J.2_Specs_Crawford.Bunkhouse.Final_3.31.2023.pdf

PDF 4 MB Posted

Attached to
Crawford Modular Bunkhouse, Boise National Forest
Solicitation number
1240LT23R0034
Issued by

About this file

This solicitation posting is for a modular bunkhouse project on the Boise National Forest. The solicitation number is 1240LT23R0034 and will be awarded by the USDA Forest Service.

The project involves site preparation, utilities installation, and furnishing and installing a new modular bunkhouse at the Crawford Guard Station site near Cascade, Idaho. A base bid is requested along with optional bid items. The base bid work includes demolition of an existing facility, new utility connections, site grading, and furnishing and installing an accessible modular bunkhouse building. The schedule of items specifies quantities for base bid items and options.

Bids are due by the response date listed in the solicitation. The contract will be awarded after that date. Pricing is to be provided for the base bid work and optional bid line items. The selected contractor must be capable of meeting all requirements and specifications for the modular bunkhouse installation and related site work.

View the file

Other files

File Type Posted
Amendment 2.pdf PDF
Amendment 1.pdf PDF
Amendment 1_CompiledDrawings_Revised.pdf PDF
1240LT23R0034.pdf PDF
J.4_Determination of Responsibility.pdf PDF
J.1_Wage Determination.pdf PDF
J.3_DWG_Crawford.Bunkhouse_FINAL_3.31.2023.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK 000001-1

Section C - Description/Specifications/Statement of Work

GENERAL SPECIFICATIONS

Crawford Modular Bunkhouse MODULAR BUNKHOUSE Final – 3/31/2023

1.1 SCOPE OF CONTRACT

A. This project involves preparation, site work, utilities, and furnishing and installation of a new modular bunkhouse at the Crawford Guard Station site on the Boise National Forest, near Cascade, Idaho. The project includes Base Bid and Optional Bid Items.

1. Base Bid Work includes the following:

a. Demolition: Demolish and dispose of the existing facility #1117 “Crawford Dwelling” that is approximately 350 SF. Remove and dispose of concrete foundations to 2’ below grade. Regrade site.

b. Construction work includes the following:

1) Installation of new utilities and modification of existing utilities as required in the drawings and specifications, including water, sewer, electricity, cable and telephone.

2) Furnishing and installation of a modular bunkhouse building as shown in the drawings and specifications, including utility connections. See Schedule of Items. Base bid buildings to be completed and installed are:

a) Accessible Modular Bunkhouse Building #1(1560 sf), including the concrete foundation, accessible ramp, stairs and railings. This includes connection and utilities of the bunkhouse

3) Grading the entire site as shown on the drawings.

4) Construction of new parking area(s) and driveway.

5) The installation of the electrical feeders for all base bid buildings are included. See schedule of items.

6) Installation of main electrical feeder and all related work, not including the feeder spurs to the Option buildings which are included in the Bid Options as shown below.

7) Installation of concrete curb stops, concrete walkways, and signs.

8) Installation of landscape items:

B. Quantities associated with these options are identified in the Schedule of Items.

1.2 PROJECT LOCATIONS

A. The project is located on Forest Service property, approximately 3 miles east of the central part of Cascade Idaho. Coordinates are 44.528996, -115.978493 at the intersection of a Forest Service Road #430 and Warm Lake Road, Cascade, Idaho.

1.3 SITE INFORMATION AND LIMITATIONS

Attachment J.2-1240LT23R0034

SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK 000001-2

A. The following site conditions are considered incidental to the contract and the contractor will not be paid directly for any of the following items:

1. Construction sites will be closed during construction. The Forest Service will issue a closure order to the public. The Contractor will be responsible for signing and limiting public access with fencing.

2. All construction equipment shall be pressure washed before entering National Forest System lands. The removal of mud and debris from treads, tracks and undercarriage, with emphasis on axles, frame, cross-members, motor mounts, and underneath steps, running boards, and front bumper/brush-guard assemblies will be required. The purpose is to reduce or eliminate the transportation of noxious weeds, which is required by Federal and State regulations.

3. Utilities may be available at the site for construction purposes. The Contractor will be responsible for coordinating the use of utilities with the COR.

4. The Contractor shall provide temporary toilet facilities (porta-potty) at the site during all construction work.

5. Where shown in the drawings, all existing trees shall be protected during construction. For each tree within 15 feet of new construction, install temporary construction fencing (plastic orange mesh fence or equivalent) centered around the trunk of each tree. Fencing to be a minimum of 30 feet in diameter or the diameter of the drip line, whichever is greater. The trunk or root system of any tree shall not be disturbed without prior written approval from the Contracting Officer.

1.4 TRAFFIC CONTROL AND CONSTRUCTION SIGNING

A. No work that endangers, interferes, or conflicts with traffic or access to work sites shall be performed until a plan for satisfactory warning and handling of traffic has been submitted by the contractor and approved by the COR and Idaho Department of Transportation. Construction signing for traffic control shall conform to the Manual of Uniform Traffic Control Devices (MUTCD). All traffic control signs will be placed in areas adequate for a truck pulling a fifth wheel trailer to be turned around. Contractor shall not be paid directly for this item, rather it will be considered incidental to other items of work listed in the Schedule of Items.

1.5 WORK CAMPS, STAGING AND STORAGE AREAS

A. Areas for staging operations and storage of materials shall be approved by the CO. The Contractor must request in writing for approval from the CO to stage trailers (work) on site.

B. No overnight camping will be allowed on site.

1.6 INSPECTION OF WORKSITE

A. The contractor acknowledges they have taken the necessary steps to ascertain the nature and location of work and have investigated and satisfied themselves as to the general and local conditions that can affect the work or its cost. Any failure of the contractor to take the actions described and acknowledged in this paragraph will not relieve the Contractor

SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK 000001-3

from the responsibility of estimating properly the difficulty and cost of successfully performing the work, or for proceeding to successfully perform the work without additional expenses to the government.

1.7 START DATE

A. Summer 2023

1.8 CONTRACT TIME

A. Base Bid: 180 Calendar Days

1.9 SPECIFICATIONS

A. The following specifications are attached. Some sections in the schedule of items refer to other sections not listed and are subsidiary to or are included in payment for other pay items in this contract. These items are considered incidental and no additional compensation will be made.

SECTION 000050 - MODULAR BUNKHOUSE UNIT

SECTION 010250 - CONSTRUCTION STAKING

SECTION 011250 - MEASUREMENT AND PAYMENT

SECTION 011900 - MOBILIZATION

SECTION 013300 - SUBMITTAL PROCEDURES

SECTION 014100 - QUALITY CONTROL

SECTION 023701 - SEDIMENT AND EROSION CONTROL MEASURES

SECTION 024100 - WASTE MATERIAL DISPOSAL

SECTION 033000 - CAST-IN-PLACE CONCRETE

SECTION 033020 - CONCRETE FROM PACKAGED DRY MIX FOR MINOR

STRUCTURES

SECTION 061000 - ROUGH CARPENTRY

SECTION 061600 - SHEATHING

SECTION 061753 - SHOP-FABRICATED WOOD TRUSSES

SECTION 064023 - INTERIOR ARCHITECTURAL WOODWORK

SECTION 071113 - BITUMINOUS DAMPPROOFING

SECTION 072100 - THERMAL INSULATION

SECTION 074113 - FORMED METAL ROOF PANELS

SECTION 074600 - FIBER CEMENT SIDING AND TRIM

SECTION 076200 - SHEET METAL FLASHING AND TRIM

SECTION 079200 - JOINT SEALANTS

SECTION 081113 - HOLLOW METAL DOORS AND FRAMES

SECTION 081416 - FLUSH WOOD DOORS

SECTION 085413 - FIBERGLASS WINDOWS

SECTION 087100 - DOOR HARDWARE

SECTION 092900 - GYPSUM BOARD

SECTION 096513 - RESILIENT BASE AND ACCESSORIES

SECTION 096520 - SHEET VINYL FLOOR COVERINGS

SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK 000001-4

SECTION 097200 - WALL COVERINGS (FIBERGLASS REINFORCED PLASTIC

(FRP) PANELS)

SECTION 099114 - EXTERIOR PAINTING (MPI STANDARDS)

SECTION 099123 - INTERIOR PAINTING

SECTION 101400 - SIGNS

SECTION 102800 - TOILET, BATH, AND LAUNDRY ACCESSORIES

SECTION 104416 - FIRE EXTINGUISHERS

SECTION 113100 - RESIDENTIAL APPLIANCES

SECTION 122113 - HORIZONTAL LOUVER BLINDS

SECTION 133402 - UTILITY BOXES

SECTION 211313 - FIRE SPRINKLER SYSTEMS

SECTION 221100 - WATER DISTRIBUTION SYSTEMS

SECTION 221102 - CURB VALVES AND BOXES

SECTION 221103 - PLUMBING APPURTENANCES

SECTION 221116 - DOMESTIC WATER PIPING

SECTION 221119 - DOMESTIC WATER PIPING SPECIALTIES

SECTION 221300 - SEWER SYSTEMS- might not be needed

SECTION 221316 - SANITARY WASTE AND VENT PIPING

SECTION 221319 - SANITARY WASTE PIPING SPECIALTIES

SECTION 223300 - ELECTRIC, DOMESTIC-WATER HEATERS

SECTION 224100 - RESIDENTIAL PLUMBING FIXTURES

SECTION 235400 - ELECTRIC FURNACES

SECTION 260500 - COMMON WORK RESULTS FOR ELECTRICAL

SECTION 260519 - LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND

CABLES

SECTION 260526 - GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS

SECTION 260533 - RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS

SECTION 260553 - IDENTIFICATION FOR ELECTRICAL SYSTEMS

SECTION 260923 - LIGHTING CONTROL DEVICES

SECTION 262416 - PANELBOARDS

SECTION 262726 - WIRING DEVICES

SECTION 262816 - ENCLOSED SWITCHES

SECTION 311000 - CLEARING AND GRUBBING

SECTION 312000 - EARTHWORK

SECTION 312100 - PROJECT SITE PREPARATION AND GRADING

SECTION 312113 - RADON MITIGATION

SECTION 312225 - EXCAVATION & EMBANKMENT

SECTION 321204 - CRUSHED AGGREGATE BASE OR SURFACE COURSE

SECTION 322622 - PRECAST CONCRETE CURB STOPS

SECTION 329204 - HYDRO-SEEDING

SECTION 329212 - INVERTED CONCRETE MOW STRIP

END OF SECTION C

NOVEMEBER 2022

MODULAR BUNKHOUSE UNIT 000050-1

USDA FOREST SERVICE, R4

Crawford Modular Bunkhouse

SECTION 000050 - MODULAR BUNKHOUSE UNIT

PART 1 - GENERAL

1.1 SUMMARY

A. This item shall consist of the supply and installation of a modular bunkhouse building at the Crawford Guard Station site on the Cascade Ranger District near Cascade Idaho.

1. Base Bid Items

a. 000050-1 -Accessible Modular Bunkhouse Building, minimum of 1,560 square feet.

B. Overall Building Descriptions

1. The modular housing unit building shall be constructed to approved floor plan, elevations and details as developed by the successful bidder in accordance with these specifications. Floor plans and elevations shall be similar or equal to the drawings shown in the contract documents. The unit shall include a new permanent reinforced concrete foundation, hold downs, and concrete porches with steps and a ramp. All units shall be placed on a concrete foundation where the top of the foundation walls are a minimum of 6” higher than finished exterior grade. Footing shall bear below the frost depth required by the local jurisdiction. Steps, steel pipe railings and handrails to the buildings shall be constructed according to International Building Code (IBC) Standards and Accessibility Guidelines (ADAABAG). The contractor is responsible for designing the necessary number steps with equal treads and risers, and railings and handrails that meet IBC requirements. The unit will also include cast in place concrete accessible ramps and railings with concrete footings. Provide necessary site grading with positive drainage 10 feet from the building, structural excavation, backfill and compaction.

The connection to utilities (water sewer, power and communications) are included in the building cost. See drawings for site utility improvements. The building shall include items listed as appliances, shown plumbing fixtures, doors and hardware, cabinets, and other items shown on plans, except for those items such as furniture that are shown as N.I.C. (Not in Contract) in the drawings. All floor areas shall be defined as the gross area within the exterior face of exterior wall lines.

2. The Modular Bunkhouse Building will meet ADAABAG Guidelines and be fully accessible.

C. The building shall be designed, constructed, and installed in accordance with the Building Codes reference in paragraph 1.3, below.

1.2 MEASUREMENT AND PAYMENT

MODULAR BUNKHOUSE UNIT 000050-2

A. The quantity to be measured shall be "Lump Sum Quantity" (LSQ) as shown on the Schedule of Items for the modular building, complete, installed, accepted, and ready for use. Payment shall be at the contract unit price as shown on the Schedule of Items. The measurement for the modular building shall include all work items including utilities, excavation, engineered fill, back-fill and grading extending outside those limits to 10 feet outside the building. The measurement will also include all required site work including concrete porches, foundations, ADAABAG accessible ramps adjacent to the building.

1.3 REFERENCE SPECIFICATIONS

A. The publications listed below form a part of this specification to the extent referenced.

The publications are referred to in the text by the basic designation only.

2021 International Building Code 2021 International Plumbing Code 2021 International Mechanical Code 2021 International Fuel Gas Code 2021 International Energy Conservation Code 2020 National Electrical Code 2014 National Fire Protection Association Standards 13D.

2010 Americans with Disabilities Act/Architectural Barriers Act Guidelines (ADAABAG) (http://www.access-board.gov/adaag/html/adaag.htm)

1.4 SUBMITTALS:

A. Provide stamped signed design documents as described in Part 2 below for review and approval.

B. Provide stamped signed structural calculations, sealed by an Architect or Engineer licensed in the State of Idaho

C. Provide Operation and Maintenance manual at the conclusion of the project.

D. Provide all submittals noted in Section 013300, Submittal Procedures.

1.5 RELATED WORK

A. The work shall be in accordance with the following subsidiary specifications. The subsidiary specifications are referred to in the text by the Section designation only.

Section 011250 - Measurement and Payment Section 011900 – Mobilization Section 013300 - Submittal Procedures Section 014100 - Quality Control Section 023701 - Sediment and Erosion Control Measures Section 033000 - Cast-In-Place Concrete Section 061000 - Rough Carpentry Section 061600 - Sheathing Section 061753 - Shop Fabricated Wood Trusses Section 064023 - Interior Architectural Woodwork Section 071113 - Bituminous Damproofing

MODULAR BUNKHOUSE UNIT 000050-3

Section 072100 - Thermal Insulation Section 074113 - Metal Roof Panels Section 074600 - Fiber Cement Siding Section 076200 - Sheet Metal Flashing and Trim Section 079200 - Joint Sealants Section 081113 - Hollow Metal Doors and Frames Section 081416 - Flush Wood Doors Section 087100 - Door Hardware Section 092900 - Gypsum Board Section 096520 - Sheet Vinyl Floor Coverings Section 096530 - Resilient Wall Base and Accessories Section 097200 - Wall Coverings (Fiberglass Reinforced Plastic (FRP) Panels) Section 099113 - Exterior Painting Section 099123 - Interior Painting Section 099300 - Staining and Transparent Finishing Section 102800 - Toilet and Bath Accessories Section 113100 - Residential Appliances Section 122113 - Horizontal Louver Blinds Section 221116 - Domestic Water Piping Section 221119 - Domestic Water Piping Specialties Section 221316 - Sanitary Waste and Vent Piping Section 221319 - Sanitary Waste and Piping Specialties Section 223300 - Electric, Domestic Water Heaters Section 224100 - Residential Plumbing Fixtures Section 230553 - Identification for HVAC Piping and Equipment Section 260500 - Common Work Results for Electrical Section 260519 - Low-Voltage Electrical Power Conductors and Cables Section 260526 - Grounding and Bonding for Electrical Systems Section 260533 - Raceway and Boxes for Electrical Systems Section 260553 - Identification for Electrical Systems Section 260923 – Lighting control Devices Section 262416 – Panelboards Section 262726 - Wiring Devices Section 312113 – Radon Mitigation

PART 2 - PRODUCTS AND EXECUTION

2.1 GENERAL - The bunkhouse shall be configured in accordance with the following specifications:

A. Submit Floor Plan and Elevations: The design shall be similar or equal to the drawings for the Modular Bunkhouse Unit in the contract documents and shall be designed in consultation with the Contracting Officer. If alternate floor plans are submitted that are different than the government plan, the Contractor shall provide building plans that will fit within the allowed areas for the buildings shown on the site plan in the contract documents. Contractor shall also coordinate the location of utility line connections for the buildings with the location of the existing utilities shown on the utility site plan. The

MODULAR BUNKHOUSE UNIT 000050-4

bunkhouse shall be in full compliance with the 2021 International Building Code for R- 3 occupancy, congregate living facility and will include installation of an NFPA 13R compliant fire sprinkler system. See paragraph 2.8 below for additional fire sprinkler system requirements.

B. The contractor shall submit a professionally prepared preliminary design (floor plan and elevations) to the Contracting Officer for approval within (2) weeks after the Notice to Proceed. Submit preliminary drawings in PDF format. The Forest Service will review and comment within 10 days of the receipt of the drawings.

C. The contractor shall resubmit drawings within 10 working days after comments to receive approval to move forward. Written approval from the Contracting Officer is required.

D. Upon approval of the final preliminary design by the Forest Service COR, the Contractor shall submit a PDF copy of the drawings as indicated below and design calculations to the Contracting Officer for approval through the Region 4, Director of Engineering within

(4) weeks after approval of the preliminary design.

1. The detailed drawings shall include:

a. Complete construction details and schedules for the building.

b. Foundation plan and details.

c. Framing plans and details for porches and covers for entries and ramps.

d. Construction plans and details for the accessible ramp.

e. Mechanical plans showing equipment, ductwork, registers.

f. Plumbing plans, showing all fixtures, waste and vent piping, supply piping and their sizes, location of water heaters, their make, model and specifications.

g. Fire sprinkler plan showing layout and equipment and hydraulic calculations.

h. Cut sheets for appliances and equipment, demonstrating Energy Star compliance.

i. Electrical plans, showing all panels, lighting schedules, device locations, circuitry, makes, models, and specifications.

j. The drawings shall be stamped by an Engineer or Architect, licensed in the

State of Idaho.

2. Upon final approval of the drawings by the Contracting Officer, the Contractor shall submit 2 full sets of stamped, signed, reproducible drawings, and an electronic copy of all files in PDF, electronic drawing files in (in DXF or DWG file format) along with 4 sets of the final working drawings on 22-lb bond.

E. Unless noted otherwise below, all appliances, fixtures, and component parts or details not specifically covered by these specifications shall be those which are considered standard or better quality for commercial home building use, be Energy Star rated, or as approved by the Contracting Officer.

F. This building shall be designed to exceed the International Energy Conservation Code (IECC), 2021 for multi-family residential construction. The Government is required to save an additional 30 percent energy use over International Energy Conservation Code (IECC), 2021 Supplement Edition if cost effective. Compliance shall be demonstrated

MODULAR BUNKHOUSE UNIT 000050-5

by providing detailed reports from software such as ResCheck (current version) or similar software. All energy related requirements identified throughout this specification are intended to be mandatory. The following required report shall show the energy performance requirements listed above have been met. Required report(s) shall include the equivalent of the following:

1. Building envelope report, including construction assembly (i.e. walls, ceiling/roof assemblies, floor assemblies, foundations, and windows and doors.) The Compliance Certificate as generated by REScheck meets this requirement.

2. Address mandatory compliance requirements of the IIEC for envelope and systems noted in the checklists for REScheck.

G. Modular Bunkhouse Unit shall be designed with the following areas:

1. Four each, minimum 120-square foot bedrooms, including a built-in closet. The closet shall be divided for two occupants. Each shall contain a closet hanging rod, 2 shelves, 1 lockable drawer with a hasp for a personal padlock, and one non-lockable drawer. One bedroom shall be fully ADAABAG compliant (accessible).

See the contract drawings for details.

2. Two toilet and shower rooms with the following components: floor mounted tank type toilet, toilet paper dispenser, 2 coat hooks, mirror unit, soap dispensers, wood framed, laminate covered countertop with top mounted lavatories, accessible faucet, a prefabricated 36” x 36” shower unit, with soap dish, mixing valve and shower head, cubicle framing and finishing, stainless steel curtain rod and anti-microbial shower curtains.

3. One of the two bathrooms shall be fully ADAABAG compliant (accessible).

Accessible plumbing fixtures shall be provided in this bathroom. See the contract drawings. There shall be one common use accessible toilet room with the following components: One floor mounted tank type toilet, 36”, and 24” stainless steel, wall mounted grab bars, toilet paper dispenser, wood framed, laminate covered countertop with top mounted lavatory and faucet, soap dispenser and anti-scald drain guard. See the ADAABAG Accessible guidelines for any additional requirements.

4. A common kitchen of approximately 150/SF to accommodate 2 each range/ovens, One each-double sink, two each combination refrigerator freezer, one each dishwasher, and 20-linear feet of 24-inch deep countertops and a 8’-foot island with an 8-foot long eating counter (30-inches above finished floor) located on the dining room side of island. Provide a minimum 12’ of 28” high by 12” deep upper cabinets. Provide 2 each microwave ovens. See the appliance specifications for details.

5. Provide a washer and dryer with venting and electrical support. See specifications.

6. Approximately 250/SF dining/common use area. This space shall be open and adjacent to the recreation/living area and shall include a laundry closet and pantry.

Provide a continuous decorative wood chair rail around the room to protect the wall.

Pantry closets shall have the same vinyl flooring as the main common use area.

Provide 25 SF of Pantry Storage space with floor to ceiling built in painted white MDF shelving. Provide details for shelving construction for the submittal.

MODULAR BUNKHOUSE UNIT 000050-6

7. Approximately 195/SF common use area. This space shall be open and adjacent to the dining area. Provide a continuous wood decorative chair rail around room to protect the wall.

8. Mechanical closet to accommodate electric water heater, and fire riser. Heating shall be electric with individual heaters and controls located in each room. See paragraph 2.6 and 2.7 below for mechanical requirements and additional information. Floor drains shall be installed to accommodate drain lines. Provide an area for housing the fire sprinkler support equipment for the building including any required booster pump for building water supply may be located in this room.

H. Finishes of Walls and Ceilings

1. All interior wall finishes shall be “light orange peel” textured, painted, 5/8-inch type-X, fire rated gypsum board with 4” rubber coved base. Ceiling finish shall be 5/8” textured, painted gypsum board. Wall finishes in bathrooms shall be Fiberglass Reinforced Plastic wainscoting (FRP) over 5/8-inch waterproof type-X gypsum board. IBC requirements for fire partitions, smoke compartments, and corridor fire resistance for R-3 occupancy are required.

I. Colors:

1. Exterior and Interior colors shall be as selected by the Contracting Officer’s Representative from the full line of products available for the materials specified:

J. Doors and Hardware:

1. All interior swinging doors shall be flush, birch veneer, solid core, stained and varnished a minimum of 1 ¾” x 3’-0” x 6’-8”. All interior hardware shall have levered handles and shall meet ADAABAG accessibility guidelines. Interior doors to bedrooms shall have lever handled, separately keyed, entrance locksets with a privacy type deadbolt keyed to match each entrance lockset. All interior locksets/deadbolts shall be master keyed to all exterior and other keyed door hardware. Doors to bathrooms shall have lever handled bathroom type privacy locksets. Water heater closet doors may be narrower but must be sized to allow service and replacement of units.

2. All sliding doors shown on the plans shall be birch veneer, solid core, stained and varnished.

3. All exterior doors shall be painted 1-3/4-inch-thick x 3-feet wide x 6-feet 8-inches tall, insulated metal doors with closers and with half-light. All exterior door hardware shall meet ADAABAG requirements and have a satin chrome or satin stainless steel (US26D or US32D) finish. Provide wall mounted 8-inch by 15-inch minimum, red photo luminescent exit signs centered above interior trim on every exterior door. Exterior doors shall have lever handled push button pin activated locks per specification.

K. Kitchen:

1. Kitchen cabinets shall be provided in compliance with Specifications Section 064023 Interior Architectural Woodwork. Provide a minimum of 20-lineal feet of countertops with 4-inch backsplashes for base cabinets in kitchens and laundry

MODULAR BUNKHOUSE UNIT 000050-7

room and wall hung and base cabinet countertops for restrooms. Provide 8 LF of island countertop with wider profile, and 30” high eating area as shown on the drawings. Provide approximately 5 lineal feet of upper wall cabinets in laundry area.

2. See the contract floor plan for preferred layout of kitchen cabinetry.

L. Exterior Front Entryway and Ramp:

1. Building elevation must be set to reduce the need for stairs and minimize runs of ramps. All exterior concrete landings at doors and bottom of ramps shall be a minimum of 5-feet square. Top landings shall be installed to match finish floor elevation of bunkhouse unit with only slight slope from building to drain. (i.e., maximum elevation differential between landing and top of door threshold shall not exceed ½ inch.). Ramps shall be a minimum of 36-inches clear width and any intermediate landing with a change in direction from the ramp shall be a minimum of 60-inches wide. Ramp shall be constructed and equipped in accordance with 2010 ADAABAG and have a maximum slope of 1 in 12 with a maximum rise of 30-inches between landings. Ramp and landing areas shall be equipped with guardrails/handrails as per paragraph above. All ramps shall be constructed cast in place concrete and shall be constructed to minimize their length by increasing fills at building and grading from building to meet ADAABAG requirements.

2.2 BUNKHOUSE BUILDING – The following construction requirements shall apply:

A. Roofing shall be exposed fastener metal roof panels, meeting requirements of specification Section 074113, with 6-feet wide ice dam membrane installed over roof sheathing at eaves and valleys, and 3-foot-wide ice dam membrane at ridges and gables.

Roof pitch shall be not less than 4 in 12, with all overhangs 24-inches minimum. All roof penetrations shall be made within 24-inches of the ridge of the roof and shall be painted to match roof color. Attic ventilation shall be installed on the roof gables and continuously in soffits. Facias shall be covered with sheet metal and match roofing. Roof trusses must be an energy heel type truss style to maximize energy efficiency. Provide R-49 insulation in roof.

B. Siding and trim material shall be as follows:

1. Horizontal Siding shall be a fiber cement composite lap siding with an 8-inch exposure, factory primed and painted, color as selected by the Contracting Officer.

Horizontal Siding shall not have continuous vertical joints at adjoining building modules.

2. Vertical Siding shall be a vertical fiber cement board as shown in the drawings:

factory pried and painted.

3. Trim shall be a minimum of 1 1/4-inch thick approximately 6-inches, and 4-inches wide and be fiber cement composite material matching siding. Trim shall be factory primed and receive a minimum of 2-finish coats of paint. Windows shall have a 3 1/2” trim border. All corners of the buildings shall receive vertical trim pieces, installed to butt up against each other. All nail holes shall be painted and

MODULAR BUNKHOUSE UNIT 000050-8

covered with Manufacturers supplied matching paint and color. All cut edges shall be painted.

C. The non-accessible lavatories shall be mounted in a plastic laminate countertop and 4-inch-high backsplash. Accessible lavatory shall be wall mounted. Toilets shall be elongated bowl, 1.2 gallon or less per flush type with pressure assist flushometer tank with tank lever located on accessible side of tank or push operators located centered on tank lid.

D. Sheet flooring shall be per specification Section 096520 Resilient Floor Coverings. Wall base shall be per specifications Section 096530 Resilient Wall Base and Accessories. All resilient floor transition strips shall be ADAABAG compliant vinyl or rubber. Submit sample of transition strips for approval by Contracting Officer.

E. Shower surrounds shall be waterproof (acrylic, or fiberglass), a minimum of 36-inches square. Accessible shower shall be fully ADAABAG compliant, including a removable, fold-down shower seat, grab bars, and shower curtain. Floor drain shall be installed centered in front of access to accessible shower. Non-accessible showers shall be equipped with shower doors. All shower units shall be equipped with anti-scald type, lever-handled shower valves, soap dish, and shelf (integral or mounted type).

F. The bunkhouse shall be insulated with the following minimum resistance rating:

1. Walls R-21

2. Ceilings/roof (energy truss required) R-49

3. Floors R-15 for slab

4. R-30 for crawlspace floor.

5. Foundation walls R-15

6. Exposed water piping in crawlspace Minimum 3” pipe insulation.

7. An extra furring wall and insulation shall be provided at all locations where piping is placed in exterior walls. See the provided plans showing bathroom, laundry and kitchen layouts.

G. All windows shall be sliding style, fully weather-stripped, double-glazed, low-E, elevation adjusted. Windows shall be rated highly for use in high wind areas. Windows shall be fiberglass framed windows. Glazing in bathrooms shall be double-glazed obscure type.

1. Basis of Design Window:

a. Pella Impervia Fiberglass Windows.

b. Color: as approved by COR from Manufacturers full range of colors.

c. Windows shall be installed per manufacturer’s recommendations.

2. Windows located in bedrooms shall be sized and located for egress requirements per 2021 IBC. Provide 1-inch horizontal metal blinds for each window except bathroom windows per specifications Section 122113 Blinds.

2.3 See Radon Mitigation Specification 312113 for Radon Mitigation requirements.

MODULAR BUNKHOUSE UNIT 000050-9

2.4 APPLIANCES - The following appliances shall be furnished and installed of one color, chosen by the COR. See Appliance Specification 113100 for Basis of Design Products.

A. Two freestanding electric range/ovens, with temperature-controlled self-cleaning bake oven with glass oven door, and four burners. Matching, exterior vented, range hood shall be supplied for each range/oven. One range/oven shall be equipped with front controls for ADA requirements and may be a drop-in type unit. Ranges shall be located so they can be each used at the same time.

B. Two range hoods shall be fully vented to exterior, a minimum 160 CFM fan capacity, with light. Color shall match range/oven. See electrical requirements paragraph 2.7D for required location of controls on the accessible range hood.

C. Two each high energy efficiency (Energy Star Rated), full size upright refrigerators freezer combination without freezer unit (25-cubic foot minimum capacity).

D. One clothes washer, large capacity, front loading, water sving washer, energy efficient (Energy Star Rated), and simple controls. The manufacturer of washer shall match the manufacturer of the dryer, See 113100, Residential Appliances.

E. One electric dryer having an auto dry cycle (i.e. senses moisture content), minimum 7 cubic foot capacity. Electric Dryer shall be front loading. Controls for washers and dryers must be front mounted. The manufacturer of dryer shall match the manufacturer of the washer.

F. Microwaves: Provide 2 each 1.7 CU capacity microwaves with turntable, 1000 Watts, stainless finish.

2.5 STRUCTURAL

A. Basis of Design Structural Requirements are as follows:

1. Governing Building Code: International Building Code (IBC) 2021

a. Risk Category 2

2. Suspended Floor Loads:

a. Live Load = 40 PSF

b. Dead Load = 30 PSF

3. Roof Loads:

a. Flat Roof Snow Load, PF: 101 PSF

1) Ground Snow Load, PG: 120 PSF

2) Snow Exposure Factor, CE: 1.0

3) Snow Load Importance Factor, IS: 1.0

4) Thermal Factor, CT:1.2

b. Live Load = 20 PSF

c. Dead Load – 20 PSF

MODULAR BUNKHOUSE UNIT 000050-10

4. Wind Design:

a. Basic Wind Speed (3 Second Gust); 115 MPH

b. Wind Exposure: B

c. Component and Cladding Design Wind Pressure shall be as required per

ASCE 7-16.

5. Seismic Design:

a. Seismic Importance Factor, IE: 1.0

b. Site Class: D

c. Seismic Category: D

6. Foundation:

a. Design Soil Pressure: 2,500 LB/SF

b. Soils Report By: US Forest Service, Dated 11/16/2022

B. The modular bunkhouse building shall be set on a permanent, engineered, reinforced concrete foundation wall system with concrete footings below grade, 6 inches minimum below frost line, set into the ground to minimize ramps and stair access to the building.

Foundation footings shall not be placed over disturbed soil. Rigid-Board Insulation (minimum R-Value of 5) will be direct buried against the vertical position of the foundation along all external walls Design and construction of the bunkhouse foundation shall conform to the 2021 International Building Code and meet all seismic requirements of this code. Top of foundation wall shall be minimum of 6” above grade.

1. Engineered, stamped drawings and calculations for the building foundation, required hold downs, required roof structures, ramps and ramp footings shall be submitted for approval by the Contracting Officer a minimum of two weeks prior to construction.

2. Provide Foundation ventilation. Vents shall be the automatic type closing at approximately 40 degrees F and opening fully at approximately 70 degrees F.

Locate foundation vents to meet IBC requirements and protect well openings from precipitation, irrigation, and roof shedding.

3. Provide vapor barrier for the crawlspace.

C. All concrete and concrete placement shall be in accordance with Section 033000.

D. The bunkhouse building module shall not be placed on the building foundation until the foundation construction is approved in writing by the Contracting Officer.

2.6 SITE WORK

A. See the Utility Site Plan for correct orientation of the building and locations of utilities.

Contractor shall verify utility locations for building supplied. See Utility Site Plan for required site improvements including concrete pads and walkways. Accessible walkways shall provide an accessible route from both accessible entrances to accessible parking, including direct access (i.e. shortest distance possible) to the accessible parking space.

MODULAR BUNKHOUSE UNIT 000050-11

B. Provide a continuous, approximately 24 inch wide, gravel drip bed at all roof lines around building which extends from face of building foundation to just beyond drip line of roof eaves. Gravel size shall be 3/8” crushed.

2.7 MECHANICAL:

A. Please see the Civil Engineering drawings for the configuration of the water supply lines for domestic service and the required fire protection system.

B. Both hot and cold water and water shall be supplied to each sink, lavatory, shower, and service sink and washing machine. Cold water lines and fixtures shall be supplied to each water heater, water closet and to two freeze-proof-type hose bibs (front and rear) for the unit. The water system in the building shall be designed for easy winter shut-down of the building including drainage of all water piping. Provide a Schrader valve for air blowout within reach of crawl space access. The Contractor shall provide a written plan in the required O&M manual, per paragraph 2.10A below, containing the building water system shut-down and startup procedures for the building. The water service line shall be connected to the proposed water system as shown on the Site Plan. It is requested that the contractor utilize alternative water piping materials that are freeze resistant such as PEX. Provide drain lines and venting required by code. Consolidate waste venting to minimize roof penetrations, and place roof penetrations within 2 feet of the peak of the roof ridge line.

C. Electric heating units and types are shown on the electrical drawings.

D. Water supply and drain, waste and vent piping shall be designed and installed in conformance with the 2021 International Plumbing Code, and State and local codes, whichever is more stringent.

E. Kitchen shall have 1 stainless steel double sinks with lever style faucet controls with separate or integral sprayer. One sink shall have one bowl with a maximum 6-inch depth and installed in countertop to meet ADAABAG requirements.

F. Water Heater Tank: See Electrical Specifications and Drawings for details.

2.8 ELECTRICAL

A. The unit shall be provided with a complete and operable electric system, including service lateral conduit, load center, grounding, boxes, branch circuits, and all devices as called for in these specifications (pumps, HVAC, etc.).

B. Electrical layout shall be 2020 National Electrical Code residential style with 20-amp circuits minimum. Refer to electrical layout drawings that show minimum requirements based on layout.

C. The Contractor shall be responsible for coordinating installation of electrical service.

D. Accessible Range hood

1. One of the range hoods in the accessible building shall be connected for accessibility as follows:

MODULAR BUNKHOUSE UNIT 000050-12

a. Disconnect factory switches for light and fan, leaving the automatic fan (turns on during high heat) connected. Label "Controls on front of cabinet."

b. Install a dual switch on a single yoke to the front of the cabinet as shown in cabinet details.

c. Factory label or other acceptable means the switch cover so the top switch is labeled "light" and the bottom switch is labeled "fan".

d. Install the range hood light (high, not night light) on the top switch. The night light function will not be connected.

e. Install the range hood fan on high on the bottom switch. The low fan function will not be connected.

f. Install the range hood fan high ambient temperature function on an always hot line from the switch.

E. Telephone and Cable TV

1. Contractor shall provide conduit lateral for telephone line and cable TV installation and provide utility connection points near the building electrical service.

2. Contractor shall certify that all telephone and TV cable wiring is functioning at all required jacks.

3. If called for in the drawings to provide phone service, coordinate telephone service through Freemont Telecom, the local provider.

a. No long-distance service, local calling only.

4. If called for in the drawings to provide Cable TV, coordinate Cable TV service through x, the local provider.

2.9 FIRE SPRINKLER SYSTEM

A. Fire sprinkler system shall be designed for a wet-pipe fire sprinkler system protected from winter freezing by filling system with antifreeze. The system design shall meet the requirements of 2007 NFPA 13R standards plus specifications section 211313 fire Sprinkler System and the following requirements/design considerations:

1. All sprinkler heads shall be concealed.

2. The system must be designed to operate with or without a building water supply with a dynamic/fire flow of 20 pounds per square inch (PSI) minimum/56 gallons per minute (GPM). Building water supply will be shut down during winter months, but fire protection must still function. See paragraph 2.6 and coordinate for required pressure requirements. System may be designed to be supplied by a pump/tank combination listed for use in an NFPA 13D fire sprinkler system.

3. Piping system shall be installed concealed in walls to allow for drainage, and possible winterization. Piping may be installed exposed only in mechanical rooms or fire equipment room.

2.10 BATHROOMS AND MISCELLANEOUS

A. Bathroom accessories shall include the following:

1. Bathroom:

MODULAR BUNKHOUSE UNIT 000050-13

a. Dual-roll toilet paper dispenser, wall mounted soap dispenser (at lavatory), 2-coat hooks (54-inches maximum above finished floor), 42”, 36” and 18” stainless steel grab bars (accessible bathroom), 24” x 36” mirror, stainless paper towel dispenser for folded paper towels.

2. ADA Bathroom:

a. Dual-roll toilet paper dispenser, wall mounted soap dispenser (at lavatory), 2-coat hook (54-inches maximum above finished floor), 42”, 36” and 18” stainless steel grab bars (accessible bathroom), 24” x 36” mirror, stainless paper towel dispenser for folded paper towels.

3. Kitchen:

a. Paper towel holder, undercounter.

4. Fire Extinguisher and cabinet:

a. 2- 10 lb residential fire extinguishers, hook mounted.

2.11 OPERATIONS AND MAINTENANCE MANUAL

A. Provide a complete, bound operations and maintenance manual upon completion of project. Manual shall include manuals for all equipment installed, including operation, maintenance, and users guides, separated with labeled, tabbed dividers, by equipment. A maintenance chart shall be included listing all equipment and indicating maintenance required on a monthly, quarterly, semi-annual, and annual basis for each piece of equipment installed. O&M Manual shall have a cover sheet with the building name, date of project completion, and full name and address of the prime contractor and names and addresses for all sub-contractors/installers of equipment included in manual.

PART 3 - EXECUTION

3.1 GENERAL

A. Work shall be completed in accordance with the contract drawings and specifications.

END OF SECTION

NOVEMBER 2022

CONSTRUCTION STAKING 010250-1

Crawford Modular Bunkhouse

SECTION 010250 - CONSTRUCTION STAKING

PART 1 - GENERAL

1.1 SUMMARY

A. This work shall consist of the construction staking for: paths, parking areas, and utilities in accordance with the Drawings and Specifications. The work includes the furnishing of all labor, equipment, instruments, materials, transportation and other incidentals necessary to complete the construction staking in accordance with these specifications and acceptable engineering practice.

1.2 QUALITY CONTROL

A. Construction staking shall be accomplished under the direction of a Civil Engineer, Engineering Technician, or Land Surveyor closely associated and familiar with construction staking; periodic visits to the project site are required.

1.3 MEASUREMENT AND PAYMENT

A. Measurement shall be lump sum for surveying and staking the project through all phases of construction.

PART 2 - PRODUCTS

2.1 GOVERNMENT-FURNISHED SURVEY SHEETS AND STAKING

A. The Government will provide the contractor with a set of survey sheets showing horizontal and vertical control for sites to be staked. The government will stake the location corners of the new building with cut/fill quantities. The Government will provide the Contractor with layout information that may include:

1. Control Points - Northing, Easting, Existing Elevations.

2. Paths, - Northing, Easting, and Finish Elevations.

3. Utility Lines - Northing, Easting, for centerline of utilities (Water Line, Sewer Line, Electrical Lines).

2.2 STAKES

A. Identification stakes and hubs shall be of sufficient length and width to provide and solid set in the ground and to provide space for marking above ground when applicable. Other dimensions and materials may be used, such as steel reinforcing bars, wire flagging and markers, and metal pins, if approved in writing by the Contracting Officer (CO). The top 2 inches of all slope, guard, reference, clearing, and structure stakes shall be painted or marked with plastic flagging. Colors used on stakes or for flagging shall be as follows:

CONSTRUCTION STAKING 010250-2

1. Waterlines, utilities, and culverts -Blue

2. Buildings, excavation and grading -Yellow/Orange

2.3 SURVEY NOTE PAPER AND BOOKS

A. Paper for survey notes shall be moisture-resistant paper. Notes shall be contained in books with covers that will protect the contents and retain the pages in numerical sequence during field use. Field notebooks or note paper shall be furnished by the contractor.

PART 3 - EXECUTION

3.1 GENERAL

A. The Contractor shall be required to provide all necessary staking and control for all phases of construction. The contractor shall use the government installed stakes as well as the data and information shown on the project drawings to establish the location of all facilities to be constructed under this contract. The Contractor may choose any method of establishing horizontal and vertical controls provided the following minimum precision and accuracy requirements are met.

B. Accuracy requirements:

1. Minimum position close; 1/1000

2. Vertical closure: 0.05 ft (vertical)/station (100 feet horizontal)

3. Cross section and slope stake precision:

C. Allowable deviation of cross section line projection from a true perpendicular to tangents, a true bisector of angle points, or a true radius of curves: +/-3 degrees.

D. Cross section topography measurements shall be taken so that variations in ground form a straight line connecting the cross-section points will not exceed: 1.0 ft.

E. Horizontal and vertical accuracy for slope stake, slope stake references, and clearing limits. In feet or percentage of horizontal distance measured form centerline or reference stake, whichever is greater. Slope reference stakes and slope stakes: 0.15 ft or 0.6%.

Clearing limits: 1.0 ft.

3.2 ESTABLISHING AND REFERENCING IMPROVEMENT LOCATIONS

A. Waterline, Sewerline, & other Utilities

1. Waterline, Sewerline, & other Utilities shall be staked at the locations shown on the drawings with the specified minimum burial depth. Waterline and sewerline elevations shall be accurately staked to provide for drainage as indicated on the drawings. Grade stakes shall be established as necessary to provide the control for the construction work.

B. Buildings

CONSTRUCTION STAKING 010250-3

1. Slope stakes and slope stake references shall be established at each building corner, offsets, and as necessary to provide adequate construction control.

3.3 MARKING STAKES

A. All stakes shall be legibly marked, in the format agreed upon with the Contracting Officer, with a stake pencil that leaves an imprinted or with waterproof ink. Marking shall conform to the nomenclature below;

PI Point of Intersection of tangents PC Point of curvature POC Point on curve Pt Point of tangency POT Point on tangent RP Reference point P P-line (preliminary location line) L L-line (final location line) BM Bench mark TBM Temporary bench mark BT Begin taper (any) ET End taper (any) C Cut F Fill L Centerline D Ditch W Width

3.4 SURVEY NOTES

A. All survey data shall be neatly recorded in survey books. All survey notes shall become the property of the Forest Service. Errors shall be deleted by lining out. Date, crew names and positions, instrumentation, and weather shall be recorded in the notes at the beginning of each day’s work. The party chief shall sign or initial each page of the notes immediately after the last entry for each day’s work.

B. Electronically recorded survey notes shall be consecutively numbered and headed to identify the contents. The notes shall be supported and accompanied by a bound book that records the project name and for each day identifies date, crew names and positions, instrumentation, weather, type of survey, stationing of sections between which survey was performed, and survey data or sketched that cannot be electronically recorded. The party chief shall sign or initial the electronically recorded notes and Day Book immediately after the last entry for each day’s work.

END OF SECTION 010250

NOVEMBER 2022

MEASUREMENT AND PAYMENT 011250-1

Crawford Modular Bunkhouse

SECTION 011250 - MEASUREMENT AND PAYMENT

PART 1 - GENERAL

1.1 SUMMARY

A. Measurement and payment for contract work will be made only for and under those pay items included in the Schedule of Items. All other work, labor, materials, equipment, and incidentals necessary to successfully complete the project will be considered as included in the payment for items shown. This section defines the method of measurements and basis of payment for work items listed in the Schedule of Items.

B. When more than one class, size, type, thickness, etc. is specified in the Schedule of Items for any pay item, suffixes will be added to the item number to differentiate between the pay items.

1.2 DETERMINATION OF QUANTITIES

A. The following measurements and calculations shall be used to determine contract quantities for payment.

1. For individual construction items, longitudinal and lateral measurements for area computations shall be made horizontally or corrected to horizontal measurement unless otherwise specified. Measurements for geotextiles, netting and erosion control blankets shall be along slope lines.

2. For excavation or embankment volumes, the average end area method shall be used to compute volumes. However, if in the judgment of the Contracting Officer (CO), the average end area method is impractical, measurement shall be made by volume in hauling vehicles or by other three-dimensional methods.

3. For Structures, they shall be measured according to neat lines shown on the drawings or as altered by the CO, in writing, to fit field conditions.

4. For items that are measured by the linear foot, such as pipe culverts, fencing, guardrail, piping, utilities, and underdrains, measurements shall be made parallel to the base or foundation upon which the structures are placed.

5. For aggregates weighed for payment, the tonnage shall not be adjusted for moisture content, unless otherwise provided for.

6. For standard manufactured items (such as fence, wire, plates, rolled shapes, pipe conduits) identified by gauge, weight, section dimensions, and so forth, such identifications shall be considered the nominal weights or dimensions. Unless controlled by tolerances in cited specifications, manufacturer's tolerances shall be accepted.

B. Earthwork Tolerances - Adjustments of horizontal or vertical alignment, within the tolerances specified in this contract, or shifts of balance points up to 100 feet shall be made by the contractor as necessary to produce the designed sections and to balance…