOR ADDITIONAL (2) 'BT-2' TYPE REPAIRS,
RE: LEGEND THIS SHEET. THIS WALL TO BE
DETERMINED BY ENGINEER IN THE FIELD.
T.O. (N)
CONC FACING
(E) JOINT IN
BARRIER WALL
B.O. (N) FOOTING
EL=644.75' V.I.F.
T.O. CURB (N)
TO MATCH (E)
1'-6"
EL=644.17' V.I.F.
(E) MANHOLE AT
CATCH BASIN
T.O. (N) FTG TO EQUAL
T.O. (E) CONC S.O.G,
U.N.O.
DENOTES (E)
8'x2' WIRE FACING
BASKET~TYP
APPROX B.O.
(E) WALL
APPROX (E) GRADE
ABOVE WALL
B.O. (E) CONC
BARRIER SLAB
DENOTES
(N) SOIL NAIL
E.
J. C .J
C .J
C .J
E.
J.
C .J
C .J
C .J
E.
J.
C .J
C .J
CONTRACTOR TO INCLUDE ALLOWANCE
FOR ADDITIONAL (5) 'CR' TYPE REPAIRS,
RE: LEGEND THIS SHEET. THIS WALL TO BE
DETERMINED BY ENGINEER IN THE FIELD.
EL=644.50
DENOTES EXTENT OF
NEW CONC FACING
DENOTES EXPANSION
JOINT IN (E) BARRIER
WALL, TYP.
FORMED CHAMFERED CONTROL JOINT IN (N)
FACING PER 9/C301 TO MATCH (E) ABOVE, ALIGN
WITH (E) JOINTS IN BARRIER WALL ABOVE. SHIFT
JOINTS AS REQ'D TO LOCATE 1'-0" (MIN) FROM CL
(N) SOIL NAIL
EL=643.67'
V.I.F.
EL=646.50' V.I.F.
T.O. (N) FACING TO EXTEND ABOVE
(E) BARRIER SLAB PER DETAILS~ ELEVATIONS
PROVIDED ONLY TO ASSIST CONTRACTOR
EL=645.75' V.I.F.
EL=646.92' V.I.F.
EL=646.92' V.I.F.
EL=647.33' V.I.F.
EL=647.47' V.I.F.
T.O. (E) CONC
BARRIER WALL
TYP
T.O. (N) FTG EQUAL TO T.O.
(E) CONC S.O.G, U.N.O.
STEP FTG AT (E)
CATCH BASIN, RE: 10/C301
STEP (N) FTG & B.O.
FACING BY CURB
THICKNESS
(E) MANHOLE AT
CATCH BASIN
B.O. (N)
CONC FACING
1'-0"
TYP
Ln=15'-0" ALL ROWS
APPROXIMATE B.O.
(E) WALL
B.O. (N)
CONC FACING
ST
AR
T W
AL
L
ST
A
0+
.0
T.O. (N) FTG EQUAL TO T.O.
(E) CONC S.O.G, U.N.O.
(E) GUARDRAIL JOINT, TYP
~CONFIRM LOC IN FIELD
C .J
C .J
E.
J. C .J
C .J
C .J
C R C R
EL=644.50
DENOTES EXTENT OF
NEW CONC FACING
EL=642.33
EL=645.17 C
R
EL=645.67
EL=641.83
DENOTES CONTROL
JOINT IN (E) BARRIER
WALL, TYP.
C R
INSTALL SEALANT AT (E) EXPANSION
JOINTS IN BARRIER WALL. CLEAN
ORGANIC MATTER FROM JOINT AND
REMOVE (E) JOINT FILLER MATERIAL
AS REQ'D, TYP ALL EXPANSION JOINTS
EL=641.33
EL=640.67
BT-2 BT-2
DENOTES CONC
REPAIR, TYP.
BT-1
(E) CONC RETAINING
WALL TO REMAIN
3'-0"5'-0"
TYP.
EL=639.50'
V.I.F.
EL=647.75' V.I.F.
EL=647.67' V.I.F.
E.
J.
EL=647.58' V.I.F.
C .J
EL=648.08' V.I.F.
EL=648.17' V.I.F.
EL=649.00' V.I.F. EL=648.75' V.I.F.
EL=648.75' V.I.F.
B.O. (N) FOOTING
640.00 FT
645.00 FT
635.00 FT
630.00 FT
650.00 FT
655.00 FT
640.00 FT
645.00 FT
635.00 FT
630.00 FT
650.00 FT
655.00 FT
640.00 FT
645.00 FT
635.00 FT
630.00 FT
650.00 FT
655.00 FT
640.00 FT
645.00 FT
635.00 FT
630.00 FT
650.00 FT
655.00 FT
640.00 FT
645.00 FT
635.00 FT
630.00 FT
650.00 FT
655.00 FT
640.00 FT
645.00 FT
635.00 FT
630.00 FT
650.00 FT
655.00 FT
A
B
C
D
E
F
A
B
C
D
E
F
DescriptionMark Date
Project No.
Date
Drawn
Checked
Scale
Sheet Title
Sheet No.C op yr ig ht
4.
A ll rig ht s r es er ve d.
N o pa rt of th is d oc um en t m ay b e re pr od uc ed in a ny fo rm o r b y an y m ea ns w ith ou t pe rm is si on fr om W is s, Ja nn ey , E ls tn er A ss oc ia te s, In c.
(W
JE
W
JE
d is cl ai m s a ny re sp on si bi lit y fo r i ts u na ut ho riz ed u se
Pl ot te d:
0/
/2
1:
P M b y
C ar ro ll, D on al d
F ile
N am e:
P
:\2
0\
.4 xx x\
.4
7.
H
SA
U
LT
S
TE
. M A
R
IE
B O
R D
ER
S
TA
TI
O N
C
D S
(D C
C )\D ra w in gs
\2
0.
.H
_S au lt St e, M ar ie
B or de r S ta tio n D ra w in gs
_R 2.
dw g
THIS SHEET PLOTS FULL SIZE
AT 24x36 (INCHES)
0 1/2" 1" 2"
C201
AS NOTED
2 10/28/24 ADDENDUM 1
WALL ELEVATIONS
2020.4797.H
Sault Ste. Marie Border Station
Retaining Wall Repairs 900 International Bridge
Plaza, Sault Ste. Marie, Michigan
U.S. General Services Administration
230 South Dearborn Street, 33rd Floor, Chicago, Illinois
Project
Client
Consultants
Headquarters &…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .