Justification and Approval Redacted.pdf
PDF 303 KB Posted
- Attached to
- Universal Testing Machine Instron
- Solicitation number
- 2024-LGD-0115
- Issued by
-
Library of Congress
About this file
This justification and approval document and related solicitation provide details for the Library of Congress to procure a single-column universal testing machine from Instron on a sole-source basis. The Library requires the equipment to replace an aging machine and needs one that can handle a wide range of sample sizes and provide highly reproducible and accurate measurements at small forces. Only Instron was identified during market research as having a machine meeting the technical and performance requirements for the Library's preservation research and testing work. The non-competitive procurement is justified based on Instron being the only responsible source. The solicitation will be publicly posted for any interested parties to submit proposals by the anticipated award date of December 20, 2023. The contract value is estimated between $100,000 and $250,000 and will include installation, training, shipping, and a one-year warranty period.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 030ADV24Q0050 0001.pdf | ||
| 030ADV24Q0050.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Justification and Approval For Other than Full and Open Competition
Plan ID Number: 2024-LGD-0115
Form Updated 4/14/2023
Justification & Approval
As a legislative branch agency, the Library is subject to the competition and advertising requirements of 41 U.S.C. § 6101. Like the Competition in
Contracting Act and the FAR, 41 U.S.C. § 6101 does not require competition when a contracting officer certifies that only one source or brand-name item is available, when dictated by public exigency, or when otherwise authorized by law.
This document sets forth the justification and approval for award of a contract or order by means providing for other than full and open competition per 41 U.S.C. § 6101, LCR 7-210, and, as applicable, FAR 6.302, FAR 13.106-1, FAR 8.405, and FAR 16.505. Contracting without competition shall not be justified on the basis of a lack of advance planning or concerns related to availability of funds.
This form shall be used to support instances where competition will be limited to a single source, a limited number of sources, including where a brand name product is required.
Part 1 – Identification
1. Contracting Agency and Activity: Library of Congress, LCSG, DPS, PRES, Preservation Research and
Testing Division (PRTD)
2. Nature of Action Being Approved Contract (or modification)
LoC or Leg Branch Order (or modification)
GSA Schedule or GWAC: Identify Schedule/Contract
Other: Identify
Plan ID Number: 2024-LGD-0115
Contractor (or Brand Name): Instron
Estimated Value (Base and all options):
Period of Performance: 2/1/24-1/31/25
3. Description of Supplies or Services Required to Meet Library Needs
Describe the supplies or services that are required to meet the Library’s minimum needs and the delivery schedule required to meet those needs. Do not focus on a description of the program.
The Library requires the following supplies or services:
The Library of Congress (Library) mission is to ensure sustained and uninterrupted access to its collections through preservation services, encompassing both research and testing. The Preservation Research and Testing Division (PRTD) oversees a comprehensive program dedicated to quality assurance and materials testing. The testing program involves assessing materials utilized in housing, storage, exhibits, conservation treatments, and construction items to guarantee compliance with the Library’s stringent standards for permanence and durability.
The Library requires a new single-column universal testing machine to replace the current equipment, which is approaching the end of its manufacturer support and useful lifespan. The universal testing machine is important because it provides valuable data about the mechanical properties of materials, facilitates quality control, supports research and development efforts, ensures product safety, and contributes to the overall improvement of materials used in various applications. The universal testing machines perform static testing, including tensile, compression, bend, peel, tear, shear, friction, puncture, and other mechanical tests. These mechanical tests play a crucial role in the PRTD’s quality assurance testing program for materials utilized in storage and housing collections, as well as in various ongoing research programs.
The contract includes the purchase of a new single-column universal testing machine, inclusive of all components necessary to meet predefined specifications. The contract will also include a system introduction, installation, and training for three (3) users. Technical support and a one-year warranty coverage is also required to be included.
Part 2 – Program Office Justification & Approval
4. Authority for Contracting Without Competition
Over $250,000 For this requirement over $250,000, under FAR part 6, the basis for contracting without providing for full and open competition is:
There is only one responsible source and no other supplies or services will satisfy Library requirements.
41 U.S.C. § 6101(b)(2)(C); FAR 6.302-1.
Library’s minimum needs can only be satisfied by contractor’s unique capabilities or products. FAR 6.302-1(b)(1).
Source controls copyrights, patents, raw materials, or secret processes cannot be acquired otherwise, or similar circumstances. FAR 6.302-
1(b)(2).
Other exception identified in FAR 6.302-1: Identify the exception
There is such unusual & compelling urgency that the Government would be seriously injured if competition is not limited.
41 U.S.C. § 6101(b)(2)(B); FAR 6.302-2. Option years are not permitted.
Source is expressly authorized or required by statute (e.g., AbilityOne, UNICOR, GPO, GSA Public Buildings Service, Appropriations Act, etc.) per 41 U.S.C. § 6101(b)(1) and FAR 6.302-5: Identify the authority
Other basis authorized in 41 U.S.C. § 6101(b) or FAR part 6.302: Identify the exception
Library’s needs can only be satisfied by a brand-name product or item which is essential to the Government’s requirement. FAR 6.302-1(c).
The Product is listed on the Library of Congress Enterprise Architecture Repository (LCEAR) database (Attach applicable
IT Standard Data Sheet)
Up to and including $250,000 For this requirement up to $250,000, using simplified acquisition procedures under FAR part 13, the basis for contracting without providing for full and open competition is:
Only one responsible source is reasonably available to meet Library requirements. 41 U.S.C. § 6101(b); FAR 13.106-1.
Product or service is reasonably available from only one source.
Source controls copyrights, patents or other exclusive licensing arrangements.
Urgent circumstances; only one source can reasonably deliver by required date. Option years are not permitted.
Source is expressly authorized or required by statute: Identify the authority
Library’s needs can only be satisfied by a brand-name product
The Product is listed the Library of Congress Enterprise Architecture Repository (LCEAR) database (Attach applicable
GSA Schedule Order For this GSA schedule order under FAR part 8, the basis for not competing among GSA schedule-holders and/or specifying a brand name product or item is:
An urgent and compelling need exists, and following GSA procedures would result in unacceptable delays.
FAR 8.405-6(a)(1)(i)(A).
Only one GSA source is capable of fulfilling the requirement at the level of quality required because the supplies or services are unique or highly specialized. FAR 8.405-6(a)(1)(i)(B).
In the interest of economy and efficiency, the new work is a logical follow-on to an original order that was placed competitively among GSA schedule-holders (i.e., the original order was not sole-source or limited-source.) FAR 8.405-6(a)(1)(i)(C).
Library’s needs can only be satisfied by a brand-name product
The Product is listed on the Library of Congress Enterprise Architecture Repository (LCEAR) database (Attach applicable
Order Under Multiple Award Indefinite-Delivery Contract or GWAC For this order under FAR subpart 16.5, the basis for contracting without providing for full and open competition is:
The need is so urgent fair opportunity would result in unacceptable delays. 41 U.S.C. § 6101(b)(2)(C) and FAR 16.505(b)(2)(i)(A).
The Library’s minimum needs can only be satisfied by contractor’s unique capabilities or products. 41 U.S.C. § 6101(b)(1) and FAR
16.505(b)(2)(i)(B).
A logical follow-on order in the interest of economy and efficiency. 41 U.S.C. § 6101(b)(1) and FAR 16.505(b)(i)(2)(C).
To satisfy a minimum guarantee. 41 U.S.C. § 6101(b)(1) and FAR 16.505(b)(2)(D).
Authorized or required by statute. 41 U.S.C. § 6101(b)(1) and FAR 16.505(b)(2)(E).
The Library’s minimum needs can only be satisfied by a brand-name product or item which is essential to the Government’s requirement. 41
U.S.C. § 6101(b)(2)(B) and FAR 16.505(a)(4)(i).
The Product is listed on the Library of Congress Enterprise Architecture Repository (LCEAR) database (Attach applicable
5. Rationale for Contracting Without Competition
In supporting an action not providing for full and open competition, it is not sufficient to demonstrate that the contractor is exceptionally well qualified or even the best qualified, or that the required brand name product is well suited to the Library’s needs. The rationale must demonstrate that no one else, or no other competing product, can satisfactorily fulfill the Library’s requirement. Do not focus on the importance of the requirement; the issue is the rationale for not competing.
In supporting urgency, address the following What are the unexpected facts or the unpredictable events that led to this situation? When is the required delivery or performance start date? Why this date? What specific harm to the Government will occur if the delivery is not made or performance not begun as scheduled? (Note that expiration of funds is not sufficient harm to justify not competing.) Demonstrate that the contract is only for items and quantities urgently needed until a competitive procurement action can be developed, or that a separate competitive follow-on is not practical.
In supporting a brand name justification, the brand name or feature must be essential to the Library’s requirements, and market research indicates that other company’s similar products or products with similar features cannot meet or be modified to meet the Library’s needs.
We are authorized to limit competition on the basis of the citation in section 4 because: Unique Capabilities
Instron is the only manufacturer that was identified during market research that offers a single column universal testing machine system that is capable of meeting or exceeding identified and specified requirements. While other manufacturers produce similar testing equipment, these have been designed for industrial quality assurance measurements which have less stringent (sensitive) requirements or flexibility in regard to testing and/or sample parameters.
Other Manufacturers fail to meet several of the Library’s requirements, particularly concerning critical performance parameters essential for the accuracy and reproducibility of movement. This could negatively impact various testing methods. Many of our testing methods demand highly reproducible measurements and accuracy at small forces, allowing us to handle small sample sizes. We’ve adjusted and miniaturized several standard test methods to accommodate those small samples, which aligns with the core functionality of the Instron universal testing machine. Only those from Instron are capable of meeting PRTD’s operational needs and requirements, particularly in regard to broad range of sample size, sensitivity, reproducibility, flexibility that PRTD requires for our research programs.
Instron has an established reputation for product quality broadly in the scientific and physical testing communities and the offerings from Instron will allow the seamless continuation of physical parameter testing and retrospective analysis with data from similar equipment that has been operating in the PRTD laboratory. Instron provides product warranty for one year from delivery and maintains lifetime service and support capabilities.
6. Actions to Overcome Barriers to Competition Before Subsequent Contract Is Required
State what actions, if any, the program office can take to overcome barriers to competition before a contracting for this requirement again, such as:
using action to provide time to develop specifications for a competitive procurement by a certain date; licensing copyrights or patents so other contractors may use the works; or breaking the requirement into parts that may be purchased competitively. If this is a one-time requirement, explain that action to increase future competition is not needed. If the source is expressly required by statute, state “Source is statutory.”
To increase competition, we will:
This is a one-time requirement, and thus action to increase further competition is not needed. We have examined other vendors’ offerings and have not found any other vendor other than Instron that can fulfill our requirements for this purchase.
In addition, we will be posting this J&A to the public for at least 15 days (or greater) before an award is made. Potential vendors are offered an opportunity for protest during this time.
7. Program Office Certification
I certify that the description of the Government’s minimum needs, schedule requirements, and technical information that provide the basis for this justification are accurate and complete.
PART 3 – CONTRACTING OFFICER DETERMINATIONS & CERTIFICATION
8. Efforts to Solicit from As Many Potential Sources As Practicable Unless a justification is based on FAR 6.302-2, Unusual and compelling urgency, contracting officers shall post justifications for other than full and open competition, including brand name justifications, to the Contract Opportunities website on sam.gov (or eBuy for Brand Name Justifications under FAR Part 8) prior to requesting a proposal or otherwise entering into negotiations.
Advance notice will be published in sam.gov for 15 days before a contract is awarded. FAR 5.203(a).
Advance or concurrent notice will be published in sam.gov for a reasonable time for commercial items FAR 5.203(a) and 12.204(b).
Advance notice will not be published because the action meets the following FAR exception:
Notice would compromise national security. FAR 5.202(a)(1).
Unusual and compelling urgency; notice period would seriously injure Government. FAR 5.202(a)(2).
Expressly authorized or required to be made through another Government agency. FAR 5.202(a)(4).
Order will be placed against an IDIQ contract awarded under FAR 16.5. FAR 5.202(a)(6).
Order will be placed against GSA schedule or other competitively-awarded contract. FAR 5.202(a)(11).
Other:
Advance notice will not be published per 41 U.S.C. § 6101; see attached deviation from the FAR per LCR 7-210 § 3.A.
We made the following efforts to interest potential sources in this award: N/A – This J&A and the draft SOW will be published publicly.
9. Listing of Sources That Expressed Interest in Writing
The following sources expressed interest in this award: N/A
10. Additional Information
The following additional information is relevant to this justification and approval: N/A
11. Contracting Officer Determination that Price Is Fair and Reasonable As explained in detail below, I have determined that the prices for this contracting action are fair and reasonable based on comparison of the prices to the following (see FAR 15.404-1(b)(2)):
Historical prices paid by the Government Published competitive price lists
Library’s Independent Government Estimate Prices obtained through market research
Other: Any other method of price analysis Prices obtained through competitive proposals
The following analysis (based on attached pricing information) supports my determination: N/A
12. Contracting Officer Determination of Responsibility Checked System for Award Management (or will check in the case of competitive proposals for a brand name product)
13. Contracting Officer Determination of Best Value I have determined that this action represents the best value to the Government because: A best value determination shall be made before an award is executed.
14. Contracting Officer Certification I certify that, to the best of my knowledge and belief, this justification is accurate and complete. For those actions up to $750,000, I approve contracting without competition for this requirement.
Name
Signature
Date
| 2023-12-20T15:56:48-0500 | |
| Robinson, James |
File details come from the government source that posted it. Updated .