This is a solicitation for a Construction Manager (CM) site demolition and stabilization project. The Department of State Office of Acquisition Management is seeking a contractor to provide demolition and stabilization services at a site located in Sarajevo, Bosnia and Herzegovina. Services include temporary electrical installations; demolition of internal and external electrical systems; removal of distribution boards, lighting fixtures, cables and protective piping; excavation of underground cable trenches; and coordination with local utility providers for removal of connected infrastructure. Offerors should propose pricing for labor, materials, equipment and all other costs. The closing date for receipt of proposals is not specified. The selected contractor will be responsible for compliance with all local safety and environmental regulations over the course of the project.

View the file

Other files for this federal contract opportunity

Other files attached to CMR Site Demolition and Stabilization, newest first.
File Type Posted
19GE5022R0118_Q and A Volume I.pdf PDF
19GE5022R0118_P00001.pdf PDF
DBAWaiver-BosniaHerzegovina.pdf PDF
J.1.6_Demolition_and_Construction_Site_Conservation.pdf PDF
J.1.8_HVAC_Installations.pdf PDF
19GE5022R0118.pdf PDF
J.1.3_Site Stabilization.pdf PDF
J.1.1_Geotechnical_Properties_.pdf PDF
J.1.2_General.pdf PDF
19GE5022R0118_RFP Cover letter.pdf PDF
J.1.9_Plumbing Installations.pdf PDF
J.1.4_Bill_of_Quantities_-_Demolition_and_Site_Conservation.pdf PDF
J.1.5_Architecture_and_Landscape_-_Demolition_and_Site_Conservation.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A-E_SERVICES_CMR_ ELECTRICAL_INSTALLATIONS

SARAJEVO, BOSNIA&HERZEGOVINA

1 | P a g e d a t e 2 0 2 2 / 0 3

Book 4

Part 4 ELECTRICAL_INSTALLATIONS

4.3.1 Techincal description

4.3.2 Calculations

4.3.3 Bill of quantity

4.3.4 Drawings

E_01 – Electrical installations for demolition – Basement

E_02 - Electrical installations for demolition – Ground floor

E_03 - Electrical installations for demolition – First floor

E_04 - Electrical installations for demolition – Second floor

E_05 - Electrical installations for demolition – Situation

E_06 - Electrical installations for demolition – Temporary electrical installation

E_07 - Electrical installations for demolition – Diagram of DB-TEMP

2 | P a g e d a t e 2 0 2 2 / 0 3

4.3.1. Technical description

The RAA building in Sarajevo, 43 Alipašina Street has floor plan dimensions of maximum length 25.80 m, maximum width 30.80 m, with different floors from the basement to the second floor.

In the image above we can see the current appearance/layout of the object in question which is the subject of demolition. On the north side of the building there is an existing transformer station from which the object in question is supplied and which is not subject to demolition, ie it is retained. In addition to the transformer station, the following is still retained: a part of the building on the south side as indicated in the drawings, a diesel generator and its associated electrical cabinets and a security building at the main entrance gate. The subject of the project documentation of the electrical phase is the removal of internal and external electrical installations of the object in question. Internal electrical installations consist of high and low voltage installations, where high voltage installations include installations of lighting, sockets, switchboards, switchpanels, cable racks, cable pipes, etc. together with all associated cables and connecting equipment.

Under low-voltage installations, we mean installations of fire alarm, video surveillance, all security systems, integrated network, telephony, etc. also together with all associated cables and connecting equipment in accordance with the drawings from the graphic part of the project documentation.All electrical equipment must be carefully dismantled and removed along with the associated cables. After dismantling, all equipment must be properly cleaned and handed over to the Investor together with the appropriate record/minutes. As already mentioned, during the complete dismantling of electrical installations, it is necessary to dismantle all protective pipes and cables. As far as external installations are concerned, it is necessary to dismantle and remove the power cables coming out of the existing transformer station, ie the cables that supply the main power supply to the building and the cabinet of the diesel generator. Removal of these installations, together with installations for powering other outdoor facilities, outdoor lighting, etc. falls under the obligations of the bidder/contractor. In addition to these installations, there are also medium voltage (10(20)kV) cables that supply the transformer station in question and low-voltage (0,4kV) transient cables that are under the jurisdiction of Elektrodistribucija Sarajevo and will be removed by the staff of Elektrodistribucija Sarajevo. Also, there are the installations of the telecom operator as shown in the graphic part of the project documentation, which must be removed in accordance with and presence of BHTelecom staff.

For the needs of supervision of the construction site itself as well as the needs of construction of new facilities as part of works on dismantling of electrical installations and other phases, the following is provided:

1. Power supply of external lighting of the building (lighting on external walls)

2. Power supply of electrical cabinets for the needs of the construction site

3 | P a g e d a t e 2 0 2 2 / 0 3

3. Construction crane power supply

4. Power supply to the southern part of the facility under the authority of the US Embassy security staff

To achieve the above power supplies, auxiliary electrical distribution cabinets are formed. DB-TEMP is the main cabinet from which the distribution, ie power supply is performed to the above items and it is located inside the room where the current measurement of electricity consumption is performed. The power cables used for power supply for the above items, which are shown in the block diagram of the DB-TEMP cabinet, are laid with plastic PVC pipes along the outer wall as shown in the situation drawing in the graphic part of the project documentation. Before the very beginning of the dismantling of the electrical installation equipment of the project in question, the bidder for the dismantling works needs to make a detailed inspection of the object in question and the listed installations that are being dismantled/removed.

4.3.1.1 Documentation Review - Answers

Comment status ID: 955109

Noted. Correction of diagram DB-TEMP will be made.

Comment status ID: 955113

Cable path (PVC pipes) will follow perimiter outer walls until the last point (southern entrance) from where we will enter through wall or window inside part of a building which remains. Additional notes will be made inside corresponding drawings.

Comment status ID: 955130

Technical measures of protections against arch flash conditions will be provided in Technical documentation.

Comment status ID: 955513

Additional confirmation of existing physical security elements will be made before any disposal of FEBR or vault doors.

Comment status ID: 956993

Temporary power line will not be connected to the generator, because internal cable connection between transformer station and generator room will be removed. Temporary power line provided by DB-TEMP will be directly connected to grid inside electricty metering building next to transformer station.

Comment status ID: 956994

DB-CONTR is distribution cabinet provided by the contractor who will manage construction site, that is the main reason why this DB is not included in BoQ. We will provide cables needed for powering aformentioned distribution board. Additional notes will be made on drawings to clarify this matter.

Comment status ID: 957072

Noted. In BoQ additional segment will be added for local copper and fiber cables which are distributed underground which are not falling under jurisdiction of BHTelecom.

4 | P a g e d a t e 2 0 2 2 / 0 3

4.3.2. Calculations

Technical measures of protection against electric shock

Protection against electric shock is achieved by appropriate technical measures, as follows:

• Measures for protection against direct contact,

• Measures for protection against indirect contact.

Protection against direct contact is achieved according to applicable technical standards as follows:

• Isolating live parts,

• Protection with bulkheads or casings,

• Protection barriers,

• Protection by placing out of reach,

• Additional protection by residual current protective devices (RCD).

Protection against direct contact with live parts of equipment and electrical installations is provided by using materials, lines and equipment within the rated values, quality according to applicable standards, a proper and conscientious preparation and maintenance of equipment and wiring. One part of equipment that is energized, is located in DBs with a key, and is accessible only to professional and competent personnel, while the rest is mostly protected by insulation (cables, lighting, installation equipment, etc.). Protection against indirect contact is performed according to applicable technical standards as follows:

• Protection by automatic power shut-down,

• Protection using a Class II or appropriate insulation,

• Protection by electrical isolation.

Protection against indirect contact with live parts of electrical installations in TN-C-S system is provided by automatic power shut-down using residual current switch. This means that the conductive parts of equipment and devices, which may become energized must be connected by protective conductor to a grounded point of the power system. A separate protective conductor will be laid and connected to all metal surfaces within the facility. Protective conductor is connected to the protective busbar in each DB, which is further connected to the GIP and grounding system. Protective devices (MCBs) and the cable cross-sections were selected to perform the automatic switch-off inside time set by protection unit. This serves in cases when there is a fault of negligible impedance (short circuit) between the phase conductors and protective conductors or conductive parts that may become energized.

Protection against thermal effects is performed according to applicable technical standards as follows:

• Fire protection,

• Protection against burns,

• Protection against overheating, Fire protection is provided by placing live parts of equipment in housing, which must withstand the highest temperature that can be produced by electrical equipment.

Protection against burns is secured so that parts which are accessible to the hand can not reach a temperature that would cause burns and must meet the temperature limits specified in the table.

5 | P a g e d a t e 2 0 2 2 / 0 3

Accessible parts Material of accessible surface

Max temp ° C

Hand-held equipment metal 55 nonmetal 65

Parts which are touched but not hand-held metal 70 nonmetal 80

Parts which are not touched in regular use metal 80 nonmetal 90

Overheating protection is achieved by providing that systems with forced air heating can not be switched on if there is no sufficient flow of air, and turn off when the air flow ceases. Equipment for heating water or steam in its construction is protected from overheating (thermostat or water pressure limiter).

Overcurrent protection

Overcurrent protection is performed according to applicable technical standards as follows:

• Protection against current overload

• Protection from the short-current

Protection against overload current has been achieved on the basis of coordination of protective devices and power lines, so working curve of the power line must meet the following conditions:

IB ≤ In ≤ Iz

I2 ≤ 1,45 x Iz where:

• IB = current for which the circuit is designed (A)

• Iz = permanently permissible current of conductors or cables (A)

• In =rated current of protective devices

• = current at which the protective device operates reliably

Protection against overload current in this case has been achieved by use of MCBs at the beginning of each circuit. This provides quality protection of lines and circuits that can be connected only to functioning and desgined appliances. Protection of short-circuit currents provides cutting of short-circuit current before the current causes a risk of thermal and mechanical effects in conductors and connections. For a short circuit that lasts up to 5s, during which short-circuit current rises the conductor temperature to a maximum limit, is calculated approximately from the expression:

I2

6 | P a g e d a t e 2 0 2 2 / 0 3 where:

duration of short circuit in which the cable reaches the maximum allowable temperature fuse reaction time k coefficient of cable type which is not defined for cable cross-sections less than 10 mm2, short circuit duration over 5s, depending on the type of conductor (74-135)

S section in mm2

Protection from potential difference was achieved by connecting all metal parts in each facility and the lightning installation. When selecting the cable cross-section (see line calculations), voltage drop was taken into account in individual circuits. Each circuit should be designed so that it can be separated from other energized conductors (connection in DB is made with screwed connection or using terminals). The distribution boards contain separate busbars for the neutral and protective conductors. Conductors in cables in DBs are marked with colors and conductor with blue insulation is required to be used for neutral, and green-yellow color for the protective conductor.

The Contractor shall carry out functional performance after installation: visual inspection and testing. Testing is generally conducted while electrical installations are disconnected, and the review includes following checks:

1. Protection against electric shock, including the distance measurement by installing security equipment in the housing (cabinets)

2. Protective measures against the spread of fire and heat from the impact of the conductors according to permanently admissible values of current and allowable voltage drop

3. Selection and setting of protective devices

4. Placing the appropriate switching devices from the standpoint of spacing

5. Choice of equipment and protective measures against external influences

6. Differentiation of neutral and protective conductor

7. Setting up schemes, tiles with warnings or similar notices

8. Differentiation of circuits, fuses, switches, terminals and other equipment

9. Conductor connection

10. Accessibility and availability of space for operation and

Constructiontenance t t t k S

I ks ks

2 2 tks t0

7 | P a g e d a t e 2 0 2 2 / 0 3

Common tests must be run in this order:

1. Continuity of protective conductor and the Construction and secondary cable for single-potential bonding

2. Insulation resistance of electrical installations

3. Protection by electrical separation of circuits (with accessories attached)

4. Functionality (functional testing of control and protective devices)

5. Measuring the level of lighting

6. Measurement of ground resistance

Technical measures of protection against Arc Flash

Switchboards, panelboards, industrial control panels, and motor control centers that are in other than dwelling occupancies and are likely to require examination, adjustment, servicing, or maintenance while energized shall be field marked to warn qualified persons of potential electric arc flash hazards. The marking shall be located so as to be clearly visible to qualified persons before examination, adjustment, servicing, or maintenance of the equipment.

FPN No. 1: NFPA 70E-2000, Electrical Safety Requirements for Employee Workplaces, provides assistance in determining severity of potential exposure, planning safe work practices, and selecting personal protective equipment.

FPN No. 2: ANSI Z535.4-1998, Product Safety Signs and Labels, provides guidelines for the design of safety signs and labels for application to products.

As arc flash technology emerges, new developments result in changes to arc flash criteria. For example, in

2004, the NFPA 70E was reissued in a completely new format with changes reflecting new developments. The flash protection marking per NEC Article 110-16 is a field marking requirement and is to be applied by the user for each specific application. The marking is similar to other NEC marking requirements, e.g., voltage, voltage hazard labels, circuits, etc. However, flash protection markings should be based on application information and calculations from the installation site. The intent of the marking is to identify the presence of a potential flash hazard and to provide assistance in determining necessary protective clothing and personal protective equipment (PPE) that should be worn by qualified electrical persons when servicing electrical equipment. The user must establish field marking requirements based upon:

• The level of the on-site personnel safety training ,

• The level of required clothing and required PPE,

• Consistency for the level of marking of various equipment, e.g., switchboards, panelboards, industrial control panels, motor control centers, etc.,

• The available flash energy on each piece of equipment. This energy is determined from short-circuit current, arc duration based on the type and degree of short circuit protection equipment and the distance of the worker from the prospective arc

8 | P a g e d a t e 2 0 2 2 / 0 3

As previously discussed, the Guideline Method should be considered an alternate method as it is based on a conservative criteria. Although, this may not always be the case in the actual application. The fault current and clearing time are given by NFPA 70E as an example and the actual application may be less, resulting in lower flash hazard energy. Or, in some cases, this could even be higher than the NFPA 70E generic values due to the application's fault current and/or the fault clearing time (the combination of higher or lower fault current with the arcing time). For example, if the fault current is lower, resulting in a longer clearing time for the applications protection device, the flash energy could be substantially greater. This case is especially important in the noncurrent-limiting range or over-current (overload) range of short-circuit protection devices. It may be best not to use the alternate, generic method but to conduct an actual “Flash Hazard Analysis” using the site's actual input criteria. From this analysis the user can determine the site's actual flash hazard determining:

• Actual site flash hazard energy (incident energy)

• Actual protective device's projected clearing times

• Actual site flash hazard risk

• Safety instructions based on both the actual available flash hazard and the MCC design features

• Assign PPE according to the Flash Hazard Energy and Risk

• Corresponding required NEC markings.

There can be benefits for the user in applying this approach, instead of usingthe generic guideline approach because the PPE equipment can be specifically selected to fit the MCC application, “workman friendly” PPE may be applied and a common flash hazard instruction, consistent with other types of equipment may be used.

New tools are now available for carrying out the Flash Hazard Analysis. One such tool is IEEE Standard 1584

[IEEE Standard 1584- 2002 “IEEE Guide for Performing Arc Flash Hazard Calculations”]

IEEE Standard 1584 on arc flash hazards calculations provides an excellent source for conducting the flash analysis and includes an analysis spreadsheet (including a CD for completing the calculations). This spreadsheet uses Microsoft Excel® . This is a useful tool as each of the sites’ applications can be defined, labeled and assigned the appropriate PPE marking. Simply follow the directions as defined in the IEEE Standard and input the requirements into the spreadsheet from the actual site and the necessary calculations will be carried out by the software. It is recommended to review this IEEE standard as it includes actual field incidents of arcing faults, research testing data, arc-time data and fuse and circuit breaker time-current characteristics (important for developing the arcing time calculations). This is an excellent tool for carrying out the NFPA 70E requirements for conducting the Flash Hazard Analysis and a base for the NEC's requirement for Flash-

Protection Marking.

Reducing Arc-Flash design features

• Reduce fault current (bolted fault less than the NFPA 70E benchmark of 50kA or any combination not exceeding 300kA cycles, i.e. 5000 ampere seconds)

• Current limiting devices or reduced clearing time, i.e. Reduction in the Flash Protection Boundary

(clearing times less than 6 cycles (0.1s) and low let-through energy)

• Consistency of Design

• Barriers and Guards

• Automatic Shutters Provide Isolation and Insulation

• CENTERLINE MCC Unit Interlock Prohibits the Insertion or Withdrawal of a Unit with the Disconnecting

Means in the “ON” or Closed Position

• Withdrawable CENTERLINE MCC Units Allow Servicing Units while Isolated from Power Bus

• Low Energy Drive Compartments

• MCC Unit Operation

9 | P a g e d a t e 2 0 2 2 / 0 3

1.1 Feeder circuits

1.1.1 Circuit Existing MB

Circuit breaker QA 10

Ib 155 A

Distance from origin NA

Sizing Information Seized by user

Range Compact NSX

Designation NSX250B

Circuit breaker rating 250 A

Breaking capacity 25 kA

TNS One pole breaking capacity 25 kA

IT One pole breaking capacity NA

Reinforced breaking capacity NA

Pole & protected pole 3P3d

Trip unit designation Micrologic 5.2 E

Trip unit rating 250 A

Long delay settings

Ir 155 A

Tr 4 s

Short delay settings

Isd current 1550 A

Tsd 0.4 s

Instantaneous tripping

Ii current 3000 A

Ti current 50 A

Selectivity Results

UpStream Selectivity Limit

Operating mode Normal

QA 0

NSX630F

Micrologic 5.3 A 630 A / 4P4d

Total Selectivity

Cable WD 10 Parameters

Length 10 m

Installation method 31 E Multi-core cables on horizontal perforated tray

Type of cable Multi-core

Nb of additional touching circuits

NA

Insulation PVC

Ambient temperature 30 °C

Level of third harmonic THDI NA %

Ib 155 A

Sizing constraint Iz

Sizing Information Sized with Ir

Correction factors

Temperature factor 1

Standard table reference B-52-14

Soil thermal resistivity factor 1

10 | P a g e d a t e 2 0 2 2 / 0 3

Standard table reference B-52-16

Loaded neutral factor 1

Standard table reference E-52-1

Touching conductor factor 1

Standard table reference B-52-20

User correction factor 1 Overall factor 1

Selected phase

Cross section area 1x150 mm²

Core Copper

Iz under real conditions 319 A

Iz’ 319 A

Selected neutral

Cross section area 1x150 mm²

Core Copper

Iz under real conditions 319 A

Iz’ 319 A

Selected PE

Cross section area 1x95 mm²

Core Copper

Short circuit current

Ik3max Ik2max Ik1max Ik2min Ik1min Iefmin Ief2min Iefmax

(kA) 12.96 11.22 11.94 9.47 10.03 10.11 NA 11.71

Synthesis for all operating mode

(kA) 12.96 11.22 11.94 9.47 10.03 10.11 NA 11.71

Calculation results in accordance with CENELEC technical report TR50480.

All assumptions and device choices are the user's responsibility.

Design current

IL1 IL2 IL3 IN

(A) 192.450 192.450 192.450 0

(A) 192.450 192.450 192.450 NA

Voltage drop

Cumulated from upstream Circuit

U3L (%) 0.277 0.140

UL1L2 (%) 0.320 0.162

UL2L3 (%) 0.320 0.162

UL3L1 (%) 0.320 0.162

UL1N (%) 0.277 0.140

UL2N (%) 0.277 0.140

UL3N (%) 0.277 0.140

11 | P a g e d a t e 2 0 2 2 / 0 3

1.2 Generic load circuits

1.2.1 Circuit DB-CONSTR

Circuit breaker QA 3

Ib 64.2 A

Distance from origin NA

Sizing Information Sized by system

Range Acti9 C120

Designation C120H

Circuit breaker rating 80 A

Breaking capacity 15 kA

TNS One pole breaking capacity 15 kA

IT One pole breaking capacity NA

Reinforced breaking capacity NA

Pole & protected pole 3P3d

Trip unit designation C

Trip unit rating 80 A

Long delay settings

Ir 80 A

Tr NA

Short delay settings

Isd current 680 A

Tsd NA

Instantaneous tripping

Ii current NA

Ti current NA

QA 10

NSX250B

Micrologic 5.2 E 250 A / 3P3d

Cable WD 3

Length 110 m

Installation method 31 E Multi-core cables on horizontal perforated tray

Type of cable Multi-core

Nb of additional touching circuits

NA

Insulation PVC

Ambient temperature 30 °C

Level of third harmonic THDI NA %

Ib 64 A

Sizing constraint Voltage drop

Sizing Information The CSA of cable WD 3 has been increased from 16 to 35 to comply with the voltage drop in the circuit. Sized with Ir

12 | P a g e d a t e 2 0 2 2 / 0 3

Correction factors

Temperature factor 1

Standard table reference B-52-14

Soil thermal resistivity factor 1

Standard table reference B-52-16

Loaded neutral factor 1

Standard table reference E-52-1

Touching conductor factor 1

Standard table reference B-52-20

Cross section area 1x35 mm²

Core Copper

Iz under real conditions 126 A

Iz’ 126 A

Selected neutral

Cross section area 1x35 mm²

Core Copper

Iz under real conditions 126 A

Iz’ 126 A

Selected PE

Cross section area 1x16 mm²

(kA) 3.62 3.13 1.96 2.33 1.43 0.93 NA 1.08

(kA) 3.62 3.13 1.96 2.33 1.43 0.93 NA 1.08

Charge AA 3

U 400 V

S 44.4 kVA

P 40 kW

I 64.2 A cos 0.9

Polarity 3Ph+N

Phase connection

Number of circuit 1

Ku (Normal) 1

Harmonic generator No

THDI3 NA

Sensitivity to over voltage NA

(A) 64.150 64.150 64.150 0

13 | P a g e d a t e 2 0 2 2 / 0 3

(A) 64.150 64.150 64.150 NA

U3L (%) 2.128 1.852

UL1L2 (%) 2.458 2.138

UL2L3 (%) 2.458 2.138

UL3L1 (%) 2.458 2.138

UL1N (%) 2.128 1.852

UL2N (%) 2.128 1.852

UL3N (%) 2.128 1.852

U3L (%) 2.128

UL1L2 (%) 2.458

UL2L3 (%) 2.458

UL3L1 (%) 2.458

UL1N (%) 2.128

UL2N (%) 2.128

UL3N (%) 2.128

1.2.1 Circuit DB-TEMP2

Circuit breaker QA 5

Ib 16 A

Distance from origin NA

Sizing Information Sized by system

Range Acti9 C120

Designation C120H

Circuit breaker rating 32 A

Breaking capacity 15 kA

TNS One pole breaking capacity 15 kA

IT One pole breaking capacity NA

Reinforced breaking capacity NA

Pole & protected pole 3P3d

Trip unit designation D

Trip unit rating 32 A

Long delay settings

Ir 32 A

Tr NA

Short delay settings

Isd current 384 A

Tsd NA

Instantaneous tripping

14 | P a g e d a t e 2 0 2 2 / 0 3

QA 10

NSX250B

Micrologic 5.2 E

Cable WD 5

Length 100 m

Installation method 31 E Multi-core cables on horizontal perforated tray

Type of cable Multi-core

Nb of additional touching circuits

NA

Insulation PVC

Ambient temperature 30 °C

Level of third harmonic THDI NA %

Ib 16 A

Sizing constraint Voltage drop

Sizing Information The CSA of cable WD 5 has been increased from 4 to 10 to comply with the voltage drop in the circuit. Sized with Ir

Correction factors

Temperature factor 1

Standard table reference B-52-14

Soil thermal resistivity factor 1

Standard table reference B-52-16

Loaded neutral factor 1

Standard table reference E-52-1

Touching conductor factor 1

Standard table reference B-52-20

Cross section area 1x10 mm²

Core Copper

Iz under real conditions 60 A

Iz’ 60 A

Selected neutral

Cross section area 1x10 mm²

Core Copper

Iz under real conditions 60 A

Iz’ 60 A

Selected PE

Cross section area 1x10 mm²

(kA) 1.31 1.14 0.67 0.82 0.48 0.48 NA 0.56

15 | P a g e d a t e 2 0 2 2 / 0 3

(kA) 1.31 1.14 0.67 0.82 0.48 0.48 NA 0.56

Charge AA 5

U 400 V

S 11.1 kVA

P 10 kW

I 16 A cos 0.9

Polarity 3Ph+N

Phase connection

Number of circuit 1

Ku (Normal) 1

Harmonic generator No

THDI3 NA

Sensitivity to over voltage NA

(A) 16.038 16.038 16.038 0

(A) 16.038 16.038 16.038 NA

U3L (%) 1.689 1.412

UL1L2 (%) 1.950 1.631

UL2L3 (%) 1.950 1.631

UL3L1 (%) 1.950 1.631

UL1N (%) 1.689 1.412

UL2N (%) 1.689 1.412

UL3N (%) 1.689 1.412

U3L (%) 1.689

UL1L2 (%) 1.950

UL2L3 (%) 1.950

UL3L1 (%) 1.950

UL1N (%) 1.689

UL2N (%) 1.689

UL3N (%) 1.689

1.2.2 Circuit DB-TEMP2

Circuit breaker QA 6

Ib 16 A

Distance from origin NA

Sizing Information Sized by system

Range Acti9 C120

16 | P a g e d a t e 2 0 2 2 / 0 3

Designation C120H

Circuit breaker rating 25 A

Breaking capacity 15 kA

TNS One pole breaking capacity 15 kA

IT One pole breaking capacity NA

Reinforced breaking capacity NA

Pole & protected pole 3P3d

Trip unit designation D

Trip unit rating 25 A

Long delay settings

Ir 25 A

Tr NA

Short delay settings

Isd current 300 A

Tsd NA

Instantaneous tripping

NSX250B

Micrologic 5.2 E

Cable WD 6

Length 200 m

Installation method 31 E Multi-core cables on horizontal perforated tray

Type of cable Multi-core

Nb of additional touching circuits

NA

Insulation PVC

Ambient temperature 30 °C

Level of third harmonic THDI NA %

Ib 16 A

Sizing constraint Voltage drop

Sizing Information The CSA of cable WD 6 has been increased from 2.5 to 16 to comply with the voltage drop in the circuit. Sized with Ir

Correction factors

Temperature factor 1

Standard table reference B-52-14

Soil thermal resistivity factor 1

Standard table reference B-52-16

Loaded neutral factor 1

Standard table reference E-52-1

Touching conductor factor 1

Standard table reference B-52-20

17 | P a g e d a t e 2 0 2 2 / 0 3

Core Copper

Iz under real conditions 80 A

Iz’ 80 A

Selected neutral

Cross section area 1x16 mm²

Core Copper

Iz under real conditions 80 A

Iz’ 80 A

Selected PE

(kA) 1.06 0.92 0.54 0.66 0.39 0.39 NA 0.45

(kA) 1.06 0.92 0.54 0.66 0.39 0.39 NA 0.45

Charge AA 6

U 400 V

S 11.1 kVA

P 10 kW

I 16 A cos 0.9

Polarity 3Ph+N

Phase connection

Number of circuit 1

Ku (Normal) 1

Harmonic generator No

THDI3 NA

Sensitivity to over voltage NA

(A) 16.038 16.038 16.038 0

(A) 16.038 16.038 16.038 NA

U3L (%) 2.060 1.784

18 | P a g e d a t e 2 0 2 2 / 0 3

UL1L2 (%) 2.379 2.060

UL2L3 (%) 2.379 2.060

UL3L1 (%) 2.379 2.060

UL1N (%) 2.060 1.784

UL2N (%) 2.060 1.784

UL3N (%) 2.060 1.784

U3L (%) 2.060

UL1L2 (%) 2.379

UL2L3 (%) 2.379

UL3L1 (%) 2.379

UL1N (%) 2.060

UL2N (%) 2.060

UL3N (%) 2.060

1.2.3 Circuit CC

Circuit breaker QA 7

Ib 96.2 A

Distance from origin NA

Sizing Information Sized by system

Range Acti9 C120

Designation C120H

Circuit breaker rating 100 A

Breaking capacity 15 kA

TNS One pole breaking capacity 15 kA

IT One pole breaking capacity NA

Reinforced breaking capacity NA

Pole & protected pole 3P3d

Trip unit designation C

Trip unit rating 100 A

Long delay settings

Ir 100 A

Tr NA

Short delay settings

Isd current 850 A

Tsd NA

Instantaneous tripping

NSX250B

Micrologic 5.2 E 250 A / 3P3d

172 A

Cable WD 7 Parameters

Length 60 m

Installation method 31

19 | P a g e d a t e 2 0 2 2 / 0 3

E Multi-core cables on horizontal perforated tray

Type of cable Multi-core

Nb of additional touching circuits

NA

Insulation PVC

Ambient temperature 30 °C

Level of third harmonic THDI NA %

Ib 96 A

Sizing constraint Voltage drop

Sizing Information The CSA of cable WD 7 has been increased from 25 to 35 to comply with the voltage drop in the circuit. Sized with Ir

Correction factors

Temperature factor 1

Standard table reference B-52-14

Soil thermal resistivity factor 1

Standard table reference B-52-16

Loaded neutral factor 1

Standard table reference E-52-1

Touching conductor factor 1

Standard table reference B-52-20

Cross section area 1x35 mm²

Core Copper

Iz under real conditions 126 A

Iz’ 126 A

Selected neutral

Cross section area 1x35 mm²

Core Copper

Iz under real conditions 126 A

Iz’ 126 A

Selected PE

(kA) 5.67 4.91 3.29 3.74 2.44 1.64 NA 1.90

(kA) 5.67 4.91 3.29 3.74 2.44 1.64 NA 1.90

Charge AA 7

U 400 V

20 | P a g e d a t e 2 0 2 2 / 0 3

S 66.7 kVA

P 60 kW

I 96.2 A cos 0.9

Polarity 3Ph+N

Phase connection

Number of circuit 1

Ku (Normal) 1

Harmonic generator No

THDI3 NA

Sensitivity to over voltage NA

(A) 96.225 96.225 96.225 0

(A) 96.225 96.225 96.225 NA

U3L (%) 1.792 1.515

UL1L2 (%) 2.069 1.749

UL2L3 (%) 2.069 1.749

UL3L1 (%) 2.069 1.749

UL1N (%) 1.792 1.515

UL2N (%) 1.792 1.515

UL3N (%) 1.792 1.515

U3L (%) 1.792

UL1L2 (%) 2.069

UL2L3 (%) 2.069

UL3L1 (%) 2.069

UL1N (%) 1.792

UL2N (%) 1.792

UL3N (%) 1.792

21 | P a g e d a t e 2 0 2 2 / 0 3

4.3.3. Bill of quantity

DESCRIPTION

QUANTI

TY

UNI

T

MATERIAL LABOR UNIT

PRICE/BAM

PRICE/BA

M

20. ELECTRICAL WORKS &

EQUIPMENT

1. Temporary electrical installation

1.1. Production, delivery and installation of temporary metal overhead distribution batteries All complete with connection and marking of lines is tested and ready for operation.

Made in everything according to the distribution board panel schedule :

DB-TEMP (according to diagram from graphical section)

1,00 pcs 3680,00 520,00 4200,00 4200,00

DB-TEMP1 (Security building on main gate) - Contains:

pcs 1120,00 280,00 1400,00 1400,00

- Main circuit brekaer 100A (32-40A), pcs 1

- Miniature circuit breaker 10A, pcs 10

- Miniature circuit breaker 16A, pcs 15

- Selector rotary switch 0-1, 25A, pcs

DB-TEMP2 (South side part of main building which remains) pcs 1065,00 280,00 1345,00 1345,00

- Main circuit brekaer 100A (32-40A), pcs 1

- Miniature circuit breaker 10A, pcs 10

- Miniature circuit breaker 16A, pcs 15

1.2. Adaptation of existing electrical

installations of Security building on main gate which remains and connection to a new distribution board DB-TEMP1. All complete ls 220,00 640,00 860,00 860,00

1.3. Adaptation of existing electrical

installations of Security building on the south side of main building which remains and connection to a new distribution board DB-TEMP2. All complete ls 380,00 920,00 1300,00 1300,00

1.4. Adaptation of existing electrical

installations for outside lighting (outside walls of compaund) and connection to a new distribution board DB-TEMP1. New installation will be lay down through new PVC pipes with cable type NYY-J 3x4 mm2. Including all connection equipment. All ls 120,00 1400,00 1520,00 1520,00

1.5. Delivery and installation of Power

Supply Cables:

NYY 4x150 mm2 (MB - DB-TEMP) 10,00 m 148,00 26,00 174,00 1740,00

NYY-J 1x95 mm2 (MB - DB-TEMP) 10,00 m 44,00 12,00 56,00 560,00

22 | P a g e d a t e 2 0 2 2 / 0 3

NYY-J 5x35 mm2 170,00 m 38,00 10,00 48,00 8160,00

NYY-J 5x16 mm2 200,00 m 20,00 8,00 28,00 5600,00

NYY-J 5x10 mm2 100,00 m 14,00 7,00 21,00 2100,00

NYY-J 3x4 mm2 (outside lighting) 190,00 m 6,00 5,00 11,00 2090,00

1.6. Delivery of insulating carpets

6,00 m2 110,00 10,00 120,00 720,00

1.7. Delivery and installation near

distribution boards of CO2-5 extinguishers

3,00 pcs 160,00 20,00 180,00 540,00

1.8. Delivery and installation of PVC tubes

Ø100 mm, for the power cables from DB-TEMP. All complete with connection equipment

380,00 m 12,00 6,00 18,00 6840,00

1.9. Unspecified material

ls 300,00 300,00 600,00 600,00

1.10

Testing and ispection of temporary installations ls 0,00 660,00 660,00 660,00

2. Demolition works - Internal electrical

Note 1:

Before the very beginning of the dismantling of the electrical installation equipment of the project in question, the bidder for the dismantling works needs to make a detailed inspection of the object in question and the listed installations that are being dismantled/removed.

Note 2:

All electrical equipment must be carefully dismantled and removed along with the associated cables. After dismantling, all equipment must be properly cleaned and handed over to the Investor together with the appropriate record/minutes

2.1. Removal of all electrical installations

(high voltage) including lighting, sockets, distribution cabinets, protective pipes and associated cables. All complete

1 ls 500,00 7200,00 7700,00 7700,00

Outlet sockets (estimated value) - 353 pcs

Lights (estimated value) - 415 pcs

Cable (visible, estimated value) - 3 000 m

Protective pipes (visible, estimated value) - 1 000 m

Distribution boards and panels (estimated value) - 8 pcs

2.2. Removal of all lighting protection

installations on roof including receiving lines, connection equipment, FeZn tapes etc. All

1 ls 150,00 620,00 770,00 770,00

2.3. Removal of all electrical installation

(low voltage) including fireprotection system, surveilance system, internal network , security systems, telephony etc. All complete

1 ls 300,00 3600,00 3900,00 3900,00

23 | P a g e d a t e 2 0 2 2 / 0 3

3. Demolition works - External electrical

Note 1:

Before the very beginning of the dismantling of the electrical installation equipment of the project in question, the bidder for the dismantling works needs to make a detailed inspection of the object in question and the listed installations that are being dismantled/removed.

Note 2:

All electrical equipment must be carefully dismantled and removed along with the associated cables. After dismantling, all equipment must be properly cleaned and handed over to the Investor together with the appropriate record/minutes

3.1. Removal of all electrical installations

(high voltage) ie. cables that are coming out of the existing transformer station. Cables which supply main distribution boards of the object, diesel generator, outdoor lighting and other non-primary object inside compaund. Removal of these cables falls under obligation of Contractor.

This includes removal of all protective piping. All complete

1 ls 200,00 1920,00 2120,00 2120,00

3.2. Removal of medium voltage

(10(20)kV) distrubution cables which are powering existing transformation station. Removal of these cables falls under jurisdiction of Elektrodistribucija Sarajevo. All complete (ESTIMATED)

1 ls 10000,00 10000,00 20000,00 20000,00

3.3. Removal of PTT Telecom installation

which includes fiber optic cables and copper cables that are connected to the main building. Removal of these cables falls under jurisdiction of BHTelekom. All complete.

ESTIMATED)

1 ls 6000,00 6000,00 12000,00 12000,00

3.4. Removal of PTT installation that does

not fall under jurisdiction of the Telecom company, which includes fiber optic cables and copper cables that are connected to the main building. All complete.

1 ls 4000,00 3000,00 7000,00 7000,00

3.5. Excavation of the cable trench in the

ground of III category for removal of power cables which are connecting main building and trasformer station.

All complete

75 m 0,00 35,00 35,00 2625,00

TOTAL ALL 96350,00

24 | P a g e d a t e 2 0 2 2 / 0 3

4.3.4. Drawings

E_01 – Electrical installations for demolition – Basement

E_02 - Electrical installations for demolition – Ground floor

E_03 - Electrical installations for demolition – First floor

E_04 - Electrical installations for demolition – Second floor

E_05 - Electrical installations for demolition – Situation

E_06 - Electrical installations for demolition – Temporary electrical installation

E_07 - Electrical installations for demolition – Diagram of DB-TEMP

A07

A07

A06

A06

A=13 m²

P=1492

A1

A=31 m²

P=2936

A2

A=77 m²

P=5224

A3

A=4 m²

P=814

A4

A=4 m²

P=808

A5

A=4 m²

P=770

A6 A=3 m²

P=742

A7

A=5 m²

P=940

A8

A=58 m²

P=3580

A9

A=30 m²

P=4511

B5

A=11 m²

P=1456

B1

A=3 m²

P=770

B3 A=5 m²

P=903

B4

A=19 m²

P=1746

B7

A=10 m²

P=1985

B8

A=8 m²

P=1368

B9

A=8 m²

P=1438

B10

A=16 m²

P=1690

B11

A=9 m²

P=1280

B12

A=12 m²

P=1414

B13

A=22 m²

P=1908

B14

A=14 m²

P=1616

B15

A=26 m²

P=2044

B16

A=22 m²

P=1886

B17

A=11 m²

P=1412

B6

A=7 m²

P=1232

B2

W1a

W1a

W5

W5

W1a

W8

W12

W8

W8W13

W1

W8

W14

W1a

W15

W9

W16

W9

W8

W8

W8

W8

W5

W5

W8

W1a

W17

W1

W5

W18 W18

W18

W18

W18

W18

W18

W1a

W1a

W18

W1a

W1a

W1a

-3.70

-3.70

-3.70

-3.70

-4.15

-3.70

-3.70

-4.15

-4.15

-4.15

-4.15

-4.15

-4.15

-4.15

M A

I N

E

T

R A

N C

E

SIDE ENTRANCESIDE ENTRANCE

S E

C U

R I T

Y

D

O O

R

S E

C U

R I T

Y

D

O O

R

S E

C U

R I T

Y

D

O O

R

S E

C U

R I T

Y

D

O O

R

S E

C U

R I T

Y

D

O O

R

UNKNOWN WALL SECTION

CLOSED OPENING

METAL STAIRCASE

MAIN EXTERIOR

STAIRACASE

PEDESTRIAN ENTRENCE TO

REMAIN

PEDESTRIAN ENTRENCE TO

REMAIN

-4.15

-Socket outlet pc 63

All electrical equipment need to be carefully dismantled with the disconnection of the connecting cables. After dismantling, the equipment must be cleaned and handed over to the Investor with the appropriate Minutes. The equipment to be dismantled is:

Notes:

Distribution boards need to be dismantled after disconnecting the cables.

-Remove all visible protective pipes and cables ls 1

-Lamps pc 112

Part of the construction which remains

Building of the existing embassy to be demolished.

Inside the existing building all electrical equipment (distribution boards, communication racks, fire alarm equipment, luminaries carefully removed and replace in accordance with investors enquiry all job must be done before structural demolition

DB-1

The new distribution board/cabinet for the part of the building that remains. The new distribution board/cabinet will be supplied from the facility where the electricity is measured (which also remains)

UNCLASSIFIED

30.07.2022.

Hamdija Torlak d.i.el.

Ajdin Buljubašić d.i.el.

(Seal)

Phase

Project Number

Classification

Checked By

Drawn By

CADD File Name

OBO Project Number

CADD Plot Scale

Date

Drawing Scale

Number

35%CONCEPT

Sheet

60% 100%90% FINAL

Release For Electrical:

Drawing Title

OBO/PDCS/PDC OBO/PDCS/DE

OVERSEAS BUILDINGS OPERATIONS

United States Department of State

Washington, D.C.

DescriptionRev Number

Revisions

Date

SARAJEVO

projektovanje, inžinjering, konsalting Srđana Aleksića 14 tel/fax: 033 213 840

FABING d.o.o.

Fadil BiberkićPrincipal

A-E_SERVICES_CMR_

DEMOLITION_&_CONSTRUCTION_

SITE_CONSERVATION

BOSNIA&HERZEGOVINA

BASEMENT

E01

1 : 100

Ul.Porodice Ribar br.43, 71000 Sarajevo, BiH

E lectra d.o.o

Projektovanje, inženjering i izgradnja

Telefon: +387 33 711 870; Fax:

+387 33 646 340 email: info@electra.ba; web: www.electra.ba

AutoCAD SHX Text WARNING: This document is the property of the U.S. Government. Further reproduction and/or distribution outside the contractor team is prohibited without the express written approval of: U.S. Department of State ATTN: Washington, DC 20520

UNCLASSIFIED

30.07.2022.

Hamdija Torlak d.i.el.

Ajdin Buljubašić d.i.el.

(Seal)

Phase

Project Number

Classification

Checked By

Drawn By

CADD File Name

OBO Project Number

CADD Plot Scale

Date

Drawing Scale

Number

35%CONCEPT

Sheet

60% 100%90% FINAL

Release For Electrical:

Drawing Title

OBO/PDCS/PDC OBO/PDCS/DE

OVERSEAS BUILDINGS OPERATIONS

United States Department of State

Washington, D.C.

DescriptionRev Number

Revisions

Date

SARAJEVO

projektovanje, inžinjering, konsalting Srđana Aleksića 14 tel/fax: 033 213 840

FABING d.o.o.

Fadil BiberkićPrincipal

A-E_SERVICES_CMR_

DEMOLITION_&_CONSTRUCTION_

SITE_CONSERVATION

BOSNIA&HERZEGOVINA

GROUND FLOOR

E02

1 : 100

Ul.Porodice Ribar br.43, 71000 Sarajevo, BiH

E lectra d.o.o

Projektovanje, inženjering i izgradnja

Telefon: +387 33 711 870; Fax:

+387 33 646 340 email: info@electra.ba; web: www.electra.ba

CONCRETE PAD

LOUVER

LOUVER

L O

U V

E R

A=11 m²

P=1354

B18

A=10 m²

P=1284

B19

A=17 m²

P=1710

B20

A=17 m²

P=1688

B21

A=29 m²

P=2501

B22

A=2 m²

P=634

B23

A=3 m²

P=652

B24

A=38 m²

P=2535

B25

A=48 m²

P=2871

B26

A=27 m²

P=2095

B27

A=32 m²

P=2255

B28

A=23 m²

P=2023

B29

A=18 m²

P=2361

B30

A=6 m²

P=958

B32

A=10 m²

P=1388

B33

A=21 m²

P=2973

B31

A=23 m²

P=2035

C1

A=4 m²

P=962

C2

A=2 m²

P=556

C3

A=50 m²

P=3597

C4

A=3 m²

P=786

C5

A=50 m²

P=2874

C6

A=12 m²

P=1477

C7

A=9 m²

P=1421

C8

A=21 m²

P=1866

C9

A=10 m²

P=1366

C10

A=10 m²

P=1336

C11

A=37 m²

P=2637

C12

W1

W2

W2

W3 W3

W3

W3

W3

W4

W5

W5

W5

W5

W5

W5

W5

W5

W2

W4a

W7

W5 W5

W5

W8

W8

W8

W8

W5

W8

W5

W9

W10

W9

W1 W1

W5

W1

W1

W1

W11

W1

-0.45

-0.45

+0.00

+0.00

+0.00

+0.00

+0.00

+1.17

+0.00

+0.00

+0.00

-0.15

+0.05

+0.00

+0.00

+0.00

+1.00

+0.55

-0.45

+0.00

MAIN ENTRANCE

SECURITY PARITION

SIDE ENTRANCE

MAIN EXTERIOR

STAIRCASE

NEW ROOF IS LOWER

THAN EXISTING ONE

METAL STAIRCASE

FOUNDATION OF

METAL STAIRCASE

DILATATION DETAIL

CONTACT OF OLD AND

NEW BUILDING

SECURITY EXIT

TRANSFORMER

UNIT

TRANSFORMER

UNIT

-Socket outlet pc 164

All electrical equipment need to be carefully dismantled with the disconnection of the connecting cables. After dismantling, the equipment must be cleaned and handed over to the Investor with the appropriate Minutes. The equipment to be dismantled is:

Notes:

-Lamps pc 103

Part of the construction which remains

Building of the existing embassy to be demolished.

Inside the existing building all electrical equipment (distribution boards, communication racks, fire alarm equipment, luminaries carefully removed and replace in accordance with investors enquiry all job must be done before structural demolition

Distribution boards need to be dismantled after disconnecting the cables.

-Remove all visible protective pipes and cables ls 1

WARNING: This document is the property of the U.S. Government. Further reproduction and/or distribution outside the contractor team is prohibited without the express written approval of: U.S. Department of State ATTN: Washington, DC 20520

Hamdija Torlak d.i.el.

Ajdin Buljubašić d.i.el.

(Seal)

Phase

Project Number

Classification

Checked By

Drawn By

CADD File Name

OBO Project Number

CADD Plot Scale

Date

Drawing Scale

Number

35%CONCEPT

Sheet

60% 100%90% FINAL

Release For Electrical:

Drawing Title

OBO/PDCS/PDC OBO/PDCS/DE

OVERSEAS BUILDINGS OPERATIONS

United States Department of State

Washington, D.C.

DescriptionRev Number

Revisions

Date

SARAJEVO

projektovanje, inžinjering, konsalting Srđana Aleksića 14 tel/fax: 033 213 840

FABING d.o.o.

Fadil BiberkićPrincipal

A-E_SERVICES_CMR_

DEMOLITION_&_CONSTRUCTION_

SITE_CONSERVATION

BOSNIA&HERZEGOVINA

FIRST FLOOR

E03

1 : 100

Ul.Porodice Ribar br.43, 71000 Sarajevo, BiH

E lectra d.o.o

Projektovanje, inženjering i izgradnja

Telefon: +387 33 711 870; Fax:

+387 33 646 340 email: info@electra.ba; web: www.electra.ba

DN UP

DN

DN

A=23 m²

P=2017

C13

A=2 m²

P=626

C14

A=8 m²

P=1366

C15

A=1 m²

P=432

C16

A=29 m²

P=3220

C17

A=6 m²

P=1056

C18

A=27 m²

P=2112

C19

A=20 m²

P=1956

C20

A=78 m²

P=3850

C21

A=4 m²

P=912

C22

A=33 m²

P=4517

B34

A=22 m²

P=2070

B35

A=13 m²

P=1616

B36

A=7 m²

P=1374

B37

A=17 m²

P=1633

B38

A=5 m²

P=939

B39

A=19 m²

P=1735

B40

A=17 m²

P=1712

B41

A=18 m²

P=1736

B42

A=13 m²

P=1734

B43

A=6 m²

P=1046

B44

A=2 m²

P=506

B45

A=3 m²

P=754

B46

A=3 m²

P=938

B47

A=29 m²

P=2201

B48

A=38 m²

P=2501

B49

A=17 m²

P=1668

B50

A=3 m²

P=746

B51

A=78 m²

P=4354

B52

A=15 m²

P=1647

B53

A=18 m²

P=1831

B54

W2a

W2a

W2a

W2a

W3

W3

W3

W3

W5

W4a

W5

W5

W5

W3

W4a

W11

W b

W11

W1b

W1b

W1b

W1b

W8

W5

W5

W5

W5

W5

W1b

W1b

W8

W1b

W1b

W5

W8

W8

W8

W8

W1b

W5

W8

W5

W5

W5

+3.70

+3.70

+3.70

+3.70

+3.70

+3.70

+3.70

+3.70

+3.70

+3.70

+3.70

+3.70

+3.70

+4.60

FLAT ROOF

GRAVEL TOP

EXTERIOR

METAL STAIRCASE

DILATATION DETAIL

CONTACT OF OLD AND

NEW BUILDING

CHECK IF THIS WALL IS

FULL OR WITH

OPENNINGS

CHECK IF THIS WALL IS

FULL OR WITH

OPENNINGS

METAL BARS ON

WINDOWS

METAL BARS ON

WINDOWS

METAL BARS ON

WINDOWS

M E

T A

L

B

A R

S

O

N

W I N

D O

W S

M E

T A

L

B

A R

S

O

N

W I N

D O

W S

INSTALATION DUCT

CHECH LOVATION AND

DIMENSIONS

INSTALATION DUCT

CHECH LOVATION AND

DIMENSIONS

INSTALATION DUCT

CHECH LOVATION AND

DIMENSIONS

-Socket outlet pc 130

All electrical equipment need to be carefully dismantled with the disconnection of the connecting cables. After dismantling, the equipment must be cleaned and handed over to the Investor with the appropriate Minutes. The equipment to be dismantled is:

Notes:

-Lamps pc 121

Part of the construction which remains

Building of the existing embassy to be demolished.

Inside the existing building all electrical equipment (distribution boards, communication racks, fire alarm equipment, luminaries carefully removed and replace in accordance with investors enquiry all job must be done before structural demolition

Distribution boards need to be dismantled after disconnecting the cables.

-Remove all visible protective pipes and cables ls 1

WARNING: This document is the property of the U.S. Government. Further reproduction and/or distribution outside the contractor team is prohibited without the express written approval of: U.S. Department of State ATTN: Washington, DC 20520

Hamdija Torlak d.i.el.

Ajdin Buljubašić d.i.el.

(Seal)

Phase

Project Number

Classification

Checked By

Drawn By

CADD File Name

OBO Project Number

CADD Plot Scale

Date

Drawing Scale

Number

35%CONCEPT

Sheet

60% 100%90% FINAL

Release For Electrical:

Drawing Title

OBO/PDCS/PDC OBO/PDCS/DE

OVERSEAS BUILDINGS OPERATIONS

United States Department of State

Washington, D.C.

DescriptionRev Number

Revisions

Date

SARAJEVO

projektovanje, inžinjering, konsalting Srđana Aleksića 14 tel/fax: 033 213 840

FABING d.o.o.

Fadil BiberkićPrincipal

A-E_SERVICES_CMR_

DEMOLITION_&_CONSTRUCTION_

SITE_CONSERVATION

BOSNIA&HERZEGOVINA

SECOND FLOOR

E04

1 : 100

Ul.Porodice Ribar br.43, 71000 Sarajevo, BiH

E lectra d.o.o

Projektovanje, inženjering i izgradnja

Telefon: +387 33 711 870; Fax:

+387 33 646 340 email: info@electra.ba; web: www.electra.ba

DN

UP

A=23 m²

P=2267

C23

A=3 m²

P=678

C24

A=6 m²

P=1170

C25

A=1 m²

P=402

C26

A=6 m²

P=1064

C27

A=5 m²

P=992

C28

A=34 m²

P=2460

C29

A=9 m²

P=1294

C30

A=10 m²

P=1800

C31

A=16 m²

P=1666

C32

A=11 m²

P=1320

C33

A=9 m²

P=1236

C34

A=61 m²

P=3528

C35

W3

W2a

W2a

W2

W5

W3 W3

W3

W3

W3

W5

W2

W5

W2

W5

W2b

W2b

W3

W19

W11

W3

W11

W12

W12

W2

W2

+7.40

+8.40

+8.40

+7.90

+7.40

+7.90

+8.44

+8.44

+7.40

+7.40

+7.40

+7.40

+7.40

+7.40

+5.63

+3.70

+4.60

FLAT ROOF

GRAVEL TOP

EXTERIOR

METAL STAIRCASE

CHECK USE OF THIS

ROOM AND ITS FINISH

MATERIALS

FLAT ROOF

GRAVEL TOP

FLAT ROOF

GRAVEL TOP

ROOF

VENTILATION

UNIT

ROOF

VENTILATION

UNIT

TOILET

INSTALATIONS

INSTALATION DUCT

CHECH LOVATION AND

DIMENSIONS

-Socket outlet pc 58

All electrical equipment need to be carefully dismantled with the disconnection of the connecting cables. After dismantling, the equipment must be cleaned and handed over to the Investor with the appropriate Minutes. The equipment to be dismantled is:

Notes:

-Lamps pc 17

Part of the construction which remains

Building of the existing embassy to be demolished.

Inside the existing building all electrical equipment (distribution boards, communication racks, fire alarm equipment, luminaries carefully removed and replace in accordance with investors enquiry all job must be done before structural demolition

Distribution boards need to be dismantled after disconnecting the cables.

-Remove all visible protective pipes and cables ls 1

WARNING: This document is the property of the U.S. Government. Further reproduction and/or distribution outside the contractor team is prohibited without the express written approval of: U.S. Department of State ATTN: Washington, DC 20520

Hamdija Torlak d.i.el.

Ajdin Buljubašić d.i.el.

(Seal)

Phase

Project Number

Classification

Checked By

Drawn By

CADD File Name

OBO Project Number

CADD Plot Scale

Date

Drawing Scale

Number

35%CONCEPT

Sheet

60% 100%90% FINAL

Release For Electrical:

Drawing Title

OBO/PDCS/PDC OBO/PDCS/DE

OVERSEAS BUILDINGS OPERATIONS

United States Department of State

Washington, D.C.

DescriptionRev Number

Revisions

Date

SARAJEVO

projektovanje, inžinjering, konsalting Srđana Aleksića 14 tel/fax: 033 213 840

FABING d.o.o.

Fadil BiberkićPrincipal

A-E_SERVICES_CMR_

DEMOLITION_&_CONSTRUCTION_

SITE_CONSERVATION

BOSNIA&HERZEGOVINA

SITUATION

E05

1 : 100

Ul.Porodice Ribar br.43, 71000 Sarajevo, BiH

E lectra d.o.o

Projektovanje, inženjering i izgradnja

Telefon: +387 33 711 870; Fax:

+387 33 646 340 email: info@electra.ba; web: www.electra.ba

Existing transformer station

- without change

Low voltage (400VAC) cable and Fiber optic cable from PTT Telecom box to old building.

Low voltage cable will be removed by

Electrical distribution company (EDSA) and removal of Fiber optic cable needs to be completed in corelation with BH Telecom

Copper cable from PTT Telecom box to old building. Removal of Copper cable needs to be completed in corelation with BH Telecom

Medium voltage (10kVAC) cable. Medium voltage cable will be removed by Electrical distribution company (EDSA).

All low voltage (400VAC) cables which are going out of the existing transformer station (towards

MDB and existing diesel generator) need to be properly disconnected and removed

AutoCAD SHX Text WARNING: This document is the property of the U.S. Government. Further reproduction and/or distribution outside the contractor team is prohibited without the express written approval of: U.S. Department of State ATTN: Washington, DC 20520

AutoCAD SHX Text 553.08

555.87

Hamdija Torlak d.i.el.

Ajdin Buljubašić d.i.el.

(Seal)

Phase

Project Number

Classification

Checked By

Drawn By

CADD File Name

OBO Project Number

CADD Plot Scale

Date

Drawing Scale

Number

35%CONCEPT

Sheet

60% 100%90% FINAL

Release For Electrical:

Drawing Title

OBO/PDCS/PDC OBO/PDCS/DE

OVERSEAS BUILDINGS OPERATIONS

United States Department of State

Washington, D.C.

DescriptionRev Number

Revisions

Date

SARAJEVO

projektovanje, inžinjering, konsalting Srđana Aleksića 14 tel/fax: 033 213 840

FABING d.o.o.

Fadil BiberkićPrincipal

A-E_SERVICES_CMR_

DEMOLITION_&_CONSTRUCTION_

SITE_CONSERVATION

BOSNIA&HERZEGOVINA

TEMPORARY ELECTRICAL

INSTALLATION

E06

1 : 100

Ul.Porodice Ribar br.43, 71000 Sarajevo, BiH

E lectra d.o.o

Projektovanje, inženjering i izgradnja

Telefon: +387 33 711 870; Fax:

+387 33 646 340 email: info@electra.ba; web: www.electra.ba

N

WC

R z

V l a d a

F e d e r a c i j e

B i

H

U l

A l i p a s i n a

WC

Vodena pumpa

Tisa-Yew

Smrca-Spruce

Tisa-Yew

S

S

S

S

R2

R1

(549.1794)

(551.3712)

N

R e s i d e n t a l b u i l d i n g

G o v e r n m e n t

R e s i d e n c e b u i l d i n g

R e s i d e n t a l b u i l d i n g

21 15m10m0 3 4 5m

N

LEGEND

EXISTING TRANSFORMER STATION

WITHOUT CHANGE

INSIDE THE EXISTING BUILDING

ALL ELECTRICAL EQUIPMENT (DISTRIBUTION BOARDS,

COMMUNICATION RACKS, FIRE ALARM EQUIPMENT,

LUMINARIES CAREFULLY REMOVED AND REPLACE IN

ACCORDANCE WITH INVESTORS ENQUIRY

ALL JOB MUST BE DONE BEFORE STRUCTURAL DEMOLITION

DURING THE REMOVING OTHER INSTALLATION

PAY ATTENTION ON EXISTING

HV CABLES TO TRANSFORMER STATION

Building of the existing embassy to be demolished.