This document consists of 100% construction drawings and specifications for a nuclear medicine camera replacement project at UConn Health Center's nuclear medicine department located at 263 Farmington Avenue, Farmington, Connecticut. The project involves demolition of select partitions, removal of existing finishes, relocation of existing door and frame assemblies, construction of new partitions and casework, installation of a new Siemens EVO nuclear medicine camera system, and application of new finishes across the scope area. The work is confined to approximately 510 square feet comprising procedure room FM047 and stress test room FM046, with associated corridor modifications in FM073. The project requires coordination with mechanical, electrical, plumbing, and fire protection systems, with particular emphasis on maintaining patient care operations during construction through environmental controls, including HEPA-filtered negative air pressure, sticky track mats, and Type-A environmental barriers. Bids are due July 29, 2026 at 2:00 p.m. EDT, with a questions and answers period running from June 30, 2026 through July 10, 2026 at 4:00 p.m. EDT. No site visit or pre-bid conference is scheduled.
The construction documents establish Level 2 classification work within a Type 1A institutional occupancy (I2) facility constructed in 1975 with current construction documents dated February 20, 2026. Work must comply with the 2021 Connecticut State Building Code, 2021 International Building Code, and FGI Guidelines for Design and Construction of Hospitals and Outpatient Facilities. The project requires structural reinforcement to support the new camera equipment weighing up to 9,100 pounds, with floor anchorage to be designed per manufacturer specifications and coordinated with the structural engineer. New finishes include sheet vinyl flooring with integral rolled cove base, gypsum wall board painted in Benjamin Moore OC-14 Baby Fawn finish, new acoustical ceiling tile assemblies matching existing conditions at 9 feet above finish floor, and stainless steel corner guards and crash rails. New casework features plastic laminate construction with adjustable shelving and solid surface countertops. All electrical, mechanical, plumbing, and fire protection systems must be coordinated through formal coordination drawing sessions with all trades signing off prior to fabrication. The contractor assumes responsibility for protecting existing conditions, managing construction sequencing to minimize patient care disruption, and providing complete as-built documentation upon project completion.
Text of this file
ARCHITECT
SILVER PETRUCELLI & ASSOC.
3190 WHITNEY AVENUE, HAMDEN CT 06518
311 STATE STREET NEW LONDON, CT 06320
PHONE 203 230 9007 silverpetrucelli.com
NOT FOR CONSTRUCTION
NOT FOR CONSTRUCTION
M/E/P/FP
SILVER PETRUCELLI & ASSOC.
3190 WHITNEY AVENUE, HAMDEN CT 06518
311 STATE STREET NEW LONDON, CT 06320
PHONE 203 230 9007 silverpetrucelli.com
NOT FOR CONSTRUCTION
STRUCTURAL
MICHAEL HORTON ASSOCIATES.
780 E MAIN ST SUITE 1, BRANFORD CT 06405
PHONE 203 481 8600 mha-eng.com
NOT FOR CONSTRUCTION
NOT FOR CONSTRUCTION
PROJECT
LOCATION
ARCHITECTURAL DRAWINGS
A001 GENERAL INFORMATION SHEET
A100 DEMOLITION & CONSTRUCTION
A200 CEILING DEMOLITION & CONSTRUCTION
A300 ELEVATIONS, FINISH PLAN, AND SCHEDULES
A310 CASEWORK DETAILS
MECHANICAL DRAWINGS
M001 MECH GENERAL NOTES
M002 MECH ABBREVIATIONS AND LEGENDS
M110 MECHANICAL PLAN
M500 MECH SCHEDULES
M600 MECH DETAILS
PLUMBING DRAWINGS
P001 PL GENERAL NOTES
P002 PL ABBREVIATIONS AND LEGENDS
P111 PL FLOOR PLANS
P500 PL SCHEDULES
P600 PL DETAILS
FIRE PROTECTION DRAWINGS
FP001 FP GENERAL NOTES, ABBREVIATIONS, AND LEGENDS
FP111 FP FIRST FLOOR PLAN
FP500 FP SCHEDULES & DETAILS
ELECTRICAL DRAWINGS
E001 ELECTRICAL ABBREVIATIONS AND LEGENDS
E002 ELECTRICAL GENERAL NOTES
E111 ELECTRICAL MAIN FLOOR LIGHTING PART PLANS
E211 ELECTRICAL MAIN FLOOR POWER PART PLANS
E600 ELECTRICAL DETAILS
SILVER
203 230 9007
3190 WHITNEY AVENUE HAMDEN
silverpetrucelli.com
CT 06320
ASSOCIATESPETRUCELLI +
CT 06518
311 STATE STREET NEW LONDON
02/20/2026100% CONSTRUCTION
DOCUMENTS
PROJECT TITLE:
CAMERA REPLACEMENT AT
UCONN NUCLEAR MED DEPARTMENT
263 FARMINGTON AVE
FARMINGTON, CT
GENERAL DRAWINGS
G001 BUILDING CODE PLANS & INFORMATION
G002 ACCESS LOGISTICS / ENVIRON. PLAN
DRAWING LIST
STRUCTURAL DRAWINGS
S100 FLOOR FRAMING PLANS, NOTES, AND SECTIONS
CODE INFORMATION
1. PROJECT DESCRIPTION:
UCH NUCLEAR MEDICINE CAMERA REPLACEMENT - THE ALTERATIONS TO THE BUILDING
PROPOSED FOR THE PROJECT DO NOT IMPACT OR CHANGE THE CONSTRUCTION
TYPE OR OCCUPANCY CLASS (I2-INSTITUTIONAL).
WORK SCOPE FOR THE PROJECT INCLUDES DEMOLITION/ ALTERATION OF EXISTING
FINISHES, MILLWORK & PARTITION WALLS WITHIN THE SPACE- NEW CONSTRUCTION
INCLUDES NEW FINISHES, MILLWORK, PARTITION WALLS & SIEMENS CAMERA. IN
ADDITION TO PARTITIONS, NEW MECHANICAL, ELECTRICAL & PLUMBING FIXTURES/
DEVICES. EXISTING FIRE ALARM & FIRE PROTECTION DEVICES TO REMAIN / UNCHANGED
3. CLASSIFICATION OF WORK: LEVEL 2
DATE OF ORIGINAL CONSTRUCTION 1975
DATE OF CURRENT CONSTRUCTION 2026
5. CONSTRUCTION TYPE (Chapter 6) (EXISTING, UNCHANGED) Type 1A
4. GROUP CLASSIFICATION (Chapter 3) (PRIMARY) I2- INSTITUTIONAL
6. EXISTING TOTAL:
MAIN LEVEL (SCOPE OF WORK) Total sq. ft. 510 SF
8. OCCUPANCY LOAD:
PROCEDURE FM047 = 293 (@240 SF/OCC)
STRESS FM046 = 147 (@240 SF/OCC)
TOTAL OCCUPANCY (WHOLE NUC. MED. DEPT.)
EXIT CAPACITY
TOTAL EXITS
Total 2
Total 1
Total 39
Total 660
Total 2
8. SPRINKLER PROTECTION: (Entire Building) YES
9. REQUIRED MEANS OF EGRESS:
0-49 MAX OCC. (REQ'D- 1) Exits Provided 2
10. COMMON PATH OF TRAVEL: (Sprinklered BLDG) < 75'-0"
11. EXIT TRAVEL DISTANCE: (Sprinklered BLDG) < 200'-0"
12. DEAN-END CORRIDOR: (Sprinklered BLDG) < 20'-0"
13. FIRE SAFETY CODE DATA
Minimum Construction Required / Actual Construction Provided
Notification / Alarms
Detection
Extinguishment Requirements
1A
YES NO
YES NO
YES NO
X
X
X
2. APPLICABLE BUILDING CODES:
-CONNECTICUT STATE BUILDING CODE (2021 ICC) 2022
-INTERNATIONAL EXISTING BUILDING CODE 2021
-INTERNATIONAL BUILDING CODE 2021
-INTERNATIONAL MECHANICAL CODE 2021
-INTERNATIONAL PLUMBING CODE 2021
-INTERNATIONAL ENERGY CONSERVATION CODE 2021
-NATIONAL ELECTRIC CODE (NFPA 70) 2021
-ICC A117.1 ACCESSIBLE & USABLE 2017
-ADA STANDARDS FOR ACCESSIBLE DESIGN 2010
HOSPITAL AND OUTPATIENT CLINICS AND SUPPORT FACILITIES
-FGI GUIDELINES FOR DESIGN AND CONSTRUCTION OF HOSPITALS 2022
-FGI GUIDELINES FOR DESIGN AND CONSTRUCTION OF OUTPATIENT FACILITIES 2022
-ALL CODE SECTION REFERENCES ARE TO BE CSBC UNLESS OTHERWISE NOTED
7. FIRE-RESISTANCE RATED REQUIREMENTS FOR BUILDING ELEMENTS
- STRUCTURAL FRAME:
INCLUDING COLUMNS, GIRDERS, TRUSSES 3 HR(S) N/A
- BEARING WALLS:
EXTERIOR (TABLE 602) 3 HR(S) N/A
INTERIOR 3 HR(S) N/A
- FIRE WALLS AND PARTY WALLS (TABLE 706) 3 HR(S) N/A
- EXIT ENCLOSURES (TABLE 1023) 2 HR(S) N/A
- MIXED USES PER TABLE 508.4 N/A
- EXIST ACCESS CORRIDORS 0 HR(S) 0-HR
- NON BEARING WALLS & PARTITIONS:
EXTERIOR (TABLE 602) PER TABLE 602 N/A
- NON BEARING WALLS & PARTITIONS:
INTERIOR (TABLE 602) 0 HR(S) N/A
- FLOOR CONSTRUCTION:
INCLUDING SUPPORTING BEAMS & JOISTS 2 HR(S) N/A
- ROOF CONSTRUCTION:
INCLUDING SUPPORTING BEAMS & JOISTS 1-1/2 HR(S) N/A
N/A - INDICATES BUILDING ELEMENTS NOT IMPACTED BY PROJECT
CONSTRUCTION (EXISTING BUILDING ELEMENTS COMPLY WITH CODE
REQUIRED RATINGS)
9. ACCESSIBLE BUILDING: DESIGNATED
NON DESIGNATED
MAX. ALLOWABLE EGRESS OCC. OF DOOR
ACTUAL EGRESS OCC. OF DOOR
SYMBOL LEGEND
TD 145'
DIRECTION OF TRAVEL W/ ACCUMULATED OCC. LOAD
EXIT CAPACITY
ROOM NUMBER
MAXIMUM TRAVEL DISTANCE FROM FURTHEST POINT
ROOM OCCUPANCY LOAD
DENOTES ACCESSIBLE THRESHOLD 1/2" MAX STEP
W/BEVELED THRESHOLD OR 1/2" STEP W/OUT BEVELED
THRESHOLD
2 HOUR RATED FIRE AND SMOKE BARRIER
1 HOUR RATED FIRE AND SMOKE BARRIER
COMMON PATH OF TRAVEL
AREA IN SF
OCC. LOAD FACTOR
C216
198'
LOT LINE
SMOKE BARRIER
300SF
REQUIRED PROVIDED
COMPUTER ROOM
FM067
150 295
STORAGE
FM068
300 1
RESIDENTS
FM063
150 1 54
ANTE
FM063C
150 1
DARK ROOM
FM064
150 1
COUNT
FM065
150 1
FILE ROOM
FM062
150 2
RECEPTION
FM041A
150 1
CONTROL ROOM
FM042
150 1
WAITING
FM041B
7 14
CORRIDOR
FM041
HOT LAB
FM043A
240 1
CONSULT
FM063B
150 171
VIEWING
FM063A
150 1
TOILET
FM060
TOILET
FM061
PREP / INJECT
FM043
240 2
PROCEDURE
FM044
240 1
PROCEDURE
FM045
240 2
STRESS
FM046
240 1
PROCEDURE
FM047
240 2
PROCEDURE
FM048
240 2
PROCEDURE
FM049
240 1
OFFICE
FM050
150 1
OFFICE
FM051
150 1
CORRIDOR
FM019
SCOPE OF PHASE 1:
CAMERA REPLACEMENT
IN PROCEDURE ROOM
FM047 & RELAYOUT OF
STRESS TEST ROOM
FM046
CORRIDOR
FM073
2 1
23 23
MAX. EXIT TRAVEL DIST. 134'-0"
GRAY SHADED
AREA NOT IN
SCOPE & IS ONLY
SHOWN FOR
REFERENCE
0' 2' 8'
SCALE: 1/8" = 1'-0"
20'
DRAWING TITLE:REVISED BY:DATE:DESCRIPTION:REVISION:PROJECT TITLE: DATE:
SCALE:
DRAWN BY:
PROJECT NUMBER:
DRAWING NUMBER:
SILVER PETRUCELLI + ASSOCIATES
203 230 9007
3190 WHITNEY AVENUE HAMDEN CT 06518
silverpetrucelli.com
311 STATE STREET NEW LONDON CT 06320
PROJECT SUBMISSION:
STATE PROJECT NUMBER:
CAMERA REPLACEMENT AT
UCONN NUC MED
263 FARMINGTON AVE
FARMINGTON, CT
100% CONSTRUCTION DOCUMENTS
25.110
02/20/2026
NORTH
KEY PLAN
AREA
AA
ACADEMIC ENTRANCE
AREA A
PROJECT
LOCATION
AREA B
AREA E
AREA C
MAIN ENTRANCE
AREA H
HOSPITAL ENTRANCE
AREA T
AREA F
AREA L
WEST
DOCK
As indicated
2/
/2
4:
:2
PMG001
BUILDING CODE PLANS &
INFORMATION
M. JAEKLE
1/8" = 1'-0"1 FIRST FLOOR CODE PLAN
FREIGHT
ELEVATORS
PROCEDURE
SM047
STRESS
SM046
CORRIDOR
SM073
CORRIDOR
SM072
CORRIDOR
SM091
CORRIDOR
SM105
CORRIDOR
SM019
CORRIDOR
SM031
PROCEDURE
SM054
PROCEDURE
SM055
OFFICE
SM056
OFFICE
SM057
OFFICE
SM069
PROCEDURE
SM045
PROCEDURE
SM044
PASSAGE
SM090
CORRIDOR
SM043
CONTROL ROOM
SM042
PREP / INJECT
SM048
HOT LAB
SM049
VIEWING
SM053
CONSULT
SM052
FILE ROOM
SM051
DARK ROOM
SM064
COUNT
SM065
COMPUTER ROOM
SM067
OFFICE
SM071
OFFICE
SM070
STORAGE
SM068
LINE OF ROOM
FM047 ABOVE
FREIGHT
ELEVATORS
OFFICE
FG110
OFFICE
FG108
PATIENT ROOM
FG112
1. PRIOR TO THE START OF WORK, CONSTRUCT TYPE-A
ENVIRONMENTAL BARRIER (AS DESCRIBED ABOVE). BARRIER
SHALL REMAIN UNTIL SUCH TIME THAT THE UCH PROJECT
MANAGER DEEMS THE CONSTRUCTION TO BE COMPLETE. AT
SUCH TIME THE CONTRACTOR SHALL REMOVE THE BARRIER
AND TOUCH-UP AFFECTED FINISHES.
2. INSTALL AND MAINTAIN "STICKY" TRACK MATS THROUGHOUT
THE DURATION OF THE PROJECT.
3. THE CONTRACTOR SHALL CLEAN COMMON AREA FLOORS
PRIOR TO THE END OF EACH DAY AND OTHERWISE AS NEEDED.
4. FOR ABOVE CEILING WORK IN ROOMS EXTENDING BEYOND THE
PROJECT AREA, SAID WORK SHALL BE PERFORMED DURING
OFF-HOURS AS SCHEDULED BY THE UCH PROJECT MANAGER.
THE DOORS TO SUCH ROOMS SHALL BE CLOSED AND THE
SUPPLY AIR DIFFUSERS SHALL BE COVERED WITH THE
EXHAUST REGISTERED FILTERED AS INDICATED ABOVE.
ROOMS SHALL BE CLEANED BY THE CONTRACTOR THEN
TERMINALLY CLEANED BY UCH PRIOR TO REOCCUPYING FOR
PATIENT USE
5. FOR ABOVE CEILING WORK IN LABOR OR DELIVERY ROOMS
(FG108, FG110, AND FG112, SAID WORK SHALL BE PERFORMED
DURING REGULAR HOURS (8AM-4PM). HOWEVER, ONCE THE
DURATION OF WORK IS KNOWN, OFF-HOURS MAY BE REQUIRED
TO REDUCE IMPACT ON CLINICAL OPERATIONS. THE PROJECT
MANAGER SHALL SCHEDULE ALL SAID WORK AND TIME FRAMES
WITH THE CONTRACTOR AND LABOR AND DELIVERY NURSE
MANAGER.
THE DOORS TO SUCH ROOMS SHALL BE CLOSED, THE SUPPLY
AIR DIFFUSERS SHALL BE COVERED AND THE EXHAUST AND OR
RETURN AIR REGISTERS FILTERED AS INDICATED ABOVE. RUN
HEPA FILTERED NEGATIVE AIR MACHINE AS INDICATED ABOVE.
ROOMS SHALL BE CLEANED BY THE CONTRACTOR THEN
TERMINALLY CLEANED BY UCH PRIOR TO REOCCUPYING FOR
PATIENT USE.
ACCESS LOGISTICS AND
ENVIRONMENTAL CONTROL NOTES
CONTRACTOR ROUTE
GENERAL NOTES
THE CONTRACTOR SHALL BE REQUIRED TO WORK IN AREAS IN OR
ADJACENT TO PATIENT CARE ACTIVITIES. AS A RESULT, THE
CONTRACTOR, SHALL BE RESPONSIBLE TO PROVIDE EFFECTIVE
MEANS AND METHODS BASED ON THE INFORMATION CONTAINED
HEREIN TO ENSURE THAT THE ENVIRONMENT FOR PATIENT CARE IS
FULLY MAINTAINED.
PRIOR TO BEGINNING ANY PHASED WORK, THE CONTRACTOR SHALL
REVIEW INSTALLATION OF ENVIRONMENTAL CONTROL MEASURES
AS INDICATED IN THE CONTRACT DOCUMENTS WITH THE UCHC
REPRESENTATIVE AND INFECTION CONTROL SPECIALIST.
WORK OCCURRING IN SUCH SPACES SHALL HAVE HEPA FILTERED
NEGATIVE AIR PRESSURE FROM THE SURROUNDING OCCUPIED
SPACES.
DISCONNECT HVAC SUPPLY DIFFUSERS AND PLUG TO PREVENT
SUPPLY AIR FROM ENTERING THE SPACE.
DISCONNECT THE HVAC RETURN REGISTER AND WRAP INLET
WITH AN 80% FILTER.
AIM HEPA FILTERED EXHAUST AIR TOWARD EXISTING RETURN
AIR INLET (DO NOT DIRECTLY CONNECT, HANG APPROX 6"
AWAY FROM INLET OPENING.)
IN AREAS WHERE PORTIONS OF THE CEILING SYSTEM IS REMOVED,
THE AREA BETWEEN THE REMAINING CEILING SYSTEM AND THE
STRUCTURE ABOVE SHALL BE SEALED WITH FIRE RATED
POLYETHYLENE (TO AID IN THE ABILITY TO CREATE A NEGATIVE
PRESSURE ENVIRONMENT).
THE ROOM WALLS IN THIS PART OF THE BUILDING ARE
CONSTRUCTED FULL HEIGHT TO THE STRUCTURE ABOVE. FIRE
RATED POLYETHYLENE WILL NOT BE NECESSARY.
REMOVAL OF DAILY CONSTRUCTION DEBRIS AND STAGING OF THE
AREA WITH NEW CONSTRUCTION MATERIALS SHALL BE
PREDETERMINED AND PRE-APPROVED ROUTE AND SHALL BE
LIMITED TO OFF HOURS ONLY.
BARRIER PLAN
X
0'
SCALE: 3/32" = 1'-0"
2' 10' 30'
DRAWING TITLE:REVISED BY:DATE:DESCRIPTION:REVISION:PROJECT TITLE: DATE:
SCALE:
DRAWN BY:
PROJECT NUMBER:
DRAWING NUMBER:
SILVER PETRUCELLI + ASSOCIATES
203 230 9007
3190 WHITNEY AVENUE HAMDEN CT 06518
silverpetrucelli.com
311 STATE STREET NEW LONDON CT 06320
PROJECT SUBMISSION:
STATE PROJECT NUMBER:
CAMERA REPLACEMENT AT
UCONN NUC MED
263 FARMINGTON AVE
FARMINGTON, CT
100% CONSTRUCTION DOCUMENTS
25.110
02/20/2026
NORTH
KEY PLAN
AREA
AA
ACADEMIC ENTRANCE
AREA A
PROJECT
LOCATION
AREA B
AREA E
AREA C
MAIN ENTRANCE
AREA H
HOSPITAL ENTRANCE
AREA T
AREA F
AREA L
WEST
DOCK
As indicated
2/
/2
4:
:2
P
MG002
ACCESS LOGISTICS / ENVIRON.
PLAN
M. JAEKLE
3/32" = 1'-0"2 MAIN FLOOR AREA ACCESS LOGISTICS AND ENVIRON. CONTROL PLAN
3/32" = 1'-0"1 GROUND FLOOR AREA ACCESS LOGISTICS AND ENVIRON. CONTROL PLAN
NOTE: GREY SHADED PLAN REGION INDICATES AREA OUTSIDE THE
PROJECT SCOPE OF WORK. SOME SCOPE CREEP MAY OCCUR
WITH MEPFP DRAWINGS & SHOULD BE COORDINATED - REFER TO
THESE DRAWINGS FOR ADDITIONAL SCOPE OF WORK AREA
12 13
A
B
EX. W18
EX. W16X26 (28)
EX. W16X26 (28)
EX. W16X26 (28)
EX
. W
X5
(2
6)
EX. W18
EX
. W
EX. W16X26 (28)
EX. W16X26 (28)
EX. W16X26 (28)
NEW CAMERA EQUIPMENT.
MAXIMUM OPERATING WEIGHT
9100LBS. COORDINATE FINAL LOCATION
WITH EQUIPMENT MANUFACTURER. ATTACH
EQUIPMENT PER MANUFACTURER'S REQUIREMENTS
L7 X4
X3 /8 L7X4X3/8
L7 X4
X3 /8
NEW ANGLE FRAME.
REFER TO SECTION
ANCHOR PLATE, QUANTITY AND SIZE OF
CONNECTORS BY EQUIPMENT MANUFACTURER.
REFER TO TYPICAL SECTION ON S100 FOR ANCHORAGE
TO STEEL DECK.
S100
V.I.F.
26' - 0"
V .I.
F.
8'
V .I.
F.
8'
V .I.
F.
8'
INSTALL ANGLE AT
ANCHOR POINT. COORD.
WITH EQUIPMENT
MANUFACTURER.
EXISTING 5 1/4" TOTAL THICKNESS
SLAB ON DECK (3 1/4" LIGHTWEIGHT
CONCRETE ON 2" STEEL DECKING). V.I.F.
1" M
IN
ANGLES PARALLEL TO DECK
SPAN DO NOT NEED TO BE DRYPACKED.
CONTRACTOR OPTION TO PROVIDE BOLTED
CONNECTION, SIMILAR TO CONNECTION TO
EXISTING BEAMS IN PLACE OF WELDING
1/4"
CONTRACTOR
OPTION TO
FIELD WELD
1 1/4"
1/
4"
1/ 2"
1/
4"
1/4"
TYP.
EX. FLOOR BEAM. V.I.F.
DRYPACK BETWEEN ANGLE AND DECK AT EACH BOTTOM
RIB LOCATION TO PROVIDE FULL BEARING
COORDINATE BEAM LOCATIONS WITH
EQUIPMENT LOCATIONS
WHERE EXISTING FRAMING IS FIREPROOFED,
REPAIR DISTURBED FIREPROOFING AREAS
AFTER WORK IS COMPLETE, TYP.
NEW EQUIPMENT. COORDINATE FINAL LOCATIONS
OF STEEL FRAMING WITH FINAL LOCATION OF NEW
EQUIPMENT. ATTACHMENT OF NEW EQUIPMENT IS
PER MANUFACTURER'S REQUIREMENTS.
L4X4X5/16X0'-5" (TYPICAL)
WITH (2)-3/4"Ø A325N BOLTS,
CONTRACTOR TO WELD TO
NEW ANGLE FRAME WITH
1/4" WELD ON 3 SIDES
CONTRACTOR OPTION TO
BOLT NEW ANGLE CONNECTION
TO EXISTING BEAM. BOLTED CONNECTIONS
SHALL BE MAG-DRILLED. FLAME CUTTING
OR PLASMA CUTTING ARE NOT ACCEPTABLE.
FLOOR FRAMING NOTES
1. FIELD VERIFY ALL EXISTING CONDITIONS, DIMENSIONS, FRAMING, AND ELEVATIONS PRIOR TO BEGINNING ANY WORK.
2. MHAI HAS NOT BEEN MADE AWARE OF ANY NEW FLOOR OPENINGS REQUIRED IN THE INSTALLATION OF THE NEW EQUIPMENT.
MHAI MUST BE NOTIFIED IF ANY NEW FLOOR OPENINGS ARE REQUIRED AS THEY MAY REQUIRE ADDITIONAL REINFORCEMENT.
OPENINGS FOR EQUIPMENT ANCHORING ARE ACCEPTABLE.
3. THE ANCHORAGE OF THE NEW EQUIPMENT MUST MEET EQUIPMENT MANUFACTURER'S REQUIREMENTS AND IS NOT PART OF
MHAI'S SCOPE.
GENERAL NOTES
GENERAL
GOVERNING CODE: 2022 CONNECTICUT STATE BUILDING CODE, (2021
INTERNATIONAL BUILDING CODE).
DESIGN LOADS: CITY OF FARMINGTON
MINIMUM LIVE LOADS: LABORATORIES: 60 PSF +
EQUIPMENT WEIGHT
1. SHOULD ANY OF THE DETAILED INSTRUCTIONS SHOWN ON THE PLANS
CONFLICT WITH THE GENERAL STRUCTURAL NOTES, THE SPECIFICATIONS,
OR WITH EACH OTHER, THE STRICTEST PROVISION SHALL GOVERN.
2. LOADS, OPENINGS AND STRUCTURE IN ANY WAY RELATED TO
REQUIREMENTS OF OTHER (NON-STRUCTURAL) DISCIPLINES ARE SHOWN FOR
BIDDING PURPOSES ONLY. THE CONTRACTOR SHALL OBTAIN FROM THE HEATING
AND VENTILATING, ELECTRICAL, PLUMBING AND OTHER SUBCONTRACTORS THE FINAL
APPROVED SIZE AND LOCATION OF ALL OPENINGS AND WORK TO BE PROVIDED FOR
THEIR TRADE IN ROOFS, FLOORS AND WALLS, WHETHER SHOWN OR NOT SHOWN ON
STRUCTURAL DRAWINGS. CONTRACTOR SHALL BE RESPONSIBLE FOR TRANSMISSION
OF REQUIREMENTS, LOCATIONS AND DETAILS TO STRUCTURAL SUBCONTRACTORS.
EXCESS COST RELATED TO VARIATION IN MECHANICAL REQUIREMENTS ARE NOT TO
BE BORNE BY THE OWNER.
3. EQUIPMENT WEIGHTS USED IN DESIGN OF SUPPORTING ELEMENTS HAVE
BEEN INDICATED ON THE DRAWINGS. CONTRACTOR SHALL NOTIFY MHAI PRIOR TO
INSTALLATION IF ACTUAL WEIGHT EXCEEDS WEIGHT SHOWN ON DRAWINGS.
4. IT IS THE CONTRACTOR'S SOLE RESPONSIBILITY TO FOLLOW ALL
APPLICABLE SAFETY CODES AND REGULATIONS DURING ALL PHASES OF
CONSTRUCTION.
5. SHOP DRAWINGS ARE TO BE CHECKED BY THE CONTRACTOR AND
SUBCONTRACTOR AND BEAR CHECKER'S INITIALS BEFORE BEING SUBMITTED TO THE
ARCHITECT FOR APPROVAL.
6. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS, ELEVATIONS, ANGLES
AND EXISTING CONDITIONS BEFORE PROCEEDING WITH ANY WORK.
7. ALL SECTIONS AND DETAILS SHALL BE CONSIDERED TYPICAL AND APPLY
FOR THE SAME AND SIMILAR SITUATIONS THROUGHOUT THE BUILDING, UNLESS
OTHERWISE SPECIFICALLY NOTED.
8. IN CASES OF DISCREPANCIES BETWEEN CONTRACT DOCUMENTS AND
SUBMITTED SHOP DRAWINGS, THE CONTRACT DOCUMENTS SHALL GOVERN
INSTALLATION OF MATERIALS.
STRUCTURAL STEEL
MATERIALS:
STRUCTURAL STEEL ASTM A 36
BOLTS ASTM A325
ANCHOR BOLTS ASTM F1554, GRADE 36
WELDING ELECTRODE ASTM E 70
1. DESIGN, FABRICATION, AND ERECTION OF STRUCTURAL STEEL SHALL
CONFORM TO AMERICAN INSTITUTE OF STEEL CONSTRUCTION
SPECIFICATION, AISC 360-10. ALL REACTIONS SHOWN ON PLAN HAVE
BEEN DEVELOPED USING ALLOWABLE STRESS DESIGN.
2. WELDING SHALL CONFORM TO THE CODE FOR "ARC AND GAS WELDING IN
BUILDING CONSTRUCTION" OF THE AMERICAN WELDING SOCIETY. ALL WELDING
SHALL BE DONE BY A CERTIFIED WELDER.
3. CONNECTIONS:
CONNECTIONS SHALL BE MADE USING 3/4" DIAMETER ASTM
A325 BOLTS (SNUG TIGHT OR SLIP CRITICAL) OR WELDS,
UNLESS NOTED OTHERWISE.
USE LARGER OF 1/4" FILLET WELDS OR MINIMUM SIZE PER AISC
REQUIREMENTS WHERE NO WELD SIZE IS SHOWN ON
DRAWINGS.
WELDS IN EXCESS OF 24" IN LENGTH SHALL BE 3" STITCH
WELDS AT 8" ON CENTERS, UNLESS SPECIFICALLY SHOWN ON
DRAWINGS TO BE CONTINUOUS.
4. NO WELDING OR FINAL BOLTING SHALL BE DONE UNTIL AS MUCH OF THE
STRUCTURE THAT WILL BE STIFFENED THEREBY HAS BEEN PROPERLY ALIGNED.
5. SEQUENCE OF PLACING WELDS SHALL BE SUCH AS TO AVOID DISTORTION
OF MEMBERS.
6. SPRAY-ON FIREPROOFING SHALL BE APPLIED TO ALL STRUCTURAL STEEL
TO ACHIEVE REQUIRED FIRE RATING, UNLESS OTHER PROTECTIVE COATING IS
INDICATED ON THE ARCHITECTURAL DRAWINGS.
7. EXISTING STEEL SURFACES TO RECEIVE FIELD WELDS SHALL BE
THOROUGHLY CLEANED UNTIL FREE FROM PAINT, RUST, GREASE, ETC.
8. STEEL CONTRACTOR SHALL PROVIDE SKETCHES FOR ALL CORRECTIVE
FIELD WORK WHICH SHALL BE SUBMITTED TO THE ENGINEER OF RECORD FOR
APPROVAL. ALL SKETCHES SHALL BE SIGNED AND SEALED BY THE STEEL
FABRICATORS CONNECTIONS ENGINEER.
9. ALL THREADED RODS OR BOLTS INDICATED TO BE DRILLED AND EPOXIED
SHALL UTILIZE HILTI HIT-HY200 ADHESIVE OR APPROVED EQUAL.
L4X4X3/8 ANGLE INSTALL
SNUG TIGHT TO UNDERSIDE OF
COMPOSITE DECKING. COORDINATE
LOCATIONS, QUANTITY, AND NUMBER
OF FASTENERS WITH EQUIPMENT
MANUFACTURER. ANGLES TO BE 2'-0" MIN.
LENGTH. WHERE ANGLES ARE INSTALLED AT
AN ANGLE TO DECK SPAN, EXTEND ANGLES SO
THEY CONTACT A MINIMUM OF 3 DECK FLUTES.
MOUNTING PLATES PER MANUFACTURER
SIZE AND QUANTITY OF ANCHORS PER
MANUFACTURER
INSTALL DOUBLE NUTS WHERE ANCHOR
ALIGNS WITH A DECK UPPER FLUTE
WHERE ANCHOR ALIGNS WITH
DECK UPPER FLUTE
WHERE ANCHOR ALIGNS WITH
DECK LOWER FLUTE
DRAWING TITLE:REVISED BY:DATE:DESCRIPTION:REVISION:PROJECT TITLE: DATE:
SCALE:
DRAWN BY:
PROJECT NUMBER:
DRAWING NUMBER:
SILVER PETRUCELLI + ASSOCIATES
203 230 9007
3190 WHITNEY AVENUE HAMDEN CT 06518
silverpetrucelli.com
311 STATE STREET NEW LONDON CT 06320
PROJECT SUBMISSION:
STATE PROJECT NUMBER:
CAMERA REPLACEMENT AT
UCONN NUC MED
263 FARMINGTON AVE
FARMINGTON, CT
100% CONSTRUCTION DOCUMENTS
25.110
02/20/2026
KEY PLAN
AREA
AA
ACADEMIC ENTRANCE
AREA A
PROJECT
LOCATION
AREA B
AREA E
AREA C
MAIN ENTRANCE
AREA H
HOSPITAL ENTRANCE
AREA T
AREA F
AREA L
WEST
DOCK
As indicated
/1
/2
:5 :4
P
MS100
FLOOR FRAMING PLANS, NOTES,
AND SECTIONS
JS
1/4" = 1'-0" REFERENCE DWG: 2 / S1001 PARTIAL FLOOR FRAMING PLAN
3/4" = 1'-0" REFERENCE DWG: 1 / S1002 SECTION
1 1/2" = 1'-0"3 ANCHORAGE AT SLAB ON DECK
ABBREVIATIONS (NOT ALL ARE USED)
1. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS & DIMENSIONS PRIOR TO FABRICATION, FURNISHING AND INSTALLATION OF ANY
MATERIALS, EQUIPMENT AND WORK.
2. ALL MATERIALS & EQUIPMENT SHOWN ARE NEW TO BE PROVIDED BY CONTRACTOR(S) UNLESS OTHERWISE NOTED.
3. ALL EXISTING UTILITIES & EQUIPMENT LOCATIONS ARE APPROXIMATE - CONTRACTOR(S) SHALL FIELD VERIFY AND/OR COORDINATE EXACT
LOCATIONS.
4. CONTRACTOR ASSUMES ALL RESPONSIBILITY DURING CONSTRUCTION TO PROTECT MATERIALS AND EQUIPMENT. ANY & ALL DAMAGED ITEMS & EQUIPMENT DURING CONSTRUCTION SHALL BE REPLACED AT NO ADDITIONAL COST TO THE OWNER.
5. ALL HANDICAP ACCESSIBLE DOOR HARDWARE SHALL BE PROVIDED TO COMPLY WITH ADA, ANSI AND ALL OTHER APPLICABLE CODES.
6. IF A NOTE IS FOUND ON ARCHITECTURAL DRAWINGS READING - "SEE STRUCTURAL DRAWINGS" - AND SIZE AND DETAILING OF MEMBER(S) IS NOT FOUND, THE CONTRACTOR SHALL CONTACT THE ARCHITECT TO REQUEST MISSING INFORMATION. THESE ITEMS SHALL BE PART OF THE BASE BID AND STEEL SUBCONTRACTOR SHALL REVIEW STRUCTURAL AS WELL AS ARCHITECTURAL DRAWINGS PRIOR TO BIDDING.
7. ALL CONTRACTORS SHALL REVIEW DRAWINGS AND PROJECT MANUAL. IF THERE IS A DISCREPANCY BETWEEN THE TWO OR ANY OTHER PARTS OF THE DOCUMENTS, THE HIGHER VALUE (IN DOLLARS) SHALL PREVAIL AS THE SCOPE OF WORK THAT WILL BE PRICED UNLESS OTHERWISE
DIRECTED IN WRITING BY THE ARCHITECT DURING THE BIDDING PERIOD.
8. PATCH ALL EXISTING WALLS AND OTHER SURFACES AFFECTED BY DEMOLITION & REMOVALS WITH MATERIALS TO MATCH EXISTING.
9. SAW CUT AND REMOVE PORTIONS OF CONCRETE SLAB AS REQUIRED TO ACCOMMODATE NEW PLUMBING, ELECTRICAL, MECHANICAL AND OTHER TRADES WORK. COORDINATE LOCATION, WIDTH, AND DEPTH OF TRENCHING WITH M.E.P. DRAWINGS FOR SCOPE OF NEW WORK
REQUIRED.
10. WALL OPENINGS RESULTING FROM REMOVAL OF DUCTS, PIPES, CONDUITS, ETC. SHALL BE INFILLED WITH MATERIALS TO MATCH THE WALL. SEE
M.E.P. DEMOLITION DRAWINGS FOR REMOVALS.
11. WHERE NEW DUCTS, PIPES, AND CONDUITS PASS THROUGH NEW AND EXISTING WALLS, PROVIDE OPENING, AND HEADER AS REQUIRED AND SEAL THE PERIMETER OF THE PENETRATION FOR SOUND TRANSMISSION RESISTANCE AND FIRE RATING WHERE INDICATED ON CODE PLANS AND OTHER DRAWINGS. COORDINATE WITH M.E.P.FP. DRAWINGS FOR ALL OPENINGS REQUIRED.
A.B. ANCHOR BOLT
ABV. ABOVE
A/C AIR CONDITIONING
A.C.P. ASBESTOS CEMENT PIPE
ACT ACOUSTICAL CEILING TILE
AD. AREA DRAIN
ADJ. ADJUSTABLE
AFF ABOVE FINISH FLOOR
AHU AIR HANDLING UNIT
ALT ALTERNATE
ALUM. ALUMINUM
ANOD ANODIZED
APPROX. APPROXIMATE
ARCH. ARCHITECT(URAL)
ASPH. ASPHALT
AVG. AVERAGE
BC BRICK COURSE
B/C BOTTOM OF CURB
BD. BOARD
B.E.J BRICK (BLOCK) EXPANSION JOINT
B.F. BOTTOM OF FOOTING
BIT. BITUMINOUS
BLDG. BUILDING
BLK. BLOCK
BLKG. BLOCKING
BM BEAM
B.M. BENCH MARK
B.O. BOTTOM OF
BRG. BEARING
BRK. BRICK
B.S. BOTH SIDES
BSMT. BASEMENT
B.U.R. BUILT UP ROOFING
B/W BOTTOM OF WALL
B.W.R. BOTH WAYS WALL
CAB CABINET
C.B. CATCH BASIN
C. BD. CHALK BOARD
C.B.R. CATCH BASIN TO BE REMOVED
C.C. CURB CUT
CEM CEMENT
CER CERAMIC
C.F.M.F. COLD FORMED METAL FRAMING
CG CORNER GUARD
C.H. CABINET HEATER
CHKBD CHALKBOARD
C.I. CAST IRON
C.I.P. CAST IN-PLACE CONCRETE
C.J. CONTROL/CONSTRUCTION JOINT
CLG. CEILING
CLG. HT. CEILING HEIGHT
CLOS. CLOSET
CLR CLEAR
CLRM CLASSROOM
CMU CONCRETE MASONRY UNIT
CNTR COUNTER
C.O. CLEAN OUT
COL COLUMN
CONC. CONCRETE
CONF. CONFERENCE
CONN CONNECTION
CONSTR. CONSTRUCTION
CONT. CONTINUOUS, CONTINUE
CONTR. CONTRACTOR
CORR. CORRIDOR
CP CONTROL PANEL
CPT CARPET
C.R. CEILING REGISTER
CT CERAMIC TILE
CT CONNECTICUT
CTR CENTER
C.U.H. CABINET UNIT HEATER
C.Y. CUBIC YARD
DBL DOUBLE
DEPT CEPARTMENT
DET. DETAIL
DF DRINKING FOUNTAIN
DIA. DIAMETER
DIFF DIFFUSER
DIM. DIMENSION(S)
DISP DISPENSER
DIV DIVISION
D.L. DEAD LOAD
DN DOWN
D.O. DOOR OPENING
DP DAMP PROOFING
DR. DOOR
HM HOLLOW METAL
HORIZ. HORIZONTAL, HORIZONTALLY
H.P. HIGH POINT
HR. HOUR
HTG HEATING
H.U. HEATING UNIT
HVAC HEATING / VENTILATION / AIR
CONDITIONING
HWD HARDWOOD
HYD. HYDRANT
ID INTERIOR DESIGN
I.D. INSIDE DIAMETER
IN. INCH
INCL. INCLUDE OR INCLUDING
INSUL. INSULATION, INSULATED
INT. INTERIOR
INV. INVERT
JAN. JANITOR
JNT/JT JOINT
JST JOIST
K.D. KOCK DOWN
KIT KITCHEN
K.P. KICK PLATE
LAM. LAMINATE(D)
LAV LAVATORY
LBS POUNDS
LCKR LOCKER
L.F. LINEAR FOOT
LG. LONG
L.L. LIVE LOAD
LOC. LOCATION
L.P. LOW POINT
LTG. LIGHTING
LVL. LEVEL
LVT LUXURY VINYL TILE
M MINUTE
MAS. MASONRY
MATL MATERIAL
MAX. MAXIMUM
M.C. MASONRY COURSE
MECH. MECHANICAL
M.H. MANHOLE
MIN. MINIMUM
MIR MIRROR
MISC. MISCELLANEOUS
M.O. MASONRY OPENING
MTD. MOUNTED
MTL. METAL
MULL MULLION
N NORTH
N.A. NOT APPLICABLE
NH NEW HAMPSHIRE
N.I.C. NOT IN CONTRACT
NJ NEW JERSEY
NO. NUMBER
NOM. NOMINAL
N.P.S. NOMINAL PIPE SIZE
N.R.C. NOISE REDUCTION COEFFICIENT
N.S. NEAR SIDE
N.T.S. NOT TO SCALE
NY NEW YORK
NYC NEW YORK CITY
O/A OUTSIDE AIR
O.C. ON CENTER
O.C.C. OCCUPANT
O.D. OUTSIDE DIAMETER
OFF OFFICE
O.H. OPPOSITE HAND
OPNG. OPENING
OPP OPPOSITE
O.W.S.J. OPEN WEB STEEL JOIST
OZ OUNCE
PA PENNSYLVANIA
PART PARTITION
P.C.B. PAINTED CONCRETE BLOCK
P.G.B. PAINTED GYPSUM BOARD
PL. OR PLAM PLASTIC LAMINATE
PLUMB. PLUMBING
PLYWD. PLYWOOD
PREFAB PREFABRICATED
PREP. PREPARATION
PROJ PROJECTION
DS DOWNSPOUT
D.S.P. DRY STAND PIPE
DTL. DETAIL
DWG, DWGS DRAWING(S)
DWL DOWEL
E EAST
EA. EACH
ECTR. EXISTING CEILING-TO-REMAIN
ED. EDUCATION
E.F. EACH FACE
EIFS EXTERIOR INSULATION & FINISH SYSTEM
E.J. EXPANSION JOINT
E.J.C. EXPENSION JOINT COVER
EL. ELEVATION
ELEC. ELECTRICAL
ELEV. ELEVATION
EMER. EMERGENCY
ENCL. ENCLOSURE
ENGR ENGINEER
ENL. ENLARGED
ENT. ENTRANCE
EP. EPOXY PAINT
EQ. / = EQUAL(S)
EQUIP EQUIPMENT
ES. EXPOSED STRUCTURE
E.T.R. EXISTING-TO-REMAIN
E.W. EACH WAY
E.W.C. ELECTRIC WATER COOLER
E.W./E.F. EACH WAY/EACH FACE
EXAM. EXAMINATION
EXH EXHAUST
EXIST. EXISTING
EXP. EXPANSION
EXPO EXPOSED
EXT. EXTERIOR
F.A. FIRE ALARM
F.A.P. FIRE ALARM PANEL
F.B. FOOTING BREAK
F.BRK FACE BRICK
FD FLOOR DRAIN
FDN. FOUNDATION
F.E. FIRE EXTINGUISHER
F.E.C. FIRE EXTINGUISHER & CABINET
F.F. FINISHED FLOOR
F.H. FIRE HYDRANT
F.H.P. FULL HEIGHT PARTITION
FFE, FF&E FURNITURE, FIXTURES, AND EQUIPMENT
FIN. FINISH, FINISHED
FIXT. FIXTURE
FL. FLOOR
FLASH FLASHING
FLEX FLEXIBLE
F.O.F. FACE OF FINISH
F.O.G. FACE OF GYPSUM BOARD
F.O.M. FACE OF MASONRY
F.O.S. FACE OF STUD
F.O.T. FACE OF TILE
F.P. FIRE PROOF / FIRE PROTECTION
FPFG FIREPROOFING
F.R. FIRE RATED
FRP FIBERGLASS REINFORCED PANEL
F.S. FAR SIDE
FT. FOOT OR FEET
F.T. FIRE TREATED
FTG FOOTING
F.T.R. FINNED TUBE RADIATION
FUR FURRING
G GAS
GA. GAGE, GUAGE
GALV. GALVANIZED
G.B. GRAB BAR
G.C. GENERAL CONTRACTOR
GEN. GENERAL
GFB GROUND FACE BLOCK
GL GLASS
GND GROUND
GRD GRADE
GYP. GYPSUM
GWB GYPSUM WALL BOARD
GYP. BD. GYPSUM BOARD
H.B. HOSE BIBB
H.C. HANDICAP(PED)
H.C. HOLLOW CORE
HD. HEADED
HDWR. HARDWARE
HGT. HEIGHT
GENERAL NOTES
V.B. VINYL BASE
VCT VINYL COMPOSITE TILE
VERT. VERTICAL
VIF VERIFY IN FIELD
VT VERMONT
W WEST
W. WATER
W/ WITH
MA MASSACHUSETTS
WB WHITE BOARD
WC WALL COVERING
WCJ WALL CONTROL JOINT
WD. WOOD
WF. WIDE FLANGE
WIN. WINDOW
W/O WITHOUT
WOM WALK-OFF-MAT
WP WATERPROOFING
WS WOOD STAIN
W.W.F WELDED WIRE FABRIC
W.W.M. WELDED WIRE MESH
& AND
∠ ∡ ANGLE
@ AT
℄ CENTERLINE
= EQUAL(S)
⌀ DIAMETER
DRAWING NUMBER
CX
DETAIL NUMBER
CONSTRUCTION NOTE
ROOM NUMBER
DX DEMOLITION NOTE
ROOM NAMEROOM NAME
ROOM IDENTIFICATION
CEILING PLAN
ROOM IDENTIFICATION
ROOM NAME
CEILING FINISH
FINISH FLOOR PLAN
ROOM IDENTIFICATION
ROOM NAME
SQ FT
ROOM NUMBER
GRAPHIC SYMBOLS
X
AXXX
REVISION CLOUD & MARK
WALL / PARTITION TYPE
x x
COLUMNS (EXISTING)
DETAIL CALL OUT
"XX" DRAWING NUMBER
"#" INTERIOR ELEVATION
DRAWING NUMBER
WALL SECTION
X
AXXX
AXXX#
X
X
AXXX
NORTH ARROW
XX
BRICK
CONCRETE
CONCRETE MASONRY UNIT (CMU)
RIGID BOARD INSULATION
INSULATION (BATT)
GYPSUM BOARD
PLYWOOD
ACOUSTICAL TILE OR PANEL
WOOD TRIM/FINISH
EXISTING DOOR
NEW DOOR
EXISTING DOOR TO BE REMOVED
MATERIAL CONVENTIONS
DOOR INDICATIONS
METAL FRAMINGNEW WALL
EXISTING WALL TO BE REMOVED
TYPICAL WINDOW
EXISTING WALL
RECESSED ITEM
WALL INDICATIONS
PROP PROPERTY
P.T., PR. TR. PRESSURE TREATED
PTD PAINTED
P.V.C. POLYVINYL CHLORIDE
QT QUARRY TILE
R. RISER
R OR RAD. RADIUS
RB RESILIENT BASE
RCP REFLECTED CEILING PLAN
R.D. ROOF DRAIN
RECPT RECEPTACLE
REF REFERENCE
REFG REFRIGERATOR
REINF. REINFORCEMENT
REQ'D REQUIRED
RES RESILIENT
RET RETAINING
REV REVISION
R.H. ROOF HATCH
RI RHODE ISLAND
R.L. ROOF LEADER
RM. ROOM
R.O. ROUGH OPENING
R.O.W. RIGHT OF WAY
R.T. RUBBER TILE
RV ROOF VENT
R.W.L. RAIN WATER LEADER
S SOUTH
S. STORM
SAN. SANITARY
SB SMART BOARD
SC SEALED CONCRETE
S.C. SOLID CORE
SCHED. SCHEDULE
S.D. SOAP DISPENSER
SECT. SECTION
SF SQUARE FEET
S.FPRG. SPRAYED-ON FIREPROOFING
S.G.F.T. STRUCTURAL GLAZED FACING TILE
SHR SHOWER
SIM. SIMILAR
SK SKETCH
S.N.D. SANITARY NAPKIN DISPENSER
S.N.R. SANITARY NAPKIN RECEPTACLE
S.O.G. SLAB-ON-GRADE
SPEC. SPECIFICATIONS
SPKLR SPRINKLER
S.P.R. SINGLE PLY ROOF
SQ. SQUARE
SQ. FT. SQUARE FEET
SS SOLID SURFACE
SSTL STAINLESS STEEL
STA STATION
STD STANDARD
STIFF STIFFENERS
STL. STEEL
STRUCT. STRUCTURAL
SUSP. SUSPENDED, SUSPENSION
S.W. SHEAR WALL
S.W.F. SHEAR WALL FOOTING
SYM SYMMETRICAL
SYS.,SYST. SYSTEM
T. TELEPHONE
TB TACKBOARD
T&B TOP & BOTTOM
TBD TO BE DETERMINED
TECH. TECHNOLOGY
TEMP TEMPERED
TERR TERRAZZO
TEL TELEPHONE
THK THICK
THRES THRESHOLD
T.O. TOP OF
T.O.F. TOP OF FOUNDATION
T.O.S. TOP OF STEEL
T.P. TOILET PARTITION
T.P.D. TOILET PAPER DISPENSER
T/S TOP OF SLAB
T.T.F. TRIM TO FIT
T/W TOP OF WALL
TYP. TYPICAL
UL UNDERWRITERS LABORATORIES
UNO UNLESS NOTED OTHERWISE
UON UNLESS OTHERWISE NOTED
Room name
RB-1
PT-1
CPT-1
ROOM NUMBER
WALL FINISH
BASE FINISH
FLOOR FINISH
9' - 0"
ACT-1
OFFICE
CEILING HEIGHT
DOUBLE LEAF DOOR
DOUBLE ACTING DOOR
SLIDING DOOR
EX EQUIPMENT SYMBOL
XXX DOOR NUMBER
MAX
10"
UNOBSTRUCTED
SIDE REACH
(308.3.1)
MAX
10"
OBSTRUCTED
HIGH SIDE REACH
(308.3.2)
>10" - 24"
OBSTRUCTED
HIGH SIDE REACH
(308.3.2)
UNOBSTRUCTED
FORWARD REACH
(308.2.1)
20" MAX
OBSTRUCTED HIGH
FORWARD REACH
(308.2.2)
>20" - 25"
OBSTRUCTED
FORWARD REACH
(308.2.2)
* 12" MIN. IF BOTH LATCH & CLOSER ARE PROVIDED
** 48" MIN. IF BOTH LATCH & CLOSER ARE PROVIDED
FRONT APPROACH,
PULL SIDE
(404.2.3.2)
FRONT APPROACH,
PUSH SIDE
HINGE APPROACH ALTERNATE HINGE
APPROACH
* 48" MIN. IF BOTH LATCH & CLOSER
ARE PROVIDED
** 54" MIN. IF CLOSER IS PROVIDED
LATCH APPROACH
22" MIN.
60" MIN. 48" MIN.
42" MIN. 36" MIN. 24" MIN.
22" MIN.
24" MIN.
ICC/ANSI A117.1-2009
ADA AND/OR BARRIER FREE HANDICAPPED
ACCESSIBILITY GUIDELINES
*WHERE BOTH CLOSER &
LATCH ARE PROVIDED
GENERAL NOTE:
ALL DIMENSIONS
SHOWN ARE FINISH
FACE DIMENSIONS.
M A
X
M A
X
M
IN
. 44
M A
X
M A
X
M
IN
M
IN
M A
X
M
IN
M
IN
M
IN
M A
X
M A
X
M
IN
M
IN
M A
X
M
IN
M
IN
ACCESSIBILITY GUIDELINES
TOP BOTTOM
VERTICAL SECTION
HORIZONTAL SECTION
1/
4"
3 5/8" METAL STUD WALL
W/ GYPSUM BOARD, ONE SIDE W/
SOUND BATT
1. 3 5/8" METAL STUDS @ 16" O.C.
2. 5/8" GYPSUM WALL BOARD, PAINTED
3. 3" SOUND ATTENUATION BATT
4. --
5. PUTTY PAD AROUND WALL PENETRATIONS
UL # - N/A
STC RATING - 35
1 2 3
TOP BOTTOM
VERTICAL SECTION
HORIZONTAL SECTION
7/
8"
INFILL 3 5/8" METAL STUD WALL
W/ SOUND BATT
1. 3 5/8" METAL STUDS @ 16" O.C.
2. 5/8" GYPSUM WALL BOARD, PAINTED
3. 3" SOUND ATTENUATION BATT
4. EXISTING METAL STUD WALL CONSTRUCTION
5. PUTTY PAD AROUND WALL PENETRATIONS
UL #U404 OR SIMILAR
STC RATING - 44
1 2 3
TOP BOTTOM
VERTICAL SECTION
HORIZONTAL SECTION
7/
8"
3 5/8" METAL STUD WALL
W/ SOUND BATT
1. 3 5/8" METAL STUDS @ 16" O.C.
2. 5/8" GYPSUM WALL BOARD, PAINTED
3. 3" SOUND ATTENUATION BATT
4. --
5. PUTTY PAD AROUND WALL PENETRATIONS
UL #U404 OR SIMILAR
STC RATING - 44
1 2 3
6"
FINISH CEILING
SYSTEM - SEE
RCP
A
LI
G N
INTERIOR PARTITION TYPES
TOP BOTTOM
VERTICAL SECTION
HORIZONTAL SECTION
EXISTING 3 5/8" METAL STUD WALL
W/ THERMAFIBER SAFB
1. 3 5/8" METAL STUDS (20 GA.) @ 16" O.C.
2. 5/8" FIRE CODE GYPSUM WALL BOARD, PAINTED
3. 3" THERMAFIBER SAFB INSULATION
4. --
5. PUTTY PAD AROUND WALL PENETRATIONS
UL #U404 OR SIMILAR
STC RATING - 44
EX-A
1 2 3
DRAWING TITLE:REVISED BY:DATE:DESCRIPTION:REVISION:PROJECT TITLE: DATE:
SCALE:
DRAWN BY:
PROJECT NUMBER:
DRAWING NUMBER:
SILVER PETRUCELLI + ASSOCIATES
203 230 9007
3190 WHITNEY AVENUE HAMDEN CT 06518
silverpetrucelli.com
311 STATE STREET NEW LONDON CT 06320
PROJECT SUBMISSION:
STATE PROJECT NUMBER:
CAMERA REPLACEMENT AT
UCONN NUC MED
263 FARMINGTON AVE
FARMINGTON, CT
100% CONSTRUCTION DOCUMENTS
25.110
02/20/2026
As indicated
2/
/2
4:
:2
P
MA001
GENERAL INFORMATION SHEET
M. JAEKLE
1. READ ALL GENERAL NOTES ON DRAWING A001.
2. COORDINATE THIS DRAWING WITH OTHER DEMOLITION DRAWINGS AND PROJECT NOTES.
3. THE UCHC REPRESENTATIVE SHALL RESERVE THE RIGHT TO HAVE ANY ITEM SCHEDULED FOR REMOVAL
TURNED OVER TO THE AGENCY. THE CONTRACTOR SHALL REVIEW THESE ITEMS WITH THE UCHC
REPRESENTATIVE PRIOR TO THE COMMENCEMENT OF THE WORK
4. PROPERLY DISPOSE OF ALL ITEMS IDENTIFIED IN DEMOLITION NOTES BELOW, UNLESS OTHERWISE NOTED AS
"SALVAGE".
5. DEMOLITION TAGS WITHOUT LEADERS AND LOCATED BENEATH EXISTING ROOM NAMES SHALL APPLY IN
ENTIRETY TO THE ROOM IN WHICH THEY ARE LOCATED.
6. COORDINATE ARCHITECTURAL DEMOLITION WORK WITH ALL OTHER TRADES, INCLUDING HAZARDOUS MATERIAL
ABATEMENT DRAWINGS.
7. WHERE INCONSISTENCIES OCCUR, NOTIFY THE DESIGN TEAM AND ASSUME THE GREATER VALUE FOR BIDDING
PURPOSES.
8. CONTRACTORS SHALL FIELD VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS.
9. SAW CUT AND REMOVE CONCRETE SLAB & SUB-BASE AT ALL AREAS AS NECESSARY TO ALLOW FOR NEW
UNDERSLAB PIPING, CONDUIT, RADON PITS & UTILITIES. COORDINATE w/ M/E/P/S/FP DRAWINGS
10. ITEMS IDENTIFIED WITH DASHED LINES, AS SHOWN BELOW, BUT WITHOUT TAGS SHALL BE ASSUMED AS ITEMS
TO BE DEMOLISHED.
11. PROVIDE NEW OPENINGS IN EXISTING WALLS AS NECESSARY FOR ALL NEW PENETRATIONS BY DUCT, PIPE, CONDUIT, ETC. REFER TO STRUCTURAL LINTEL SCHEDULE FOR HEADER SIZES.
TYPICAL DEMOLITION DESIGNATION
DEMOLITION GENERAL NOTES
D
A
STRESS
FM046
PROCEDURE
FM047
PROCEDURE
FM048
CORRIDOR
FM073
PROCEDURE
FM045
D04
D05
D08
D09
D10
D11
D12
D02 D13
D07
D07
D07
D07
D07
D07
D07 D07
D08
D10
D12
D12
D12
D06
3' -2
/8
D13
D01
D09
D14 D14
A
PROCEDURE
FM045
STRESS
FM046
PROCEDURE
FM047
PROCEDURE
FM048
CORRIDOR
FM073
REFERENCE FROM
FORMER DEMO WALL
1' -0
1'-1 1/2" +/-
'-0
2'
-5
/4
6" 12'-0"
A
PROCEDURE
FM045
STRESS
FM046
PROCEDURE
FM047
PROCEDURE
FM048
CORRIDOR
FM073
A3003
A300
A300 6
A300 7
A3005
5'-9 5/8" 6"6'-11"
3' -5
2' -4
'-6
C01
C02
C03
C04
C05
C07
C08
C10
C11
C12
C13
C02
C01
C03
C03
C04
C05
C08
C10
A3009
C05
C05
C06
'-2
14'-5 1/2"
A310
13'-10"
A
PROCEDURE
FM045
STRESS
FM046
PROCEDURE
FM047
PROCEDURE
FM048
CORRIDOR
FM073
E1
E2
E3
E4
E5
E6
E7
E8 E9
E10
E17
E18
E11
E12
E13
E14
E15
E16
'-6
M
IN
. C
LE
A R
3' -0
MIN. CLEAR
3'-0"
M
IN
. C
LE
A R
3' -0
DASHED LINE INDICATES
AREA TO BE FREE OF
ANY OBSTRUCTION FOR
THE PRESENT OR
FUTURE COLLIMATOR
CART TRAVEL PATH
1. AFTER REMOVAL OF FLOORING AND ALL RESIDUAL ADHESIVE, VERIFY THAT THE SUBSTRATE IN THE AREA IDENTIFIED IS FLAT AND LEVEL. PROVIDE FIELD PLAN (EXISTING CONDITIONS) FOR ARCHITECT AND
EQUIPMENT MANUFACTURER'S REVIEW
2. WITHIN THE FIELD, VERIFY THAT THE LEVELNESS FROM EDGE TO EDGE IN BOTH DIRECTIONS FROM EACH CORNER DOES NOT EXCEED 1/8" IN 10'-0" OF RUN. FILL AREA AS REQUIRED TO CONFORM WITH ARDEX-SD-
F CEMENT BASED FINISHING UNDERLAYMENT
3. INCREMENTALLY (24" O/C IN EACH DIRECTION) MEASURE FOR FLOOR FLATNESS. AREAS OF ELEVATED SURFACES (HIGH) SHALL BE GROUND DOWN AND AREAS WITH DEPRESSED SURFACES SHALL BE FILLED WITH ARDEX-SD-F CEMENT BASED FINISHING UNDERLAYMENT TO PROVIDE A FLAT AND LEVEL SURFACE
OVER THE 12'-0" X 14'-0" AREA
FLOOR LEVELNESS NOTES X
SIEMENS EVO CAMERA EQUIPMENT LEGEND
ITEM DESCRIPTION
MAX HEAT
OUTPUT
(btu)
WEIGHT
(lbs)
E1
E2
E3
E4
E5
DIMENSIONS (INCHES)
SYMBIA EVO GANTRY WITH
COLLIMATORS
FRONT PHS
AUTOMATIC COLLIMATOR
CHANGER-ACC WITH AQC -
PRODUCTIVITY PACKAGE
PHS CABLE ON THE FLOOR
STANDARD
PHS STANDARD PIVOT
E6
E7
REAR PHS WITH SNAC
PATIENT BOOM SWING ARM
E8
E9
COLLIMATOR CART (EMPTY)
(OPTION)
UPS FOR SPECT (OPTION)
E10
E11
TVSS SURGE PROTECTION UPS
FOR SPECT (OPTION)
SYMBIA EVO SYNGO
ACQUISITION WORKPLACE CPU
E12
E13
E14
UPS FOR E.SOFT / C.CAM (OPTION)
TVSS FOR UPS FOR
E.SOFT / C.CAM (OPTION)
E15
DEDICATED RECONSTRUCTION
SYSTEM WORKPLACE
E16 DVD (OPTION)
E17
E18
SYMBIA.NET WORKPLACE CPU
(OPTION)
SYMBIA.NET WORKPLACE
KEYBOARD AND MONITOR (OPTION)
W D
SYMBIA EVO SYNGO ACQUISITION
WORKPLACE MONITOR
5,123 6,114 89 83 89
H
- 1,966 27 97 1/2 23 3/16
- 658 33 24 1/2 24 1/2
- 331 - - -
- 400 47 1/2 32 5/8 39 7/8
1,024 124 10 28 3/8 17 7/8
- 11 8 6 10
2,732 55 8 20 3/4 17 3/4
* 31 20 1/4 19 1/2 21
148 45 6 13/16 13 3/16 10 3/16
- 11 2 3/4 2 3/4 4 1/2
3,757 55 8 21 18
1,434 51 8 21 17 1/2
* 55 17 5/8 18 5/16 17
EX
REMARKS
3,415 BTU ON STANDBY. WORST CASE
WEIGHT 6,114 LBS. WITH 1 SET HIGH
ENERGY COLLIMATORS 275 LBS. EACH
MAXIMUM HEIGHT 41"
WEIGHT CALCULATED WITH 1 SET
LOW AND MEDIUM ENERGY
COLLIMATORS.
41" CABLE EXPOSED ON THE FLOOR
STANDARD PIVOT - 33 DEGREES
ON FLOOR
NOTE INDIVIDUAL COLLIMATORS
ADD 80 LBS - 275 LBS. PER
COLLIMATOR TO CART WEIGHT.
ON TOP OF UPS FOR SPECT
OFF FLOOR
*BTU'S INCL. W/ ACS CPU
ON FLOOR
ON TOP OF UPS FOR E.SOFT / C.CAM
OFF FLOOR
ON CUSTOMER'S COUNTER
OFF FLOOR
*BTU'S INCL. W/ ACS CPU
ON FLOOR
SYMBOL LEGEND
- NEW METAL STUD PARTITIONS
- ROOM NUMBER
- PARTITION TYPE
- CONSTRUCTION NOTE
1A
- ROOM NAME
- WALL SECTION NUMBER
- SHEET NUMBER
- INTERIOR ELEVATION NUMBER
- SHEET NUMBER
CO#
A101
A420
ROOM NAME
- EXISTING WALL
- EXISTING WALL / MATERIALS TO
BE REMOVED
1. READ ALL GENERAL NOTES ON DRAWING A001.
2. COORDINATE THIS DRAWING WITH OTHER PROJECT DRAWINGS AND PROJECT NOTES.
3. INTERIOR PARTITION DIMENSIONS ARE FROM OUTSIDE FACE OF GWB.
4. CONTRACTORS SHALL FIELD VERIFY ALL CONDITIONS AND DIMENSIONS.
5. THE EXISTING CORRIDOR WALL IS A 0-HR SMOKE PARTITION. ALL NEW PENETRATIONS SHALL BE SMOKE SEALED, EXISTING PENETRATIONS (THROUGH THIS WALL, WITHIN THE PROJECT AREA) SHALL BE SMOKE SEALED.
6. PATCH TO MATCH ALL EXISTING WALLS, CEILINGS, AND SURFACES TO REMAIN THAT ARE AFFECTED BY THE NEW
WORK.
7. AT INTERSECTION OF DEMOLISHED WALLS FROM EXISTING WALLS TO REMAIN AND ITEMS REMOVED, THE
CONTRACTOR SHALL PATCH AREAS TO MATCH EXISTING AND MAKE READY TO RECEIVE NEW PAINT.
8. FLOOR PENETRATION FILL: IN AREAS OF REMOVAL OF FLOOR PENETRATING ITEMS, FASTEN 18 GA. METAL FORM
TO UNDERSIDE OF HOLE, FILL HOLE WITH NON-SHRINK GROUT FOR FULL THICKNESS OF FLOOR SLAB. FINISH TO
BE FLUSH WITH ADJACENT FLOOR SURFACE
9. THE CONTRACTOR SHALL PROVIDE AND INSTALL ALL ITEMS UNLESS NOTED OTHERWISE.
10. ATTACHMENT BLOCK: THE CONTRACTOR SHALL PROVIDE AND INSTALL ALL NECESSARY ATTACHMENT BLOCKING
FOR SUPPORT OF ALL ITEMS PRIOR TO THE INSTALLATION OF ALL FINISH (WALL/CEILING) MATERIALS. FAILURE TO DO SO SHALL RESULT IN THE CONTRACTOR HAVING TO OPEN THE AREA AND SUBSEQUENTLY INSTALLING ALL REQUIRED ANCHORAGE SUPPORTS NECESSARY FOR THE COMPLETE INSTALLATION OF SAID ACCESSORY DEVICE, AND REINSTALLATION OF THE APPLIED FINISH MATERIALS.
11. ALL NEW WALL AND PARTITION ASSEMBLIES SHALL EXTEND TO UNDERSIDE OF DECK UNLESS OTHERWISE NOTED.
12. SEE ALSO M. E. P. FP. DRAWINGS TO COORDINATE ALL REQUIRED TRENCHING AT CONCRETE SLABS. SAW CUT
SLAB TO THE REQUIRED EXTENT, INSTALL UTILITIES, INFILL SLAB FLUSH WITH ADJACENT. SEE ALSO OTHER DETAILS IN THE DRAWINGS AS APPLICABLE. COORDINATE NEW OPENINGS REQUIRED IN EXISTING WALLS TO
ACCOMMODATE NEW DUCTS, PIPES, AND CONDUITS.
CONSTRUCTION GENERAL NOTES
THIS PLAN IS PROVIDED FOR REFERENCE ONLY. REFER TO MANUFACTURERS INSTALLATION DRAWINGS FOR
COORDINATION OF EQUIPMENT.
CLASS 1 IMAGING ROOM REQUIRES A 3-FOOT CLEARANCE AROUND ALL CIRCULATION SIDES OF A FREESTANDING IMAGING DEVICE, INCLUDING THE PATIENT IMAGING TABLE, BED/COUCH, GANTRY, OR
ASSEMBLY.
EQUIPMENT GENERAL NOTES
FINISHED ROOM HEIGHT: MINIMUM CEILING HEIGHT 8'-0"
ENVIRONMENTAL REQUIREMENTS:
PLEASE SEE EQUIPMENT LEGEND TO GET SPECIFIC COMPONENT
HEAT DISSIPATION.
COMBINED CONTROL AND SCANNER ROOM:
THE COMBINED ROOM AREA SHOULD MAINTAIN BETWEEN 65°F-86°F
(± 8°F/HR.) WITH A RELATIVE HUMIDITY OF 20-80%, NON-
CONDENSING.
VENTILATION AND AIR FILTERS:
FOR EXTERNAL AIR SUPPLY (FRESH AIR) IT IS RECOMMENDED THAT
COURSE FILTERS OF THE CLASS EU3 TO EU4 BE USED ON-SITE TO
FILTER OUT DUST PARTICLES > 10µm.
POWER REQUIREMENTS: SEE E DWGS FOR MORE INFORMATION
ITEM 1 (R) - 208 VAC SINGLE PHASE; 30 AMPS. DEDICATED OUTLET
FOR SYMBIA EVO SYSTEM. INSTALL A TWIST-LOCK NEMA L6-30 R
RECEPTACLE TO RECEIVE L6-30P PLUG FOR INSTALLATION OF THE
SIEMENS GANTRY POWER CABLES. LOCATED 12" ABOVE FINISHED
FLOOR.
ITEM 2 (R1) - 100 VAC TO 120 VAC SINGLE PHASE; 20 AMPS.
DEDICATED DOUBLE DUPLEX OUTLET FOR COMPUTERS
NOTE: THE SPECT UPS (OPTION) IS RATED FOR 200-240 VAC INPUT
VOLTAGE. THE SPECT UPS AUTO-CONFIGS OUT TO THE SPECT
SYSTEM AT 208 VAC.
* POWER SUPPLIED FOR SIEMENS MEDICAL SOLUTIONS EQUIPMENT
SHALL BE DEDICATED SERVICES KEPT ENTIRELY FREE AND
INDEPENDENT OF ALL OTHER BUILDING WIRING AND EQUIPMENT
SUCH AS: ELEVATORS, GENERATORS, PUMPS, HVAC SYSTEMS, ETC.
FLOOR REQUIREMENTS: SEE S DWGS FOR MORE INFORMATION
1) THE MINIMUM ALLOWABLE CONCRETE THICKNESS FOR
NONSEISMIC REGIONS OF THE SCANNER ROOM FLOOR IS 6".
2) FLOOR LEVELNESS REFER TO THE FLOOR LEVELNESS CHECK
3) EXISTING MOUNTING FRAME ATTACHED TO THE CONCRETE
FLOOR WITH SCREWS, HAVE TO BE REMOVED. REWORK THE FLOOR
(WITH THE RESPECT TO BEING LEVEL, MATERIAL), IF REQUIRED.
4) THE BASE FRAME PLATE-FOOT ARE MOUNTED TO THE FLOOR
USING (4) 3/4" X 8" ANCHORS. SEE STRUCTURAL DRAWINGS
5) THE MINIMUM REQUIREMENTS FOR COMPRESSIVE STRENGTH
FOR THE FLOOR COVERING BASED ON SYMBIA COLLIMATOR CART
SHALL BE 375 PSI. THIS IS BASE ON WORSE CASE LOADING WITH 2-
HIGH ENERGY AND 2-MEDIUM ENERGY COLLIMATORS PLACED ON
THE COLLIMATOR CART.
NOISE LEVEL:
SYMBIA EVO SYSTEM NOTES
DECIBEL LEVEL
(APPROX. AT 2'-0"
DISTANCE)
63.2 62.1
SYSTEM COMPONENT
GANTRY
PHS
NOTE: GREY SHADED PLAN REGION INDICATES AREA OUTSIDE
THE PROJECT SCOPE OF WORK. SOME SCOPE CREEP MAY
OCCUR WITH MEPFP DRAWINGS & SHOULD BE COORDINATED -
REFER TO THESE DRAWINGS FOR ADDITIONAL SCOPE OF
WORK AREA
0' 1' 4' 10'
SCALE: 1/4" = 1'-0"
DRAWING TITLE:REVISED BY:DATE:DESCRIPTION:REVISION:PROJECT TITLE: DATE:
SCALE:
DRAWN BY:
PROJECT NUMBER:
DRAWING NUMBER:
SILVER PETRUCELLI + ASSOCIATES
203 230 9007
3190 WHITNEY AVENUE HAMDEN CT 06518
silverpetrucelli.com
311 STATE STREET NEW LONDON CT 06320
PROJECT SUBMISSION:
STATE PROJECT NUMBER:
CAMERA REPLACEMENT AT
UCONN NUC MED
263 FARMINGTON AVE
FARMINGTON, CT
100% CONSTRUCTION DOCUMENTS
25.110
02/20/2026
NORTH
KEY PLAN
AREA
AA
ACADEMIC ENTRANCE
AREA A
PROJECT
LOCATION
AREA B
AREA E
AREA C
MAIN ENTRANCE
AREA H
HOSPITAL ENTRANCE
AREA T
AREA F
AREA L
WEST
DOCK
As indicated
2/
/2
4:
:3
P
MA100
DEMOLITION & CONSTRUCTION
M. JAEKLE
1/4" = 1'-0"2 CONSTRUCTION PLAN
1/4" = 1'-0"1 DEMOLITION PLAN
DEMOLITION KEYNOTES
D01 CAREFULLY REMOVE & RELOCATE EXISTING LAB EQUIPMENT, INCLUDING BED, TREADMILL, LINEN CART, MOBILE
WORKSTATION, CODE CART, ETC.
D02 CAREFULLY REMOVE EXISTING CAMERA & ASSOCIATED EQUIPMENT. REFER TO M/E/P DRAWINGS FOR ADDITIONAL
INFORMATION.
D03 DEMOLISH EXISTING WORKSTATION, COUNTER SUPPORTS AND CABINETS ABOVE. PATCH/REPAIR WALL SURFACE AS
REQUIRED
D04 DEMOLISH EXISTING METAL STUD AND DRYWALL CONSTRUCTION ABOVE CABINETS TO BE DEMOLISHED.
D05 DEMOLISH EXISTING WALL CONSTRUCTION BETWEEN FM046 AND FM047
D06 DEMOLISH EXISTING CORRIDOR WALL CONSTRUCTION, DOOR AND FRAME TO THE EXTENT SHOWN ON PLAN. SAVE
DOOR FRAME AND DOOR FOR REINSTALLATION.
D07 REMOVE EXISTING FLOOR COVERING AND ROLLUP BASE AT PERIMETER OF ROOMS F046 AND FM047.
D08 REMOVE EXISTING WINDOW BLINDS AT EXTERIOR WINDOWS.
D09 REMOVE A PORTION OF EXISTING WALL CONSTRUCTION TO PROVIDE ACCESS FOR CORE BORE AT FLOOR LEVEL.
D10 REMOVE EXISTING WHITEBOARD(S)/TACKBOARD(S). TURN OVER TO THE UCH PROJECT MANAGER FOR DETERMINIATION
OF REUSE.
D11 REMOVE EXISTING WORK SURFACE AND METAL STUD AND DRYWALL ABOVE IN ROOM FM046
D12 REMOVE EXISTING FRP WAINSCOTT & ALL RESIDUAL ADHESIVE IN ROOM FM046
D13 REMOVE EXISTING ROOM SIGNS.
D14 REMOVE EXISTING PAINTINGS ON WALL AND RETURN TO OWNER FOR REINSTALLATION
1/4" = 1'-0"3 FLOOR LEVELNESS CHECK
1/4" = 1'-0"4 EQUIPMENT PLAN
D#
CONSTRUCTION KEYNOTES - PLAN
C01 PATCH / REPAIR WALLS AT ITEMS REMOVED IN FM046 AND FM047. PRIME PAINT AREA(S). PREP FOR FINISH
PAINT.
C02 INSTALL NEW FLOORING WITH ROLL UP BASE IN FM046 AND FM047. SEE FINISH SCHEDULE.
C03 PAINT NEW WALLS (1) PRIME COAT AND (2) FINISH COATS IN FM046, FM047, AND CORRIDOR.
C04 PAINT EXISTING WALLS (1) FINISH COAT IN FM046 AND FM047.
C05 INSTALL NEW WALL PROTECTION RAILS AT COLLIMATOR ALCOVE (WP-1)
C06 INSTALL NEW STAINLESS STEEL SINK AND EXISTING FAUCET. SEE PLUMBING DRAWINGS FOR FIXTURE
INFORMATION
C07 INSTALL NEW STORAGE CABINETRY. REFER TO ELEVATIONS.
C08 INSTALL NEW ROLLER SHADES AT EXTERIOR WINDOWS (WT-1).
C10 MODIFY EXISTING HAND RAILING AT CORRIDOR
C11 REINSTALL RELOCATED DOOR AND FRAME. REMOVE EXISTING DOOR HARDWARE AND INSTALL NEW LOCKSET
C12 PATCH AND REPAIR WALL AT AREA OF INTERCOM REMOVED.
C13 INSTALL NEW BALL IN WALL DEVICE (LOC IN SAME POSITION AS REMOVED UNDER PREVIOUS PROJECT).
C#
STRESS
FM046
PROCEDURE
FM047
PROCEDURE
FM048
PROCEDURE
FM045
CORRIDOR
FM073
ACT-1
9' - 0"
ACT-1
9' - 0"
C01
C03
C04C04
C03
C03
C02
C01
ALIGN
S O
F F
IT
2' -4
E
Q E
Q
EQEQ
E Q
E Q
EQ EQ
A200
A200
A200
A200
A200
A200
A200
A200
A200
A200
A200
A200
A200
GYP-1
7' - 1"
GYP-1
7' - 1"
GYP-1
10' - 9"
GYP-1
10' - 9"
A
DC1
DC2
DC3
DC4
DC1
1'-7 1/2"
DC1
STRESS
FM046
PROCEDURE
FM047
PROCEDURE
FM048
PROCEDURE
FM045
CORRIDOR
FM073
DC2
1. IT IS NOT THE INTENT OF THE CONTRACT DRAWINGS TO SHOW ALL EXISTING CONDITIONS. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS APPLICABLE TO THIS PROJECT, AND SHALL INCLUDE ALL REQUIREMENTS NECESSARY FOR THE COMPLETION OF THE WORK, BASED ON THE EXISTING
CONDITIONS.
2. THE UCHC REPRESENTATIVE SHALL RESERVE THE RIGHT TO HAVE ANY ITEM SCHEDULED FOR REMOVAL
TURNED OVER TO THE AGENCY. THE CONTRACTOR SHALL REVIEW THESE ITEMS WITH THE UCHC
REPRESENTATIVE PRIOR TO THE COMMENCEMENT OF THE WORK
3. THE CONTRACTOR SHALL DISPOSE OF ITEMS DEEMED NOT NEEDED. USED ELECTRONIC PRODUCTS AND FLUORESCENT BULBS MUST BE DISPOSED OF PROPERLY AND MUST NOT ENTER THE NORMAL TRASH
STREAM,
4. IT IS INTENT FOR ITEMS SCHEDULED FOR REMOVAL THAT THE ITEM BE REMOVED IN ITS ENTIRETY UNLESS
NOTED OTHERWISE
5. REMOVAL OF EXISTING CEILING SYSTEMS SHALL INCLUDE: SUPPORTING DEVICES, LIGHT FIXTURES, OCCUPANCY SENSORS, SPRINKLER HEADS, SUPPLY AND RETURN AIR DIFFUSERS. SCOPE OF THE WORK SHALL BE SHOWN ON RESPECTIVE ELECTRICAL, MECHANICAL, AND FIRE SUPPRESSION TRADE DRAWINGS.
6. CONTRACTOR SHALL PROVIDE ADDITIONAL SUPPORT AND RESTRAINT FOR EXISTING PIPING, DUCTWORK
AND EQUIPMENT IN AREAS WHERE CEILINGS ARE REMOVED AS WORK OF THIS PROJECT.
7. SUPPORT AND RESTRAINT OF EXISTING SERVICES SHALL BE IN ACCORDANCE WITH THE REQUIREMENTS OF
SECTION 15140.
TYPICAL DEMOLITION DESIGNATION
REFLECTED CEILING DEMOLITION GENERAL NOTES
1. THE EXISTING FLOOR ASSEMBLY CONSTRUCTION WITH SPRAY FIREPROOFING IS 2-HR RATED. PRIOR TO STEEL ERECTION, THE CONTRACTOR SHALL REMOVE FIREPROOFING MATERIALS ONLY AS NECESSARY TO INSTALL AND ATTACH NEW STEEL REINFORCING MEMBERS. REFER TO STRUCTURAL FOR MORE INFORMATION.
AFTER STEEL ATTACHMENT, SPRAY FIREPROOF ALL UNCOATED STEEL SURFACES, INCLUDING SUPPORTS AND METAL DECKING, WITH NEW FIREPROOFING AS REQUIRED TO ACHIEVE AND MAINTAIN A 2-HR RATING.
2. THROUGH FLOOR CONDUIT PENETRATIONS SHALL BE FIRESTOPPED WITH MATERIALS AND METHODS REQUIRED TO PROVIDE A UL ASSEMBLY OF 2HRS. REFER TO ELECTRICAL DRAWINGS FOR LOCATION AND SIZE
OF PENETRATIONS.
3. THROUGH FLOOR PLUMBING PENETRATIONS SHALL BE FIRESTOPPED WITH MATERIALS AND METHODS REQUIRED TO PROVIDE A UL ASSEMBLY OF 2HRS. REFER TO PLUMBING DRAWINGS FOR LOCATION AND SIZE
OF PENETRATIONS.
ATTACHMENT BLOCK: THE CONTRACTOR SHALL PROVIDE AND INSTALL ALL NECESSARY ATTACHMENT BLOCKING FOR SUPPORT OF ALL ITEMS PRIOR TO THE INSTALLATION OF ALL FINISH (WALL/CEILING) MATERIALS. FAILURE TO DO SO SHALL RESULT IN THE CONTRACTOR HAVING TO OPEN THE AREA AND SUBSEQUENTLY INSTALLING ALL REQUIRED ANCHORAGE SUPPORTS NECESSARY FOR THE COMPLETE INSTALLATION OF SAID ACCESSORY DEVICE, AND REINSTALLATION OF THE APPLIED FINISH MATERIALS.
GROUND FLOOR ABOVE CEILING NOTES X
RCP SYMBOL LEGEND
- ACOUSTICAL CEILING TILES & GRID W/
SUPPORTS
- PAINTED GYPSUM BOARD CEILING
- EXIT SIGN, REFER TO ELECTRICAL DRAWINGS
- RECESSED LIGHT FIXTURES,
REFER TO ELECTRICAL DRAWINGS
- RECESSED LIGHT FIXTURE,
REFER TO ELECTRICAL DRAWINGS
ROOM NUMBER
ROOM NAME
9' - 0"
CEILING FINISH,
REFER TO PROJECT MANUAL
SCHEDULE OF FINISHES
CEILING HEIGHT
ROOM CEILING TAG
SECONDARY CEILING TAG
ACT-1
OFFICE
9' - 0"
ACT-1 CEILING FINISH,
REFER TO PROJECT MANUAL
SCHEDULE OF FINISHES
CEILING HEIGHT
- SUPPLY DIFFUSER,
REFER TO MECHANICAL DRAWINGS
- RETURN DIFFUSER,
REFER TO MECHANICAL DRAWINGS
- CONCEALED SPINKLER HEAD,
REFER TO FIRE PROTECTION DRAWINGS
- EXPOSED SPINKLER HEAD,
REFER TO FIRE PROTECTION DRAWINGS
- CONSTRUCTION NOTE
- PLAN/SECTION/DETAIL NUMBER
- SHEET NUMBER
Cxx
A101
SIM
- PENDANT STYLE LIGHT FIXTURE,
REFER TO ELECTRICAL DRAWINGS
- SURFACE MOUNTED LIGHT FIXTURE,
REFER TO ELECTRICAL DRAWINGS
- LINEAR RECESSED STYLE LIGHT FIXTURE,
REFER TO ELECTRICAL DRAWINGS
NOTE: GREY SHADED PLAN REGION INDICATES AREA OUTSIDE
THE PROJECT SCOPE OF WORK. SOME SCOPE CREEP MAY
OCCUR WITH MEPFP DRAWINGS & SHOULD BE COORDINATED -
REFER TO THESE DRAWINGS FOR ADDITIONAL SCOPE OF
WORK AREA
1. REFER TO PROJECT MANUAL & FINISH LEGEND FOR CEILING FINISHES.
2. COORDINATE THIS DRAWING WITH OTHER PROJECT DRAWINGS AND PROJECT NOTES
3. THE CONTRACTOR SHALL SURVEY THE PROJECT SITE AND MAKE PART OF THE BID ALL NECESSARY ITEMS (CEILING TILES AND GRID REPLACEMENT) SUCH THAT AT THE END OF THE PROJECT THE CEILING AREAS
ARE COMPLETE WITHOUT OPENINGS OR MISSING CEILING COMPONENTS.
REFLECTED CEILING GENERAL NOTES
A B
LINE OF ROOM
FM047 ABOVE
CENTERLINE OF
EQUIPMENT ACCESS
ABOVE
OUTLINE OF
NEW SIEMENS
CAMERA ABOVE
LINE OF CORRIDOR
FM073 ABOVE
OFFICE
FG110
OFFICE
FG108
PATIENT ROOM
FG112
3 TURNS MIN. IN
1 1/2" - TYP.
12 GAUGE
VERTICAL
HANGAR @ 4'-0"
O.C.
CROSS RUNNER
3 TURNS MIN. IN
1 1/2" - TYP.
MAIN RUNNER
12 GAUGE VERTICAL HANGER
@ 4'-0" O.C.
CROSS RUNNER
NOTE:
BRACING TO OCCUR @
4'-0" O.C. - TYP. - ALL ACT LOCATIONS
MAIN RUNNER
45°
45°
45°
45°
HANGERS @ 2'-6" O.C. (MAX)
SECURE TO STRUCTURE ABOVE
ADJACENT WALL CONSTRUCTION - SEE
PLANS AND PARTITION TYPES
FOR ALL NEW CEILINGS SEE
REFLECTED CEILING PLANS
FOR CEILING HEIGHTS
FOR ACT CEILINGS: ACOUSTICAL CEILING TILE
& SUSPENSION SYSTEM
FOR GYP. BD. CEILINGS: DRYWALL GRID SYSTEM
w/ MAIN BEAMS @ 48" O.C. (SLOPED/CURVED)
REFER TO RCP AND DETAILS
FOR GYP. BD. CEILINGS: 5/8" GYP. BD (PTD)
5/8" GYP. BD. ON SUSPENDED CEILING SYSTEM.
6" M
IN
5/8" GYP. BD. ON 3 5/8"
METAL STUDS @ 16" O.C.
EXTEND STUDS TO
UNDERSIDE OF DECK
ABOVE.
METAL STUDS WITH TOP
& BOTTOM RUNNER.
METAL STUD BRACE
@ 32" O.C.
S E
E R
C P
A N
D
S C
H E
D . F
O R
H E
IG
H
T
D T
Y P
E
S E
E R
C P
A
H E
D
F O
R
E
IG
H
T A
N D
T Y
P E
HANGERS @ 2'-6" O.C. SECURE TO DECK ABOVE -
COORDINATE WITH OBSTACLES INCLUDING DUCTWORK.
ACOUSTICAL CEILING TILE
& SUSPENSION SYSTEM
E X
IS
T
IN
G
S O
F F
IT
V E
R
IF
Y H
E
IG
T
IN
F
IE
LD
S E
E R
C P
A
H E
D
F O
R
E
IG
H
T A
N D
T Y
P E
EXISTING GYP. BD. ON
SUSPENDED CEILING SYSTEM.
EXISTING GYP. BD. ON 3 5/8"
METAL STUDS EXTENDED TO
UNDERSIDE OF DECK ABOVE.
EXISTING METAL STUDS WITH
TOP & BOTTOM RUNNER.
EXISTING METAL STUD BRACE
@ 32" O.C.
SUSPENDED ACT. CEILING
SYSTEM.
HANGERS @ 2'-6" O.C. SECURE
TO DECK ABOVE - COORDINATE
WITH OBSTACLES INCLUDING
DUCTWORK.
0' 1' 4' 10'
SCALE: 1/4" = 1'-0"
DRAWING TITLE:REVISED BY:DATE:DESCRIPTION:REVISION:PROJECT TITLE: DATE:
SCALE:
DRAWN BY:
PROJECT NUMBER:
DRAWING NUMBER:
SILVER PETRUCELLI + ASSOCIATES
203 230 9007
3190 WHITNEY AVENUE HAMDEN CT 06518
silverpetrucelli.com
311 STATE STREET NEW LONDON CT 06320
PROJECT SUBMISSION:
STATE PROJECT NUMBER:
CAMERA REPLACEMENT AT
UCONN NUC MED
263 FARMINGTON AVE
FARMINGTON, CT
100% CONSTRUCTION DOCUMENTS
25.110
02/20/2026
KEY PLAN
AREA
AA
ACADEMIC ENTRANCE
AREA A
PROJECT
LOCATION
AREA B
AREA E
AREA C
MAIN ENTRANCE
AREA H
HOSPITAL ENTRANCE
AREA T
AREA F
AREA L
WEST
DOCK
As indicated
2/
/2
4:
:3
P
MA200
CEILING DEMOLITION &
CONSTRUCTION
M. JAEKLE
1/4" = 1'-0"2 CEILING CONSTRUCTION PLAN
1/4" = 1'-0"1 CEILING DEMOLITION PLAN
CONSTRUCTION KEYNOTES - RCP
C01 INSTALL A NEW ACOUSTICAL CEILING ASSEMBLY (ACT-1) TO INCLUDE LIGHTING, HAVAC, FIRE SUPPRESSION. HEIGHT ABOVE FLOOR TO MATCH EXISTING, VERIFY HEIGHT IN
FIELD.
C02 INSTALL REMOVED CEILING PADS AND GRID SECTIONS TAKEN FROM FM047 TO
REPLACE DAMAGED PADS AND RELOCATED PADS FROM LIGHT AND DIFFUSER
LOCATIONS, AS REQUIRED.
C03 REINSTALL EXISTING HVAC DIFFUSERS AND GRILLES IN NEW LOCATION. SEE
MECHANICAL DRAWINGS FOR MORE INFORMATION
C04 GYPSUM FINISHED SOFFIT (85" AFF). FRAME WITH 3-5/8" METAL STUDS AT 16" O.C.
APPLY 1 LAYER OF 5/8" GYPSUM BOARD. REFER TO ELEVATIONS & WALL TYPES.
DEMOLITION KEYNOTES - RCP
DC1 REMOVE EXISTING CEILING ASSEMBLY, REMOVE AND CLEAN HVAC DIFFUSERS AND RETURN
GRILLE FOR REUSE. KEEP ENOUGH OF THE REMOVED CEILING PADS FROM FM046 TO INFILL
CEILING PADS AT FM047.
DC2 REMOVE EXISTING CEILING TRACK AND CURTAIN AND RETURN TO OWNER.
DC3 REMOVE EXISTING EL PASO DEVICE. SAVE FOR REUSE.
DC4 REMOVE EXISTING EL PASO DEVICE AND ASSOCIATED WIRING.
DC#
C#
1/4" = 1'-0"3 GROUND FLOOR ABOVE CEILING PLAN
1 1/2" = 1'-0"4 SEISMIC BRACING DETAIL
1 1/2" = 1'-0" REFERENCE DWG: 2 / A2005 ACT / GYPSUM BOARD CEILING TO WALL DETAIL, TYP.
1 1/2" = 1'-0" REFERENCE DWG: 2 / A2006 ACT TO GYPSUM BOARD SOFFIT
1 1/2" = 1'-0" REFERENCE DWG: 2 / A2007 A.C.T. TO EXSTING GYP. SOFFIT
FINISH PLAN LEGEND
ROOM NUMBER
Room name
RB-1
PT-1
CPT-1
ROOM NAME
WALL FINISH
BASE FINISH
A. REFER TO PROJECT MANUAL AND FINISH LEGEND FOR FINISH
TYPES AND ABBREVIATIONS.
B.
This is the start of the file's text. The full file is on GovTribe.
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .