This is an Invitation to Bid (ITB) issued by the Georgia Department of Transportation (GDOT) for demolition, abatement, and removal services in Bibb County. The scope of work involves complete demolition and removal of structures and improvements located in the right-of-way and easement areas at the SR 247/US 41/Anthony Road Roundabout project (PI# 0017395) in Macon, Georgia. The specific demolition items include removal of one metal-framed billboard (5'6" x 12') mounted on an 18-foot steel pole with associated concrete footer and electrical conduit, removal of one 1,000-gallon underground grease trap with feed line capping, and removal of three concrete parking stop devices (6' x 7" x 6" height each) to be placed on-site for the property owner. An asbestos inspection completed on January 17, 2026, identified no regulated asbestos-containing materials requiring abatement. Bids are due on April 1, 2026, by 2:00 PM EST and must be submitted electronically to SpecialProjectsProcurement@dot.ga.gov and TCrowder@dot.ga.gov. Questions regarding the solicitation must be submitted by March 27, 2026, at 2:00 PM. The anticipated contract term is thirty (30) days from the Notice to Proceed, unless modified in writing by GDOT through a purchase change order. Work must commence as soon as possible following the Notice to Proceed, and all demolition debris must be properly disposed of in accordance with Georgia Comprehensive Solid Waste Management Act requirements.

Bidders must be prequalified by GDOT in Right of Way Property Management services, with the prime contractor required to hold prequalification in either Asbestos Abatement (E-2) or Demolition (E-3) service classes, and the team collectively required to maintain prequalification in both E-2 and E-3 service classes. GDOT will award the contract to the lowest responsive and responsible bidder meeting all requirements. The selected contractor must provide a Performance and Payment Bond equal to 100 percent of the total bid price within ten (10) business days of receiving the Notice of Intent to Award, utilizing GDOT Form-SP404. Insurance requirements include Workers Compensation coverage with statutory limits, Commercial General Liability with a $3,000,000 general aggregate limit, and Automobile Liability with a $1,000,000 combined single limit, all from insurers rated A- or better by A.M. Best's and registered in Georgia. GDOT must be named as an additional insured with a thirty (30) day cancellation notice provision. All insurance certificates must be provided within ten (10) business days of purchase order issuance. No bid bond requirement applies to this solicitation. A communication restriction is in effect from the advertisement date until award announcement, prohibiting unauthorized contact with GDOT personnel. The solicitation encourages participation from small, female-owned, and minority-owned businesses and maintains a 15 percent overall annual Disadvantaged Business Enterprise (DBE) participation goal that is not a quota or set-aside.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ITB-48400-RWPROPMGMT000651

PI#: 0017395

County: Bibb

Revised 11/5/2025 1

Georgia Department of Transportation

Invitation to Bid

To Provide

Demolition, Abatement and Removal Services

Bids Due: April 1, 2026 by 2:00PM EST

One Georgia Center

600 West Peachtree Street, NW Atlanta, Georgia 30308

Revised 11/5/2025 2

I. INTRODUCTION:

A. Overview

The Georgia Department of Transportation (GDOT), is soliciting bids from qualified firm(s) to provide Demolition of Improvements, Structures, or other Encumbrances in the Right Of Way and/or Easement Areas.

This solicitation seeks to identify potential firms to provide Demolition of Improvements, Structures, or other Encumbrances in the Right Of Way and/or Easement Areas for the Scope of Services for the project /contract identified in Exhibit I. All respondents to this solicitation are subject to instructions communicated in this document, and are cautioned to completely review the entire solicitation and follow instructions carefully.

GDOT reserves the right to reject any or all bids and to waive technicalities and informalities at the discretion of GDOT.

B. IMPORTANT- A RESTRICTION OF COMMUNICATION IS IN EFFECT FOR THIS PROJECT.

From the advertisement date of this solicitation until successful respondents are selected and the award is made official and announced, firms are not allowed to communicate about this solicitation or scope with any staff of GDOT including the Commissioner and GDOT Board Members, except for the submission of questions as instructed in the solicitation, or with the contact designated in Invitation to Bid, Section V.B., or as provided by any existing work agreement(s). For violation of this provision, GDOT reserves the right to reject the submittal of the offending respondent.

C. Prohibition Against Collusive Bidding

Respondent shall not submit a bid that was made with a prior understanding agreement or connection with any corporation, firm, or individual submitting proposals for the same project. The Respondent shall submit a bid that is fair and made without collusion of fraud. Collusive bidding is a violation of Georgia and Federal Law and such bidding can result in fines, prison sentences, and civil damage awards.

D. Certification

This solicitation is being conducted by the Georgia Department of Transportation under its authority to procure services ancillary to the construction and maintenance of a public road (as defined in O.C.O.G.A 32-1-3 (24) as provided for in O.C.G.A 32-2-61 (c) and (d) (1) (D).

E. Conflict of Interest

The Contractor agrees that all work done as part of the awarded Agreement will comply fully with the provisions of Section 45-10-20 through 45-10-28 of the Official Code of Georgia Annotated relating to Conflicts of Interest when trading with State of Georgia employees and officials .

F. Americans with Disabilities Act Guidelines

The State of Georgia adheres to the guidelines set forth in the Americans with Disabilities Act. Suppliers should contact the Issuing Officer at least one day in advance if they require special arrangements when attending the Bidders/Offerors’ Conference (if any). The Georgia Relay Center at 1-800-255-0056 (TDD Only) or 1-800-255- 0135 (Voice) will relay messages, in strict confidence, for the speech and hearing impaired.

G. Drug-Free Workplace

GDOT, as policy, operates all facilities as a drug-free workplace, and requires that the labor force of the Bidder be drug-free. The Drug-Free Workplace Certification is attached as EXHIBIT II.

Revised 11/5/2025 3

If the Bidder is an individual, he or she hereby certifies that he or she will not engage in the unlawful manufacture, sale, distribution, dispensation, possession, or use of a controlled substance or marijuana during the performance of any contract resulting from this Invitation to Bid.

If the Bidder is an entity other than an individual, it hereby certifies that:

A drug-free workplace will be provided for the Bidder’s employees during the performance of any contract resulting from this Invitation to Bid; and

It will secure from any subcontractor hired to work in a drug-free workplace the following written certification:

"As a part of the subcontracting agreement with (contractor's name, subcontractor's name) certifies to the contractor that a drug-free workplace will be provided for the subcontractor's employees during the performance of this contract pursuant to paragraph 7 of subsection B of Code Section 50-24-3."

The Bidder hereby acknowledges this requirement, and asserts that the organization of the Bidder adheres to such policy and practice. The Bidder acknowledges that it may be required to produce certificates affirming its compliance of these requirements of drug-free workplace for duration of agreement term, at execution, or at any time during the term of the agreement.

The Bidder may be suspended, terminated, or debarred if it is determined that:

1. The Bidder has made false certification hereinabove; or

2. The Bidder has violated such certification by failure to carry out the requirements of Official Code of

Georgia Section 50-24.

H. Small and Minority Business Enterprise

It is the policy of the State of Georgia that small businesses, female-owned businesses and minority businesses have a fair and equal opportunity to participate in the State purchasing process. Therefore, the Department encourages all small businesses, female-owned businesses and minority-owned businesses to compete for contracts to provide services, and encourages consultant to solicit female-owned businesses and minority-owned businesses in procuring sub-providers and suppliers. This desire on the part of the Department is not intended to restrict or limit competitive bidding or to increase the cost of the work. The Department supports a healthy free market system that seeks to include responsible businesses and provides ample opportunity for business growth and development. Consultants and sub-providers who utilize qualified minority sub-providers may qualify for a Georgia state income tax credits for qualified payments made to minority sub-providers. See Official Code of Georgia Annotated (O.C.G.A.) O.C.G.A. Section 48-7-38.

The Georgia Department of Transportation has adopted a 15% overall annual goal for DBE participation on all projects. This goal is not to be considered as a fixed quota, set aside or preference. The DBE goal can be met by prime contracting, sub-contracting, joint venture or mentor/ protégé relationship.

For more information on the GDOT DBE Program please contact:

Equal Opportunity Division

One Georgia Center, Floor 7 600 West Peachtree NW Atlanta, Georgia 30308 Phone: (404) 631-1972

I. Project Requirements and Scope of Services

Under the terms of the resulting contract, the selected contractor will provide services for the GDOT Project identified. The anticipated scope of work for the project/contract is included in Exhibit I. Compliance with all pertinent regulations (State/Federal/Local/Industry) is required. It is the responsibility of the respondent to obtain knowledge of rules and regulations relevant to the Scope of Work identified herein.

Revised 11/5/2025 4

J. Contract Term and Type

GDOT anticipates one (1) award to one (1) firm, for the project/contract identified. GDOT will issue a purchase order contract to the lowest, responsive, and responsible bidding firm. The purchase order will serve as the official Notice to Proceed. It is GDOT’s intention that the contract will remain in effect for thirty (30) days unless modified in writing by GDOT with a purchase change order.

II. Selection Information

A. Selection Process

Once the deadline for bids has passed, all bids will be opened and reviewed to determine all mandatory requirements have been addressed correctly. All bids which are identified as correctly addressing all mandatory requirements will be reviewed and the total amount of the bid will be evaluated. The award will be made to the bid deemed to be the lowest responsive and responsible bid.

B. Cost/Pricing

In the event of discrepancy(ies) between any unit prices and total bid prices, unit pricing shall prevail and total bid price shall be adjusted to reflect the sum total of all unit prices.

C. Bonding Requirements

The winning firm will be notified in writing via email and must provide the required Performance and Payment Bond within ten (10) business days of receiving the Notice of Intent to Award (NOIA). The Performance and Payment Bond shall be provided to the Department in the amount of 100 percent (%) of the total bid price, utilizing the Department’s form, GDOT Form-SP404, Performance and Payment Bonds, effectively securing the Contractor’s obligations to perform the Services hereunder and to ensure that payments owed to subcontractors approved by the Department are made with respect to performance of portions of the services.

If the Contractor does not provide the required Performance and Payment Bond form by the deadline, the Contractor may be deemed “non-responsive” and the Department may rescind the award and purchaser order.

At that point, the next lowest bidder will be notified via e-mail of the Department’s intent to accept the next lowest bid and the ten (10) business day requirement to provide the Performance and Payment Bond will be upheld.

D. Insurance Coverage Requirements

The winning firm will be required to provide a Certificate of Insurance from insurers rated at least A- by A. M.

Best’s and registered to do business in the State of Georgia. The Contractor shall provide the following kinds of insurance in the minimum amount of coverage set forth below, to cover all loss and liability for damages on account of bodily injury, including death therefrom, and injury to or destruction of property caused by or arising from any and all operations carried on and any and all work performed by the Contractor to this project, the Contractor shall maintain liability insurance as follows: Workers Compensation (WC): Statutory coverage shall be maintained for Worker’s Compensation as required by the laws of the State of Georgia.

Bodily injury by Accident – each employee $100,000 Bodily injury by Disease – each employee $100,000 Bodily injury by Disease – policy limit $500,000

Commercial General Liability (CGL):

Each Occurrence Limit $1,000,000 Personal & Aggregate Limit $1,000,000 General Aggregate Limit $3,000,000 Products/Completed Ops. Aggregate Limit $1,000,000

Automobile Liability Combined Single Limit: $1,000,000 To cover vehicles, owned, leased or rented by the Contractor

Revised 11/5/2025 5

The Contractor shall require its sub-contractors to maintain Commercial General Liability insurance with business automobile liability coverage with companies and limits as stated above. GDOT shall be named as an additional insured and a copy of the policy endorsement shall be provided with the insurance certificate.

The Contractor shall procure the insurance policies at the Contractor’s own expense and shall furnish GDOT an insurance certificate listing the agency (GDOT) as the certificate holder. The insurance certificate must be provided within ten (10) business days of receiving the purchase order from GDOT.

The insurance certificate must document that the liability coverage purchased by the Contractor includes contractual liability coverage to insure the indemnity agreement as stated. In addition, the insurance certificate must provide the following:

a. Name, address, signature and telephone number of authorized agents.

b. Name and address of insured.

c. Name of Insurance Company.

d. Description of coverage in standard terminology.

e. Policy number, policy period and limits of liability.

f. Name and address of State Agency as certificate holder.

g. Thirty (30) day notice of cancellation.

h. Details of any special policy exclusions.

Excess liability coverage may be used in combination with the base policy to obtain these limits.

E. Method of Communication

All general communication of relevant information regarding this solicitation will be made via the Georgia Procurement Registry (GPR). All firms are responsible for checking the GPR on a regular basis for updates, clarifications, bid tabulation, and announcements. GDOT reserves the right to communicate via electronic-mail with the primary contact listed in the bid response document. Other specific communications will be made as indicated in this solicitation.

F. Award

Lowest, Responsive and Responsible: Any award resulting from this solicitation will be made to the lowest, responsive, and responsible bidding firm meeting all requirements.

G. Award Conditions

This solicitation and any bid submitted in response, regardless of whether the bid is determined to be the lowest cost, is not binding upon GDOT and does not obligate GDOT to procure or contract for any services. Neither GDOT nor any party submitting a bid will be bound unless and until the bid is mutually accepted by both parties.

GDOT will issue a Notice of Award announcing the awarded bidding firm. GDOT will issue a purchase order to the awarded firm which will represent GDOT’s acceptance of the selected Contractor.

III. Schedule of Events

The following Schedule of Events represents GDOT’s best estimate of the Schedule that will be followed. All times indicated are prevailing times in Atlanta, Georgia. GDOT reserves the right to adjust the Schedule as GDOT deems necessary.

DATE TIME

a. GDOT issues public advertisement 3/25/2026

Revised 11/5/2025 6

IV. Criteria for Evaluation of Bids

The bidding firm must be prequalified in the indicated Right of Way Property Management service class(es) identified in Exhibit I in order to be evaluated and considered. All bid submittals will be pre-screened to verify that the bidding firm is prequalified in the required service class(es) and that the subcontractor(s) is prequalified in the required service class(es). GDOT’s Right of Way Property Management prequalification listing will be utilized to pre-screen the prequalification status of each bidding firm. Any bid submittal in which the bidding firm or the subcontractor(s) prequalification requirements are not met will be disqualified from further evaluation and consideration.

V. Instructions for Submittal of Bids

A. There is one (1) electronic bid submittal required. Bid submittal must include all completed and signed exhibits in their entirety that are identified in Section VII and all completed and signed addenda. The completed and signed bid documents must be legible. Bid submittal must be submitted in a PDF document attached to an e-mail.

The bid submittal email subject line must follow the naming convention for electronic records as follows:

Bidding firm’s full legal name Solicitation number (ITB number)

Bids are to be e-mailed to SpecialProjectsProcurement@dot.ga.gov and TCrowder@dot.ga.gov

No bid submittals will be accepted after the time and date set for receipt.

All expenses for preparing and submitting responses are the sole cost of the bidder submitting the response.

GDOT is not obligated to any party to reimburse such expenses. All submittals upon receipt become the property of GDOT. Labeling information provided in submittals “proprietary” or “confidential”, or any other designation of restricted use will not protect the information from public view. Subject to the provisions of the Open Records Act, the details of the proposal documents will remain confidential until final award.

GDOT reserves the right, in its sole discretion, to waive any technicalities associated with this submittal if deemed in the best interest of the State.

A public bid opening will not be held by GDOT. A bid tabulation will be posted to the GPR once bid evaluations have been completed.

B. Questions and Requests for Clarification

Questions about any aspect of this solicitation, or the project, shall be submitted in writing via e-mail to Tameka Crowder, email TCrowder@dot.ga.gov . The deadline for submission of questions relating to this solicitation is the time and date shown in the (Schedule of Events- Section III above). From the issue date of this solicitation

b. Questions due to GDOT 3/27/2026 2:00 PM

c. Deadline for submission of Bid Response 4/1/2026 2:00 PM

d. GDOT completes evaluation and issues notification to winning firm TBD mailto:SpecialProjectsProcurement@dot.ga.gov mailto:TCrowder@dot.ga.gov

Revised 11/5/2025 7 until a successful bidder is selected and the award is made official and announced, respondents are subject to the Restriction of Communication in Section I.B (above).

VI. GDOT Terms and Conditions

A. Statement of Agreement

With the submission of a bid, the respondent agrees that he/she has carefully examined the solicitation and agrees that it is the respondent’s responsibility to request clarification on any issues in any section of the solicitation with which the respondent disagrees or needs clarified. The respondent also understands that failure to mention these items during the question period will be interpreted to mean that the respondent is in full agreement with the terms, conditions, specifications and requirements therein. With submission of a bid, the respondent hereby certifies: (a) that this bid is genuine and is not made in the interest or on behalf of any undisclosed person, firm, or corporation; (b) that respondent has not directly or indirectly included or solicited any other respondent to put in a false or insincere bid; (c) that respondent has not solicited or induced any person, firm, or corporation to refrain from sending a bid.

The respondent also understands that failure to provide required information may result in disqualification.

Failure to provide administrative information may not result in disqualification. At the Department’s discretion, the Department may notify the respondent that administrative information is not provided or there was an error in the information provided, and the Department will allow a respondent to provide an update to the administrative information. However, the exception to this is the provision of the required GEORGIA SECURITY AND IMMIGRATION COMPLIANCE ACT AFFIDAVIT, which by Georgia Law requires disqualification of the response. The above changes mentioned to administrative information would be considered allowable as these would be limited to changes which do not affect the information which will be used in the evaluation process.

Failure of a respondent to provide the specific exhibits will result in disqualification. Any respondent who provides changes in addition to the information requested in the notice shall be subject to disqualification.

B. Sub-Contractors

Sub-Contractors shall generally be considered any team member which is performing any service which typically requires prequalification. Sub-Contractor must be listed in the Bid Summary Form and is subject to all terms and conditions in the Agreement.

C. Non-Discrimination

The Georgia Department of Transportation in accordance with Title VI of the Civil Rights Act of 1964 and 78 Stat. 252, 42 USC 2000d--42 and Title 49, Code of Federal Regulations, Department of Transportation, Subtitle A, Office of the Secretary, part 21, Nondiscrimination in federally assisted programs of the Department of Transportation issued pursuant to such Act, hereby notifies all proposers that it will affirmatively ensure that any contract entered into pursuant to this advertisement, minority business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, sex, or national origin in consideration for an award.

D. Submittal Costs and Confidentiality

All expenses for preparing and submitting responses are the sole cost of the respondent submitting the response. The Department is not obligated to any respondent to reimburse such expenses. All submittals upon receipt become the property of the Department. Labeling information provided in submittals as “proprietary” or “confidential”, or any other designation of restricted use will not protect the information from public view. Subject to the provisions of the Open Records Act, the details of the proposal documents will remain confidential until a final award.

E. Right to Cancel or Change Solicitation

Revised 11/5/2025 8

GDOT reserves the right to cancel any solicitations where it is determined to be in the best interest of the Department to do so. GDOT reserves the right to increase, reduce, add, or delete any item in this solicitation as deemed necessary.

It is the responsibility of all firms interested in submitting a bid for this solicitation to routinely check the posting on the Georgia Procurement Registry for any revisions to this solicitation.

F. Substitutions, Alternates, Exceptions, and Extensions

No substitutions or alternates will be accepted for this solicitation. Any respondent submitting substitutions or alternates will be considered non-responsive and will not be considered for award.

Revised 11/5/2025 9

VII. Post Bid Submittal Documents

The intended awardee will receive a Notice of Intent to Award with instructions via e-mail of the Department’s intent accept the Contractor’s bid. The preferred method for returning this documentation is by email however, hard copies of the documentation are required sent to the issuing officer at the address listed on page one. The intended awardee must submit copies of the documents listed below to the Issuing Officer referenced in Table 1, with original signatures and applicable required notary seals. The final award is contingent on post bid submittals being received within 10 calendar days and sufficiently meeting the Department’s needs.

A. Required Insurance Coverage and Certificates of Insurance:

The Contractor shall, prior to the issuance of the PO, procure and maintain the insurance coverage listed in Section II, Selection Information, Subsection D Insurance Coverage Requitements, which shall protect the Contractor and GDOT (as an additional insured) from any claims for bodily injury, property damage, or personal injury throughout the duration of the work, at the Contractor’s own expense. The Contractor will not be permitted to commence any work prior to the Department acceptance of insurance coverage. Failure to retain insurance for the term of the performance of the Services will result in a cease of work and may be grounds for termination.

B. Performance and Payment Bonds:

As required in Section II, Selection Information, Subsection C Bonding Requitements.

VIII. Solicitation Exhibits

The following list of Exhibits apply to this solicitation and must be submitted with the bid, with the exception of Exhibit I, Scope of Work. All information provided on the exhibits must be legible. Failure to complete an submit the required Exhibits with bid will result in disqualification of bid response:

EXHIBIT I – Scope of Services.

EXHIBIT II – Drug-Free Workplace Certification (Complete and return with bid).

EXHIBIT III – Bid Form (Complete and return).

EXHIBIT IV– Bid Summary Form (Complete and return with bid).

EXHIBIT V – Lien Waiver and Release (Complete and return with bid).

EXHIBIT VI - Georgia Security and Immigration Compliance Act Affidavit (Complete and return with bid).

EXHIBIT VII - Scrutinized Company (Complete and return).

EXHIBIT VIII - Performance and Payment Bond Form

Revised 11/5/2025 10

EXHIBIT I

Scope of Services

1. Required Prequalification Service Classes

Prime Contractors are defined as the firm submitting the bid response and the firm with whom GDOT will contract.

The Team is defined as the Prime Contractor and their sub-contractor(s), who are considered team members. The Prime Contractor must be prequalified in the Right of Way Property Management service class (es) identified below in Section 5.A. The Prime Contractor or sub-contractor team members must be prequalified in the Right of Way Property Management service classes identified below in Section 5.B. A copy of the prequalification form must be provided for both the Prime as well as the Team at the time of bid submittal.

A. The Prime Contractor MUST be prequalified by GDOT in either of the service classes listed below:

Service Class Number

Service Class Name

E-2 Asbestos Abatement or E-3 Demolition

B. The Team (either the Prime Contractor and/or one or more of their sub-contractor team members) MUST be prequalified by GDOT in the service classes listed below:

Service Class Number

Service Class Name

E-2 Asbestos Abatement E-3 Demolition

NOTE: The team must include team members, either prime or sub, which are prequalified in both service classes.

If a Prime or Sub-Contractor’s prequalification will expire prior to the due date of this bid or if a firm has not been prequalified by GDOT, documentation must be provided which shows that the firm has submitted its application for prequalification prior to the bid due date. A copy of the prequalification form must be provided for both the Prime as well as the Team at the time of bid submittal.

For Prequalification information visit http://www.dot.ga.gov/PS/Business/Prequalification/SpecialtyServices .

The work consists of the equipment, supervision, and all other services required for the complete demolition of the structures identified and described in the Asbestos Inspection Reports. All improvements must be completely demolished and removed from their present site. All demolition debris must be removed and disposed of properly in an appropriate landfill or recycled in accordance with the provisions of the Georgia Comprehensive Solid Waste Management Act of 1990 and the Georgia Rules for Solid Waste Management Chapter 391-3-4. The work will be completed in strict accordance with the Technical Specifications.

The Georgia Environmental Protection Division (EPD) Project Notification Forms are required to be submitted by the Contractor immediately once the Notice of Award is received. Work shall commence as soon as possible following issuance of the Notice to Proceed. All work must be completed thirty (30) days following the Notice to Proceed unless modified in writing by GDOT with a purchase change order. The EPD Notification filing is included in the thirty (30) day period.

The work shall be completed as noted in the Demolition requirements within the Asbestos Inspection Report.

http://www.dot.ga.gov/PS/Business/Prequalification/SpecialtyServices

Structure No:

County:

Parcel No:

Street Address:

SR 247 / US 41 / Anthony Rd RoundaboutProject No:

2198 Pio Nono Avenue MaconCity: State: 31204Zip Code:

Bibb NW corner of Pio Nono Ave & Anthony Rd. Lat.: 32° 49’ 13.30” N; Long.:

-83° 39’ 45.01” WNearest Major Intersection:

REGULATED ASBESTOS CONTAINING MATERIALS

Description of Material/Location: Quantity

(SF/LF):

NONE

Asbestos Inspector: January 17, 2026Date of Inspection:

Certificate Number: Inspector Phone No.:

Thomas K. Corish, Jr.

20608 Exp 9/10/26 404/312-9037

Percent Asbestos

MI1: Remove/clear one (1) metal-framed (5’6”x12’±) billboard on 6.5”dia x 18’±ht steel pole.

Work includes associated concrete footer and electrical conduit.

MI2: Remove/clear one (1) 1,000±gal (underground) grease trap. Cut and cap feed line at

RW/DE.

MI3: Remove/clear three (3) 6’x7”x6”±ht concrete park stop devices and place on ground for Owner at right side of commercial building.

GA EPD notification through GEOS portal is not required.

Items to be Demolished:

GA

PARCEL PRE-DEMOLITION INSPECTION REPORT

Nicole LegallDOT Contact: Central OfficeOffice: 404/347-0172Phone:

0017395PI No: MI1-MI3

ASBESTOS INSPECTION AND PRE-DEMO REPORT: PARCEL COMMENTS

No. MI1-MI3

Additional Site Photographs

Street Address: 2198 Pio Nono Avenue

MaconCity: State: 31204Zip Code: BibbCounty:GA

MI1: Remove/clear one (1) metal-framed (5’6”x12’±) billboard on 6.5”dia x 18’±ht steel pole. Work includes associated concrete footer and electrical conduit. Fill footer void with clean soils and/or gradable gravel.

Photo shows reverse perspective on MI1. Photo also shows balance of work area to include MI2 & MI3.

10Parcel No.:

No. MI1-MI3

Additional Site Photographs

Street Address: 2198 Pio Nono Avenue

MaconCity: State: 31204Zip Code: BibbCounty:GA 10Parcel No.:

MI2: Remove/clear one (1) 1,000±gal grease trap. Cut and cap feed line at RW/DE towards commercial building. Do Not Disturb sewer line adjacent to grease trap.

MI3: Remove/clear three (3) 6’x7”x6”±ht concrete park stop devices and place on ground for Owner at right side of commercial building. Photo shows alternate view of MI2 (grease trap access) & MI3 concrete park stop devices.

Bulk Sample No. Location Bulk Sample Description Bulk Sample Result

No Suspect Building Materials

*Materials must have more than (>) 1% asbestos-containing material to be considered as an asbestos-containing building material (ACBM). OSHA defines asbestos-containing material (ACM) as a material with any amount of asbestos, even less than (<) 1 percent.

Abbreviations: Ext. - exterior; Int. - interior; SM - surfacing material; TSI - thermal system insulation; Misc. - miscellaneous material; VFT -vinyl/asphalt floor tile; VSF - vinyl sheet flooring; WPG - window pane glazing; WFC - window frame caulking; DFC - door frame caulking;

ACT - acoustical ceiling tile; ACP - acoustical ceiling panel; DW/JTC - drywall/joint tape compound; JTC - joint tape compound; TCM -textured ceiling material; L1 - Layer 1.

Summary of Bulk Sample Analytical Results 2198 Pio Nono Ave. - P10-MI1 thru MI3 Miscellaneous Items

Macon, GA 31204 January 17, 2026

Date of Inspection: 1/17/26

ABATEMENT and DEMOLITION CONTRACT ITEMS

SR 247 / US 41 / Anthony Rd RoundaboutProject No: 0017395PI No: 10Parcel No:

ADDITIONAL DEMOLITION PROJECT NOTES

* Contractor is to refer and adhere to the requirements of the Georgia Erosion and Sedimentation Act (O.C.G.A. Title 12, Chapter 7 when performing work on GDOT Right of Way. Please consult the 2016 Field Manual for Erosion & Sediment Control in Georgia that is available from the Georgia Soil & Water Conservation Commission - www.gaswcc.org. It is required that a Blue Card holder be on site throughout the performance of this project. A Blue Card holder is a person that has completed and passed an exam in the Level 1A Fundamentals Seminar: Education and Training Certification Requirements for Persons Involved with Land Disturbing Activities sponsored by the Georgia Soil and Water Conservation Commission (GSWCC).

1. All work is to be performed in accordance with the GDOT ROW master abatement and demolition specifications issued on June 1, 2018 by ROW’s State Property Manager, Demolition & Removal. Demolition workers must show evidence of having attended a GDOT approved awareness training program.

GA EPD notification through GEOS portal is not required.

2. Asbestos abatement includes: MI1, MI2, & MI3 - None.

3. Demolition includes:

MI1: Remove/clear one (1) metal-framed (5’6”x12’±) billboard on 6.5”dia x 18’±ht steel pole. Work includes associated concrete footer and electrical conduit.

MI2: Remove/clear one (1) 1,000±gal grease trap. Cut and cap feed line at RW/DE. Remove any asphalt and concrete required to access grease trap tank device for removal.

MI3: Remove/clear three (3) 6’x7”x6”±ht concrete park stop devices and place on ground for Owner at right side of commercial building.

Areas of the parcel disturbed by the removal of MI1, MI2, MI3, are to be cleared of debris, and filled with gradable aggregate base (GAB) and/or “crush & run” aggregate and tamped. Any hole openings created by the removal of posts, footers, conduit or other items shall be filled and compacted with aggregate as described above.

Mechanical and/or electrical service lines or conduit to include electrical stubs are to be traced, de-electrified, and removed from the easement and Right of Way areas or to the street and cut or capped as appropriate. Obtain the services of a licensed electrician to de-electrify or consult with the property owner (see below) to pull the electrical circuit supplying the item to be de-electrified.

Items discovered during the demolition not included in the report are to be reported to the Site Inspector.

All foundations, porches, sidewalks, concrete footers, slabs related to the structure; mechanical equipment; trash; debris and miscellaneous parts are to be removed from the R/W. Parts of the structure or Miscellaneous Items are not to be pushed into the soil. Any dead foliage or foliage damaged to access removal of the structures or other items are to be removed from the parcel and disposed, not pushed to the edge of the parcel.

Appropriate erosion and sedimentation control devices and vegetative & structural best management practices (BMPs) are to be deployed & maintained during the demolition in accordance with Georgia Erosion and Sedimentation Act (GESA)*.

The acquisition is a limited take and other structures or items on the parcel not enumerated or described are to remain.

Owner Contact: Ms. Saleem, cell: 478-978-9477.

PI No: Parcel No: 11

Street Address:

SUMMARY ASBESTOS INSPECTION AND PRE-DEMO REPORT

SR 247 / US 41 / Anthony Rd Roundabout

Project No: 0017395

2195 Pio Nono Avenue MaconCity: State: 31204Zip Code:

MorganCounty:

NE corner of Pio Nono Ave & Anthony Rd. Lat.: 32° 49’ 13.86” N; Long.:

-83° 39’ 46.56” WNearest Major Intersection:

ASBESTOS-CONTAINING MATERIALS

PulledElectric Meter No.:

Cut & Rolled BackElectric Supply:

Asbestos Inspector:February 20, 2026Date of Inspection:

Certificate Number:

Inspector Phone No.:

Description of Material/Location: Quantity

(SF/LF/#):

Window Pane Glazing on eight (8) metal-frame industrial windows found in multiple locations in S1. (#)

8±

Building Use: 62±Age of Building: 1458±Size of Building:years SF

Thomas K. Corish, Jr.

20608 Exp 9/10/26 404/312-9037

Nicole LegallDOT Contact: Central OfficeOffice: 404/347-0172Phone:

2% Chrysotile

Percent Asbestos

Vacant

S1: Demolish 1458±SF CMU/brick/glass façade wood-framed insulated commercial building with cold tar & rolled roofing. Demo to include building concrete pad to include 402±SF surrounding concrete walk with 10”±ht.

Brief Structure Description:

Structure

No.

GA

Information provided on quantities of ACM reflects field observations and the condition of the structure and material at the time of the asbestos inspection. Quantities and conditions may change due to vandalism, exposure to weather/climate, or for other unknown conditions. The Abatement Contractor should visit the site to verify quantities and condition of ACM prior to preparing and submitting a bid and should notify the GDOT Contracting Officer and the Asbestos Consultant to report any significant discrepancies.

No. 01

Additional Site Photographs

Street Address: 2195 Pio Nono Avenue

MaconCity: State: 31204Zip Code: MorganCounty:GA

S1: Interior view of right side of S1 (mechanics bay). Photo shows 2 of 8 metal-framed windows that the WPG was found to be ACM. The dimensions of these two windows are 62”x80”±. See A&DCIL for list of window sizes and number.

S1: Exterior rear view of S1. Photo shows 5 of 8 metal-framed windows that the WPG was found to be ACM. See A&DCIL for list of window dimensions and number.

11Parcel No.:

SR 247 / US 41 / Anthony Rd RoundaboutProject

No: 0017395PI No: 11 Parcel

No: 01 Structure

No.

Additional Site Photographs

View of S1 from front left. Note 3’9”± wide concrete walk at building surround. Also note MI3 WF privacy fencing, MI5 wood framing for metal panel roof system (panels removed), and MI6 WF (2”x4”) constructed framework and WF pallets that were used to store/stack vehicle tires. See A&DCIL for quantities.

Alternative perspective of S1 left side. Note concrete and asphalt that is to be cleared.

View of area to rear of S1. Note MI7 3±Yd3 of loose stacked CMU on parcel., additional CMU at left rear as well. View of additional MI3 & MI5 WF materials.

View of parcel from right rear of S1. View of additional MI3 & MI5 WF materials. Site Inspector recommends Demo Contractors visit site to verify quantities.

MI4: Remove/clear three 36"x42"± concrete pads at parcel rear.

SR 247 / US 41 / Anthony Rd RoundaboutProject

No: 0017395PI No: 11 Parcel

No: 01 Structure

No.

Additional Site Photographs

MI2: View of chain-link fence poles cut at grade and one C-L pole with 6’±ht near front of vehicle at left rear asphalt area on parcel left side. Also note concrete curbing at bottom left of photo and at rear of asphalt. Asphalt to be removed to concrete entry apron. Concrete apron remains.

MI2: Remove/clear 17± chain-link fence poles and their associated concrete footer along parcel front (10 ±) and left rear (7±). Photo of two C-L posts in front concrete area.

MI8: Remove/clear 10±Yd3 of miscellaneous debris from parcel., to include trash/debris on parcel right and rear outside of WF privacy fencing. View of debris outside privacy fency parcel right side.

MI9: Remove/clear 31± vehicle tires from parcel. Tires largely noted just outside WF privacy fencing at parcel right and rear.

MI1: Remove/clear 20’x4’x6”±ht concrete (closed) fuel island and any associated piping and/or electrical conduit/wiring. Three galvanized steel fuel pipes are capped at former dispenser points. Per GA EPD Database (2026) Information UST removed 1/1/2000.

No. 01

Additional Site Photographs

Street Address: 2195 Pio Nono Avenue

MaconCity: State: 31204Zip Code: MorganCounty:GA

11Parcel No.:

Demo to include 8,281± SF concrete / asphalt mix from the parcel & an additional 613±SF at parcel left rear along Anthony Rd. Demo to include 64’x5”x6.5”±ht concrete curb at parcel left front and left., and an additional 10’x5”x6.5”±ht at parcel left rear.

Demo to include 8,281± SF concrete / asphalt mix from the parcel & an additional 613±SF at parcel left rear along Anthony Rd. Demo to include 64’x5”x6.5”±ht concrete curb at parcel left front and left., and an additional 10’x5”x6.5”±ht at parcel left rear.

MI10: Remove/clear monitoring well at front left of parcel.

Do Not Disturb storm drain at parcel front left. Cut concrete cleanly with saw as marked. Place erosion control barriers at storm drain. Note concrete curbing at parcel front left included in work.

ASBESTOS INSPECTION AND PRE-DEMO REPORT: PARCEL COMMENTS

Structure

No. 01

Additional Site Photographs

Street Address: 2195 Pio Nono Avenue

MaconCity: State: 31204Zip Code: MorganCounty:GA 11Parcel No.:

No. 01

Additional Site Photographs

Street Address: 2195 Pio Nono Avenue

MaconCity: State: 31204Zip Code: MorganCounty:GA

11Parcel No.:

MI11a: Remove/clear (4’6”x6’±) metal frame sign and associated 6.5”±dia sign pole with 17’±ht and its associated footer. Parcel front right.

MI11b: Remove/clear (4”x4”x9’±ht) metal frame sign pole its associated metal devices and its associated footer.

No. 01

Additional Site Photographs

Street Address: 2195 Pio Nono Avenue

MaconCity: State: 31204Zip Code: MorganCounty:GA

11Parcel No.:

Close-up view of S1 front. Note 128±LF x 3’9” x 10”±ht concrete walk (on three sides of S1) that is to be cleared as part of work.

View of S1 interior administrative area. Interior contents are relatively minimum.

25035-11-1-01 Ext. Roof - Right. Misc. Rolled roofing over BUR. No asbestos detected.

25035-11-1-02 Ext. Roof - Left. Misc. Rolled roofing over BUR. No asbestos detected.

25035-11-1-03 Ext. Roof - Right parapet. Misc. Rolled roofing & mastics. No asbestos detected.

25035-11-1-04 Ext. Roof - Left parapet. Misc. Rolled roofing & mastics. No asbestos detected.

25035-11-1-05 Ext. Power mast - right rear. Misc. Mastic / sealant. No asbestos detected.

25035-11-1-06 Int. Restroom - metal frame window. Misc. WPG. 2% Chrysotile asbestos.

25035-11-1-07 Int. Garage bay - metal frame window. Misc. WPG. 2% Chrysotile asbestos.

*Materials must have more than (>) 1% asbestos-containing material to be considered as an asbestos-containing building material (ACBM). OSHA defines asbestos-containing material (ACM) as a material with any amount of asbestos, even less than (<) 1 percent.

Abbreviations: Ext. - exterior; Int. - interior; SM - surfacing material; TSI - thermal system insulation; Misc. - miscellaneous material; VFT -vinyl/asphalt floor tile; VSF - vinyl sheet flooring; WPG - window pane glazing; WFC - window frame caulking; DFC - door frame caulking;

ACT - acoustical ceiling tile; ACP - acoustical ceiling panel; DW/JTC - drywall/joint tape compound; JTC - joint tape compound; TCM -textured ceiling material; L1 - Layer 1.

Summary of Bulk Sample Analytical Results 2195 Pio Nono Avenue - P11 - S1- Commercial Bldg.

Macon, GA 31204 February 20, 2026

Inspector: Thomas K. Corish, Jr. Inspector Accreditation: 20608 Expiration Date: 9/10/26

Date of Inspection: 2/20/26

No Suspect Building Materials

*Materials must have more than (>) 1% asbestos-containing material to be considered as an asbestos-containing building material (ACBM). OSHA defines asbestos-containing material (ACM) as a material with any amount of asbestos, even less than (<) 1 percent.

Abbreviations: Ext. - exterior; Int. - interior; SM - surfacing material; TSI - thermal system insulation; Misc. - miscellaneous material; VFT -vinyl/asphalt floor tile; VSF - vinyl sheet flooring; WPG - window pane glazing; WFC - window frame caulking; DFC - door frame caulking;

ACT - acoustical ceiling tile; ACP - acoustical ceiling panel; DW/JTC - drywall/joint tape compound; JTC - joint tape compound; TCM -textured ceiling material; L1 - Layer 1.

Summary of Bulk Sample Analytical Results 2195 Pio Nono Ave. - P11-MI1 thru MI11 Miscellaneous Items

Macon, GA 31204 February 20, 2026

Date of Inspection: 2/20/26

GA EPD Database Information - 2026 Facility ID: 4110099

2195 Pio Nono Avenue Macon, GA 31204

Owner: Shijing Dong (706-315-5020); 3310 Pio Nono Avenue; Macon, GA 31204 Operator: None

ABATEMENT and DEMOLITION CONTRACT ITEMS

SR 247 / US 41 / Anthony Rd RoundaboutProject No: 0017395PI No: 11Parcel No:

1. All work is to be performed in accordance with the GDOT ROW master abatement and demolition specifications issued on June 1, 2018 by ROW’s State Property Manager, Demolition & Removal. Demolition workers must show evidence of having attended a GDOT approved awareness training program.

2. Asbestos abatement includes: S1 - WPG on eight (8) metal-frame industrial style windows (3 @ 20”x32”; 2 @ 42” x30”; 1 @ 46”x48”; 2 @ 62”x80”).

3. Demolition includes:

S1: Demolish 1458±SF CMU/brick/glass façade, insulated commercial building (former gas station circa 1963) with rolled roofing over BUR on concrete pad. Building has 3’9” concrete walk on three sides (128±LF) with up to 10”±ht. Front drive-thru (18’x26’4”±) canopy with metal roof covering rolled roofing over BUR.

Do Not Disturb storm drain at parcel front left. Put in place erosion controls around storm drain.

Demo to include 8,281± SF concrete / asphalt mix from the parcel & an additional 613±SF at parcel left rear along Anthony Rd.

Demo to include 64’x5”x6.5”±ht concrete curb at parcel left front and left., and an additional 10’x5”x6.5”±ht at parcel left rear.

Demo to include building concrete pad and 540±SF concrete drive at right side drive-thru.

Entry / exit apron pads are to be left intact. Put in place straw bales at entry/exit aprons using wood or metal stakes in conjunction with silt barrier when work is complete.

MI1: Remove/clear 20’x4’x6”±ht concrete (closed) fuel island and any associated piping and/or electrical conduit/wiring.

Three galvanized steel fuel pipes are capped at former dispenser points. One (1) 3,000 gallon UST reported removed 1/1/2000 per GA EPD UST Database. See last page of A&DCIL and page 11 of this report.

MI2: Remove/clear 17± chain-link fence poles and their associated concrete footer along parcel front (10±) and left rear (7±). All but one (6’±ht) have been cut at ground level.

MI3: Remove/clear 342±LF of 8’±ht WF privacy fencing and associated concrete footer(s). Parcel right side (143±LF), parcel left side (91±LF), and parcel rear (108±LF).

MI4: Remove/clear three 36"x42"± concrete pads at parcel rear.

MI5: Remove/clear WF (2”x4” & 4”x4”) constructed (6,286±SF) framework for metal panel roof system surrounding S1.

Metal roof panels have been removed.

MI6: Remove/clear WF (2”x4”) constructed framework and WF pallets that were used to store/stack vehicle tires. This wood is estimated to be 11±Yd3 of material.

MI7: Remove/clear 3±Yd3 of loose CMU on parcel.

MI8: Remove/clear 10±Yd3 of miscellaneous debris from parcel., to include trash/debris on parcel right and rear outside of WF privacy fencing.

MI9: Remove/clear 31± vehicle tires from parcel. Tires largely noted just outside WF privacy fencing at parcel right and rear.

MI10: Remove/clear monitoring well at front left of parcel.

MI11a: Remove/clear (4’6”x6’±) metal frame sign and associated 6.5”±dia sign pole with 17’±ht and its associated footer.

Parcel front right.

MI11b: Remove/clear (4”x4”x9’±ht) metal frame sign pole its associated metal devices and its associated footer.

Power has been disconnected to the structure.

All abandoned items within and outside of the structures are to be removed as part of the demolition and clearing the R/W area including disposal of scrap / used tires as regulated by the State of Georgia EPD. Obtain a receipt documenting proper transfer / disposal of tires.

Cut and remove public water supply piping at the meters and cut, cap, and remove drain pipes & sewer line, (related to S1) if present, at the right of way or street in accord with GDOT technical specifications.

All foundations, porches, sidewalks, concrete footers, wood platforms & piers, slabs related to the structure;

mechanical equipment; landscape and garden borders; tents; grills; LP tanks; trash; debris and miscellaneous parts are to be removed from the R/W. Parts of the structure are not to be pushed into the soil.

Affected clearance areas of the parcels are to be cleared of debris caused by the removal/clearance. Any dead foliage or foliage damaged to access removal of the items that may be considered a potential fire hazard are to be removed from the parcel and disposed.

ADDITIONAL DEMOLITION PROJECT NOTES

* Contractor is to refer and adhere to the requirements of the Georgia Erosion and Sedimentation Act (O.C.G.A. Title 12, Chapter 7 when performing work on GDOT Right of Way. Please consult the 2016 Field Manual for Erosion & Sediment Control in Georgia that is available from the Georgia Soil & Water Conservation Commission - www.gaswcc.org. It is required that a Blue Card holder be on site throughout the performance of this project. A Blue Card holder is a person that has completed and passed an exam in the Level 1A Fundamentals Seminar: Education and Training Certification Requirements for Persons Involved with Land Disturbing Activities sponsored by the Georgia Soil and Water Conservation Commission (GSWCC).kk

Items discovered during the demolition not included in the report are to be reported to the Site Inspector. Parcel is to be cleared of debris, rock raked, graded and sloped properly for drainage, and sown with seed (appropriate for the season) and straw*.

Appropriate erosion and sedimentation control devices and vegetative & structural best management practices (BMPs) are to be deployed & maintained during the demolition in accordance with Georgia Erosion and Sedimentation Act (GESA)*. Hay seed or tall grass seeds are not to be used. Any hole openings created by the removal of posts, footers, conduit or other items shall be filled and compacted with clean soils.

Notice of UST Status:

Per GA EPD Database Information - 2026:

Facility ID: 4110099 Bibb County, 2195 Pio Nono Avenue.; Macon, GA 31204.

One (1) UST has been prior removed from this location (1/1/2000). Last operated as service station: unknown.

Automotive Detail & Service Center. UST Legacy tank #1 (3000 Gal - Gas) - Removed from ground.

The owner and “responsible party” for this facility is:

Shijing Dong (706-315-5020).; 3310 Pio Nono Avenue; Macon, GA 31204.

GPS co-ordinates for the site are: Lat.: 32° 49’ 13.86” N; Long.: -83° 39’ 46.56” W

The UST(s) are considered to be “Removed From Ground”.

ABATEMENT and DEMOLITION CONTRACT ITEMS

SR 247 / US 41 / Anthony Rd RoundaboutProject No: 0017395PI No: 11Parcel No:

GEOS INFORMATION

SECTION 2 – SITE INFORMATION

PROJECT NAME: GDOT #0017395 - P11 - S1 Commercial Structure

PROJECT ADDRESS: 2195 Pio Nono Ave.

PROJECT CITY: Macon ZIP: 31204 COUNTY: Bibb

NEAREST MAJOR INTERSECTION: NE corner of Pio Nono Ave & Anthony Rd. Lat.: 32° 49’ 13.86” N; Long.: -83° 39’ 46.56” W

BLDG SIZE IN SQ. FT: 1458± AGE OF BUILDING IN YEARS: 62± NUMBER OF FLOORS IN BUILDING: 1

SPECIFIC LOCATION IN BUILDING OF ASBESTOS BEING REMOVED: S1- Int Window Pane Glazing (WPG) Eight (8) Steel Frame Windows.

SECTION 3A – ABATEMENT CONTRACTOR

ASBESTOS REMOVAL CONTRACTOR:

CONTRACTOR STREET ADDRESS: COMPANY CERTIFICATE #:

CITY: STATE: ZIP: PHONE: FAX:

LICENSED AGENT: AGENT’S ID: EXPIRES: CELL PHONE:

3B OTHER CONTRACTOR

GENERAL/SUB/DEMOLITION CONTRACTOR: JOB CONTRACTED:

OTHER CONTRACTOR STREET ADDRESS:

CITY: STATE: ZIP: PHONE: FAX:

SECTION 4 – ACM INFORMATION

IS ASBESTOS PRESENT? YES FRIABLE NON-FRIABLE BOTH

DID AN AHERA ACCREDITED INSPECTOR INSPECT THIS SITE? YES

INSPECTOR NAME: Thomas K. Corish, Jr. INSPECTOR PHONE: 404/312-9037

ACCREDITATION COURSE: Inspector CERTIFICATE NUMBER: 20608 EXPIRES: September 10, 2026

SECTION 5 – WORK SCHEDULES (10 WORKING DAY ADVANCE NOTIFICATION REQUIRED FOR NON-EMERGENCY NOTIFICATIONS!!!)

ABATEMENT START DATE ABATEMENT END DATE WORK DAYS (MON-SUN) WORK HOURS (EX : 7-4)

DEMOLITION START DATE DEMOLITION END DATE WORK DAYS (MON-SUN) WORK HOURS (EX : 7-4)

SECTION 6 – ACM AMOUNTS, TYPE CODES, AND FEE CALCULATION

� CHECK IF SECTION REVISED

FIRST, LOCATE THE MATERIAL TO BE REMOVED IN COLUMN A. COLUMN B SHOWS THE USUAL NESHAP CATEGORY FOR THE MATERIAL. COLUMN C SHOWS THE CATEGORY THE MATERIAL WILL LIKELY BECOME DURING ABATEMENT, AND THAT IS THE CODE

THAT SHOULD BE USED FOR COMPLETING THIS FORM. NOW, ENTER THE SQ. FT AND/OR L.F. AMOUNTS OF ACM TO BE ABATED DURING THIS PROJECT UNDER THE CORRECT HEADING ACCORDING TO TYPE IN COLUMN D, E, AND/OR F. THEN, LOCATE THE

CORRESPONDING TYPE CODE(S) FOR THE MATERIAL(S) IN COLUMN G AND ENTER THE CODES IN THE SPACES PROVIDED BEFORE

PROCEEDING TO THE FEE CALCULATION SECTION.

Column A Column B Column C SF OR LF AMOUNT TO BE ABATED

DURING PROJECT

Column G

USUAL NESHAP…