J3. DRAFT-Specifications_12970225R0002.pdf

PDF 2 MB Posted

Attached to
Job Corps Pine Ridge Building 511 – Dorm Siding
Solicitation number
12970225R0002
Issued by

About this file

This document is a Pre-Solicitation Notice for a federal construction contract opportunity to perform exterior renovation work on Building 511 at the Pine Ridge Job Corps Center in Chadron, Nebraska. The project involves installing siding, sheathing, and flashing; making roof modifications; removing and reinstalling windows, doors, gutters, and downspouts; removing a deck and other exterior components; and performing minor site work.

The contract is anticipated to be a single award firm-fixed-price contract with a 30-calendar day period of performance. The government estimates the contract value will be between $500,000 and $1,000,000. The contract will be set aside for small businesses. Key dates include the anticipated solicitation posting on November 23, 2024 with proposals due by January 10, 2025, and contract award on or about January 31, 2025. The government plans to hold a pre-proposal conference, with details to be provided in the solicitation. Offerors must have an active SAM.gov registration to be considered.

View the file

Other files

File Type Posted
J4. DRAFT-Drawings(1).pdf PDF
J2. DRAFT-ScheduleOfItems_12970225R0002.pdf PDF
J5. WD NE20230016, 01052024.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UNITED STATES DEPARTMENT OF AGRICULTURE

FOREST SERVICE

ROCKY MOUNTAIN REGION

NEBRASKA NATIONAL FOREST

PINE RIDGE JOB CORPS CIVILIAN

CONSERVATION CENTER

BLDG 511 REHAB

DAWES COUNTY NEBRASKA

PROJECT SPECIFICATIONS

1/28/2022

DRAFT

TABLE OF CONTENTS

DIVISION 01 – GENERAL REQUIREMENTS

01 0150 GENERAL REQUIREMENTS

DIVISION 02 – EXISTING CONDITIONS

02 4119 SELECTIVE DEMOLITION

DIVISION 06 – WOOD, PLASTICS, AND COMPOSITES

06 1000 ROUGH CARPENTRY

06 2000 FINISH CARPENTRY

DIVISION 07 – THERMAL AND MOISTURE PROTECTION

07 2100 THERMAL INSULATION

07 2119 FOAMED-IN-PLACE INSULATION

07 3113 ASPHALT SHINGLES

07 4646 FIBER-CEMENT SIDING

07 6200 SHEET METAL FLASHING AND TRIM

07 9200 JOINT SEALANTS

DIVISION 09 – FINISHES

09 9113 EXTERIOR PAINTING

DIVISION 32 – EXTERIOR IMPROVEMENTS

31 0000 EARTHWORK

32 1300 RIGID PAVING

Division 01 - Division 09 Division 32

1-28-22

BLDG 511 MISC REHAB WORK 010150 – 1

PINE RIDGE JOB CORPS CCC GENERAL REQUIREMENTS

SECTION 010150

GENERAL REQUIREMENTS

PART 1 – SUMMARY OF WORK

1.1 DESCRIPTION

A. Work for this project requires the contractor to be responsible for supplying all labor, materials, equipment, utilities, miscellaneous items, freight and delivery and all necessary valid licenses for the work summarized as follows:

1. Siding/sheathing/insulation/flashing installation, roof modifications, removal and re-installation of windows, doors and gutters/downspouts, deck removal and removal of other exterior components, and minor exterior site work existing Dormitory.

1.2 LOCATION

A. This project is located at the Pine Ridge Job Corps Center campus located approximately 13 miles south of Chadron, Nebraska. The address is 15710 South Highway 385, Chadron, Nebraska 69337. Driving directions can be obtained by calling the Center at 308.432.3316.

1.3 PROJECT SCHEDULING

A. Work hours for this project are between 8:00 AM-4:30 PM Monday through Friday.

1.4 POINT OF CONTACT

Center Point of Contact: David Jones, ph: 308-432-8660, david.jones@usda.gov.

1.5 USE OF PREMISES

A. Confine constructions operations to immediate area of work. Do not disturb portions of Project site beyond areas in which the Work is indicated.

B. Government will occupy site and buildings during entire construction period. Cooperate with Government during construction operations to minimize conflicts and facilitate Government usage. Perform the work so as not to interfere with Government's day-to-day operations.

C. Keep driveways, parking areas, loading areas and entrances to buildings clear and available to Government, Government's employees, and emergency vehicles at all times.

Do not use these areas for parking or storage of materials. Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from Government.

DRAFT

mailto:david.jones@usda.gov dvalles Typewritten Text /re-installation

BLDG 511 MISC REHAB WORK 010150 – 2

1.6 WORK RESTRICTIONS

A. Smoking is permitted on campus only in the designated smoking area.

1.7 SCHEDULE OF ITEMS

A. Schedule of Items:

1. Provide pricing for all items listed in the Schedule of Items.

2. Contract award will be made for all Base Items.

3. Optional Items may or may not be awarded, depending on funding availability.

B. Base Items (BI)

1. Base Item No. 1 – Bldg 511 Misc Architectural Rehab Work

a. Measurement: This item is measured as a Lump Sum quantity.

b. Payment: The contract lump sum price as shown in the Schedule of Items includes all demolition, materials, equipment, labor and incidentals to perform all architectural work as shown on the Drawings and Specifications, including siding and sheathing work, roof work, and door/window/gutter/downspout removal and re-installation.

2. Base Item No. 2 – Bldg 511 Misc Site Rehab Work

a. Measurement: This item is measured as a Lump Sum quantity.

b. Payment: The contract lump sum price as shown in the Schedule of Items includes all demolition, materials, equipment, labor and incidentals to perform all site work as shown on the Drawings and Specifications, including deck and deck foundation removal, grading, and concrete steps and sidewalk.

C. Optional Items (OI)

1. Base Item No. 3 – Bldg 511 Batt Wall Insulation

a. Measurement: This item is measured as a unit price, per square foot.

b. Payment: The contract lump sum price as shown in the Schedule of Items includes all demolition, materials, equipment, labor and incidentals to remove existing batt wall insulation and install new batt insulation.

PART 2 – SUBMITTAL PROCEDURES

2.1 DEFINITIONS

A. Action Submittals: Written and graphic information that requires Government approval.

BLDG 511 MISC REHAB WORK 010150 – 3

B. Informational Submittals: Written information that does not require Government approval. Submittals may be rejected for not complying with requirements.

2.2 PROCEDURES

A. Contractor Responsibilities

1. Review each submittal and check for compliance with the Contract Documents.

2. Highlight, encircle, or otherwise identify deviations from the Contract Documents on submittals.

3. Include the following information on label or cover sheet for processing and recording action taken:

a. Project name.

b. Date.

c. Name and address of Contractor.

d. Name of manufacturer.

e. Unique identifier, including revision number.

f. Number and title of appropriate Specification Section.

g. Drawing number and detail references, as appropriate.

h. Date of Contractor’s approval.

i. Statement certifying that submittal has been reviewed, checked, and approved by the Contractor for compliance with the Contract Documents.

4. The Government will not review submittals that do not bear Contractor's approval and will return them without action.

5. Unless additional copies are required for final submittal, and unless the

Contracting Officer (CO) observes noncompliance with provisions of the Contract Documents, initial submittal may serve as final submittal.

6. Submittals must be submitted in electronic PDF format. Submit to CO via email or electronic file transfer site.

7. Only final submittals with mark indicating action taken by Government are to be used for construction.

8. Submittals not required by the Contract Documents will not be reviewed and may be discarded.

B. Processing Time: Time for review shall commence on CO's receipt of submittal.

1. Initial Review: Government will review initial submittal within 10 working days.

Additional time may be needed if processing must be delayed to permit coordination with subsequent submittals. CO will advise Contractor when a submittal being processed must be delayed for coordination.

2. Resubmittals: If resubmittal is necessary, it will be processed in same timeframe as initial submittal.

2.3 ACTION SUBMITTALS

A. Prepare and submit Action Submittals required in the Technical Specifications in this contract, if applicable, and as indicated at the end of this subsection.

BLDG 511 MISC REHAB WORK 010150 – 4

B. Collect information into a single submittal for each element of construction and type of product or equipment.

1. Mark up each submittal to show which products and options are applicable.

2. Include the following information, as applicable:

a. Manufacturer's written recommendations.

b. Manufacturer's product specifications.

c. Manufacturer's installation instructions.

d. Manufacturer's catalog cuts.

e. Wiring diagrams showing factory-installed wiring.

f. Compliance with recognized trade association standards.

g. Compliance with recognized testing agency standards.

C. Required Action Submittals

1. Product Data: See Technical Specification Sections.

2.4 INFORMATIONAL SUBMITTALS

A. Prepare and submit Informational Submittals required in the Technical Specifications in this contract, if applicable, and as indicated below:

B. Required Informational Submittals:

1. Accident Prevention Plan.

2. Construction Schedule.

3. Schedule of Values, broken down by CSI Division.

4.1 CLOSEOUT SUBMITTALS

A. Prepare and submit Closeout Submittals, as follows:

1. See Technical Specification Sections.

2. Project Record Documents.

PART 3 – TEMPORARY FACILITIES AND CONTROLS

3.1 USE OF UTILITIES

A. Utilities: Use of Government existing facilities will be permitted without metering and without payment of use charges, as long as facilities are cleaned and maintained in an acceptable condition. At Substantial Completion, restore these facilities to condition existing before initial use. The following are available for use by the contractor: water, and electrical power services. The following are not available: telephone service. The contractor is expected to provide whatever phone service deemed necessary for the duration of the project.

3.2 SANITARY FACILITIES

BLDG 511 MISC REHAB WORK 010150 – 5

A. Sanitary facilities are available for use by the Contractor. Facilities must be cleaned and maintained daily.

3.3 STAGING AND STORAGE

A. Coordinate on-site staging and storage requirements with the Center Point of Contact or the Contracting Officer Representative (COR).

3.4 CONSTRUCTION WASTE DISPOSAL FACILITIES

A. Provide waste-collection containers in sizes adequate to handle waste from construction operations. Containerize and clearly label hazardous, dangerous, or unsanitary waste materials separately from other waste. Use of Government waste containers will not be permitted.

3.5 SAFETY AND ENVIRONMENTAL PROTECTION

A. Environmental Protection: Contractor shall provide protection, operate temporary facilities, and conduct construction in ways and by methods that comply with environmental regulations and that minimize possible air, waterway, and subsoil contamination or pollution or other undesirable effects.

B. Barricades, Warning Signs, and Lights: Comply with the national or state Manual on Uniform Traffic Control Devices (MUTCD) for erecting structurally adequate barricades, paint with appropriate colors, graphics, and warning signs/lights to inform personnel, students, and the public of possible hazards.

C. Fire Protection.

1. Store combustible materials in containers in fire-safe locations.

2. Maintain unobstructed access to fire extinguishers, fire hydrants, fire-protection facilities, stairways, and other access routes for firefighting. Prohibit smoking in hazardous fire-exposure areas.

3. Supervise welding operations, combustion-type temporary heating units, and similar sources of fire ignition.

PART 4 – EXECUTION REQUIREMENTS

4.1 EXAMINATION

A. Before beginning work, examine areas and document existing conditions. Proceed with installation only after unsatisfactory conditions have been corrected. Proceeding with the Work indicates acceptance of surfaces and conditions.

B. Field verify all new and existing dimensions affecting the work of this contract before ordering products.

BLDG 511 MISC REHAB WORK 010150 – 6

C. Immediately on discovery of the need for clarification of the Contract Documents, submit a request for information to CO. Include a detailed description of problem encountered, together with recommendations for changing the Contract Documents.

4.2 INSTALLATION

A. Locate the Work and components of the Work accurately, in correct alignment and elevation to fit with existing construction.

B. Make vertical work plumb and make horizontal work level.

C. Install per manufacturer's written instructions and recommendations.

4.3 PROGRESS CLEANING

A. Clean Project site and work areas daily, including common areas. Dispose of materials lawfully.

1. Comply with NFPA 241 requirements for removal of combustible waste materials and debris.

2. Do not hold materials more than 7 days during normal weather or 3 days if the temperature is expected to rise above 80 deg F (27 deg C).

B. Burying or burning waste materials on-site will not be permitted. Washing waste materials down sewers or into waterways will not be permitted.

4.4 PROTECTION OF INSTALLED CONSTRUCTION

A. Provide protection and maintain conditions that ensure installed Work does not get damaged or deteriorated prior to Substantial Completion.

4.5 CORRECTION OF THE WORK

A. Repair or remove and replace defective construction. Restore damaged substrates and finishes.

1. Repairing includes replacing defective parts, refinishing damaged surfaces, touching up with matching materials, and properly adjusting operating equipment.

PART 5 – CLOSEOUT PROCEDURES

5.1 SUBSTANTIAL COMPLETION

A. Definition of Substantial Completion: The Date certified by the CO when construction is sufficiently complete, in accordance with the Contract Documents, so the Government can occupy or utilize the Work or designated portion thereof for the use for which it is intended, as expressed in the Contract Documents.

BLDG 511 MISC REHAB WORK 010150 – 7

B. Preliminary Procedures: Before requesting inspection for determining date of Substantial Completion, complete the following. List items below that are incomplete in request.

1. Prepare a list of items to be completed and corrected (punch list), the value of items on the list, and reasons why the Work is not complete.

2. Advise the CO of pending insurance changeover requirements.

3. Submit specific warranties, workmanship bonds, final certifications, and similar documents.

4. Obtain and submit releases permitting Government unrestricted use of the Work and access to services and utilities.

5. Deliver tools, spare parts, extra materials, and similar items to location designated by Government. Label with manufacturer's name and model number where applicable.

6. Complete startup testing of systems.

7. Submit changeover information related to Government occupancy, use, operation, and maintenance.

8. Complete final cleaning requirements, including touchup painting.

9. Touch up and otherwise repair and restore marred exposed finishes to eliminate visual defects.

C. Inspection: Submit a written request for inspection for Substantial Completion. On receipt of request, CO will either proceed with inspection or notify Contractor of unfulfilled requirements. CO will prepare the Certificate of Substantial Completion after inspection or will notify Contractor of items, either on Contractor's list or additional items identified by CO, that must be completed or corrected before certificate will be issued.

1. Reinspection: Request reinspection when the Work identified in previous inspections as incomplete is completed or corrected.

2. Results of completed inspection will form the basis of requirements for Final

Completion.

5.2 FINAL COMPLETION

A. Preliminary Procedures: Before requesting final inspection for determining date of Final Completion, complete the following:

1. Submit certified copy of CO’s Substantial Completion inspection list of items to be completed or corrected (punch list), endorsed and dated by CO. The certified copy of the list shall state that each item has been completed or otherwise resolved for acceptance.

2. Submit evidence of final, continuing insurance coverage complying with insurance requirements.

3. Instruct Government personnel in operation, adjustment, and maintenance of products, equipment, and systems.

BLDG 511 MISC REHAB WORK 010150 – 8

B. Inspection: Submit a written request for final inspection for acceptance. On receipt of request, CO will either proceed with inspection or notify Contractor of unfulfilled requirements. CO will prepare a final Certificate for Payment after inspection or will notify Contractor of construction that must be completed or corrected before certificate will be issued.

1. Reinspection: Request reinspection when the Work identified in previous inspections as incomplete is completed or corrected.

5.3 LIST OF INCOMPLETE ITEMS (PUNCH LIST)

A. Preparation: Submit two copies of list. Include name and identification of each space and area affected by construction operations for incomplete items and items needing correction including, if necessary, areas disturbed by Contractor that are outside the limits of construction.

5.4 PROJECT RECORD DOCUMENTS

A. General: Do not use Project Record Documents for construction purposes. Protect Project Record Documents from deterioration and loss. Provide access to Project Record Documents for CO's reference during normal working hours.

B. Provide Draft of Project Record Drawings at Substantial Completion. CO will return reviewed copy. Provide Final Project Record Drawings at Final Completion.

C. Record Drawings: Maintain and submit one set of blue- or black-line white prints of Contract Drawings and Shop Drawings.

1. Mark Record Prints to show the actual installation where installation varies from that shown originally. Require individual or entity who obtained record data, whether individual or entity is Installer, subcontractor, or similar entity, to prepare the marked-up Record Prints.

a. Give particular attention to information on concealed elements that cannot be readily identified and recorded later.

b. Record data as soon as possible after obtaining it. Record and check the markup before enclosing concealed installations.

2. Mark record sets with erasable, red-colored pencil. Use other colors to distinguish between changes for different categories of the Work at the same location.

3. Note Construction Change Directive numbers, Change Order numbers, alternate numbers, and similar identification where applicable.

4. Identify and date each Record Drawing; include the designation "PROJECT RECORD DRAWING" in a prominent location. Organize into manageable sets;

bind each set with durable paper cover sheets. Include identification on cover sheets.

BLDG 511 MISC REHAB WORK 010150 – 9

5.5 FINAL CLEANING

A. General: Provide final cleaning. Conduct cleaning and waste-removal operations to comply with local laws and ordinances and Federal and local environmental and antipollution regulations.

B. Cleaning Agents: Use cleaning materials and agents recommended by manufacturer or fabricator of the surface to be cleaned. Do not use cleaning agents that are potentially hazardous to health or property or that might damage finished surfaces.

C. Complete the following cleaning operations before requesting inspection for certification of Substantial Completion for entire Project or for a portion of Project:

1. Clean Project site, yard, and grounds, in areas disturbed by construction activities, including landscape development areas, of rubbish, waste material, litter, and other foreign substances.

2. Remove tools, construction equipment, machinery, and surplus material from Project site.

3. Touch up and otherwise repair and restore marred, exposed finishes and surfaces.

Replace finishes and surfaces that cannot be satisfactorily repaired or restored or that already show evidence of repair or restoration.

D. Remove waste materials from Project site and dispose of lawfully.

PART 6 – PROJECT SCHEDULE

6.1 PROJECT SCHEDULE

ITEM* REQUIRED DUE DATE (calendar days)

Bonds 10 days after Award

Action and Informational Submittals

10 days after Award

Construction Start (NTP)

5 days after Submittal Approval

Closeout Submittals prior to CO acceptance of project

BLDG 511 MISC REHAB WORK 010150 – 10

Contract Release form and final pay request

10 days after CO acceptance of project

* All items above must be included in contractor’s construction schedule

END OF SECTION 010150

BLDG 511 MISC REHAB WORK

PINE RIDGE JOB CORPS CCC

02 4119 - 1

SELECTIVE

DEMOLITION

SECTION 02 4119

SELECTIVE DEMOLITION

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Demolition and removal of selected portions of building or structure.

2. Demolition and removal of selected site elements.

1.2 MATERIALS OWNERSHIP

A. Unless otherwise indicated, demolition waste becomes property of Contractor.

1.3 PREINSTALLATION MEETINGS

A. Predemolition Conference: Conduct conference at Project site.

1.4 INFORMATIONAL SUBMITTALS

A. Engineering Survey: Submit engineering survey of condition of building.

B. Proposed Protection Measures: Submit written plan, including Drawings, that indicates the measures proposed for protecting individuals and property, for dust control and for noise control. Indicate proposed locations and construction of any needed barriers.

C. Schedule of selective demolition activities with starting and ending dates for each activity.

D. Predemolition photographs or video.

1.5 FIELD CONDITIONS

A. Owner will occupy portions of building immediately adjacent to selective demolition area.

Conduct selective demolition so Owner's operations will not be disrupted.

B. Conditions existing at time of inspection for bidding purpose will be maintained by Owner as far as practical.

C. Notify CO of discrepancies between existing conditions and Drawings before proceeding with selective demolition.

D. Hazardous Materials: It is not expected that hazardous materials will be encountered in the

Work.

02 4119 - 2

SELECTIVE

DEMOLITION

1. If suspected hazardous materials are encountered, do not disturb; immediately notify CO.

Hazardous materials will be removed by CO under a separate contract.

E. Storage or sale of removed items or materials on-site is not permitted.

F. Utility Service: Maintain existing utilities indicated to remain in service and protect them against damage during selective demolition operations.

1. Maintain fire-protection facilities in service during selective demolition operations.

G. Arrange selective demolition schedule so as not to interfere with Owner's operations.

1.6 WARRANTY

A. Existing Warranties: Remove, replace, patch, and repair materials and surfaces cut or damaged during selective demolition, by methods and with materials and using approved contractors so as not to void existing warranties.

PART 2 - PRODUCTS

2.1 PERFORMANCE REQUIREMENTS

A. Regulatory Requirements: Comply with governing EPA notification regulations before beginning selective demolition. Comply with hauling and disposal regulations of authorities having jurisdiction.

B. Standards: Comply with ANSI/ASSP A10.6 and NFPA 241.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Verify that utilities have been disconnected and capped before starting selective demolition operations.

B. Inventory and record the condition of items to be removed and salvaged with the CO.

3.2 PREPARATION

A. Refrigerant: Before starting demolition, remove refrigerant from mechanical equipment according to 40 CFR 82 and regulations of authorities having jurisdiction.

02 4119 - 3

SELECTIVE

DEMOLITION

3.3 UTILITY SERVICES AND MECHANICAL/ELECTRICAL SYSTEMS

A. Existing Services/Systems to Remain: Maintain services/systems indicated to remain and protect them against damage.

B. Existing Services/Systems to Be Removed, Relocated, or Abandoned: Locate, identify, disconnect, and seal or cap off utility services and mechanical/electrical systems serving areas to be selectively demolished.

1. Arrange to shut off utilities with utility companies; coordinate any utility disruptions with

CO.

2. If services/systems are required to be removed, relocated, or abandoned, provide temporary services/systems that bypass area of selective demolition and that maintain continuity of services/systems to other parts of building.

C. PROTECTION

D. Temporary Protection: Provide temporary barricades and other protection required to prevent injury to people and damage to adjacent buildings and facilities to remain.

E. Temporary Shoring: Design, provide, and maintain shoring, bracing, and structural supports as required to preserve stability and prevent movement, settlement, or collapse of construction and finishes to remain, and to prevent unexpected or uncontrolled movement or collapse of construction being demolished.

F. Remove temporary barricades and protections where hazards no longer exist.

3.4 SELECTIVE DEMOLITION

A. General: Demolish and remove existing construction only to the extent required by new construction and as indicated. Use methods required to complete the Work within limitations of governing regulations and as follows:

1. Neatly cut openings and holes plumb, square, and true to dimensions required. Use cutting methods least likely to damage construction to remain or adjoining construction.

Use hand tools or small power tools designed for sawing or grinding, not hammering and chopping. Temporarily cover openings to remain.

2. Cut or drill from the exposed or finished side into concealed surfaces to avoid marring existing finished surfaces.

3. Do not use cutting torches until work area is cleared of flammable materials. At concealed spaces, such as duct and pipe interiors, verify condition and contents of hidden space before starting flame-cutting operations. Maintain portable fire-suppression devices during flame-cutting operations.

4. Maintain fire watch during and for at least 4 hours after flame-cutting operations.

5. Locate selective demolition equipment and remove debris and materials so as not to impose excessive loads on supporting walls, floors, or framing.

6. Dispose of demolished items and materials promptly. Comply with requirements in

Section 010150 "General Requirements."

02 4119 - 4

SELECTIVE

DEMOLITION

B. Site Access and Temporary Controls: Conduct selective demolition and debris-removal operations to ensure minimum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities.

C. Removed and Reinstalled Items:

1. Clean and repair items to functional condition adequate for intended reuse.

2. Protect items from damage during transport and storage.

3. Reinstall items in locations indicated. Comply with installation requirements for new materials and equipment. Provide connections, supports, and miscellaneous materials necessary to make item functional for use indicated.

D. Existing Items to Remain: Protect construction indicated to remain against damage and soiling during selective demolition. When permitted by CO, items may be removed to a suitable, protected storage location during selective demolition, cleaned and reinstalled in their original locations after selective demolition operations are complete.

3.5 CLEANING

A. Remove demolition waste materials from Project site.

1. Do not allow demolished materials to accumulate on-site.

2. Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas.

3. Remove debris from elevated portions of building by chute, hoist, or other device that will convey debris to grade level in a controlled descent.

4. Comply with requirements specified in Section 010150 "General Requirements."

B. Burning: Do not burn demolished materials.

C. Clean adjacent structures and improvements of dust, dirt, and debris caused by selective demolition operations. Return adjacent areas to condition existing before selective demolition operations began.

END OF SECTION DRAFT

06 1000 - 1

ROUGH CARPENTRY

SECTION 06 1000

ROUGH CARPENTRY

PART 1 GENERAL

1.1 SECTION INCLUDES

A. Rough framing for walls, doors, windows, and roof openings.

B. Miscellaneous framing and sheathing.

C. Concealed wood blocking, nailers, and supports.

1.2 RELATED REQUIREMENTS

A. Section 07 6200 - Sheet Metal Flashing and Trim: Sill flashings.

1.3 REFERENCE STANDARDS

A. ASTM A153/A153M - Standard Specification for Zinc Coating (Hot-Dip) on Iron and Steel Hardware; 2016a.

B. PS 20 - American Softwood Lumber Standard; 2020.

1.4 SUBMITTALS

A. See Section 01 0150 - General Requirements for submittal procedures.

B. Product Data: Provide technical data on insulated sheathing, wood preservative materials, and application instructions.

1.5 DELIVERY, STORAGE, AND HANDLING

A. General: Cover wood products to protect against moisture. Support stacked products to prevent deformation and to allow air circulation.

PART 2 PRODUCTS

2.1 GENERAL REQUIREMENTS

A. Dimension Lumber: Comply with PS 20 and requirements of specified grading agencies.

1. Species: Douglas Fir-Larch, unless otherwise indicated.

2. If no species is specified, provide species graded by the agency specified; if no grading agency is specified, provide lumber graded by grading agency meeting the specified requirements.

3. Grading Agency: Grading agency whose rules are approved by the Board of Review, American Lumber Standard Committee at www.alsc.org, and who

BLDG 511 MISC REHAB WORK 06 1000 - 2

PINE RIDGE JOB CORPS CCC ROUGH CARPENTRY

provides grading service for the species and grade specified; provide lumber stamped with grade mark unless otherwise indicated.

2.2 DIMENSION LUMBER FOR CONCEALED APPLICATIONS

A. Sizes: Nominal sizes as indicated on drawings, S4S.

B. Moisture Content: S-dry or MC19.

C. Stud Framing (2 by 2 through 2 by 6 ):

1. Grade: No. 2.

D. Miscellaneous Framing, Blocking, Nailers, Grounds, and Furring:

1. Lumber: S4S, No. 2 or Standard Grade.

2. Boards: Standard or No. 3.

2.3 ACCESSORIES

A. Fasteners and Anchors:

1. Metal and Finish: Hot-dipped galvanized steel complying with ASTM

A153/A153M for high humidity and preservative-treated wood locations, unfinished steel elsewhere.

2. Drywall Screws: Bugle head, hardened steel, power driven type, length three times thickness of sheathing.

B. Sill Gasket on Top of Foundation Wall: 1/4 inch thick, plate width, closed cell plastic foam from continuous rolls.

C. Sill Flashing: See Section 07 6200.

PART 3 EXECUTION

3.1 PREPARATION

A. Where wood framing bears on cementitious foundations, install full width sill flashing continuous over top of foundation, lap ends of flashing minimum of 4 inches and seal.

B. Install sill gasket under sill plate of framed walls bearing on foundations; puncture gasket cleanly to fit tightly around protruding anchor bolts.

3.2 INSTALLATION - GENERAL

A. Select material sizes to minimize waste.

B. Reuse scrap to the greatest extent possible; clearly separate scrap for use on site as accessory components, including: shims, bracing, and blocking.

06 1000 - 3

ROUGH CARPENTRY

3.3 BLOCKING, NAILERS, AND SUPPORTS

A. Provide framing and blocking members as indicated or as required to support finishes, fixtures, specialty items, and trim.

B. In framed assemblies that have concealed spaces, provide solid wood fireblocking as required by the current International Building Code to close concealed draft openings between floors and between top story and roof/attic space.

C. In metal stud walls, provide continuous blocking around door and window openings for anchorage of frames, securely attached to stud framing.

D. In walls, provide blocking attached to studs as backing and support for wall-mounted items, unless item can be securely fastened to two or more studs or other method of support is explicitly indicated.

E. Where ceiling-mounting is indicated, provide blocking and supplementary supports above ceiling, unless other method of support is explicitly indicated.

F. Provide the following specific nonstructural framing and blocking:

1. Cabinets and shelf supports.

2. Wall brackets.

3. Handrails.

4. Grab bars.

5. Towel and bath accessories.

6. Wall-mounted door stops.

7. Chalkboards and marker boards.

8. Wall paneling and trim.

9. Joints of rigid wall coverings that occur between studs.

3.4 TOLERANCES

A. Framing Members: 1/4 inch from true position, maximum.

B. Variation from Plane, Other than Floors: 1/4 inch in 10 feet maximum, and 1/4 inch in 30 feet maximum.

END OF SECTIONDRAFT

06 2000 - 1

FINISH CARPENTRY

SECTION 06 2000

FINISH CARPENTRY

PART 1 GENERAL

1.1 SECTION INCLUDES

A. Finish carpentry items.

B. Hardware and attachment accessories.

1.2 REFERENCE STANDARDS

A. ANSI A135.4 - Basic Hardboard; 2012 (R2020).

B. ANSI A208.1 - American National Standard for Particleboard; 2016.

C. AWI (QCP) - Quality Certification Program; Current Edition.

D. AWI/AWMAC/WI (AWS) - Architectural Woodwork Standards, 2nd Edition; 2014, with Errata (2016).

E. AWMAC/WI (NAAWS) - North American Architectural Woodwork Standards, U.S.

Version 4.0; 2021.

F. AWPA U1 - Use Category System: User Specification for Treated Wood; 2018.

G. BHMA A156.9 - American National Standard for Cabinet Hardware; 2015.

H. HPVA HP-1 - American National Standard for Hardwood and Decorative Plywood;

2016.

I. PS 1 - Structural Plywood; 2009 (Revised 2019).

1.3 SUBMITTALS

A. See Section 01 0150 - General Requirements for submittal procedures.

B. Product Data:

1. Provide manufacturer's product data, storage and handling instructions for factory-fabricated units.

C. Shop Drawings: Indicate materials, component profiles, fastening methods, jointing details, and accessories.

1. Scale of Drawings: 1-1/2 inch to 1 foot, minimum.

2. Provide information as required by AWI/AWMAC/WI (AWS) or AWMAC/WI

(NAAWS).

3. Include certification program label.

BLDG 511 MISC REHAB WORK 06 2000 - 2

PINE RIDGE JOB CORPS CCC FINISH CARPENTRY

D. Samples: Submit two samples of finish plywood, 8 by 8 inch in size illustrating wood grain and specified finish.

E. Samples: Submit two samples of wood trim 12 inch long.

1.4 QUALITY ASSURANCE

A. Fabricator Qualifications: Company specializing in fabricating the products specified in this section with minimum five years of documented experience.

1. Accredited participant in the specified certification program prior to the commencement of fabrication and throughout the duration of the project.

B. Quality Certification:

1. Comply with AWI (QCP) woodwork association quality certification service/program in accordance with requirements for work specified in this section: www.awiqcp.org/#sle.

2. Provide labels or certificates indicating that work complies with AWI/AWMAC/WI (AWS) or AWMAC/WI (NAAWS) requirements for grade or grades specified.

3. Provide designated labels on shop drawings as required by certification program.

4. Provide designated labels on installed products as required by certification program.

5. Submit certifications upon completion of installation that verifies this work is in compliance with specified requirements.

1.5 DELIVERY, STORAGE, AND HANDLING

A. Deliver factory-fabricated units to project site in original packages, containers or bundles bearing brand name and identification.

B. Store finish carpentry items under cover, elevated above grade, and in a dry, well-ventilated area not exposed to heat or sunlight.

C. Protect from moisture damage.

PART 2 PRODUCTS

2.1 FINISH CARPENTRY ITEMS

A. Quality Standard: Custom Grade, in accordance with AWI/AWMAC/WI (AWS) or AWMAC/WI (NAAWS), unless noted otherwise.

B. Interior Woodwork Items:

1. Moldings, Bases, Casings, and Miscellaneous Trim: Clear white pine; prepare for paint or stain to match existing finish.

06 2000 - 3

FINISH CARPENTRY

2.2 SHEET MATERIALS

A. Softwood Plywood, Not Exposed to View: Any face species, medium density fiberboard core; PS 1 Grade A-B, glue type as recommended for application.

B. Softwood Plywood, Exposed to View: Face species as indicated, plain sawn, medium density fiberboard core; PS 1 Grade A-B, glue type as recommended for application.

C. Hardwood Plywood: Face species as indicated, plain sawn, book matched, medium density fiberboard core; HPVA HP-1, Front Face Grade AA, Back Face Grade 1, glue type as recommended for application.

D. Particleboard: ANSI A208.1; Composed of wood chips, sawdust, or flakes of medium density, made with waterproof resin binders; of grade to suit application; sanded faces.

E. Hardboard: ANSI A135.4; Pressed wood fiber with resin binder, Class 1 - Tempered, 1/4 inch thick, smooth one side (S1S).

2.3 FASTENINGS

A. Adhesive for Purposes Other Than Laminate Installation: Suitable for the purpose; not containing formaldehyde or other volatile organic compounds.

B. Fasteners: Of size and type to suit application; galvanized finish in concealed locations and finish to match existing finish in exposed locations.

2.4 HARDWARE

A. Hardware: Comply with BHMA A156.9.

2.5 WOOD TREATMENT

A. Factory-Treated Lumber: Comply with requirements of AWPA U1 - Use Category System for pressure impregnated wood treatments determined by use categories, expected service conditions, and specific applications.

B. Wood Preservative by Pressure Treatment (PT Type): Provide AWPA U1 treatment using waterborne preservative with 0.25 percent retainage.

2.6 FABRICATION

A. Shop assemble work for delivery to site, permitting passage through building openings.

B. When necessary to cut and fit on site, provide materials with ample allowance for cutting. Provide trim for scribing and site cutting.

BLDG 511 MISC REHAB WORK 06 2000 - 4

PINE RIDGE JOB CORPS CCC FINISH CARPENTRY

2.7 SHOP FINISHING

A. Sand work smooth and set exposed nails and screws.

B. Apply wood filler in exposed nail and screw indentations.

C. On items to receive transparent finishes, use wood filler that matches surrounding surfaces and is of type recommended for the applicable finish.

D. Finish work in accordance with AWI/AWMAC/WI (AWS) or AWMAC/WI (NAAWS), Section 5 - Finishing for grade specified and as follows:

PART 3 EXECUTION

3.1 EXAMINATION

A. Verify adequacy of backing and support framing.

3.2 INSTALLATION

A. Install custom fabrications in accordance with AWI/AWMAC/WI (AWS) or AWMAC/WI (NAAWS) requirements for grade indicated.

B. Set and secure materials and components in place, plumb and level.

C. Carefully scribe work abutting other components, with maximum gaps of 1/32 inch.

Do not use additional overlay trim to conceal larger gaps.

3.3 TOLERANCES

A. Maximum Variation from True Position: 1/16 inch.

B. Maximum Offset from True Alignment with Abutting Materials: 1/32 inch.

END OF SECTIONDRAFT

07 2100 - 1

THERMAL INSULATION

SECTION 07 2100

THERMAL INSULATION

PART 1 GENERAL

1.1 SECTION INCLUDES

A. Board insulation and integral vapor retarder at cavity wall construction, perimeter foundation wall, underside of floor slabs, and exterior wall behind fiber cement siding.

B. Batt insulation and vapor retarder in exterior wall, ceiling, and roof construction.

C. Batt insulation for filling perimeter window and door shim spaces and crevices in exterior wall and roof.

1.2 REFERENCE STANDARDS

A. ASTM C553 - Standard Specification for Mineral Fiber Blanket Thermal Insulation for Commercial and Industrial Applications; 2013 (Reapproved 2019).

B. ASTM C578 - Standard Specification for Rigid, Cellular Polystyrene Thermal Insulation; 2019.

C. ASTM C665 - Standard Specification for Mineral-Fiber Blanket Thermal Insulation for Light Frame Construction and Manufactured Housing; 2017.

D. ASTM E84 - Standard Test Method for Surface Burning Characteristics of Building Materials; 2021a.

E. ASTM E96/E96M - Standard Test Methods for Water Vapor Transmission of Materials; 2016.

F. ASTM E136 - Standard Test Method for Assessing Combustibility of Materials Using a Vertical Tube Furnace at 750°C; 2019a.

1.3 QUALITY ASSURANCE

A. Air Barrier Association of America (ABAA) Quality Assurance Program (QAP);

www.airbarrier.org/#sle:

1. Installer Qualification: Use accredited contractors, certified installers, evaluated materials, and third-party field quality control audit.

2. Manufacturer Qualification: Use evaluated materials from a single manufacturer regularly engaged in air barrier material manufacture. Use secondary materials approved in writing by primary material manufacturer.

1.4 SUBMITTALS

A. See Section 01 0150 - General Requirements for submittal procedures.

BLDG 511 MISC REHAB WORK 07 2100 - 2

PINE RIDGE JOB CORPS CCC THERMAL INSULATION

B. Product Data: Provide data on product characteristics, performance criteria, and product limitations.

ABAA Field Quality Control Submittals: Submit third-party reports of testing and inspection required by Air Barrier Association of America Quality Assurance Program

(ABAA QAP).

C. ABAA Manufacturer Qualification: Submit documentation of current evaluation of proposed manufacturer and materials.

D. ABAA Installer Qualification: Submit documentation of current contractor accreditation and current installer certification. Keep copies of contractor accreditation and installer certification on project site during and after installation. Present on-site documentation upon request.

PART 2 PRODUCTS

2.1 FOAM BOARD INSULATION MATERIALS

A. Huber Engineered Woods Zip System R-sheathing panels or approved equal: Oriented strand board panel with an integrated water-resistive barrier laminated to the exterior face and a rigid foam insulation panel bonded on the opposite (interior) face. 1-1/2" thick R6 panel with R-value of 6.6.

2.2 BATT INSULATION MATERIALS

A. Where batt insulation is indicated, either glass fiber or mineral fiber batt insulation may be used, at Contractor's option.

B. Glass Fiber Batt Insulation: Flexible preformed batt or blanket, complying with ASTM C665; friction fit.

1. Flame Spread Index: 75 or less, when tested in accordance with ASTM E84.

2. Smoke Developed Index: 450 or less, when tested in accordance with ASTM E84.

3. Combustibility: Non-combustible, when tested in accordance with ASTM E136, except for facing, if any.

C. Mineral Fiber Batt Insulation: Flexible or semi-rigid preformed batt or blanket, complying with ASTM C665; friction fit; unfaced flame spread index of 0 (zero) when tested in accordance with ASTM E84.

1. Smoke Developed Index: 0 (zero), when tested in accordance with ASTM E84.

2.3 ACCESSORIES

A. Tape: Zip System flashing tapes: pressure-activated advanced acrylic adhesive.

1. Application: Sealing of penetrations, such as sills, pipes or cables.

2. Width: Are required for application.

DRAFT

http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C665 http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C665 http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C665 http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C665 http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C665 http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C665 http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C665 http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C665 http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C665 http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C665 http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C665 http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C665

07 2100 - 3

THERMAL INSULATION

B. Insulation Fasteners: Appropriate for purpose intended and approved by roofing manufacturer.

PART 3 EXECUTION

3.1 EXAMINATION

A. Verify that substrate, adjacent materials, and insulation materials are dry and that substrates are ready to receive insulation.

B. Verify substrate surfaces are flat, free of honeycomb, fins, irregularities, or materials or substances that may impede adhesive bond.

3.2 BATT INSTALLATION

A. Install insulation and vapor retarder in accordance with manufacturer's instructions.

B. Install in exterior wall and roof spaces without gaps or voids. Do not compress insulation.

C. Trim insulation neatly to fit spaces. Insulate miscellaneous gaps and voids.

D. Fit insulation tightly in cavities and tightly to exterior side of mechanical and electrical services within the plane of the insulation.

END OF SECTION

DRAFT

http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C665 http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C665 http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C665 http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C665 http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C665 http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C665 http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C665 http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C665 http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C665 http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C665 http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C665 http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C665 http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C665 http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C665 http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C665 http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C665 http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C665 http://global.ihs.com/doc_detail.cfm?rid=BSD&document_name=ASTM%20C665

07 2119 - 1

FOAMED-IN-PLACE

INSULATION

SECTION 07 2119

FOAMED-IN-PLACE INSULATION

PART 1 GENERAL

1.1 SECTION INCLUDES

A. Foamed-in-place insulation.

1. In exterior framed walls.

2. In exterior wall crevices.

3. At junctions of dissimilar wall and roof materials.

1.2 REFERENCE STANDARDS

A. ASTM C518 - Standard Test Method for Steady-State Thermal Transmission Properties by Means of the Heat Flow Meter Apparatus; 2017.

B. ASTM D2842 - Standard Test Method for Water Absorption of Rigid Cellular Plastics;

2019.

C. ASTM E84 - Standard Test Method for Surface Burning Characteristics of Building Materials; 2021a.

D. ASTM E96/E96M - Standard Test Methods for Water Vapor Transmission of Materials; 2016.

E. ASTM E2178 - Standard Test Method for Determining Air Leakage Rate and Calculation of Air Permeance of Building Materials; 2021a.

1.3 SUBMITTALS

A. See Section 01 0150 - General Requirements for submittal procedures.

B. Product Data: Provide product description, insulation properties, overcoat properties, and preparation requirements. Provide safety data sheet including information indicating product is low in VOC's.

C. Manufacturer's Installation Instructions: Indicate special procedures, and perimeter conditions requiring special attention.

D. Closeout Submittal: Test Reports

PART 2 PRODUCTS

2.1 MANUFACTURERS

A. Foamed-In-Place Insulation:

1. Carlisle Spray Foam Insulation SealTite PRO One Zero; www.carlislesfi.com/#sle

BLDG 511 MISC REHAB WORK 07 2119 - 2

PINE RIDGE JOB CORPS CCC FOAMED-IN-PLACE INSULATION

2. Icynene-Lapolla; Lapolla Foam-Lok 2000-4G: www.icynene.com/#sle.

3. Johns Manville; JM Corbond III Closed Cell Spray Polyurethane Foam:

www.jm.com/#sle.

2.2 MATERIALS

A. Foamed-In-Place Insulation: Medium-density, rigid or semi-rigid, closed cell polyurethane foam; foamed on-site, using blowing agent of water or non-ozone-depleting gas.

1. Regulatory Requirements: Comply with applicable code for flame and smoke, concealment, and overcoat limitations.

a. Comply with testing requirements according to NFPA 275.

2. Thermal Resistance: R-value of 5.0, minimum, per 1 inch thickness at 75 degrees F mean temperature when tested in accordance with ASTM C518.

3. Water Vapor Permeance: Vapor retarder; 1 perms, maximum, when tested at intended 1.5" thickness in accordance with ASTM E96/E96M, desiccant method.

4. Water Absorption: Less than 2 percent by volume, maximum, when tested in accordance with ASTM D2842.

5. Air Permeance: 0.04 cfm per square foot, maximum, when tested at intended thickness in accordance with ASTM E2178 at 1.57 psf.

6. Closed Cell Content: At least 90 percent.

7. Surface Burning Characteristics: Flame spread/Smoke developed index of 25/450, maximum, when tested in accordance with ASTM E84.

2.3 ACCESSORIES

A. Primer: As required by insulation manufacturer.

B. Protective Coating: Intumescent type, spray applied; flame spread index (FSI) of 25 and smoke developed index (SDI) of 450, when tested in accordance with ASTM E84.

1. Acceptable Product:

a. Product required by accepted insulation manufacturer to comply with applicable code requirements for fire-resistant coating at exposed locations.

PART 3 EXECUTION

3.1 APPLICATION

A. Apply insulation in accordance with manufacturer's instructions.

B. Apply insulation around windows where existing window bucks are not tight to surrounding framing. Install insulation prior to the application of the new sheathing; cut existing foam flush with face of frame.

END OF SECTION

07 3113 - 1

ASPHALT SHINGLES

SECTION 07 3113

ASPHALT SHINGLES

PART 1 GENERAL

1.1 SECTION INCLUDES

A. Asphalt shingle roofing for repair and/or replacement of existing shingles damaged during construction.

B. Flexible sheet membranes for eave protection, underlayment, and valley protection.

C. Associated metal flashings and accessories.

1.2 REFERENCE STANDARDS

A. ASTM D226/D226M - Standard Specification for Asphalt-Saturated Organic Felt Used in Roofing and Waterproofing; 2017.

B. ASTM D1970/D1970M - Standard Specification for Self-Adhering Polymer Modified Bituminous Sheet Materials Used as Steep Roofing Underlayment for Ice Dam Protection; 2020.

C. ASTM D3161/D3161M - Standard Test Method for Wind-Resistance of Steep Slope Roofing Products (Fan-Induced Method); 2020.

D. ASTM D3462/D3462M - Standard Specification for Asphalt Shingles Made From Glass Felt and Surfaced with Mineral Granules; 2019.

E. ASTM D7158/D7158M - Standard Test Method for Wind Resistance of Asphalt Shingles (Uplift Force/Uplift Resistance Method); 2020.

F. ASTM E108 - Standard Test Methods for Fire Tests of Roof Coverings; 2020a.

G. ASTM F1667 - Standard Specification for Driven Fasteners: Nails, Spikes, and Staples;

2021.

H. Miami (APD) - Approved Products Directory; Miami-Dade County; Current Edition.

I. NRCA (RM) - The NRCA Roofing Manual; 2019.

J. SMACNA (ASMM) - Architectural Sheet Metal Manual; 2012.

K. UL (DIR) - Online Certifications Directory; Current Edition.

1.3 SUBMITTALS

A. See Section 01 0150 - General Requirements, for submittal procedures.

BLDG 511 MISC REHAB WORK 07 3113 - 2

PINE RIDGE JOB CORPS CCC ASPHALT SHINGLES

B. Product Data: Provide data indicating material characteristics.

C. Shop Drawings: For metal flashings, indicate specially configured metal flashings.

D. Samples: Submit two samples of each shingle color indicating color range and finish texture/pattern; for color selection.

E. Manufacturer's Installation Instructions: Indicate installation criteria and procedures.

F. Manufacturer's Certificate: Certify that products meet or exceed specified requirements.

G. Warranty Documentation: Submit manufacturer warranty and ensure that forms have been completed in Owner's name and registered with manufacturer.

1.4 QUALITY ASSURANCE

A. Products are Required to Comply with Fire Resistance Criteria: UL (DIR) listed and labeled.

1.5 WARRANTY

A. See Section 01 0150 - General Requirements for additional warranty requirements.

B. Correct defective Work within a five year period after Date of Substantial Completion.

1.6 MAINTENANCE

A. Furnish to the Government any unused full shingles plus one bundle of shingles."

PART 2 PRODUCTS

2.1 MANUFACTURERS

A. Asphalt Shingles:

1. GAF; Timberline HD Reflector Series: www.gaf.com/#sle. Or approved equal.

Submitted product shall match existing shingle thickness, profile, performance and color.

2.2 ASPHALT SHINGLES

A. Asphalt Shingles: Asphalt-coated…