J.1.5_Architecture_and_Landscape_-_Demolition_and_Site_Conservation.pdf

PDF 809 KB Posted

Attached to
CMR Site Demolition and Stabilization Federal contract opportunity
Solicitation number
19GE5022R0118
Issued by
Department of State Office of Acquisition Management

About this file

This package includes demolition and site conservation plans for a consular compound in Sarajevo, Bosnia and Herzegovina. Key details include specifications for the removal of three buildings (Buildings B, C, and parts of Building A), as well as site features such as ponds, tanks, and containers. Vegetation is to be removed within five meters of the perimeter wall for security purposes. Remaining structures and infrastructure such as entrances, transformers, and generators are also indicated. The related federal contract opportunity is for site demolition and stabilization work at the compound outlined in the plans. The solicitation was issued by the Department of State Office of Acquisition Management under number 19GE5022R0118. Responses were due on a unspecified date. Award information and other contractual terms are not provided in the file.

View the file

Other files for this federal contract opportunity

Other files attached to CMR Site Demolition and Stabilization, newest first.
File Type Posted
19GE5022R0118_Q and A Volume I.pdf PDF
19GE5022R0118_P00001.pdf PDF
DBAWaiver-BosniaHerzegovina.pdf PDF
19GE5022R0118.pdf PDF
J.1.3_Site Stabilization.pdf PDF
J.1.1_Geotechnical_Properties_.pdf PDF
J.1.7_Electrical_installations.pdf PDF
J.1.2_General.pdf PDF
19GE5022R0118_RFP Cover letter.pdf PDF
J.1.9_Plumbing Installations.pdf PDF
J.1.4_Bill_of_Quantities_-_Demolition_and_Site_Conservation.pdf PDF
J.1.6_Demolition_and_Construction_Site_Conservation.pdf PDF
J.1.8_HVAC_Installations.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UNCLASSIFIED

30.07.2022.

Ognjen Mandić d.i.a.

CUBE DESIGN d.o.o.

Mehmeda Spahe 6

71 000 Sarajevo

+387 66 810 018 info@cubedesign.ba www.cubedesign.ba

(Seal)

Phase

Project Number

Classification

Checked By

Drawn By

CADD File Name

OBO Project Number

CADD Plot Scale

Date

Drawing Scale

Number

35%CONCEPT

Sheet

60% 100%90% FINAL

Release For Construction:

Drawing Title

OBO/PDCS/PDC OBO/PDCS/DE

OVERSEAS BUILDINGS OPERATIONS

United States Department of State

Washington, D.C.

DescriptionRev Number

Revisions

Date

SARAJEVO

projektovanje, inžinjering, konsalting Srđana Aleksića 14 tel/fax: 033 213 840

FABING d.o.o.

Fadil BiberkićPrincipal

A-E_SERVICES_CMR_

DEMOLITION_&_CONSTRUCTION_

SITE_CONSERVATION

BOSNIA&HERZEGOVINA

Fadil Biberkić d.i.g.

BOOK 4

DEMOLITION PLAN

CONTENTS

A01 DEMOLITION SITE PLAN

A02 VEGETATION DISPOSAL

ARCHITECTURE AND LANDSCAPE

AutoCAD SHX Text WARNING: This document is the property of the U.S. Government. Further reproduction and/or distribution outside the contractor team is prohibited without the express written approval of: U.S. Department of State ATTN: Washington, DC 20520

UNCLASSIFIED

30.07.2022.

Ognjen Mandić d.i.a.

Buildings/Facilities to remain

Buildings/Facilities to be removed

CUBE DESIGN d.o.o.

Mehmeda Spahe 6

71 000 Sarajevo

+387 66 810 018 info@cubedesign.ba www.cubedesign.ba

(Seal)

Phase

Project Number

Classification

Checked By

Drawn By

CADD File Name

OBO Project Number

CADD Plot Scale

Date

Drawing Scale

Number

35%CONCEPT

Sheet

60% 100%90% FINAL

Release For Demolition:

Drawing Title

OBO/PDCS/PDC OBO/PDCS/DE

OVERSEAS BUILDINGS OPERATIONS

United States Department of State

Washington, D.C.

DescriptionRev Number

Revisions

Date

SARAJEVO

projektovanje, inžinjering, konsalting Srđana Aleksića 14 tel/fax: 033 213 840

FABING d.o.o.

Fadil BiberkićPrincipal

A-E_SERVICES_CMR_

DEMOLITION_&_CONSTRUCTION_

SITE_CONSERVATION

BOSNIA&HERZEGOVINA

1 : 200

DEMOLITION SITE PLAN

A01

N

WC

R z

V l a d a

F e d e r a c i j

B i

H

U l

A l i p a s i n a

G

WC

Vodena pumpa

Tisa-Yew

Smrca-Spruce

Tisa-Yew

S

S

S

S

R2

R1

(549.1794)

(551.3712)

N

R e s i d e n t a l b u i l d i n g

G o v e r n m e n t

R e s i d e n c e b u i l d i n g

R e s i d e n t a l b u i l d i n g

N

P

E

D

E

S

T

R

I A

N

E

T

R

A

N

C

E

T

O

R

M

A

I

P l e a s r f e r t o

B o o k s h e e t

A

A

EXISTING CAC WITH SALLYPORT

TO REMAIN

T R

A N

S F

O R

M

A T

O R

U N

IT

S

T O

R E

M

A

INNO INTERVENTION ON

EXISTING ENTRANCES

NO INTERVENTION ON

EXISTING ENTRANCES

NO INTERVENTION ON

EXISTING ENTRANCES

NOTE: During our conversations we decided that would be good to avoid any demolition interventions on the perimeter wall. We decided to leave part of the existing consular entrance

(where guards are stationed), existing CAC with sallyport and all existing entrances (doors, gates, etc). It would be safety issue, if we open so many "holes" in the perimeter wall and it would be very difficult to control those points during the demolition process and afterwards during the construction.

M

A

W

G

N

E

R

A

T

O

R

U

N

M

A

I N

O

F F

IC

E

C O

N T

A

IN

E R

U N

IT

S

(2

S

T A

C K

E D

T

O B

E M

O V

E D

T O

A N

O T

H E

R L

O C

A T

IO

N

N E

A R

C A

C

E X

IS

T

IN

G

U N

D E

R G

R O

U N

D

F U

E L T

A N

K T

O B

E R

E M

O V

E D

EXISTING ANTI-RAM

BARRIER TO BE REMOVED

EXISTING POND

TO BE REMOVED

EXISTING WATER TANK

TO REMAIN

NO INTERVENTION ON

EXISTING ENTRANCES

EXISTING TOILETS

TO BE REMOVED

B

U

I L

D

I

C

N

W

N

E

X

M

O

V

E

D

B

U

I L

D

I

O

L

D

H

A

N

C

E

R

Y

M

O

V

E

D

B

U

I L

D

I

N

W

N

S

U

L

R

T

P

A

R

T

I A

L

Y

M

O

V

E

D

Building A - New Consular part (To be removed)

Wall Material: Mostly Reinforced concrete

Building B - Old Chancery (To be removed)

Wall Material: Mostly brick

Building C - New Annex (Partialy to be removed)

Wall Material: Reinforced concrete

Fadil Biberkić d.i.g.

WARNING: This document is the property of the U.S. Government. Further reproduction and/or distribution outside the contractor team is prohibited without the express written approval of: U.S. Department of State ATTN: Washington, DC 20520

15701566

T

T

1164 1165

N N N

UNCLASSIFIED

30.07.2022.

Ognjen Mandić d.i.a.

CUBE DESIGN d.o.o.

Mehmeda Spahe 6

71 000 Sarajevo

+387 66 810 018 info@cubedesign.ba www.cubedesign.ba

(Seal)

Phase

Project Number

Classification

Checked By

Drawn By

CADD File Name

OBO Project Number

CADD Plot Scale

Date

Drawing Scale

Number

35%CONCEPT

Sheet

60% 100%90% FINAL

Release For Construction:

Drawing Title

OBO/PDCS/PDC OBO/PDCS/DE

OVERSEAS BUILDINGS OPERATIONS

United States Department of State

Washington, D.C.

DescriptionRev Number

Revisions

Date

SARAJEVO

projektovanje, inžinjering, konsalting Srđana Aleksića 14 tel/fax: 033 213 840

FABING d.o.o.

Fadil BiberkićPrincipal

A-E_SERVICES_CMR_

DEMOLITION_&_CONSTRUCTION_

SITE_CONSERVATION

BOSNIA&HERZEGOVINA

Fadil Biberkić d.i.g.

VEGETATION DISPOSAL

A02

1 : 200

NOTE: All around perimeter wall, falling branches from inside trees surrounding perimeter wall, must be cut to proper height so nobody can't use them for climbing the wall from outside. Also, all bushes, small trees, branches, etc. inside 5 meter from perimeter wall must be removed, because of security issues and clear security cameras views.

Trees to cut

Disposal tree

Cut all branches, bushes and small trees inside 5 meter ofset from wall

NOTE 2: All trees in good health with caliper larger than 75mm shall remain until new CMR design process is underway. CMR design will determine which trees will remain and which shall be removed.

WARNING: This document is the property of the U.S. Government. Further reproduction and/or distribution outside the contractor team is prohibited without the express written approval of: U.S. Department of State ATTN: Washington, DC 20520

Sheets and Views
Model
b.pdf
Sheets and Views
Model
c.pdf
Sheets and Views
Model

File details come from the government source that posted it. Updated .