This is a solicitation for a Construction Manager (CM) site demolition and stabilization project. The Department of State Office of Acquisition Management is seeking a contractor to provide demolition and stabilization services at a site located in Sarajevo, Bosnia and Herzegovina. Services include temporary electrical installations; demolition of internal and external electrical systems; removal of distribution boards, lighting fixtures, cables and protective piping; excavation of underground cable trenches; and coordination with local utility providers for removal of connected infrastructure. Offerors should propose pricing for labor, materials, equipment and all other costs. The closing date for receipt of proposals is not specified. The selected contractor will be responsible for compliance with all local safety and environmental regulations over the course of the project.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 19GE5022R0118_Q and A Volume I.pdf | ||
| 19GE5022R0118_P00001.pdf | ||
| DBAWaiver-BosniaHerzegovina.pdf | ||
| J.1.6_Demolition_and_Construction_Site_Conservation.pdf | ||
| J.1.8_HVAC_Installations.pdf | ||
| 19GE5022R0118.pdf | ||
| J.1.3_Site Stabilization.pdf | ||
| J.1.1_Geotechnical_Properties_.pdf | ||
| J.1.2_General.pdf | ||
| 19GE5022R0118_RFP Cover letter.pdf | ||
| J.1.9_Plumbing Installations.pdf | ||
| J.1.4_Bill_of_Quantities_-_Demolition_and_Site_Conservation.pdf | ||
| J.1.5_Architecture_and_Landscape_-_Demolition_and_Site_Conservation.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A-E_SERVICES_CMR_ ELECTRICAL_INSTALLATIONS
SARAJEVO, BOSNIA&HERZEGOVINA
1 | P a g e d a t e 2 0 2 2 / 0 3
Book 4
Part 4 ELECTRICAL_INSTALLATIONS
4.3.1 Techincal description
4.3.2 Calculations
4.3.3 Bill of quantity
4.3.4 Drawings
E_01 – Electrical installations for demolition – Basement
E_02 - Electrical installations for demolition – Ground floor
E_03 - Electrical installations for demolition – First floor
E_04 - Electrical installations for demolition – Second floor
E_05 - Electrical installations for demolition – Situation
E_06 - Electrical installations for demolition – Temporary electrical installation
E_07 - Electrical installations for demolition – Diagram of DB-TEMP
2 | P a g e d a t e 2 0 2 2 / 0 3
4.3.1. Technical description
The RAA building in Sarajevo, 43 Alipašina Street has floor plan dimensions of maximum length 25.80 m, maximum width 30.80 m, with different floors from the basement to the second floor.
In the image above we can see the current appearance/layout of the object in question which is the subject of demolition. On the north side of the building there is an existing transformer station from which the object in question is supplied and which is not subject to demolition, ie it is retained. In addition to the transformer station, the following is still retained: a part of the building on the south side as indicated in the drawings, a diesel generator and its associated electrical cabinets and a security building at the main entrance gate. The subject of the project documentation of the electrical phase is the removal of internal and external electrical installations of the object in question. Internal electrical installations consist of high and low voltage installations, where high voltage installations include installations of lighting, sockets, switchboards, switchpanels, cable racks, cable pipes, etc. together with all associated cables and connecting equipment.
Under low-voltage installations, we mean installations of fire alarm, video surveillance, all security systems, integrated network, telephony, etc. also together with all associated cables and connecting equipment in accordance with the drawings from the graphic part of the project documentation.All electrical equipment must be carefully dismantled and removed along with the associated cables. After dismantling, all equipment must be properly cleaned and handed over to the Investor together with the appropriate record/minutes. As already mentioned, during the complete dismantling of electrical installations, it is necessary to dismantle all protective pipes and cables. As far as external installations are concerned, it is necessary to dismantle and remove the power cables coming out of the existing transformer station, ie the cables that supply the main power supply to the building and the cabinet of the diesel generator. Removal of these installations, together with installations for powering other outdoor facilities, outdoor lighting, etc. falls under the obligations of the bidder/contractor. In addition to these installations, there are also medium voltage (10(20)kV) cables that supply the transformer station in question and low-voltage (0,4kV) transient cables that are under the jurisdiction of Elektrodistribucija Sarajevo and will be removed by the staff of Elektrodistribucija Sarajevo. Also, there are the installations of the telecom operator as shown in the graphic part of the project documentation, which must be removed in accordance with and presence of BHTelecom staff.
For the needs of supervision of the construction site itself as well as the needs of construction of new facilities as part of works on dismantling of electrical installations and other phases, the following is provided:
1. Power supply of external lighting of the building (lighting on external walls)
2. Power supply of electrical cabinets for the needs of the construction site
3 | P a g e d a t e 2 0 2 2 / 0 3
3. Construction crane power supply
4. Power supply to the southern part of the facility under the authority of the US Embassy security staff
To achieve the above power supplies, auxiliary electrical distribution cabinets are formed. DB-TEMP is the main cabinet from which the distribution, ie power supply is performed to the above items and it is located inside the room where the current measurement of electricity consumption is performed. The power cables used for power supply for the above items, which are shown in the block diagram of the DB-TEMP cabinet, are laid with plastic PVC pipes along the outer wall as shown in the situation drawing in the graphic part of the project documentation. Before the very beginning of the dismantling of the electrical installation equipment of the project in question, the bidder for the dismantling works needs to make a detailed inspection of the object in question and the listed installations that are being dismantled/removed.
4.3.1.1 Documentation Review - Answers
Comment status ID: 955109
Noted. Correction of diagram DB-TEMP will be made.
Comment status ID: 955113
Cable path (PVC pipes) will follow perimiter outer walls until the last point (southern entrance) from where we will enter through wall or window inside part of a building which remains. Additional notes will be made inside corresponding drawings.
Comment status ID: 955130
Technical measures of protections against arch flash conditions will be provided in Technical documentation.
Comment status ID: 955513
Additional confirmation of existing physical security elements will be made before any disposal of FEBR or vault doors.
Comment status ID: 956993
Temporary power line will not be connected to the generator, because internal cable connection between transformer station and generator room will be removed. Temporary power line provided by DB-TEMP will be directly connected to grid inside electricty metering building next to transformer station.
Comment status ID: 956994
DB-CONTR is distribution cabinet provided by the contractor who will manage construction site, that is the main reason why this DB is not included in BoQ. We will provide cables needed for powering aformentioned distribution board. Additional notes will be made on drawings to clarify this matter.
Comment status ID: 957072
Noted. In BoQ additional segment will be added for local copper and fiber cables which are distributed underground which are not falling under jurisdiction of BHTelecom.
4 | P a g e d a t e 2 0 2 2 / 0 3
4.3.2. Calculations
Technical measures of protection against electric shock
Protection against electric shock is achieved by appropriate technical measures, as follows:
• Measures for protection against direct contact,
• Measures for protection against indirect contact.
Protection against direct contact is achieved according to applicable technical standards as follows:
• Isolating live parts,
• Protection with bulkheads or casings,
• Protection barriers,
• Protection by placing out of reach,
• Additional protection by residual current protective devices (RCD).
Protection against direct contact with live parts of equipment and electrical installations is provided by using materials, lines and equipment within the rated values, quality according to applicable standards, a proper and conscientious preparation and maintenance of equipment and wiring. One part of equipment that is energized, is located in DBs with a key, and is accessible only to professional and competent personnel, while the rest is mostly protected by insulation (cables, lighting, installation equipment, etc.). Protection against indirect contact is performed according to applicable technical standards as follows:
• Protection by automatic power shut-down,
• Protection using a Class II or appropriate insulation,
• Protection by electrical isolation.
Protection against indirect contact with live parts of electrical installations in TN-C-S system is provided by automatic power shut-down using residual current switch. This means that the conductive parts of equipment and devices, which may become energized must be connected by protective conductor to a grounded point of the power system. A separate protective conductor will be laid and connected to all metal surfaces within the facility. Protective conductor is connected to the protective busbar in each DB, which is further connected to the GIP and grounding system. Protective devices (MCBs) and the cable cross-sections were selected to perform the automatic switch-off inside time set by protection unit. This serves in cases when there is a fault of negligible impedance (short circuit) between the phase conductors and protective conductors or conductive parts that may become energized.
Protection against thermal effects is performed according to applicable technical standards as follows:
• Fire protection,
• Protection against burns,
• Protection against overheating, Fire protection is provided by placing live parts of equipment in housing, which must withstand the highest temperature that can be produced by electrical equipment.
Protection against burns is secured so that parts which are accessible to the hand can not reach a temperature that would cause burns and must meet the temperature limits specified in the table.
5 | P a g e d a t e 2 0 2 2 / 0 3
Accessible parts Material of accessible surface
Max temp ° C
Hand-held equipment metal 55 nonmetal 65
Parts which are touched but not hand-held metal 70 nonmetal 80
Parts which are not touched in regular use metal 80 nonmetal 90
Overheating protection is achieved by providing that systems with forced air heating can not be switched on if there is no sufficient flow of air, and turn off when the air flow ceases. Equipment for heating water or steam in its construction is protected from overheating (thermostat or water pressure limiter).
Overcurrent protection
Overcurrent protection is performed according to applicable technical standards as follows:
• Protection against current overload
• Protection from the short-current
Protection against overload current has been achieved on the basis of coordination of protective devices and power lines, so working curve of the power line must meet the following conditions:
IB ≤ In ≤ Iz
I2 ≤ 1,45 x Iz where:
• IB = current for which the circuit is designed (A)
• Iz = permanently permissible current of conductors or cables (A)
• In =rated current of protective devices
• = current at which the protective device operates reliably
Protection against overload current in this case has been achieved by use of MCBs at the beginning of each circuit. This provides quality protection of lines and circuits that can be connected only to functioning and desgined appliances. Protection of short-circuit currents provides cutting of short-circuit current before the current causes a risk of thermal and mechanical effects in conductors and connections. For a short circuit that lasts up to 5s, during which short-circuit current rises the conductor temperature to a maximum limit, is calculated approximately from the expression:
I2
6 | P a g e d a t e 2 0 2 2 / 0 3 where:
duration of short circuit in which the cable reaches the maximum allowable temperature fuse reaction time k coefficient of cable type which is not defined for cable cross-sections less than 10 mm2, short circuit duration over 5s, depending on the type of conductor (74-135)
S section in mm2
Protection from potential difference was achieved by connecting all metal parts in each facility and the lightning installation. When selecting the cable cross-section (see line calculations), voltage drop was taken into account in individual circuits. Each circuit should be designed so that it can be separated from other energized conductors (connection in DB is made with screwed connection or using terminals). The distribution boards contain separate busbars for the neutral and protective conductors. Conductors in cables in DBs are marked with colors and conductor with blue insulation is required to be used for neutral, and green-yellow color for the protective conductor.
The Contractor shall carry out functional performance after installation: visual inspection and testing. Testing is generally conducted while electrical installations are disconnected, and the review includes following checks:
1. Protection against electric shock, including the distance measurement by installing security equipment in the housing (cabinets)
2. Protective measures against the spread of fire and heat from the impact of the conductors according to permanently admissible values of current and allowable voltage drop
3. Selection and setting of protective devices
4. Placing the appropriate switching devices from the standpoint of spacing
5. Choice of equipment and protective measures against external influences
6. Differentiation of neutral and protective conductor
7. Setting up schemes, tiles with warnings or similar notices
8. Differentiation of circuits, fuses, switches, terminals and other equipment
9. Conductor connection
10. Accessibility and availability of space for operation and
Constructiontenance t t t k S
I ks ks
2 2 tks t0
7 | P a g e d a t e 2 0 2 2 / 0 3
Common tests must be run in this order:
1. Continuity of protective conductor and the Construction and secondary cable for single-potential bonding
2. Insulation resistance of electrical installations
3. Protection by electrical separation of circuits (with accessories attached)
4. Functionality (functional testing of control and protective devices)
5. Measuring the level of lighting
6. Measurement of ground resistance
Technical measures of protection against Arc Flash
Switchboards, panelboards, industrial control panels, and motor control centers that are in other than dwelling occupancies and are likely to require examination, adjustment, servicing, or maintenance while energized shall be field marked to warn qualified persons of potential electric arc flash hazards. The marking shall be located so as to be clearly visible to qualified persons before examination, adjustment, servicing, or maintenance of the equipment.
FPN No. 1: NFPA 70E-2000, Electrical Safety Requirements for Employee Workplaces, provides assistance in determining severity of potential exposure, planning safe work practices, and selecting personal protective equipment.
FPN No. 2: ANSI Z535.4-1998, Product Safety Signs and Labels, provides guidelines for the design of safety signs and labels for application to products.
As arc flash technology emerges, new developments result in changes to arc flash criteria. For example, in
2004, the NFPA 70E was reissued in a completely new format with changes reflecting new developments. The flash protection marking per NEC Article 110-16 is a field marking requirement and is to be applied by the user for each specific application. The marking is similar to other NEC marking requirements, e.g., voltage, voltage hazard labels, circuits, etc. However, flash protection markings should be based on application information and calculations from the installation site. The intent of the marking is to identify the presence of a potential flash hazard and to provide assistance in determining necessary protective clothing and personal protective equipment (PPE) that should be worn by qualified electrical persons when servicing electrical equipment. The user must establish field marking requirements based upon:
• The level of the on-site personnel safety training ,
• The level of required clothing and required PPE,
• Consistency for the level of marking of various equipment, e.g., switchboards, panelboards, industrial control panels, motor control centers, etc.,
• The available flash energy on each piece of equipment. This energy is determined from short-circuit current, arc duration based on the type and degree of short circuit protection equipment and the distance of the worker from the prospective arc
8 | P a g e d a t e 2 0 2 2 / 0 3
As previously discussed, the Guideline Method should be considered an alternate method as it is based on a conservative criteria. Although, this may not always be the case in the actual application. The fault current and clearing time are given by NFPA 70E as an example and the actual application may be less, resulting in lower flash hazard energy. Or, in some cases, this could even be higher than the NFPA 70E generic values due to the application's fault current and/or the fault clearing time (the combination of higher or lower fault current with the arcing time). For example, if the fault current is lower, resulting in a longer clearing time for the applications protection device, the flash energy could be substantially greater. This case is especially important in the noncurrent-limiting range or over-current (overload) range of short-circuit protection devices. It may be best not to use the alternate, generic method but to conduct an actual “Flash Hazard Analysis” using the site's actual input criteria. From this analysis the user can determine the site's actual flash hazard determining:
• Actual site flash hazard energy (incident energy)
• Actual protective device's projected clearing times
• Actual site flash hazard risk
• Safety instructions based on both the actual available flash hazard and the MCC design features
• Assign PPE according to the Flash Hazard Energy and Risk
• Corresponding required NEC markings.
There can be benefits for the user in applying this approach, instead of usingthe generic guideline approach because the PPE equipment can be specifically selected to fit the MCC application, “workman friendly” PPE may be applied and a common flash hazard instruction, consistent with other types of equipment may be used.
New tools are now available for carrying out the Flash Hazard Analysis. One such tool is IEEE Standard 1584
[IEEE Standard 1584- 2002 “IEEE Guide for Performing Arc Flash Hazard Calculations”]
IEEE Standard 1584 on arc flash hazards calculations provides an excellent source for conducting the flash analysis and includes an analysis spreadsheet (including a CD for completing the calculations). This spreadsheet uses Microsoft Excel® . This is a useful tool as each of the sites’ applications can be defined, labeled and assigned the appropriate PPE marking. Simply follow the directions as defined in the IEEE Standard and input the requirements into the spreadsheet from the actual site and the necessary calculations will be carried out by the software. It is recommended to review this IEEE standard as it includes actual field incidents of arcing faults, research testing data, arc-time data and fuse and circuit breaker time-current characteristics (important for developing the arcing time calculations). This is an excellent tool for carrying out the NFPA 70E requirements for conducting the Flash Hazard Analysis and a base for the NEC's requirement for Flash-
Protection Marking.
Reducing Arc-Flash design features
• Reduce fault current (bolted fault less than the NFPA 70E benchmark of 50kA or any combination not exceeding 300kA cycles, i.e. 5000 ampere seconds)
• Current limiting devices or reduced clearing time, i.e. Reduction in the Flash Protection Boundary
(clearing times less than 6 cycles (0.1s) and low let-through energy)
• Consistency of Design
• Barriers and Guards
• Automatic Shutters Provide Isolation and Insulation
• CENTERLINE MCC Unit Interlock Prohibits the Insertion or Withdrawal of a Unit with the Disconnecting
Means in the “ON” or Closed Position
• Withdrawable CENTERLINE MCC Units Allow Servicing Units while Isolated from Power Bus
• Low Energy Drive Compartments
• MCC Unit Operation
9 | P a g e d a t e 2 0 2 2 / 0 3
1.1 Feeder circuits
1.1.1 Circuit Existing MB
Circuit breaker QA 10
Ib 155 A
Distance from origin NA
Sizing Information Seized by user
Range Compact NSX
Designation NSX250B
Circuit breaker rating 250 A
Breaking capacity 25 kA
TNS One pole breaking capacity 25 kA
IT One pole breaking capacity NA
Reinforced breaking capacity NA
Pole & protected pole 3P3d
Trip unit designation Micrologic 5.2 E
Trip unit rating 250 A
Long delay settings
Ir 155 A
Tr 4 s
Short delay settings
Isd current 1550 A
Tsd 0.4 s
Instantaneous tripping
Ii current 3000 A
Ti current 50 A
Selectivity Results
UpStream Selectivity Limit
Operating mode Normal
QA 0
NSX630F
Micrologic 5.3 A 630 A / 4P4d
Total Selectivity
Cable WD 10 Parameters
Length 10 m
Installation method 31 E Multi-core cables on horizontal perforated tray
Type of cable Multi-core
Nb of additional touching circuits
NA
Insulation PVC
Ambient temperature 30 °C
Level of third harmonic THDI NA %
Ib 155 A
Sizing constraint Iz
Sizing Information Sized with Ir
Correction factors
Temperature factor 1
Standard table reference B-52-14
Soil thermal resistivity factor 1
10 | P a g e d a t e 2 0 2 2 / 0 3
Standard table reference B-52-16
Loaded neutral factor 1
Standard table reference E-52-1
Touching conductor factor 1
Standard table reference B-52-20
User correction factor 1 Overall factor 1
Selected phase
Cross section area 1x150 mm²
Core Copper
Iz under real conditions 319 A
Iz’ 319 A
Selected neutral
Cross section area 1x150 mm²
Core Copper
Iz under real conditions 319 A
Iz’ 319 A
Selected PE
Cross section area 1x95 mm²
Core Copper
Short circuit current
Ik3max Ik2max Ik1max Ik2min Ik1min Iefmin Ief2min Iefmax
(kA) 12.96 11.22 11.94 9.47 10.03 10.11 NA 11.71
Synthesis for all operating mode
(kA) 12.96 11.22 11.94 9.47 10.03 10.11 NA 11.71
Calculation results in accordance with CENELEC technical report TR50480.
All assumptions and device choices are the user's responsibility.
Design current
IL1 IL2 IL3 IN
(A) 192.450 192.450 192.450 0
(A) 192.450 192.450 192.450 NA
Voltage drop
Cumulated from upstream Circuit
U3L (%) 0.277 0.140
UL1L2 (%) 0.320 0.162
UL2L3 (%) 0.320 0.162
UL3L1 (%) 0.320 0.162
UL1N (%) 0.277 0.140
UL2N (%) 0.277 0.140
UL3N (%) 0.277 0.140
11 | P a g e d a t e 2 0 2 2 / 0 3
1.2 Generic load circuits
1.2.1 Circuit DB-CONSTR
Circuit breaker QA 3
Ib 64.2 A
Distance from origin NA
Sizing Information Sized by system
Range Acti9 C120
Designation C120H
Circuit breaker rating 80 A
Breaking capacity 15 kA
TNS One pole breaking capacity 15 kA
IT One pole breaking capacity NA
Reinforced breaking capacity NA
Pole & protected pole 3P3d
Trip unit designation C
Trip unit rating 80 A
Long delay settings
Ir 80 A
Tr NA
Short delay settings
Isd current 680 A
Tsd NA
Instantaneous tripping
Ii current NA
Ti current NA
QA 10
NSX250B
Micrologic 5.2 E 250 A / 3P3d
Cable WD 3
Length 110 m
Installation method 31 E Multi-core cables on horizontal perforated tray
Type of cable Multi-core
Nb of additional touching circuits
NA
Insulation PVC
Ambient temperature 30 °C
Level of third harmonic THDI NA %
Ib 64 A
Sizing constraint Voltage drop
Sizing Information The CSA of cable WD 3 has been increased from 16 to 35 to comply with the voltage drop in the circuit. Sized with Ir
12 | P a g e d a t e 2 0 2 2 / 0 3
Correction factors
Temperature factor 1
Standard table reference B-52-14
Soil thermal resistivity factor 1
Standard table reference B-52-16
Loaded neutral factor 1
Standard table reference E-52-1
Touching conductor factor 1
Standard table reference B-52-20
Cross section area 1x35 mm²
Core Copper
Iz under real conditions 126 A
Iz’ 126 A
Selected neutral
Cross section area 1x35 mm²
Core Copper
Iz under real conditions 126 A
Iz’ 126 A
Selected PE
Cross section area 1x16 mm²
(kA) 3.62 3.13 1.96 2.33 1.43 0.93 NA 1.08
(kA) 3.62 3.13 1.96 2.33 1.43 0.93 NA 1.08
Charge AA 3
U 400 V
S 44.4 kVA
P 40 kW
I 64.2 A cos 0.9
Polarity 3Ph+N
Phase connection
Number of circuit 1
Ku (Normal) 1
Harmonic generator No
THDI3 NA
Sensitivity to over voltage NA
(A) 64.150 64.150 64.150 0
13 | P a g e d a t e 2 0 2 2 / 0 3
(A) 64.150 64.150 64.150 NA
U3L (%) 2.128 1.852
UL1L2 (%) 2.458 2.138
UL2L3 (%) 2.458 2.138
UL3L1 (%) 2.458 2.138
UL1N (%) 2.128 1.852
UL2N (%) 2.128 1.852
UL3N (%) 2.128 1.852
U3L (%) 2.128
UL1L2 (%) 2.458
UL2L3 (%) 2.458
UL3L1 (%) 2.458
UL1N (%) 2.128
UL2N (%) 2.128
UL3N (%) 2.128
1.2.1 Circuit DB-TEMP2
Circuit breaker QA 5
Ib 16 A
Distance from origin NA
Sizing Information Sized by system
Range Acti9 C120
Designation C120H
Circuit breaker rating 32 A
Breaking capacity 15 kA
TNS One pole breaking capacity 15 kA
IT One pole breaking capacity NA
Reinforced breaking capacity NA
Pole & protected pole 3P3d
Trip unit designation D
Trip unit rating 32 A
Long delay settings
Ir 32 A
Tr NA
Short delay settings
Isd current 384 A
Tsd NA
Instantaneous tripping
14 | P a g e d a t e 2 0 2 2 / 0 3
QA 10
NSX250B
Micrologic 5.2 E
Cable WD 5
Length 100 m
Installation method 31 E Multi-core cables on horizontal perforated tray
Type of cable Multi-core
Nb of additional touching circuits
NA
Insulation PVC
Ambient temperature 30 °C
Level of third harmonic THDI NA %
Ib 16 A
Sizing constraint Voltage drop
Sizing Information The CSA of cable WD 5 has been increased from 4 to 10 to comply with the voltage drop in the circuit. Sized with Ir
Correction factors
Temperature factor 1
Standard table reference B-52-14
Soil thermal resistivity factor 1
Standard table reference B-52-16
Loaded neutral factor 1
Standard table reference E-52-1
Touching conductor factor 1
Standard table reference B-52-20
Cross section area 1x10 mm²
Core Copper
Iz under real conditions 60 A
Iz’ 60 A
Selected neutral
Cross section area 1x10 mm²
Core Copper
Iz under real conditions 60 A
Iz’ 60 A
Selected PE
Cross section area 1x10 mm²
(kA) 1.31 1.14 0.67 0.82 0.48 0.48 NA 0.56
15 | P a g e d a t e 2 0 2 2 / 0 3
(kA) 1.31 1.14 0.67 0.82 0.48 0.48 NA 0.56
Charge AA 5
U 400 V
S 11.1 kVA
P 10 kW
I 16 A cos 0.9
Polarity 3Ph+N
Phase connection
Number of circuit 1
Ku (Normal) 1
Harmonic generator No
THDI3 NA
Sensitivity to over voltage NA
(A) 16.038 16.038 16.038 0
(A) 16.038 16.038 16.038 NA
U3L (%) 1.689 1.412
UL1L2 (%) 1.950 1.631
UL2L3 (%) 1.950 1.631
UL3L1 (%) 1.950 1.631
UL1N (%) 1.689 1.412
UL2N (%) 1.689 1.412
UL3N (%) 1.689 1.412
U3L (%) 1.689
UL1L2 (%) 1.950
UL2L3 (%) 1.950
UL3L1 (%) 1.950
UL1N (%) 1.689
UL2N (%) 1.689
UL3N (%) 1.689
1.2.2 Circuit DB-TEMP2
Circuit breaker QA 6
Ib 16 A
Distance from origin NA
Sizing Information Sized by system
Range Acti9 C120
16 | P a g e d a t e 2 0 2 2 / 0 3
Designation C120H
Circuit breaker rating 25 A
Breaking capacity 15 kA
TNS One pole breaking capacity 15 kA
IT One pole breaking capacity NA
Reinforced breaking capacity NA
Pole & protected pole 3P3d
Trip unit designation D
Trip unit rating 25 A
Long delay settings
Ir 25 A
Tr NA
Short delay settings
Isd current 300 A
Tsd NA
Instantaneous tripping
NSX250B
Micrologic 5.2 E
Cable WD 6
Length 200 m
Installation method 31 E Multi-core cables on horizontal perforated tray
Type of cable Multi-core
Nb of additional touching circuits
NA
Insulation PVC
Ambient temperature 30 °C
Level of third harmonic THDI NA %
Ib 16 A
Sizing constraint Voltage drop
Sizing Information The CSA of cable WD 6 has been increased from 2.5 to 16 to comply with the voltage drop in the circuit. Sized with Ir
Correction factors
Temperature factor 1
Standard table reference B-52-14
Soil thermal resistivity factor 1
Standard table reference B-52-16
Loaded neutral factor 1
Standard table reference E-52-1
Touching conductor factor 1
Standard table reference B-52-20
17 | P a g e d a t e 2 0 2 2 / 0 3
Core Copper
Iz under real conditions 80 A
Iz’ 80 A
Selected neutral
Cross section area 1x16 mm²
Core Copper
Iz under real conditions 80 A
Iz’ 80 A
Selected PE
(kA) 1.06 0.92 0.54 0.66 0.39 0.39 NA 0.45
(kA) 1.06 0.92 0.54 0.66 0.39 0.39 NA 0.45
Charge AA 6
U 400 V
S 11.1 kVA
P 10 kW
I 16 A cos 0.9
Polarity 3Ph+N
Phase connection
Number of circuit 1
Ku (Normal) 1
Harmonic generator No
THDI3 NA
Sensitivity to over voltage NA
(A) 16.038 16.038 16.038 0
(A) 16.038 16.038 16.038 NA
U3L (%) 2.060 1.784
18 | P a g e d a t e 2 0 2 2 / 0 3
UL1L2 (%) 2.379 2.060
UL2L3 (%) 2.379 2.060
UL3L1 (%) 2.379 2.060
UL1N (%) 2.060 1.784
UL2N (%) 2.060 1.784
UL3N (%) 2.060 1.784
U3L (%) 2.060
UL1L2 (%) 2.379
UL2L3 (%) 2.379
UL3L1 (%) 2.379
UL1N (%) 2.060
UL2N (%) 2.060
UL3N (%) 2.060
1.2.3 Circuit CC
Circuit breaker QA 7
Ib 96.2 A
Distance from origin NA
Sizing Information Sized by system
Range Acti9 C120
Designation C120H
Circuit breaker rating 100 A
Breaking capacity 15 kA
TNS One pole breaking capacity 15 kA
IT One pole breaking capacity NA
Reinforced breaking capacity NA
Pole & protected pole 3P3d
Trip unit designation C
Trip unit rating 100 A
Long delay settings
Ir 100 A
Tr NA
Short delay settings
Isd current 850 A
Tsd NA
Instantaneous tripping
NSX250B
Micrologic 5.2 E 250 A / 3P3d
172 A
Cable WD 7 Parameters
Length 60 m
Installation method 31
19 | P a g e d a t e 2 0 2 2 / 0 3
E Multi-core cables on horizontal perforated tray
Type of cable Multi-core
Nb of additional touching circuits
NA
Insulation PVC
Ambient temperature 30 °C
Level of third harmonic THDI NA %
Ib 96 A
Sizing constraint Voltage drop
Sizing Information The CSA of cable WD 7 has been increased from 25 to 35 to comply with the voltage drop in the circuit. Sized with Ir
Correction factors
Temperature factor 1
Standard table reference B-52-14
Soil thermal resistivity factor 1
Standard table reference B-52-16
Loaded neutral factor 1
Standard table reference E-52-1
Touching conductor factor 1
Standard table reference B-52-20
Cross section area 1x35 mm²
Core Copper
Iz under real conditions 126 A
Iz’ 126 A
Selected neutral
Cross section area 1x35 mm²
Core Copper
Iz under real conditions 126 A
Iz’ 126 A
Selected PE
(kA) 5.67 4.91 3.29 3.74 2.44 1.64 NA 1.90
(kA) 5.67 4.91 3.29 3.74 2.44 1.64 NA 1.90
Charge AA 7
U 400 V
20 | P a g e d a t e 2 0 2 2 / 0 3
S 66.7 kVA
P 60 kW
I 96.2 A cos 0.9
Polarity 3Ph+N
Phase connection
Number of circuit 1
Ku (Normal) 1
Harmonic generator No
THDI3 NA
Sensitivity to over voltage NA
(A) 96.225 96.225 96.225 0
(A) 96.225 96.225 96.225 NA
U3L (%) 1.792 1.515
UL1L2 (%) 2.069 1.749
UL2L3 (%) 2.069 1.749
UL3L1 (%) 2.069 1.749
UL1N (%) 1.792 1.515
UL2N (%) 1.792 1.515
UL3N (%) 1.792 1.515
U3L (%) 1.792
UL1L2 (%) 2.069
UL2L3 (%) 2.069
UL3L1 (%) 2.069
UL1N (%) 1.792
UL2N (%) 1.792
UL3N (%) 1.792
21 | P a g e d a t e 2 0 2 2 / 0 3
4.3.3. Bill of quantity
DESCRIPTION
QUANTI
TY
UNI
T
MATERIAL LABOR UNIT
PRICE/BAM
PRICE/BA
M
20. ELECTRICAL WORKS &
EQUIPMENT
1. Temporary electrical installation
1.1. Production, delivery and installation of temporary metal overhead distribution batteries All complete with connection and marking of lines is tested and ready for operation.
Made in everything according to the distribution board panel schedule :
DB-TEMP (according to diagram from graphical section)
1,00 pcs 3680,00 520,00 4200,00 4200,00
DB-TEMP1 (Security building on main gate) - Contains:
pcs 1120,00 280,00 1400,00 1400,00
- Main circuit brekaer 100A (32-40A), pcs 1
- Miniature circuit breaker 10A, pcs 10
- Miniature circuit breaker 16A, pcs 15
- Selector rotary switch 0-1, 25A, pcs
DB-TEMP2 (South side part of main building which remains) pcs 1065,00 280,00 1345,00 1345,00
- Main circuit brekaer 100A (32-40A), pcs 1
- Miniature circuit breaker 10A, pcs 10
- Miniature circuit breaker 16A, pcs 15
1.2. Adaptation of existing electrical
installations of Security building on main gate which remains and connection to a new distribution board DB-TEMP1. All complete ls 220,00 640,00 860,00 860,00
1.3. Adaptation of existing electrical
installations of Security building on the south side of main building which remains and connection to a new distribution board DB-TEMP2. All complete ls 380,00 920,00 1300,00 1300,00
1.4. Adaptation of existing electrical
installations for outside lighting (outside walls of compaund) and connection to a new distribution board DB-TEMP1. New installation will be lay down through new PVC pipes with cable type NYY-J 3x4 mm2. Including all connection equipment. All ls 120,00 1400,00 1520,00 1520,00
1.5. Delivery and installation of Power
Supply Cables:
NYY 4x150 mm2 (MB - DB-TEMP) 10,00 m 148,00 26,00 174,00 1740,00
NYY-J 1x95 mm2 (MB - DB-TEMP) 10,00 m 44,00 12,00 56,00 560,00
22 | P a g e d a t e 2 0 2 2 / 0 3
NYY-J 5x35 mm2 170,00 m 38,00 10,00 48,00 8160,00
NYY-J 5x16 mm2 200,00 m 20,00 8,00 28,00 5600,00
NYY-J 5x10 mm2 100,00 m 14,00 7,00 21,00 2100,00
NYY-J 3x4 mm2 (outside lighting) 190,00 m 6,00 5,00 11,00 2090,00
1.6. Delivery of insulating carpets
6,00 m2 110,00 10,00 120,00 720,00
1.7. Delivery and installation near
distribution boards of CO2-5 extinguishers
3,00 pcs 160,00 20,00 180,00 540,00
1.8. Delivery and installation of PVC tubes
Ø100 mm, for the power cables from DB-TEMP. All complete with connection equipment
380,00 m 12,00 6,00 18,00 6840,00
1.9. Unspecified material
ls 300,00 300,00 600,00 600,00
1.10
Testing and ispection of temporary installations ls 0,00 660,00 660,00 660,00
2. Demolition works - Internal electrical
Note 1:
Before the very beginning of the dismantling of the electrical installation equipment of the project in question, the bidder for the dismantling works needs to make a detailed inspection of the object in question and the listed installations that are being dismantled/removed.
Note 2:
All electrical equipment must be carefully dismantled and removed along with the associated cables. After dismantling, all equipment must be properly cleaned and handed over to the Investor together with the appropriate record/minutes
2.1. Removal of all electrical installations
(high voltage) including lighting, sockets, distribution cabinets, protective pipes and associated cables. All complete
1 ls 500,00 7200,00 7700,00 7700,00
Outlet sockets (estimated value) - 353 pcs
Lights (estimated value) - 415 pcs
Cable (visible, estimated value) - 3 000 m
Protective pipes (visible, estimated value) - 1 000 m
Distribution boards and panels (estimated value) - 8 pcs
2.2. Removal of all lighting protection
installations on roof including receiving lines, connection equipment, FeZn tapes etc. All
1 ls 150,00 620,00 770,00 770,00
2.3. Removal of all electrical installation
(low voltage) including fireprotection system, surveilance system, internal network , security systems, telephony etc. All complete
1 ls 300,00 3600,00 3900,00 3900,00
23 | P a g e d a t e 2 0 2 2 / 0 3
3. Demolition works - External electrical
Note 1:
Before the very beginning of the dismantling of the electrical installation equipment of the project in question, the bidder for the dismantling works needs to make a detailed inspection of the object in question and the listed installations that are being dismantled/removed.
Note 2:
All electrical equipment must be carefully dismantled and removed along with the associated cables. After dismantling, all equipment must be properly cleaned and handed over to the Investor together with the appropriate record/minutes
3.1. Removal of all electrical installations
(high voltage) ie. cables that are coming out of the existing transformer station. Cables which supply main distribution boards of the object, diesel generator, outdoor lighting and other non-primary object inside compaund. Removal of these cables falls under obligation of Contractor.
This includes removal of all protective piping. All complete
1 ls 200,00 1920,00 2120,00 2120,00
3.2. Removal of medium voltage
(10(20)kV) distrubution cables which are powering existing transformation station. Removal of these cables falls under jurisdiction of Elektrodistribucija Sarajevo. All complete (ESTIMATED)
1 ls 10000,00 10000,00 20000,00 20000,00
3.3. Removal of PTT Telecom installation
which includes fiber optic cables and copper cables that are connected to the main building. Removal of these cables falls under jurisdiction of BHTelekom. All complete.
ESTIMATED)
1 ls 6000,00 6000,00 12000,00 12000,00
3.4. Removal of PTT installation that does
not fall under jurisdiction of the Telecom company, which includes fiber optic cables and copper cables that are connected to the main building. All complete.
1 ls 4000,00 3000,00 7000,00 7000,00
3.5. Excavation of the cable trench in the
ground of III category for removal of power cables which are connecting main building and trasformer station.
All complete
75 m 0,00 35,00 35,00 2625,00
TOTAL ALL 96350,00
24 | P a g e d a t e 2 0 2 2 / 0 3
4.3.4. Drawings
E_01 – Electrical installations for demolition – Basement
E_02 - Electrical installations for demolition – Ground floor
E_03 - Electrical installations for demolition – First floor
E_04 - Electrical installations for demolition – Second floor
E_05 - Electrical installations for demolition – Situation
E_06 - Electrical installations for demolition – Temporary electrical installation
E_07 - Electrical installations for demolition – Diagram of DB-TEMP
A07
A07
A06
A06
A=13 m²
P=1492
A1
A=31 m²
P=2936
A2
A=77 m²
P=5224
A3
A=4 m²
P=814
A4
A=4 m²
P=808
A5
A=4 m²
P=770
A6 A=3 m²
P=742
A7
A=5 m²
P=940
A8
A=58 m²
P=3580
A9
A=30 m²
P=4511
B5
A=11 m²
P=1456
B1
A=3 m²
P=770
B3 A=5 m²
P=903
B4
A=19 m²
P=1746
B7
A=10 m²
P=1985
B8
A=8 m²
P=1368
B9
A=8 m²
P=1438
B10
A=16 m²
P=1690
B11
A=9 m²
P=1280
B12
A=12 m²
P=1414
B13
A=22 m²
P=1908
B14
A=14 m²
P=1616
B15
A=26 m²
P=2044
B16
A=22 m²
P=1886
B17
A=11 m²
P=1412
B6
A=7 m²
P=1232
B2
W1a
W1a
W5
W5
W1a
W8
W12
W8
W8W13
W1
W8
W14
W1a
W15
W9
W16
W9
W8
W8
W8
W8
W5
W5
W8
W1a
W17
W1
W5
W18 W18
W18
W18
W18
W18
W18
W1a
W1a
W18
W1a
W1a
W1a
-3.70
-3.70
-3.70
-3.70
-4.15
-3.70
-3.70
-4.15
-4.15
-4.15
-4.15
-4.15
-4.15
-4.15
M A
I N
E
T
R A
N C
E
SIDE ENTRANCESIDE ENTRANCE
S E
C U
R I T
Y
D
O O
R
S E
C U
R I T
Y
D
O O
R
S E
C U
R I T
Y
D
O O
R
S E
C U
R I T
Y
D
O O
R
S E
C U
R I T
Y
D
O O
R
UNKNOWN WALL SECTION
CLOSED OPENING
METAL STAIRCASE
MAIN EXTERIOR
STAIRACASE
PEDESTRIAN ENTRENCE TO
REMAIN
PEDESTRIAN ENTRENCE TO
REMAIN
-4.15
-Socket outlet pc 63
All electrical equipment need to be carefully dismantled with the disconnection of the connecting cables. After dismantling, the equipment must be cleaned and handed over to the Investor with the appropriate Minutes. The equipment to be dismantled is:
Notes:
Distribution boards need to be dismantled after disconnecting the cables.
-Remove all visible protective pipes and cables ls 1
-Lamps pc 112
Part of the construction which remains
Building of the existing embassy to be demolished.
Inside the existing building all electrical equipment (distribution boards, communication racks, fire alarm equipment, luminaries carefully removed and replace in accordance with investors enquiry all job must be done before structural demolition
DB-1
The new distribution board/cabinet for the part of the building that remains. The new distribution board/cabinet will be supplied from the facility where the electricity is measured (which also remains)
UNCLASSIFIED
30.07.2022.
Hamdija Torlak d.i.el.
Ajdin Buljubašić d.i.el.
(Seal)
Phase
Project Number
Classification
Checked By
Drawn By
CADD File Name
OBO Project Number
CADD Plot Scale
Date
Drawing Scale
Number
35%CONCEPT
Sheet
60% 100%90% FINAL
Release For Electrical:
Drawing Title
OBO/PDCS/PDC OBO/PDCS/DE
OVERSEAS BUILDINGS OPERATIONS
United States Department of State
Washington, D.C.
DescriptionRev Number
Revisions
Date
SARAJEVO
projektovanje, inžinjering, konsalting Srđana Aleksića 14 tel/fax: 033 213 840
FABING d.o.o.
Fadil BiberkićPrincipal
A-E_SERVICES_CMR_
DEMOLITION_&_CONSTRUCTION_
SITE_CONSERVATION
BOSNIA&HERZEGOVINA
BASEMENT
E01
1 : 100
Ul.Porodice Ribar br.43, 71000 Sarajevo, BiH
E lectra d.o.o
Projektovanje, inženjering i izgradnja
Telefon: +387 33 711 870; Fax:
+387 33 646 340 email: info@electra.ba; web: www.electra.ba
AutoCAD SHX Text WARNING: This document is the property of the U.S. Government. Further reproduction and/or distribution outside the contractor team is prohibited without the express written approval of: U.S. Department of State ATTN: Washington, DC 20520
UNCLASSIFIED
30.07.2022.
Hamdija Torlak d.i.el.
Ajdin Buljubašić d.i.el.
(Seal)
Phase
Project Number
Classification
Checked By
Drawn By
CADD File Name
OBO Project Number
CADD Plot Scale
Date
Drawing Scale
Number
35%CONCEPT
Sheet
60% 100%90% FINAL
Release For Electrical:
Drawing Title
OBO/PDCS/PDC OBO/PDCS/DE
OVERSEAS BUILDINGS OPERATIONS
United States Department of State
Washington, D.C.
DescriptionRev Number
Revisions
Date
SARAJEVO
projektovanje, inžinjering, konsalting Srđana Aleksića 14 tel/fax: 033 213 840
FABING d.o.o.
Fadil BiberkićPrincipal
A-E_SERVICES_CMR_
DEMOLITION_&_CONSTRUCTION_
SITE_CONSERVATION
BOSNIA&HERZEGOVINA
GROUND FLOOR
E02
1 : 100
Ul.Porodice Ribar br.43, 71000 Sarajevo, BiH
E lectra d.o.o
Projektovanje, inženjering i izgradnja
Telefon: +387 33 711 870; Fax:
+387 33 646 340 email: info@electra.ba; web: www.electra.ba
CONCRETE PAD
LOUVER
LOUVER
L O
U V
E R
A=11 m²
P=1354
B18
A=10 m²
P=1284
B19
A=17 m²
P=1710
B20
A=17 m²
P=1688
B21
A=29 m²
P=2501
B22
A=2 m²
P=634
B23
A=3 m²
P=652
B24
A=38 m²
P=2535
B25
A=48 m²
P=2871
B26
A=27 m²
P=2095
B27
A=32 m²
P=2255
B28
A=23 m²
P=2023
B29
A=18 m²
P=2361
B30
A=6 m²
P=958
B32
A=10 m²
P=1388
B33
A=21 m²
P=2973
B31
A=23 m²
P=2035
C1
A=4 m²
P=962
C2
A=2 m²
P=556
C3
A=50 m²
P=3597
C4
A=3 m²
P=786
C5
A=50 m²
P=2874
C6
A=12 m²
P=1477
C7
A=9 m²
P=1421
C8
A=21 m²
P=1866
C9
A=10 m²
P=1366
C10
A=10 m²
P=1336
C11
A=37 m²
P=2637
C12
W1
W2
W2
W3 W3
W3
W3
W3
W4
W5
W5
W5
W5
W5
W5
W5
W5
W2
W4a
W7
W5 W5
W5
W8
W8
W8
W8
W5
W8
W5
W9
W10
W9
W1 W1
W5
W1
W1
W1
W11
W1
-0.45
-0.45
+0.00
+0.00
+0.00
+0.00
+0.00
+1.17
+0.00
+0.00
+0.00
-0.15
+0.05
+0.00
+0.00
+0.00
+1.00
+0.55
-0.45
+0.00
MAIN ENTRANCE
SECURITY PARITION
SIDE ENTRANCE
MAIN EXTERIOR
STAIRCASE
NEW ROOF IS LOWER
THAN EXISTING ONE
METAL STAIRCASE
FOUNDATION OF
METAL STAIRCASE
DILATATION DETAIL
CONTACT OF OLD AND
NEW BUILDING
SECURITY EXIT
TRANSFORMER
UNIT
TRANSFORMER
UNIT
-Socket outlet pc 164
All electrical equipment need to be carefully dismantled with the disconnection of the connecting cables. After dismantling, the equipment must be cleaned and handed over to the Investor with the appropriate Minutes. The equipment to be dismantled is:
Notes:
-Lamps pc 103
Part of the construction which remains
Building of the existing embassy to be demolished.
Inside the existing building all electrical equipment (distribution boards, communication racks, fire alarm equipment, luminaries carefully removed and replace in accordance with investors enquiry all job must be done before structural demolition
Distribution boards need to be dismantled after disconnecting the cables.
-Remove all visible protective pipes and cables ls 1
WARNING: This document is the property of the U.S. Government. Further reproduction and/or distribution outside the contractor team is prohibited without the express written approval of: U.S. Department of State ATTN: Washington, DC 20520
Hamdija Torlak d.i.el.
Ajdin Buljubašić d.i.el.
(Seal)
Phase
Project Number
Classification
Checked By
Drawn By
CADD File Name
OBO Project Number
CADD Plot Scale
Date
Drawing Scale
Number
35%CONCEPT
Sheet
60% 100%90% FINAL
Release For Electrical:
Drawing Title
OBO/PDCS/PDC OBO/PDCS/DE
OVERSEAS BUILDINGS OPERATIONS
United States Department of State
Washington, D.C.
DescriptionRev Number
Revisions
Date
SARAJEVO
projektovanje, inžinjering, konsalting Srđana Aleksića 14 tel/fax: 033 213 840
FABING d.o.o.
Fadil BiberkićPrincipal
A-E_SERVICES_CMR_
DEMOLITION_&_CONSTRUCTION_
SITE_CONSERVATION
BOSNIA&HERZEGOVINA
FIRST FLOOR
E03
1 : 100
Ul.Porodice Ribar br.43, 71000 Sarajevo, BiH
E lectra d.o.o
Projektovanje, inženjering i izgradnja
Telefon: +387 33 711 870; Fax:
+387 33 646 340 email: info@electra.ba; web: www.electra.ba
DN UP
DN
DN
A=23 m²
P=2017
C13
A=2 m²
P=626
C14
A=8 m²
P=1366
C15
A=1 m²
P=432
C16
A=29 m²
P=3220
C17
A=6 m²
P=1056
C18
A=27 m²
P=2112
C19
A=20 m²
P=1956
C20
A=78 m²
P=3850
C21
A=4 m²
P=912
C22
A=33 m²
P=4517
B34
A=22 m²
P=2070
B35
A=13 m²
P=1616
B36
A=7 m²
P=1374
B37
A=17 m²
P=1633
B38
A=5 m²
P=939
B39
A=19 m²
P=1735
B40
A=17 m²
P=1712
B41
A=18 m²
P=1736
B42
A=13 m²
P=1734
B43
A=6 m²
P=1046
B44
A=2 m²
P=506
B45
A=3 m²
P=754
B46
A=3 m²
P=938
B47
A=29 m²
P=2201
B48
A=38 m²
P=2501
B49
A=17 m²
P=1668
B50
A=3 m²
P=746
B51
A=78 m²
P=4354
B52
A=15 m²
P=1647
B53
A=18 m²
P=1831
B54
W2a
W2a
W2a
W2a
W3
W3
W3
W3
W5
W4a
W5
W5
W5
W3
W4a
W11
W b
W11
W1b
W1b
W1b
W1b
W8
W5
W5
W5
W5
W5
W1b
W1b
W8
W1b
W1b
W5
W8
W8
W8
W8
W1b
W5
W8
W5
W5
W5
+3.70
+3.70
+3.70
+3.70
+3.70
+3.70
+3.70
+3.70
+3.70
+3.70
+3.70
+3.70
+3.70
+4.60
FLAT ROOF
GRAVEL TOP
EXTERIOR
METAL STAIRCASE
DILATATION DETAIL
CONTACT OF OLD AND
NEW BUILDING
CHECK IF THIS WALL IS
FULL OR WITH
OPENNINGS
CHECK IF THIS WALL IS
FULL OR WITH
OPENNINGS
METAL BARS ON
WINDOWS
METAL BARS ON
WINDOWS
METAL BARS ON
WINDOWS
M E
T A
L
B
A R
S
O
N
W I N
D O
W S
M E
T A
L
B
A R
S
O
N
W I N
D O
W S
INSTALATION DUCT
CHECH LOVATION AND
DIMENSIONS
INSTALATION DUCT
CHECH LOVATION AND
DIMENSIONS
INSTALATION DUCT
CHECH LOVATION AND
DIMENSIONS
-Socket outlet pc 130
All electrical equipment need to be carefully dismantled with the disconnection of the connecting cables. After dismantling, the equipment must be cleaned and handed over to the Investor with the appropriate Minutes. The equipment to be dismantled is:
Notes:
-Lamps pc 121
Part of the construction which remains
Building of the existing embassy to be demolished.
Inside the existing building all electrical equipment (distribution boards, communication racks, fire alarm equipment, luminaries carefully removed and replace in accordance with investors enquiry all job must be done before structural demolition
Distribution boards need to be dismantled after disconnecting the cables.
-Remove all visible protective pipes and cables ls 1
WARNING: This document is the property of the U.S. Government. Further reproduction and/or distribution outside the contractor team is prohibited without the express written approval of: U.S. Department of State ATTN: Washington, DC 20520
Hamdija Torlak d.i.el.
Ajdin Buljubašić d.i.el.
(Seal)
Phase
Project Number
Classification
Checked By
Drawn By
CADD File Name
OBO Project Number
CADD Plot Scale
Date
Drawing Scale
Number
35%CONCEPT
Sheet
60% 100%90% FINAL
Release For Electrical:
Drawing Title
OBO/PDCS/PDC OBO/PDCS/DE
OVERSEAS BUILDINGS OPERATIONS
United States Department of State
Washington, D.C.
DescriptionRev Number
Revisions
Date
SARAJEVO
projektovanje, inžinjering, konsalting Srđana Aleksića 14 tel/fax: 033 213 840
FABING d.o.o.
Fadil BiberkićPrincipal
A-E_SERVICES_CMR_
DEMOLITION_&_CONSTRUCTION_
SITE_CONSERVATION
BOSNIA&HERZEGOVINA
SECOND FLOOR
E04
1 : 100
Ul.Porodice Ribar br.43, 71000 Sarajevo, BiH
E lectra d.o.o
Projektovanje, inženjering i izgradnja
Telefon: +387 33 711 870; Fax:
+387 33 646 340 email: info@electra.ba; web: www.electra.ba
DN
UP
A=23 m²
P=2267
C23
A=3 m²
P=678
C24
A=6 m²
P=1170
C25
A=1 m²
P=402
C26
A=6 m²
P=1064
C27
A=5 m²
P=992
C28
A=34 m²
P=2460
C29
A=9 m²
P=1294
C30
A=10 m²
P=1800
C31
A=16 m²
P=1666
C32
A=11 m²
P=1320
C33
A=9 m²
P=1236
C34
A=61 m²
P=3528
C35
W3
W2a
W2a
W2
W5
W3 W3
W3
W3
W3
W5
W2
W5
W2
W5
W2b
W2b
W3
W19
W11
W3
W11
W12
W12
W2
W2
+7.40
+8.40
+8.40
+7.90
+7.40
+7.90
+8.44
+8.44
+7.40
+7.40
+7.40
+7.40
+7.40
+7.40
+5.63
+3.70
+4.60
FLAT ROOF
GRAVEL TOP
EXTERIOR
METAL STAIRCASE
CHECK USE OF THIS
ROOM AND ITS FINISH
MATERIALS
FLAT ROOF
GRAVEL TOP
FLAT ROOF
GRAVEL TOP
ROOF
VENTILATION
UNIT
ROOF
VENTILATION
UNIT
TOILET
INSTALATIONS
INSTALATION DUCT
CHECH LOVATION AND
DIMENSIONS
-Socket outlet pc 58
All electrical equipment need to be carefully dismantled with the disconnection of the connecting cables. After dismantling, the equipment must be cleaned and handed over to the Investor with the appropriate Minutes. The equipment to be dismantled is:
Notes:
-Lamps pc 17
Part of the construction which remains
Building of the existing embassy to be demolished.
Inside the existing building all electrical equipment (distribution boards, communication racks, fire alarm equipment, luminaries carefully removed and replace in accordance with investors enquiry all job must be done before structural demolition
Distribution boards need to be dismantled after disconnecting the cables.
-Remove all visible protective pipes and cables ls 1
WARNING: This document is the property of the U.S. Government. Further reproduction and/or distribution outside the contractor team is prohibited without the express written approval of: U.S. Department of State ATTN: Washington, DC 20520
Hamdija Torlak d.i.el.
Ajdin Buljubašić d.i.el.
(Seal)
Phase
Project Number
Classification
Checked By
Drawn By
CADD File Name
OBO Project Number
CADD Plot Scale
Date
Drawing Scale
Number
35%CONCEPT
Sheet
60% 100%90% FINAL
Release For Electrical:
Drawing Title
OBO/PDCS/PDC OBO/PDCS/DE
OVERSEAS BUILDINGS OPERATIONS
United States Department of State
Washington, D.C.
DescriptionRev Number
Revisions
Date
SARAJEVO
projektovanje, inžinjering, konsalting Srđana Aleksića 14 tel/fax: 033 213 840
FABING d.o.o.
Fadil BiberkićPrincipal
A-E_SERVICES_CMR_
DEMOLITION_&_CONSTRUCTION_
SITE_CONSERVATION
BOSNIA&HERZEGOVINA
SITUATION
E05
1 : 100
Ul.Porodice Ribar br.43, 71000 Sarajevo, BiH
E lectra d.o.o
Projektovanje, inženjering i izgradnja
Telefon: +387 33 711 870; Fax:
+387 33 646 340 email: info@electra.ba; web: www.electra.ba
Existing transformer station
- without change
Low voltage (400VAC) cable and Fiber optic cable from PTT Telecom box to old building.
Low voltage cable will be removed by
Electrical distribution company (EDSA) and removal of Fiber optic cable needs to be completed in corelation with BH Telecom
Copper cable from PTT Telecom box to old building. Removal of Copper cable needs to be completed in corelation with BH Telecom
Medium voltage (10kVAC) cable. Medium voltage cable will be removed by Electrical distribution company (EDSA).
All low voltage (400VAC) cables which are going out of the existing transformer station (towards
MDB and existing diesel generator) need to be properly disconnected and removed
AutoCAD SHX Text WARNING: This document is the property of the U.S. Government. Further reproduction and/or distribution outside the contractor team is prohibited without the express written approval of: U.S. Department of State ATTN: Washington, DC 20520
AutoCAD SHX Text 553.08
555.87
Hamdija Torlak d.i.el.
Ajdin Buljubašić d.i.el.
(Seal)
Phase
Project Number
Classification
Checked By
Drawn By
CADD File Name
OBO Project Number
CADD Plot Scale
Date
Drawing Scale
Number
35%CONCEPT
Sheet
60% 100%90% FINAL
Release For Electrical:
Drawing Title
OBO/PDCS/PDC OBO/PDCS/DE
OVERSEAS BUILDINGS OPERATIONS
United States Department of State
Washington, D.C.
DescriptionRev Number
Revisions
Date
SARAJEVO
projektovanje, inžinjering, konsalting Srđana Aleksića 14 tel/fax: 033 213 840
FABING d.o.o.
Fadil BiberkićPrincipal
A-E_SERVICES_CMR_
DEMOLITION_&_CONSTRUCTION_
SITE_CONSERVATION
BOSNIA&HERZEGOVINA
TEMPORARY ELECTRICAL
INSTALLATION
E06
1 : 100
Ul.Porodice Ribar br.43, 71000 Sarajevo, BiH
E lectra d.o.o
Projektovanje, inženjering i izgradnja
Telefon: +387 33 711 870; Fax:
+387 33 646 340 email: info@electra.ba; web: www.electra.ba
N
WC
R z
V l a d a
F e d e r a c i j e
B i
H
U l
A l i p a s i n a
WC
Vodena pumpa
Tisa-Yew
Smrca-Spruce
Tisa-Yew
S
S
S
S
R2
R1
(549.1794)
(551.3712)
N
R e s i d e n t a l b u i l d i n g
G o v e r n m e n t
R e s i d e n c e b u i l d i n g
R e s i d e n t a l b u i l d i n g
21 15m10m0 3 4 5m
N
LEGEND
EXISTING TRANSFORMER STATION
WITHOUT CHANGE
INSIDE THE EXISTING BUILDING
ALL ELECTRICAL EQUIPMENT (DISTRIBUTION BOARDS,
COMMUNICATION RACKS, FIRE ALARM EQUIPMENT,
LUMINARIES CAREFULLY REMOVED AND REPLACE IN
ACCORDANCE WITH INVESTORS ENQUIRY
ALL JOB MUST BE DONE BEFORE STRUCTURAL DEMOLITION
DURING THE REMOVING OTHER INSTALLATION
PAY ATTENTION ON EXISTING
HV CABLES TO TRANSFORMER STATION
Building of the existing embassy to be demolished.