This document package includes a mechanical design file and bill of quantities for demolition and removal of existing HVAC systems at a government residence in Bosnia and Herzegovina, along with the related federal contract solicitation.
The mechanical design file provides details on the existing boiler room, central heating system, air conditioning systems, and natural gas connections to be demolished at the residence. It includes an existing site plan drawing and specifies demolition of the underground fuel oil tank, oil and gas piping, boiler and radiator equipment, and ductwork. The accompanying bill of quantities estimates costs for the demolition and removal work both inside and outside of the building.
The related federal contract solicitation seeks offers for site demolition and stabilization work at the residence, to include the HVAC system removal work outlined in the design documents. The solicitation was issued by the Department of State Office of Acquisition Management.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 19GE5022R0118_Q and A Volume I.pdf | ||
| 19GE5022R0118_P00001.pdf | ||
| DBAWaiver-BosniaHerzegovina.pdf | ||
| 19GE5022R0118_RFP Cover letter.pdf | ||
| J.1.9_Plumbing Installations.pdf | ||
| J.1.4_Bill_of_Quantities_-_Demolition_and_Site_Conservation.pdf | ||
| J.1.5_Architecture_and_Landscape_-_Demolition_and_Site_Conservation.pdf | ||
| 19GE5022R0118.pdf | ||
| J.1.3_Site Stabilization.pdf | ||
| J.1.1_Geotechnical_Properties_.pdf | ||
| J.1.7_Electrical_installations.pdf | ||
| J.1.2_General.pdf | ||
| J.1.6_Demolition_and_Construction_Site_Conservation.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A-E_SERVICES_CMR_ DEMOLITION_&_CONSTRUCTION_ SITE_CONSERVATION
SARAJEVO, BOSNIA&HERZEGOVINA
1 | P a g e d a t e 2 0 2 1 / 0 9
Book 4
Part 5 MECHANICAL INSTALLATIONS
4.6.1 Technical description
4.6.2 Bill of Quantities
4.6.3 Drawing
M-001
M-001 EXISTING SITE PLAN MECHANICAL INSTALLATION 1:1000
2 | P a g e d a t e 2 0 2 1 / 0 9
4.6.1 TECHNICAL DESCRIPTION
This design refers to demolition works of mechanical installations at the “ Chief of Mission Residence CMR Sarajevo”.
GENERAL
Mechanical installation in existing building originally consists of central heating system with its own boiler room and hot water system for heating with radiators. As the building changes its purpose and internal space organisation, some local air conditioning systems have been added and installed.
BOILER ROOM
The boiler room is in ground floor of the building and use the fuel oil. There is one hot water boiler with fuel oil burner and all necessary equipment as circulating pumps, closed expansion vessel, headers, regulating three-way valve, steel pipes, water softener and chimney.
All mentioned and installed equipment is older more than 25 years. Complete installation is out of use for a long period of time.
Having in mind the age and current condition, it is reasonable to conclude that all equipment has no use value.
Picture 1. Boiler room
3 | P a g e d a t e 2 0 2 1 / 0 9
Boiler room has been supplied by fuel oil from the underground fuel storage with total capacity of 22.7 m3. Fuel storage is located on the north side of compound and connected by underground return and supply oil line to the boiler room. Oil lines are installed in 150 mm conduit.
CENTRAL HEATING SYSTEM
Central heating system consists of main steel pipes network installed under the ceiling of ground floor and in the slabs and walls. Some relatively new reconstructions of horizontal networks are visible and made of cupper pipes installed above the floors and along the walls.
Generally, two types of radiators are installed within the building, cast iron radiators, mainly on the ground floor, and aluminium radiators on the first and second floor.
Radiator batteries consist of up to 20 segments and significant amount of them is already dismantled from wall hangers and supports.
Having in mind that complete installation is out of water for a long period of time, steel pipes and cast-iron radiators are probably heavily damaged by corrosion and have no use value. Beside that, there was possibility of water freezing during the winter period that could seriosly damaged aluminium radiators. In that case neither aluminium radiator would have any use value.
Picture 2. Existing radiators
4 | P a g e d a t e 2 0 2 1 / 0 9
AIR CONDITIONG SYSTEMS
Air conditioning systems consists of split systems installed under the ceilings on the first and second floor as well as in guards’ facilities. This quipment is in relatively good condition. Some indoor units are with flexible ducts and connected with air diffusers in different rooms. Ducting work and air diffusers are in bad condition.
Picture 3. Uderceilng indoor AHU and air diffuser
NATURALE GAS COMPOUND CONECTION
There is natural gas compound connection on the south side, in the front of the building, direction Alipasina street. On the existing site plan drawings there is the PE gas pipeline diameter 63 mm in total length of 45 m. There is also the pressure regulation station.
Natural gas has not been used in existing boiler room because of boiler room location which is not in accordance to technical norms.
5 | P a g e d a t e 2 0 2 1 / 0 9
DEMOLITION WORKS
Demolition works include all necessary works on removal of existing outside and inside mechanical installations. Outside installation includes fuel oil and natural gas installations.
Inside works refer to dismantling and demolition of boiler room as well as entire steel and coper pipeline installations and radiators. Inside demolition works also include dismantling of all air handling units with its ducting work and diffusers.
In accordance with previously stated opinion some of aluminium radiators as well as air conditioning systems have some value and should not be removed to the dump site.
NOTE: We didn't have any data about tank type that is installed and way that is installed. We presumed that is laid down on the concrete slab and strapped to it and afterwards covered with soil.
When removal start, we will know in what condition is the tank and is there any soil contamination around it. If so, all surrounding soil will be excavated, tested for contamination and changed with new soil.
During the excavation all soil samples and photographs will be provided.
Main designer :
Mr. Sc. Kenan Ceric dipl. ing. mas
COMMENTS AND ANSWERS
Comment status ID: 954938
Answer: The use of natural gas in new boiler room is envisaged by new mechanical project.
Reason for dismantling and removal of existing natural gas pipeline, as well as gas regulation station, is safety measure during construction. It would be very dangerous to have natural gas pipeline and gas regulation station under the pressure in the middle of construction site with a plenty of heavy machinery, trucks, and all kind of workers.
Revised Oct 18 2021.
Comment status ID: 956972
Answer: Enclosed drawings P-01,02,03 in Book 4 - Part 5 "Mechanical" are canceled and replaced with new drawing M-001
Revised Oct 18 2021
6 | P a g e d a t e 2 0 2 1 / 0 9
Comment status ID: 956987 replaced with new drawing M-001.
Comment status ID: 956988
Answer: Enclosed drawings P-01,02,03 in Book 4 - Part 5 "Mechanical" are canceled and
Comment status ID: 956989
Comment status ID: 956990 replaced with new drawing M-001
Comment status ID: 957142
Answer: Enclosed drawings P-01,02,03 in Book 4 - Part 5 "Mechanical" are canceled and
Comment status ID: 954938 rev2 comment open
Answer: Intention is to remove the natural gas pipeline and gas regulation station only during construction.
Backcheck Recommendation Open Comment Please clarify, is it your intention to remove natural gas from the residence permanently, or only during construction?
Submitted By: Frank Luciani (703-875-6113) Submitted On: Oct 22 2021 mailto:Lucianifs@state.gov
7 | P a g e d a t e 2 0 2 1 / 0 9
8 | P a g e d a t e 2 0 2 1 / 0 9
4.6.2_ BILL OF QUANTITIES
No. Descritpion Meas.
Unit Quantity Unit price Total
A DEMOLITION WORKS
1.0. OUTSIDE THE BUILDING
1.1. Excavation and taking out of the trench the
existing underground fuel oil tank volume 22 m3. Loading it on the track and disposal on a location according to investor request.
Calculate transport up to the 20 km.
pcs. 1 4000 4000
1.2. Excavation and taking out of existing fuel oil
supply and return pipes in conduit Æ150mm.
m' 70 30 2100
1.3. Dismantling of existing remote oil fill box with
fill tank line length 5 m.
pcs. 1 200 200
1.4. Excavation and taking out of the existing
natural gas pipe line, PE Æ63. This works have to be done by approval of KJKP SARAJEVOGAS and after closing of gas connection and venting out of the pipe.
m'. 45 30 1350
1.5. Dismantling and removal of existing gas
regulation station with connection gas pipe length up to 10 m and relocation of new position. This works have to be done by approval of KJKP SARAJEVOGAS and after closing of gas connection and venting out of all pipes.
pcs. 1 3000 3000
1.6. Dismantling and closing the existing connection
on natural gas distribution network. This works have to be done by approval of KJKP SARAJEVOGAS and according to technical documentation.
pcs. 1 2000 2000
1.0. TOTAL DEMOLITION WORKS OUTSIDE THE BUILDING 12650
9 | P a g e d a t e 2 0 2 1 / 0 9
A DEMOLITION WORKS
2.0. INSIDE THE BUILDING
These works include dismantling, removal, loading on the track and disposal on location according to investor request. Calculate transport distance up to the 20 km. All necessary anciliary works, tools and other services have to be included.
2.1. Oil fired steel hot water boiler, nominal power
Q=180 kW pcs. 1 1500 1500
2.2. Oil fuel burner, Weishaupt, model WL 30/1-C
ZM, heat load Q= 194 kW, Burner is equipped with oil filter, ball valves and houses and electrical switch board.
pcs. 1 200 200
2.3. Hot water circulation pump pcs. 2 100 200
2.4. Three-way valve, with actuator pcs. 1 50 50
2.5. Closed expansion vessel, for hot water, useful
volume V = 80 l pcs. 1 70 70
2.6. Water softener, capacity Q=0.5 - 1 m3/h pcs. 1 150 150
2.7. Hot water headers, made of steel seamless
pipe dimension Ø 108 x 3,6 , length up to 1200 mm, with connections pcs. 2 100 200
2.8. Cast iron radiators, batteries up to 25
segments, height 300 mm, installed on ground floor. All wall/floor accessories included.
pcs. 35 20 700
2.9. Aluminium radiators, batteries up to 20
segments, height 600 mm, installed on first and second floor. All wall/floor accessories included.
pcs. 45 15 675
2.8. Visible Steel seamless pipes, installed as
vertical and horizontal pipeline network, dimensions up to DN 50, max total length up to 600 m. All wall/floor accessories included.
lump sum 500
10 | P a g e d a t e 2 0 2 1 / 0 9
2.9. Visible coper pipes in PE insulation, installed
above the floors and along the walls, dimensions up to 16 mm, max total length up to 300 m. All wall/floor accessories included.
lump sum 300
2.10. Air conditioning systems, inside units installed
under the ceiling of second floor. Unit capacity up to 15 kW. Outside units installed on the roof are included. This item also includes flexible ducting works and air diffusers where installed pcs. 8 500 4000
2.0 TOTAL DEMOLITION WORKS INSIDE THE BUILDING 8245
RECAPITULATION
1.0. TOTAL DEMOLITION WORKS OUTSIDE THE BUILDING 12650
2.0 TOTAL DEMOLITION WORKS INSIDE THE BUILDING 8245
TOTAL ALL 20895
11 | P a g e d a t e 2 0 2 1 / 0 9
4.6.3 DRAWINGS
M-001 EXISTING SITE PLAN MECHANICAL INSTALLATION
N
WC
R z
V l a d a
F e d e r a c i j e
B i
H
U l
A l i p a s i n a
G
WC
Vodena pumpa
Tisa-Yew
Smrca-Spruce
Tisa-Yew
S
S
S
S
R2
R1
(549.1794)
(551.3712)
N
R e s i d e n t a l b u i l d i n g
G o v e r n m e n t
R e s i d e n c e b u i l d i n g
R e s i d e n t a l b u i l d i n g
PEDESTRIAN ENTRANCE TO REMAIN
EXISTING CAC TO REMAIN
NO INTERVENTION ON
EXISTING ENTRANCES
NO INTERVENTION ON
EXISTING ENTRANCES
NO INTERVENTION ON
EXISTING ENTRANCES
NOTE: We didn't have any data about tank type that is installed and way that is installed. We presumed that is laid down on the concrete slab and strapped to it and afterwards covered with soil.
When removal start, we will know in what condition is the tank and is there any soil contamination around it. If so, all surrounding soil will be excavated, tested for contamination and changed with new soil.
During the excavation all soil samples and photographs will be provided.
EXISTING STEEL GAS
SERVICE LINE 51mm (2")
GAS CONNECTION TO BE CLOSED
G
G
G
EXISTING PLASTIC GAS
SERVICE LINE 62 mm (2-1/2")
AND GAS REGULATING
STATION TO BE REMOVED
FUEL OL SUPPLY &RETURN
PIPING RUN IN 150mm CONDUIT
TO BE REMOVED
EXISTING 22.7 m3 (6.000 GAL)
UNDERGROUND FUEL
STORGE TANK TO BE REMOVED
75 mm FILL LINE
TO BE REMOVED
REMOTE FILL BOX
TO BE REMOVED
Phase
Project Number
(Seal)
Classification
Checked By
Drawn By
CADD File Name
OBO Project Number
CADD Plot Scale
Date
Drawing Scale
Number
35%CONCEPT
Sheet
60% 100%90% FINAL
Release For Construction:
Drawing Title
OBO/PDCS/PDC OBO/PDCS/DE
DescriptionRev Number
Revisions
Date
CAD_NAME
PROJ_NO
PNUM
OVERSEAS BUILDINGS OPERATIONS
United States Department of State
Washington, D.C.
KENEN_CERIC,DIM
30/07/2022
BIBERKIC_FADIL,DIG
SENSITIVE_BUT_UNCLASSIFIED(SBU)
1:100
1:1000
SARAJEVO
projektovanje, inžinjering, konsalting Srđana Aleksića 14 tel/fax: 033 213 840
FABING d.o.o.
Fadil BiberkićPrincipal
ENERGO DESIGN d.o.o.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text N
AutoCAD SHX Text WARNING: This document is the property of the U.S. Government. Further reproduction and/or distribution outside the contractor team is prohibited without the express written approval of: U.S. Department of State ATTN: Washington, DC 20520
AutoCAD SHX Text
BOSNIA&HERZEGOVINA
AutoCAD SHX Text
DEMOLITION_&_CONSTRUCTION_
AutoCAD SHX Text
A-E_SERVICES_CMR_
AutoCAD SHX Text
EXISTING
AutoCAD SHX Text M_001
AutoCAD SHX Text
SITE_PLAN
AutoCAD SHX Text
SITE_CONSERVATION
AutoCAD SHX Text
MECHANICAL_INSTALLATION
| M001 REV1_CAD 2010-Model.pdf |
| Sheets and Views |
| Model |
File details come from the government source that posted it. Updated .