J.1.5_Architecture_and_Landscape_-_Demolition_and_Site_Conservation.pdf
PDF 809 KB Posted
- Attached to
- CMR Site Demolition and Stabilization Federal contract opportunity
- Solicitation number
- 19GE5022R0118
About this file
This package includes demolition and site conservation plans for a consular compound in Sarajevo, Bosnia and Herzegovina. Key details include specifications for the removal of three buildings (Buildings B, C, and parts of Building A), as well as site features such as ponds, tanks, and containers. Vegetation is to be removed within five meters of the perimeter wall for security purposes. Remaining structures and infrastructure such as entrances, transformers, and generators are also indicated. The related federal contract opportunity is for site demolition and stabilization work at the compound outlined in the plans. The solicitation was issued by the Department of State Office of Acquisition Management under number 19GE5022R0118. Responses were due on a unspecified date. Award information and other contractual terms are not provided in the file.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 19GE5022R0118_Q and A Volume I.pdf | ||
| 19GE5022R0118_P00001.pdf | ||
| DBAWaiver-BosniaHerzegovina.pdf | ||
| 19GE5022R0118.pdf | ||
| J.1.3_Site Stabilization.pdf | ||
| J.1.1_Geotechnical_Properties_.pdf | ||
| J.1.7_Electrical_installations.pdf | ||
| J.1.2_General.pdf | ||
| 19GE5022R0118_RFP Cover letter.pdf | ||
| J.1.9_Plumbing Installations.pdf | ||
| J.1.4_Bill_of_Quantities_-_Demolition_and_Site_Conservation.pdf | ||
| J.1.6_Demolition_and_Construction_Site_Conservation.pdf | ||
| J.1.8_HVAC_Installations.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UNCLASSIFIED
30.07.2022.
Ognjen Mandić d.i.a.
CUBE DESIGN d.o.o.
Mehmeda Spahe 6
71 000 Sarajevo
+387 66 810 018 info@cubedesign.ba www.cubedesign.ba
(Seal)
Phase
Project Number
Classification
Checked By
Drawn By
CADD File Name
OBO Project Number
CADD Plot Scale
Date
Drawing Scale
Number
35%CONCEPT
Sheet
60% 100%90% FINAL
Release For Construction:
Drawing Title
OBO/PDCS/PDC OBO/PDCS/DE
OVERSEAS BUILDINGS OPERATIONS
United States Department of State
Washington, D.C.
DescriptionRev Number
Revisions
Date
SARAJEVO
projektovanje, inžinjering, konsalting Srđana Aleksića 14 tel/fax: 033 213 840
FABING d.o.o.
Fadil BiberkićPrincipal
A-E_SERVICES_CMR_
DEMOLITION_&_CONSTRUCTION_
SITE_CONSERVATION
BOSNIA&HERZEGOVINA
Fadil Biberkić d.i.g.
BOOK 4
DEMOLITION PLAN
CONTENTS
A01 DEMOLITION SITE PLAN
A02 VEGETATION DISPOSAL
ARCHITECTURE AND LANDSCAPE
AutoCAD SHX Text WARNING: This document is the property of the U.S. Government. Further reproduction and/or distribution outside the contractor team is prohibited without the express written approval of: U.S. Department of State ATTN: Washington, DC 20520
UNCLASSIFIED
30.07.2022.
Ognjen Mandić d.i.a.
Buildings/Facilities to remain
Buildings/Facilities to be removed
CUBE DESIGN d.o.o.
Mehmeda Spahe 6
71 000 Sarajevo
+387 66 810 018 info@cubedesign.ba www.cubedesign.ba
(Seal)
Phase
Project Number
Classification
Checked By
Drawn By
CADD File Name
OBO Project Number
CADD Plot Scale
Date
Drawing Scale
Number
35%CONCEPT
Sheet
60% 100%90% FINAL
Release For Demolition:
Drawing Title
OBO/PDCS/PDC OBO/PDCS/DE
OVERSEAS BUILDINGS OPERATIONS
United States Department of State
Washington, D.C.
DescriptionRev Number
Revisions
Date
SARAJEVO
projektovanje, inžinjering, konsalting Srđana Aleksića 14 tel/fax: 033 213 840
FABING d.o.o.
Fadil BiberkićPrincipal
A-E_SERVICES_CMR_
DEMOLITION_&_CONSTRUCTION_
SITE_CONSERVATION
BOSNIA&HERZEGOVINA
1 : 200
DEMOLITION SITE PLAN
A01
N
WC
R z
V l a d a
F e d e r a c i j
B i
H
U l
A l i p a s i n a
G
WC
Vodena pumpa
Tisa-Yew
Smrca-Spruce
Tisa-Yew
S
S
S
S
R2
R1
(549.1794)
(551.3712)
N
R e s i d e n t a l b u i l d i n g
G o v e r n m e n t
R e s i d e n c e b u i l d i n g
R e s i d e n t a l b u i l d i n g
N
P
E
D
E
S
T
R
I A
N
E
T
R
A
N
C
E
T
O
R
M
A
I
P l e a s r f e r t o
B o o k s h e e t
A
A
EXISTING CAC WITH SALLYPORT
TO REMAIN
T R
A N
S F
O R
M
A T
O R
U N
IT
S
T O
R E
M
A
INNO INTERVENTION ON
EXISTING ENTRANCES
NO INTERVENTION ON
EXISTING ENTRANCES
NO INTERVENTION ON
EXISTING ENTRANCES
NOTE: During our conversations we decided that would be good to avoid any demolition interventions on the perimeter wall. We decided to leave part of the existing consular entrance
(where guards are stationed), existing CAC with sallyport and all existing entrances (doors, gates, etc). It would be safety issue, if we open so many "holes" in the perimeter wall and it would be very difficult to control those points during the demolition process and afterwards during the construction.
M
A
W
G
N
E
R
A
T
O
R
U
N
M
A
I N
O
F F
IC
E
C O
N T
A
IN
E R
U N
IT
S
(2
S
T A
C K
E D
T
O B
E M
O V
E D
T O
A N
O T
H E
R L
O C
A T
IO
N
N E
A R
C A
C
E X
IS
T
IN
G
U N
D E
R G
R O
U N
D
F U
E L T
A N
K T
O B
E R
E M
O V
E D
EXISTING ANTI-RAM
BARRIER TO BE REMOVED
EXISTING POND
TO BE REMOVED
EXISTING WATER TANK
TO REMAIN
NO INTERVENTION ON
EXISTING ENTRANCES
EXISTING TOILETS
TO BE REMOVED
B
U
I L
D
I
C
N
W
N
E
X
M
O
V
E
D
B
U
I L
D
I
O
L
D
H
A
N
C
E
R
Y
M
O
V
E
D
B
U
I L
D
I
N
W
N
S
U
L
R
T
P
A
R
T
I A
L
Y
M
O
V
E
D
Building A - New Consular part (To be removed)
Wall Material: Mostly Reinforced concrete
Building B - Old Chancery (To be removed)
Wall Material: Mostly brick
Building C - New Annex (Partialy to be removed)
Wall Material: Reinforced concrete
Fadil Biberkić d.i.g.
WARNING: This document is the property of the U.S. Government. Further reproduction and/or distribution outside the contractor team is prohibited without the express written approval of: U.S. Department of State ATTN: Washington, DC 20520
15701566
T
T
1164 1165
N N N
UNCLASSIFIED
30.07.2022.
Ognjen Mandić d.i.a.
CUBE DESIGN d.o.o.
Mehmeda Spahe 6
71 000 Sarajevo
+387 66 810 018 info@cubedesign.ba www.cubedesign.ba
(Seal)
Phase
Project Number
Classification
Checked By
Drawn By
CADD File Name
OBO Project Number
CADD Plot Scale
Date
Drawing Scale
Number
35%CONCEPT
Sheet
60% 100%90% FINAL
Release For Construction:
Drawing Title
OBO/PDCS/PDC OBO/PDCS/DE
OVERSEAS BUILDINGS OPERATIONS
United States Department of State
Washington, D.C.
DescriptionRev Number
Revisions
Date
SARAJEVO
projektovanje, inžinjering, konsalting Srđana Aleksića 14 tel/fax: 033 213 840
FABING d.o.o.
Fadil BiberkićPrincipal
A-E_SERVICES_CMR_
DEMOLITION_&_CONSTRUCTION_
SITE_CONSERVATION
BOSNIA&HERZEGOVINA
Fadil Biberkić d.i.g.
VEGETATION DISPOSAL
A02
1 : 200
NOTE: All around perimeter wall, falling branches from inside trees surrounding perimeter wall, must be cut to proper height so nobody can't use them for climbing the wall from outside. Also, all bushes, small trees, branches, etc. inside 5 meter from perimeter wall must be removed, because of security issues and clear security cameras views.
Trees to cut
Disposal tree
Cut all branches, bushes and small trees inside 5 meter ofset from wall
NOTE 2: All trees in good health with caliper larger than 75mm shall remain until new CMR design process is underway. CMR design will determine which trees will remain and which shall be removed.
WARNING: This document is the property of the U.S. Government. Further reproduction and/or distribution outside the contractor team is prohibited without the express written approval of: U.S. Department of State ATTN: Washington, DC 20520
| Sheets and Views |
| Model |
| b.pdf |
| Sheets and Views |
| Model |
| c.pdf |
| Sheets and Views |
| Model |
File details come from the government source that posted it. Updated .