ILDOT 62W73-005.pdf

PDF 2 MB Posted

Attached to
Standard and Design Overlay & ADA Improvements
Solicitation number
62W73
Issued by
Cook County, Illinois

About this file

This is a Notice to Bidders and Specifications document for the Illinois Department of Transportation (IDOT) District 1 for Contract No. 62W73, a Standard and Design Overlay & ADA Improvements project located on Green Bay Road (Route FAU 2744) spanning approximately 2.89 miles across the Villages of Glencoe, Winnetka, and Kenilworth in Cook County, Illinois. The project consists of pavement overlay and resurfacing with Americans with Disabilities Act (ADA) accessibility improvements, including the removal and replacement of brick pavers, construction of detectable warning systems, curb and gutter removal and replacement, and traffic signal modifications. Electronic bids must be submitted through the iCX-Integrated Contractors Exchange system by 12:00 p.m. on September 18, 2026, at which time bids will be publicly opened. The contract will be awarded to the lowest responsive and responsible bidder in accordance with the Department's terms and conditions as outlined in the Invitation for Bids and contract documents. The project involves multiple utility adjustments and relocations by AT&T, Nicor Gas, Verizon/MCI, and ComEd, with specific staging and coordination requirements detailed in the specifications.

The contract requires compliance with the Standard Specifications for Road and Bridge Construction (Adopted January 1, 2022, Revised January 1, 2026), the Manual on Uniform Traffic Control Devices, and various supplemental and recurring special provisions. The project includes specific provisions for hot-mix asphalt (HMA) mixtures with quality control and quality assurance requirements, regulated substance removal and disposal at multiple intersections with contaminant sampling parameters for VOCs, SVOCs, and metals, and a Project Labor Agreement. The contractor must establish and maintain an Engineer's Field Office Type A (D1) with specified dimensions and equipment, provide traffic control plans with coordination requirements, and manage construction sequencing across multiple stages. No specific contract amount or funding source is stated in the document; however, the project is identified as receiving Federal-aid funds under designation STP-34NK(011), which requires federal compliance certifications and regulations. The contractor assumes responsibility for roadway maintenance beginning on the work start date and must comply with all prevailing wage, equal employment opportunity, and disadvantaged business enterprise (DBE) participation requirements as outlined in the recurring special provisions.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Letting September 18, 2026

Notice to Bidders, Specifications and Proposal

Contract No. 62W73 COOK County Section 2024-951-RS,SW Route FAU 2744 Project STP-34NK(011) District 1 Construction Funds

Prepared by F

Checked by

(Printed by authority of the State of Illinois)

NOTICE TO BIDDERS

1. TIME AND PLACE OF OPENING BIDS. Electronic bids are to be submitted to the electronic bidding system

(iCX-Integrated Contractors Exchange). All bids must be submitted to the iCX system prior to 12:00 p.m.

September 18, 2026 at which time the bids will be publicly opened from the iCX SecureVault.

2. DESCRIPTION OF WORK. The proposed improvement is identified and advertised for bids in the

Invitation for Bids as:

Contract No. 62W73 COOK County Section 2024-951-RS,SW Project STP-34NK(011) Route FAU 2744 District 1 Construction Funds

(2.89-Mile) This project consists of Standard and Design Overlay & ADA Improvements and all incidental and collateral work. The project is in the Village of Glencoe, Village of Winnetka, and the Village of Kenilworth in Cook County.

3. INSTRUCTIONS TO BIDDERS. (a) This Notice, the invitation for bids, proposal and letter of award shall, together with all other documents in accordance with Article 101.09 of the Standard Specifications for Road and Bridge Construction, become part of the contract. Bidders are cautioned to read and examine carefully all documents, to make all required inspections, and to inquire or seek explanation of the same prior to submission of a bid.

(b) State law, and, if the work is to be paid wholly or in part with Federal-aid funds, Federal law requires the bidder to make various certifications as a part of the proposal and contract. By execution and submission of the proposal, the bidder makes the certification contained therein. A false or fraudulent certification shall, in addition to all other remedies provided by law, be a breach of contract and may result in termination of the contract.

4. AWARD CRITERIA AND REJECTION OF BIDS. This contract will be awarded to the lowest responsive and responsible bidder considering conformity with the terms and conditions established by the Department in the rules, Invitation for Bids and contract documents. The issuance of plans and proposal forms for bidding based upon a prequalification rating shall not be the sole determinant of responsibility. The Department reserves the right to determine responsibility at the time of award, to reject any or all proposals, to re-advertise the proposed improvement, and to waive technicalities.

By Order of the Illinois Department of Transportation

Gia Biagi, Secretary

FAU Route 2744 (Green Bay Road)

Section 2024-951-RS, SW Cook County

INDEX

FOR

SUPPLEMENTAL SPECIFICATIONS

AND RECURRING SPECIAL PROVISIONS

Adopted January 1, 2026

This index contains a listing of SUPPLEMENTAL SPECIFICATIONS, frequently used RECURRING SPECIAL PROVISIONS, and LOCAL ROADS AND STREETS RECURRING SPECIAL PROVISIONS.

ERRATA Standard Specifications for Road and Bridge Construction (Adopted 1-1-22) (Revised 1-1-26)

SUPPLEMENTAL SPECIFICATIONS

Std. Spec. Sec. Page No.

109 Measurement and Payment 202 Earth and Rock Excavation 204 Borrow and Furnished Excavation 207 Porous Granular Embankment 211 Topsoil and Compost 214 Grading and Shaping Ditches 406 Hot-Mix Asphalt Binder and Surface Course 407 Hot-Mix Asphalt Pavement (Full-Depth) 420 Portland Cement Concrete Pavement 502 Excavation for Structures 504 Precast Concrete Structures 509 Metal Railings 522 Retaining Walls 540 Box Culverts 542 Pipe Culverts 550 Storm Sewers 586 Granular Backfill for Structures 601 Pipe Drains, Pipe Underdrains, and French Drains 630 Steel Plate Beam Guardrail 632 Guardrail and Cable Road Guard Removal 644 High Tension Cable Median Barrier 665 Woven Wire Fence 701 Work Zone Traffic Control and Protection 781 Raised Reflective Pavement Markers 782 Reflectors 801 Electrical Requirements 821 Roadway Luminaires

1003 Fine Aggregates 1004 Coarse Aggregates 1010 Finely Divided Minerals 1020 Portland Cement Concrete ……… 1030 Hot-Mix Asphalt 1040 Drain Pipe, Tile, and Wall Drain 1042 Precast Concrete Products 1061 Waterproofing Membrane System 1067 Luminaire ……… 1097 Reflectors 1102 Hot-Mix Asphalt Equipment

Section 2024-951-RS, SW

RECURRING SPECIAL PROVISIONS

The following RECURRING SPECIAL PROVISIONS indicated by an “X” are applicable to this contract and are included by reference:

CHECK SHEET # PAGE NO.

1 X Additional State Requirements for Federal-Aid Construction Contracts 2 X Subletting of Contracts (Federal-Aid Contracts)

3 X EEO

4 Specific EEO Responsibilities Nonfederal-Aid Contracts 5 Required Provisions - State Contracts 6 Asbestos Bearing Pad Removal 7 Asbestos Waterproofing Membrane and Asbestos Hot-Mix Asphalt Surface Removal 8 Temporary Stream Crossings and In-Stream Work Pads 9 Construction Layout Stakes

10 Use of Geotextile Fabric for Railroad Crossing 11 Subsealing of Concrete Pavements 12 Hot-Mix Asphalt Surface Correction 13 X Pavement and Shoulder Resurfacing 14 X Patching with Hot-Mix Asphalt Overlay Removal 15 Polymer Concrete 16 Reserved 17 Bicycle Racks 18 Temporary Portable Bridge Traffic Signals 19 Nighttime Inspection of Roadway Lighting 20 English Substitution of Metric Bolts 21 Calcium Chloride Accelerator for Portland Cement Concrete 22 Quality Control of Concrete Mixtures at the Plant 23 X Quality Control/Quality Assurance of Concrete Mixtures 24 Reserved 25 Reserved 26 Temporary Raised Pavement Markers 27 Restoring Bridge Approach Pavements Using High-Density Foam 28 Portland Cement Concrete Inlay or Overlay 29 Portland Cement Concrete Partial Depth Hot-Mix Asphalt Patching 30 Longitudinal Joint and Crack Patching 31 Concrete Mix Design – Department Provided 32 Station Numbers in Pavements or Overlays

Section 2024-951-RS, SW i

TABLE OF CONTENTS

LOCATION OF PROJECT

DESCRIPTION OF PROJECT

MAINTENANCE OF ROADWAYS (D1)

STATUS OF UTILITIES (D1)

DETECTABLE WARNINGS (SPECIAL)

REMOVE EXISTING BRICK PAVERS

REMOVE AND REINSTALL BRICK PAVER

WASHOUT BASIN

TEMPORARY RAMP (SPECIAL)

REMOVAL AND DISPOSAL OF REGULATED SUBSTANCES (PROJECT SPECIFIC)

CONSTRUCTION LAYOUT SPECIAL FOR RESURFACING WITH ADA AND STAND ALONE ADA (D1)

PUBLIC CONVENIENCE AND SAFETY (D1)

RECLAIMED ASPHALT PAVEMENT FOR NON-POROUS EMBANKMENT AND BACKFILL (D1)

HOT-MIX ASPHALT BINDER AND SURFACE COURSE (D1)

CLEANING EXISTING DRAINAGE STRUCTURES (D1)

ADJUSTMENTS AND RECONSTRUCTIONS (D1)

DRAINAGE AND INLET PROTECTION UNDER TRAFFIC (D1)

CURB OR COMBINATION CURB AND GUTTER REMOVAL AND REPLACEMENT (D1)

ENGINEER’S FIELD OFFICE TYPE A (D1)

TRAFFIC CONTROL PLAN (D1)

FRICTION AGGREGATE (D1)

HOT-MIX ASPHALT – MIXTURE DESIGN VERIFICATION AND PRODUCTION (D1)

TEMPORARY INFORMATION SIGNING (D1)

KEEPING ARTERIAL ROADWAYS OPEN TO TRAFFIC (LANE CLOSURES ONLY)

MAST ARM SIGN PANELS

TRAFFIC SIGNAL GENERAL REQUIREMENTS

RE-OPTIMIZE TRAFFIC SIGNAL SYSTEM

COILABLE NON-METALLIC CONDUIT

UNDERGROUND RACEWAYS

ROD AND CLEAN EXISTING CONDUIT

HANDHOLES

ELECTRIC CABLE

GROUNDING EXISTING HANDHOLE FRAME AND COVER

PEDESTRIAN SIGNAL POST

Section 2024-951-RS, SW ii

CONCRETE FOUNDATIONS

LIGHT EMITTING DIODE (LED) SIGNAL HEAD AND OPTICALLY PROGRAMMED LED SIGNAL HEAD

LIGHT EMITTING DIODE (LED) PEDESTRIAN SIGNAL HEAD

DETECTOR LOOP REPLACEMENT AND/OR INSTALLATION (ROADWAY GRINDING,

RESURFACING, & PATCHING OPERATIONS)

VIDEO VEHICLE DETECTION SYSTEM

ACCESSIBLE PEDESTRIAN SIGNALS

MODIFY EXISTING CONTROLLER CABINET

REMOVE EXISTING TRAFFIC SIGNAL EQUIPMENT

REBUILD EXISTING HANDHOLE

REBUILD EXISTING HANDHOLE TO HEAVY-DUTY HANDHOLE

TRAFFIC SIGNAL PAINTING

DRILLED SHAFTS

BITUMINOUS MATERIALS COST ADJUSTMENTS (BDE)

CEMENT, FINELY DIVIDED MINERALS, ADMIXTURES, CONCRETE, AND MORTAR (BDE)

COMPENSABLE DELAY COSTS (BDE)

CONSTRUCTION AIR QUALITY – DIESEL RETROFIT (BDE)

DISADVANTAGED BUSINESS ENTERPRISE PARTICIPATION (BDE)

FUEL COST ADJUSTMENT (BDE)

HOT-MIX ASPHALT – LONGITUDINAL JOINT SEALANT (BDE)

PAVEMENT MARKING (BDE)

PAVEMENT PATCHING (BDE)

PERFORMANCE GRADED ASPHALT BINDER (BDE)

RAISED REFLECTIVE PAVEMENT MARKERS (BDE)

REMOVAL AND DISPOSAL OF REGULATED SUBSTANCES (BDE)

SHORT TERM AND TEMPORARY PAVEMENT MARKINGS (BDE)

SIGN PANELS AND APPURTENANCES (BDE)

SOURCE OF SUPPLY AND QUALITY REQUIREMENTS (BDE)

SUBCONTRACTOR AND DBE PAYMENT REPORTING (BDE)

SUBCONTRACTOR MOBILIZATION PAYMENTS (BDE)

SUBMISSION OF BIDDERS LIST INFORMATION (BDE)

SUBMISSION OF PAYROLL RECORDS – FEDERAL AID CONTRACT (BDE)

SURFACE TESTING OF PAVEMENTS – IRI (BDE)

SURVEYING SERVICES (BDE)

TRAINING SPECIAL PROVISIONS (BDE)

IDOT TRAINING PROGRAM GRADUATE ON-THE-JOB TRAINING SPECIAL PROVISION

Section 2024-951-RS, SW iii

VEHICLE AND EQUIPMENT WARNING LIGHTS (BDE)

WEEKLY DBE TRUCKING REPORTS (BDE)

WORK ZONE TRAFFIC CONTROL DEVICES (BDE)

WORK ZONE WIDTH RESTRICTION (BDE)

WORKING DAYS (BDE)

PROJECT LABOR AGREEMENT

Section 2024-951-RS, SW

STATE OF ILLINOIS

SPECIAL PROVISIONS

The following Special Provisions supplement the "Standard Specifications for Road and Bridge Construction," adopted January 1, 2022, the latest edition of the "Manual on Uniform Traffic Control Devices for Streets and Highways," and the "Manual of Test Procedures for Materials" in effect on the date of invitation for bids, and the Supplemental Specifications and Recurring Special Provisions indicated on the Check Sheet included herein which apply to and govern the construction of FAU Route 2744 (Green Bay Road), Project STP-34NK(011), Section 2024-951- RS, SW, Cook County, Contract No. 62W73 and in case of conflict with any parts of said Specifications, the said Special Provisions shall take precedence and shall govern.

Section 2024-951-RS, SW

LOCATION OF PROJECT

The project is located along Green Bay Road from just south of Scott Avenue to just south of Kenilworth Avenue in the Village of Glencoe, Village of Winnetka, and the Village of Kenilworth in Cook County.

DESCRIPTION OF PROJECT

This project consists of approximately 2.89 miles of Standard and Design Overlay & ADA Improvements and all incidental and collateral work necessary to complete the project as shown on plans and as described herein.

Section 2024-951-RS, SW

MAINTENANCE OF ROADWAYS (D1)

Effective: September 30, 1985 Revised: November 1, 1996

Beginning on the date that work begins on this project, the Contractor shall assume responsibility for normal maintenance of all existing roadways within the limits of the improvement. This normal maintenance shall include all repair work deemed necessary by the Engineer, but shall not include snow removal operations. Traffic control and protection for maintenance of roadways will be provided by the Contractor as required by the Engineer.

If items of work have not been provided in the contract, or otherwise specified for payment, such items, including the accompanying traffic control and protection required by the Engineer, will be paid for in accordance with Article 109.04 of the Standard Specifications.

STATUS OF UTILITIES (D1)

Effective: June 1, 2016 Revised: January 1, 2020

Utility companies and/or municipal owners located within the construction limits of this project have provided the following information regarding their facilities and the proposed improvements.

The tables below contain a description of specific conflicts to be resolved and/or facilities which will require some action on the part of the Department’s contractor to proceed with work. Each table entry includes an identification of the action necessary and, if applicable, the estimated duration required for the resolution.

UTILITIES TO BE ADJUSTED

Conflicts noted below have been identified by following the suggested staging plan included in the contract. The company has been notified of all conflicts and will be required to obtain the necessary permits to complete their work; in some instances, resolution will be a function of the construction staging. The responsible agency must relocate, or complete new installations as noted below; this work has been deemed necessary to be complete for the Department’s contractor to then work in the stage under which the item has been listed.

Section 2024-951-RS, SW

Pre-Stage

STAGE /

LOCATION

TYPE DESCRIPTION

RESPONSIBLE

AGENCY

DURATION OF

TIME

Sta. 14+29 to Sta.

115+00

Sta. 130+00 to Sta.

Telecommunication Manholes

32 telecommunication manholes on Green Bay Road in conflict with the roadway resurfacing and will require frame & grate adjustments.

AT&T

AT&T to set manholes below ex.

HMA

Duration-_____

TBD

Valves for

Underground Gas TBD Nicor Gas TBD

TBD

Telecommunication

Manholes TBD Verizon/MCI TBD

TBD Electrical Manholes

4 electric manholes on Green Bay Road in conflict with the roadway resurfacing and will require frame & grate adjustments.

ComEd

ComEd to set manholes below ex.

HMA

Stage 1

TYPE DESCRIPTION

RESPONSIBLE

AGENCY

DURATION OF

TIME

Sta. 14+29 to Sta.

115+00

Sta. 130+00 to Sta.

Telecommunication Manholes

There 32 telecommunications on Green Bay Road in conflict with the roadway resurfacing and will require frame & grate adjustments.

AT&T

AT&T to set manholes to finished grade

TBD

Valves for

Underground Gas TBD Nicor Gas TBD

TBD

Telecommunication

Manholes TBD Verizon/MCI TBD

TBD Electrical Manholes

4 electric manholes on Green Bay Road in conflict with the roadway resurfacing and will require frame & grate adjustments.

ComEd

ComEd to set manholes to finished grade

Section 2024-951-RS, SW

Stage 2

TYPE DESCRIPTION

RESPONSIBLE

AGENCY

DURATION OF

TIME

No conflicts to be resolved (or if there are conflicts they are to be listed as noted above)

Pre-Stage: ________ Days Total Installation Stage 1: ________ Days Total Installation Stage 2: ________ Days Total Installation

The following contact information is what was used during the preparation of the plans as provided by the Agency/Company responsible for resolution of the conflict.

Agency/Company Responsible to

Resolve Conflict

Name of contact Phone E-mail address

AT&T Tom Laskowski, OSP Design Engineering

O 630.573.5643, M 630.779.4722 tl7895@att.com

Nicor Gas Karey Johnson DOT Liason

O (630) 388-2923 M (224) 471-9356 karejohn@southernco.com

Verizon/MCI Dakari Hall Telecom Engineering

Services

O 312.612.5216 dhall@telecom-eng.com

ComEd Daniel.McQuillan 779-231-2107 Daniel.McQuillan@Comed.com

Section 2024-951-RS, SW

UTILITIES TO BE WATCHED AND PROTECTED

The areas of concern noted below have been identified by following the suggested staging plan included for the contract. The information provided is not a comprehensive list of all remaining utilities, but those which during coordination were identified as ones which might require the Department’s contractor to take into consideration when making the determination of the means and methods that would be required to construct the proposed improvement. In some instances, the contractor will be responsible to notify the owner in advance of the work to take place so necessary staffing on the owner’s part can be secured.

Pre-Stage

TYPE DESCRIPTION OWNER

Sta. 14+00 – Sta.

15+00 Rt & Lt

Sta. 71+00 Crossing GB Rd.

Sta 71+00 to Sta 81+50 Lt

Sta. 81+00 Crossing GB Rd.

Sta 81+00 – Sta 96+50 Rt

Sta 97+50 Crossing GB Rd.

Sta 97+50 – Sta 129+50 Lt

Sta 129+50 Crossing GB Rd.

Sta 129+50 – Sta 143+5 Rt

Underground Telecommunications

Facilities

Per Verizon/MCI all underground conduits should be deep enough to avoid the resurfacing and ADA ramp improvements.

Verizon/MCI

Within Project Limits Electrical Overhead

Cables

There are existing facilities located in the area of the subject improvement. Please be certain that all workers follow the current OSHA rules and other applicable guidelines regarding working safely around electrical power lines.

ComEd

Section 2024-951-RS, SW

Stage 1

TYPE DESCRIPTION OWNER

Sta. 14+00 – Sta.

15+00 Rt & Lt

Sta. 71+00 Crossing GB Rd.

Sta 71+00 to Sta 81+50 Lt

Sta. 81+00 Crossing GB Rd.

Sta 81+00 – Sta 96+50 Rt

Sta 97+50 Crossing GB Rd.

Sta 97+50 – Sta 129+50 Lt

Sta 129+50 Crossing GB Rd.

Sta 129+50 – Sta 143+5 Rt

Underground Telecommunic ations Facilities

Per Verizon/MCI all underground conduits should be deep enough to avoid the resurfacing and ADA ramp improvements.

Verizon/MCI

Within Project Limits Electrical Overhead

Cables

There are existing facilities located in the area of the subject improvement.

Please be certain that all workers follow the current OSHA rules and other applicable guidelines regarding working safely around electrical power lines.

ComEd

Stage 2

TYPE DESCRIPTION OWNER

No facilities requiring extra consideration (or listed as noted above)

Section 2024-951-RS, SW

The following contact information is what was used during the preparation of the plans as provided by the owner of the facility.

Agency/Company Responsible to

Resolve Conflict

Name of contact Phone E-mail address

AT&T Tom Laskowski, OSP Design Engineering

O 630.573.5643 M 630.779.4722 tl7895@att.com

Nicor Gas Karey Johnson DOT Liason

O (630) 388-2923 M (224) 471-9356 karejohn@southernco.com

Verizon/MCI Dakari Hall Telecom Engineering

Services

O 312.612.5216 dhall@telecom-eng.com

ComEd Daniel.McQuillan 779-231-2107 Daniel.McQuillan@Comed.com

The above represents the best information available to the Department and is included for the convenience of the bidder. The days required for conflict resolution should be considered in the bid as this information has also been factored into the timeline identified for the project when setting the completion date. The applicable portions of the Standard Specifications for Road and Bridge Construction shall apply.

Estimated duration of time provided above for the first conflicts identified will begin on the date of the executed contract regardless of the status of the utility relocations. The responsible agencies will be working toward resolving subsequent conflicts in conjunction with contractor activities in the number of days noted.

The estimated relocation duration must be part of the progress schedule submitted by the contractor. A utility kickoff meeting will be scheduled between the Department, the Department’s contractor and the utility companies when necessary. The Department’s contractor is responsible for contacting J.U.L.I.E. prior to all excavation work.

Section 2024-951-RS, SW

DETECTABLE WARNINGS (SPECIAL)

Description. This work shall consist of construction of Detectable Warnings (Special) at concrete sidewalk accessibility ramps at locations shown on the plans or as determined by the Engineer and shall be in accordance with the Americans with Disabilities Act (ADA) standards, Section

424.09 of the Standard Specifications, and as described below.

Materials. The detectable warnings shall be cast iron panels of the sizes shown on the plans and shall meet the following material specification:

The detectable warning plate shall be constructed of gray iron meeting the requirements of Article

1006.14 of the “Standard Specifications” and ASTM A48, CLASS 30A, 30B or 35B; or cast ductile iron meeting the requirements of Article 1006.15 of the “Standard Specifications”.

The coating system shall consist of a rust inhibiting epoxy primer and a finish coat.

The epoxy primer shall have the following properties:

Cold Rolled Steel Lab Panels

The finish coat shall be a powder coat and shall have the following properties:

Property Test Method Performance Color --- Federal Yellow Corrosion Resistance (Salt Spray) ASTM B117 1000 Hours Minimum

Cold Rolled Steel Lab Panels

General. The installation of detectable warnings shall meet the requirements of Article 424.09 of the “Standard Specifications”.

Construction. The detectable warning plates shall extend across the width of the ramp. The plates shall be placed such that the top of the truncated domes are flush with the surrounding surface of concrete.

Placement, finishing and curing shall conform to the above noted specifications, and as determined by the Engineer.

Method of Measurement. DETECTABLE WARNINGS (SPECIAL) shall be measured for payment in place and the area computed in square feet.

Basis of Payment. This work will be paid for at the contract unit price per square foot for DETECTABLE WARNINGS (SPECIAL) AND shall include all equipment, materials and labor required to install the panels.

Property Test Method Performance Humidity ASTM D1735 1000 Hours Minimum Water Immersion ASTM D870 250 Hours Minimum Corrosion Resistance (Salt Spray) ASTM B117 1000 Hours Minimum

Section 2024-951-RS, SW

REMOVE EXISTING BRICK PAVERS

This work shall consist of the complete removal of existing brick pavers and subbase material at the locations shown in the plans and as directed by the Engineer.

Description: Removal of the existing brick pavers and subbase material shall be performed in accordance with the applicable portions of Section 440 of the Standard Specifications. The existing subgrade shall be rolled or tamped to the in-kind line and grade. If additional material is required to establish the in-kind grade, the material used shall be satisfactory to the Engineer and placed according to Section 205 of the Standard Specifications.

Basis of Payment: This work shall be measured and paid for at the contract unit price per square foot for REMOVE EXISTING BRICK PAVERS. This price shall include all necessary labor, material and equipment

REMOVE AND REINSTALL BRICK PAVER

Description. This work shall consist of restorative methods for removal, secure storage, sawcut, and reinstall brick pavers on a sand bed around the perimeter where proposed Portland cement concrete sidewalk is to be installed or as directed by the Engineer.

Construction Requirements. The Contractor shall make a record of the existing layout and patterns of the bricks or pavers prior to their removal so that the pattern can be replicated upon reinstallation. All bricks or pavers shall be removed carefully and stored securely. All bricks or pavers damaged by the Contractor shall be replaced at the Contractor’s expense with ones that match the shape, size, and color.

The bricks or pavers and base materials shall be placed to the desired layout with a small face and shall be constructed in general conformance to accepted industry requirements and procedures for brick paver installation.

Method of Measurement. This work will be measured for payment in square feet.

Basis of Payment. This work will be paid for at the contract unit price per SQUARE FOOT for REMOVE AND REINSTALL BRICK PAVER, which price shall be payment in full for brick paver removal, temporary secure storage, sawcutting the bricks pavers, and reinstallation of brick pavers.

Section 2024-951-RS, SW

WASHOUT BASIN

Description. This work shall consist of the construction, maintenance, and removal of a concrete washout basin for concrete trucks and other construction vehicles in accordance with the plans and details and as specified herein.

General Requirements The Contractor shall install a sufficient number of washout basins at the locations indicated on the plans or as depicted by the Engineer. Contractor shall maintain concrete washout facilities including the removal and disposal of hardened concrete and/or slurry and returning the facility to a functional condition. Washout Basins shall be cleaned or reconstructed in a new area once the washout becomes two-thirds (2/3) full. The contractor shall provide a barrier wall washout basin per the requirements shown in the detail for “Temporary Concrete Washout Facility – Barrier Wall” in the construction details.

The Contractor must submit a plan of his/her proposed temporary concrete washout facility to the Engineer for his/her approval at least 10 days prior to the first concrete pour.

Temporary concrete washout facilities are to be in place prior to any delivery of concrete to the construction site.

Temporary concrete washout facilities are to be located at least 50 feet from storm drain inlets, open drainage facilities, or water bodies.

Each facility is to be located away from construction traffic or access areas to prevent disturbance or tracking.

A sign is to be installed adjacent to each temporary concrete washout facility to inform concrete equipment operations of the designated washout facility.

The Contractor may request in writing to the Engineer to utilize alternate methods/designs for the washout basin. Any alternates will need to be approved by the Engineer.

Basis of Payment. This work shall be paid for at the contract lump sum unit price for WASHOUT BASIN which price shall include the materials, equipment, and labor to furnish, install, maintain and remove washout basins as specified herein.

If an alternate design for the washout basin has been submitted and approved for use in the project, there shall be no additional compensation to the original unit bid price for Washout Basin.

Section 2024-951-RS, SW

TEMPORARY RAMP (SPECIAL)

Description. This work shall consist of the construction and removal of temporary HMA ramps.

The ramps shall be constructed at all driveway entrances immediately upon completion of the milling operation and when the drop-off is greater than 2.5 in. (64mm). Ramps shall be 2 in.

(51mm) in height by 24 in. (600mm) in width along the full width of the driveway. Work shall be to the satisfaction of the Engineer.

The contractor shall use HMA according to Section 406 of the Standard Specifications, and other applicable HMA special provisions as contained herein. The HMA mixtures to be used shall be specified in the plans.

The temporary ramps shall be removed just prior to placing the proposed binder course.

Method of Measurement. Temporary Ramp (Special) will be measured for payment in place and the area computed in square yards (square meters).

Basis of Payment. Temporary Ramp (Special) will be paid for at the contract unit price per square yard (square meter) for TEMPORARY RAMP (SPECIAL)

REMOVAL AND DISPOSAL OF REGULATED SUBSTANCES (PROJECT SPECIFIC)

Description. This work shall consist of the removal and disposal of regulated substances according to Section 669 of the Standard Specifications as revised below.

Contract Specific Sites. The excavated soil and groundwater within the areas listed below shall be managed as either “uncontaminated soil”, hazardous waste, special waste or non-special waste. For stationing, the lateral distance is measured from centerline and the farthest distance is the offset distance or construction limit, whichever is less.

Soil Disposal Analysis. When the waste material requires sampling for landfill disposal acceptance, the Contractor shall secure a written list of the specific analytical parameters and analytical methods required by the landfill. The Contractor shall collect and analyze the required number of samples for the parameters required by the landfill using the appropriate analytical procedures. A copy of the required parameters and analytical methods (from landfill email or on landfill letterhead) shall be provided as Attachment 4A of the BDE 2733 (Regulated Substances Final Construction Report). The price shall include all sampling materials and effort necessary for collection and management of the samples, including transportation of samples from the job site to the laboratory. The Contractor shall be responsible for determining the specific disposal facilities to be utilized; and collect and analyze any samples required for disposal facility acceptance using a NELAP certified analytical laboratory registered with the State of Illinois.

Section 2024-951-RS, SW

Intersection of Green Bay Road and Scott Avenue, Winnetka, Cook County All excavation planned at the southwest quadrant at the intersection of Green Bay Road and

Scott Avenue. The Engineer has determined this material meets the criteria of and shall be managed in accordance with Article 669.05(a)(5). Potential contaminants of concern sampling parameters: VOCs, SVOCs and Metals.

All excavation planned at the northwest quadrant, northeast quadrant, and southeast quadrant at the intersection of Green Bay Road and Scott Avenue. The Engineer has determined this material meets the criteria of and shall be managed in accordance with Article 669.05(a)(1).

Potential contaminants of concern sampling parameters: VOCs, SVOCs and Metals.

Intersection of Green Bay Road and Merrill Street, Winnetka, Cook County All excavation planned at the northwest quadrant, northeast quadrant, southwest quadrant, and southeast quadrant at the intersection of Green Bay Road and Merrill Street. The Engineer has determined this material meets the criteria of and shall be managed in accordance with Article 669.05(a)(1). Potential contaminants of concern sampling parameters: VOCs, SVOCs and Metals.

Intersection of Green Bay Road and Gage Street, Winnetka, Cook County All excavation planned at the northwest quadrant, northeast quadrant, southwest quadrant, and southeast quadrant at the intersection of Green Bay Road and Gage Street. The Engineer has determined this material meets the criteria of and shall be managed in accordance with Article 669.05(a)(1). Potential contaminants of concern sampling

Intersection of Green Bay Road and Tower Road (west approach), Winnetka, Cook County All excavation planned at the northeast quadrant at the intersection of Green Bay Road and

Tower Road (west approach). The Engineer has determined this material meets the criteria of and shall be managed in accordance with Article 669.05(a)(5). Potential contaminants of concern sampling parameters: VOCs, SVOCs and Metals.

All excavation planned at the northwest quadrant, and southwest quadrant at the intersection of Green Bay Road and Tower Road (west approach). The Engineer has determined this material meets the criteria of and shall be managed in accordance with Article 669.05(a)(1).

Potential contaminants of concern sampling parameters: VOCs, SVOCs and Metals.

Intersection of Green Bay Road and Tower Road (east approach), Winnetka, Cook County All excavation planned at the northeast quadrant, southwest quadrant, and southeast quadrant at the intersection of Green Bay Road and Tower Road (east approach). The Engineer has determined this material meets the criteria of and shall be managed in accordance with Article 669.05(a)(5). Potential contaminants of concern sampling

Intersection of Green Bay Road and Chatfield Road, Winnetka, Cook County All excavation planned at the northwest quadrant, and southwest quadrant at the intersection of Green Bay Road and Chatfield Road. The Engineer has determined this material meets the criteria of and shall be managed in accordance with Article 669.05(a)(1). Potential contaminants of concern sampling parameters: VOCs, SVOCs and Metals.

Section 2024-951-RS, SW

Intersection of Green Bay Road and Eldorado Street, Winnetka, Cook County All excavation planned at the northeast quadrant, and southeast quadrant at the intersection of Green Bay Road and Eldorado Street. The Engineer has determined this material meets the criteria of and shall be managed in accordance with Article 669.05(a)(5). Potential

Intersection of Green Bay Road and Westmoor Road, Winnetka, Cook County of Green Bay Road and Westmoor Road. The Engineer has determined this material meets

Intersection of Green Bay Road and Pine Street, Winnetka, Cook County All excavation planned at the southeast quadrant at the intersection of Green Bay Road and

Pine Street. The Engineer has determined this material meets the criteria of and shall be managed in accordance with Article 669.05(a)(5). Potential contaminants of concern sampling parameters: VOCs, SVOCs and Metals.

All excavation planned at the northwest quadrant, and southwest quadrant at the intersection of Green Bay Road and Pine Street. The Engineer has determined this material meets the criteria of and shall be managed in accordance with Article 669.05(a)(1). Potential

Intersection of Green Bay Road and Spruce Street, Winnetka, Cook County of Green Bay Road and Spruce Street. The Engineer has determined this material meets the

Intersection of Green Bay Road and Elm Street, Winnetka, Cook County All excavation planned at the southeast quadrant at the intersection of Green Bay Road and

Elm Street. The Engineer has determined this material meets the criteria of and shall be managed in accordance with Article 669.05(a)(5). Potential contaminants of concern sampling

Intersection of Green Bay Road and Oak Street/Linden Street, Winnetka, Cook County All excavation planned at the northwest quadrant, and northeast quadrant at the intersection of Green Bay Road and Oak Street/Linden Street. The Engineer has determined this material meets the criteria of and shall be managed in accordance with Article 669.05(a)(1). Potential

Intersection of Green Bay Road and Cherry Street, Winnetka, Cook County All excavation planned at the southwest quadrant at the intersection of Green Bay Road and

Cherry Street. The Engineer has determined this material meets the criteria of and shall be managed in accordance with Article 669.05(a)(1). Potential contaminants of concern sampling

Section 2024-951-RS, SW

Intersection of Green Bay Road and Ash Street, Winnetka, Cook County of Green Bay Road and Ash Street. The Engineer has determined this material meets the

Intersection of Green Bay Road and Ash Street, Winnetka, Cook County of Green Bay Road and Ash Street. The Engineer has determined this material meets the

Intersection of Green Bay Road and Willow Road, Winnetka, Cook County of Green Bay Road and Willow Road. The Engineer has determined this material meets the

Intersection of Green Bay Road and Church Road, Winnetka, Cook County All excavation planned at the southwest quadrant, north island, and south island at the intersection of Green Bay Road and Church Road. The Engineer has determined this material

Intersection of Green Bay Road and Sunset Road, Winnetka, Cook County of Green Bay Road and Sunset Road. The Engineer has determined this material meets the

Intersection of Green Bay Road and Wayland Avenue, Kenilworth, Cook County of Green Bay Road and Wayland Avenue. The Engineer has determined this material meets

Intersection of Green Bay Road and Melrose Avenue, Kenilworth, Cook County of Green Bay Road and Melrose Avenue. The Engineer has determined this material meets

Section 2024-951-RS, SW

Intersection of Green Bay Road and Park Drive, Kenilworth, Cook County All excavation planned at the northeast quadrant at the intersection of Green Bay Road and

Park Drive. The Engineer has determined this material meets the criteria of and shall be managed in accordance with Article 669.05(a)(5). Potential contaminants of concern sampling parameters: VOCs, SVOCs and Metals.

All excavation planned at the northwest quadrant, southwest quadrant, and median at the intersection of Green Bay Road and Park Drive. The Engineer has determined this material

Intersection of Green Bay Road and Kenilworth Avenue, Kenilworth, Cook County All excavation planned at the northeast quadrant, and southeast quadrant at the intersection of Green Bay Road and Kenilworth Avenue. The Engineer has determined this material meets the criteria of and shall be managed in accordance with Article 669.05(a)(5). Potential contaminants of concern sampling parameters: VOCs, SVOCs and Metals.

All excavation planned at the northwest quadrant, and southwest quadrant at the intersection of Green Bay Road and Kenilworth Avenue. The Engineer has determined this material meets

Work Zones Three distinct OSHA HAZWOPER work zones (exclusion, decontamination, and support) shall apply to projects adjacent to or within sites with documented leaking underground storage tank (LUST) incidents, or sites under management in accordance with the requirements of the Site Remediation Program (SRP), Resource Conservation and Recovery Act (RCRA), or Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), or as deemed necessary. For this project, the work zones apply for the following ISGS PESA Sites:

None

CONSTRUCTION LAYOUT SPECIAL FOR RESURFACING WITH ADA AND STAND ALONE

ADA (D1)

Effective: January 1, 2017 Revised: April 17, 2017

Description. This work shall consist of furnishing and placing construction layout stakes for the construction of ADA Ramps shown in the plans. The Contractor shall furnish and place stakes marking the locations and elevations of points indicated in the plans for ADA Ramp Construction.

The Contractor shall locate all reference points as shown on the plans and listed herein. Any additional control points required will be identified in the field by the Contractor and all field notes will be kept in the office of the Resident Engineer.

The Contractor shall provide field forces, equipment, and material to set all additional stakes for this project, which are needed to establish offset stakes, reference points, and any other horizontal and vertical controls necessary to secure a correct layout for the work.

Section 2024-951-RS, SW

Layout stakes shall be set to assure conformance to the ADA Ramp design shown on the plans and shall meet the approval of the Engineer.

The Contractor shall be responsible for having the finished work conform to the lines, grades, elevations, and dimensions called for in the plans. Any inspection or checking of the Contractor’s layout by the Engineer and the acceptance of all or any part of it shall not relieve the Contractor of his/her responsibility to secure the proper dimensions, grades, and elevations of the work. The Contractor shall exercise care in the preservation of stakes and bench marks and shall have them reset when any are damaged, lost, displaced, removed or otherwise obliterated.

Responsibility of the Department.

The Department will make random checks of the Contractor’s staking to determine if the work is in conformance with the plans. When the Contractor’s work will tie into work that is being or will be done by others, checks will be made to determine if the work is in conformance with the proposed overall grade and horizontal alignment.

Where the Contractor, in setting construction stakes, discovers discrepancies, the Department will check to determine their nature and make whatever revisions are necessary to the plans. Any additional restaking required by the Engineer will be the responsibility of the Contractor. The additional restaking done by the Contractor will be paid for according to Article 109.04 of the Standard Specifications.

The Department will be responsible for the accuracy of the initial reference points shown in the plans.

It is not the responsibility of the Department, except as provided herein, to check the correctness of the Contractor’s stakes. Any apparent errors will be immediately called to the Contractor’s attention and the Contractor will be required to make the necessary correction before the stakes are used for construction purposes. The Contractor shall provide the Engineer a copy of any field notes and layout diagrams produced during the course of the project.

Responsibility of the Contractor.

The Contractor shall establish from the given survey points and contract plan information, all the control points or reference points necessary to layout the ADA Ramp elements. The Contractor shall furnish and place the layout stakes. The Contractor shall notify the Engineer when the stakes are complete and available for review and approval by the Engineer at least 3 working days in advance of the actual construction.

Field notes shall be kept in standard survey field notebooks and those books shall become the property of the Department at the completion of the project. All notes shall be neat, orderly, and in accepted form.

Measurement and Payment. This work will be paid for at the contract lump sum price for

CONSTRUCTION LAYOUT (SPECIAL).

Section 2024-951-RS, SW

PUBLIC CONVENIENCE AND SAFETY (D1)

Effective: May 1, 2012 Revised: July 15, 2012

Add the following to the end of the fourth paragraph of Article 107.09:

“If the holiday is on a Saturday or Sunday, and is legally observed on a Friday or Monday, the length of Holiday Period for Monday or Friday shall apply.”

Add the following sentence after the Holiday Period table in the fourth paragraph of Article 107.09:

“The Length of Holiday Period for Thanksgiving shall be from 5:00 AM the Wednesday prior to 11:59 PM the Sunday After”

Delete the fifth paragraph of Article 107.09 of the Standard Specifications:

“On weekends, excluding holidays, roadways with Average Daily Traffic of 25,000 or greater, all lanes shall be open to traffic from 3:00 P.M. Friday to midnight Sunday except where structure construction or major rehabilitation makes it impractical.”

RECLAIMED ASPHALT PAVEMENT FOR NON-POROUS EMBANKMENT AND BACKFILL

(D1) Effective: April 1, 2001 Revised: January 1, 2007

Add the following sentence to Article 1004.05 (a) of the Standard Specifications:

"Reclaimed Asphalt Pavement (RAP) may be used as aggregate in Non-porous Granular Embankment and Backfill. The RAP material shall be reclaimed asphalt pavement material resulting from the cold milling or crushing of an existing hot-mix bituminous concrete pavement structure, including shoulders. RAP containing contaminants such as earth, brick, concrete, sheet asphalt, sand, or other materials identified by the Department will be unacceptable until the contaminants are thoroughly removed.

Add the following sentence to Article 1004.05 (c)(2) of the Standard Specifications:

"One hundred percent of the RAP when used shall pass the 3 inch (75 mm) sieve. The RAP shall be well graded from coarse to fine. RAP that is gap-graded or single-sized will not be accepted.”

Section 2024-951-RS, SW

HOT-MIX ASPHALT BINDER AND SURFACE COURSE (D1)

Effective: November 1, 2019 Revised: April 1, 2026

Add the following to the end of Article 406.06(c) of the Standard Specifications:

“ The amount of HMA binder course placed shall be limited to that which can be surfaced during the same construction season.”

Revise the fifteenth through eighteenth paragraphs of Article 406.14 of the Standard Specifications to read:

“ The mixture used in constructing acceptable HMA test strips will be paid for at the contract unit price. Unacceptable HMA test strips shall be removed and replaced at no additional cost to the Department.”

Revise Article 1004.03(c) to read:

“(c) Gradation. The coarse aggregate gradations shall be as listed in the following table.

Use Size/Application Gradation No.

Class A-1, A-2, & A-3 3/8 in. (10 mm) Seal CA 16 or CA 20 Class A-1 1/2 in. (13 mm) Seal CA 15 Class A-2 & A-3 Cover Coat CA 14

HMA High ESAL

IL-19.0;

Stabilized Subbase IL-19.0

CA 11 1/

SMA 12.5 2/ CA 134/, CA 14, or CA 16 SMA 9.5 2/ CA 133/4/ or CA 163/

IL-9.5 CA 16, CM 134/

IL-9.5FG CA 16

HMA Low ESAL

IL-19.0L CA 11 1/

IL-9.5L CA 16

1/ CA 16 or CA 13 may be blended with the CA 11.

2/ The coarse aggregates used shall be capable of being combined with the fine aggregates and mineral filler to meet the approved mix design and the mix requirements noted herein.

3/ The specified coarse aggregate gradations may be blended.

4/ CA 13 shall be 100 percent passing the 1/2 in. (12.5mm) sieve.”

Section 2024-951-RS, SW

Revise Article 1004.03(e) of the Standard Specifications to read:

“(e) Absorption. For SMA the coarse aggregate shall also have water absorption ≤ 2.0 percent.”

Revise the “High ESAL” portion of the table in Article 1030.01 to read:

“High ESAL Binder Courses

IL-19.0, IL-9.5, IL-9.5FG, IL-4.75, SMA

12.5, SMA 9.5

Stabilized Subbase IL-19.0

Surface Courses

IL-9.5, IL-9.5FG,

SMA 12.5, SMA 9.5”

Revise Note 2. and add Note 6 to Article 1030.02 of the Standard Specifications to read:

“Item Article/Section

(g)Performance Graded Asphalt Binder (Note 6) 1032

(h) Fibers (Note 2)

Note 2. A stabilizing additive such as cellulose or mineral fiber shall be added to the SMA mixture according to Illinois Modified AASHTO M 325. The stabilizing additive shall meet the Fiber Quality Requirements listed in Illinois Modified AASHTO M 325. Prior to approval and use of fibers, the Contractor shall submit a notarized certification by the producer of these materials stating they meet these requirements. Reclaimed Asphalt Shingles (RAS) may be used in Stone Matrix Asphalt (SMA) mixtures designed with an SBA polymer modifier as a fiber additive if the mix design with RAS included meets AASHTO T305 requirements. The RAS shall be from a certified source that produces either Type I or Type 2. Material shall meet requirements noted herein and the actual dosage rate will be determined by the Engineer.

Note 6. The asphalt binder shall be an SBS PG 76-28 when the SMA is used on a full-depth asphalt pavement and SBS PG 76-22 when used as an overlay, except where modified herein. The asphalt binder shall be a SBS PG 76-22 for IL-4.75, except where modified herein..”

Section 2024-951-RS, SW

Revise table in Article 1030.05(a) of the Standard Specifications to read:

“MIXTURE COMPOSITION (% PASSING) 1/

Sieve Size

IL-19.0 mm SMA 12.5 SMA 9.5 IL-9.5mm IL-9.5FG IL-4.75 mm min max min max min max min max min max min max

1 1/2 in (37.5 mm)

1 in.

(25 mm) 100

3/4 in.

(19 mm) 90 100 100

1/2 in.

(12.5 mm) 75 89 80 100 100 100 100 100

3/8 in.

(9.5 mm) 65 90 100 90 100 90 100 100

#4 (4.75 mm) 40 60 20 30 36 50 34 69 60 756/ 90 100

#8 (2.36 mm) 20 42 16 24 4/ 16 324/ 34 5/ 52 2/ 45 606/ 70 90

#16 (1.18 mm) 15 30 10 32 25 40 50 65

#30 (600 m) 12 16 12 18 15 30

#50 (300 m) 6 15 4 15 8 15 15 30

#100 (150 m) 4 9 3 10 6 10 10 18

#200 (75 m) 3.0 6.0 7.0 9.0 3/ 7.5 9.5 3/ 4.0 6.0 4.0 6.5 7.0 9.0 3/

#635 (20 m)

≤ 3.0 ≤ 3.0

Ratio Dust/Asphalt Binder

1.0 1.5 1.5 1.0

1.0 1.0

1/ Based on percent of total aggregate weight.

2/ The mixture composition shall not exceed 44 percent passing the #8 (2.36 mm) sieve for surface courses with Ndesign = 90.

3/ Additional minus No. 200 (0.075 mm) material required by the mix design shall be mineral filler, unless otherwise approved by the Engineer.

4/ When establishing the Adjusted Job Mix Formula (AJMF) the percent passing the

#8 (2.36 mm) sieve shall not be adjusted above the percentage stated on the table.

5/ When establishing the Adjusted Job Mix Formula (AJMF) the percent passing the

#8 (2.36 mm) sieve shall not be adjusted below 34 percent.

6/ When the mixture is used as a binder, the maximum shall be increased by 0.5 percent passing.”

Section 2024-951-RS, SW

Revise Article 1030.05(b) of the Standard Specifications to read:

(b) Volumetric Requirements. The target value for the air voids of the HMA shall be 4.0 percent, for IL-4.75 and SMA mixtures it shall be 3.5 percent and for Stabilized Subbase it shall be

3.0 percent at the design number of gyrations. The voids in the mineral aggregate (VMA) and voids filled with asphalt binder (VFA) of the HMA design shall be based on the nominal maximum size of the aggregate in the mix and shall conform to the following requirements.

Voids in the Mineral Aggregate (VMA), % Minimum for Ndesign

Mix Design 30 50 70 80 90

IL-19.0 13.5 13.5 13.5

IL-9.5 15.0 15.0

IL-9.5FG 15.0 15.0

IL-4.751/ 18.5

SMA-12.51/2/5/ 17.03//16.04/

SMA-9.51/2/5/ 17.03//16.04/

IL-19.0L 13.5

IL-9.5L 15.0

1/ Maximum draindown shall be 0.3 percent according to Illinois Modified

AASHTO T 305.

2/ The draindown shall be determined at the JMF asphalt binder content at the mixing temperature plus 30°F.

3/ Applies when specific gravity of coarse aggregate is ≥ 2.760.

4/ Applies when specific gravity of coarse aggregate is < 2.760.

5/ For surface course, the coarse aggregate can be crushed steel slag, crystalline crushed stone or crushed sandstone. For binder course, coarse aggregate shall be crushed stone (dolomite), crushed gravel, crystalline crushed stone, or crushed sandstone”

Revise the last paragraph of Article 1102.01 (a) (5) of the Standard Specifications to read:

“IL-4.75 and Stone Matrix Asphalt (SMA) mixtures which contain aggregate having absorptions greater than or equal to 2.0 percent, or which contain steal slag sand, shall have minimum surge bin storage plus haul time of 1.5 hours.”

Section 2024-951-RS, SW

Revise the first and second paragraphs of Articles 1030.06(c)(2) of the Standard Specifications to read:

“(2) Personnel. The Contractor shall provide a QC Manager who shall have overall responsibility and authority for quality control. This individual shall maintain active certification as a Hot-Mix Asphalt Level II technician.

In addition to the QC Manager, the Contractor shall provide sufficient personnel to perform the required visual inspections, sampling, testing, and documentation in a timely manner. Mix designs shall be developed by personnel with an active certification as a Hot-Mix Asphalt Level III technician. Technicians performing mix design testing and plant sampling/testing shall maintain active certification as a Hot-Mix Asphalt Level I technician. The Contractor may provide a technician trainee who has successfully completed the Department’s “Hot-Mix Asphalt Trainee Course” to assist in the activities completed by a Hot-Mix Asphalt Level I technician for a period of one year after the course completion date. The Contractor may also provide a Gradation Technician who has successfully completed the Department's "Gradation Technician Course" to run gradation tests only under the supervision of a Hot-Mix Asphalt Level II Technician. The Contractor shall provide a Hot-Mix Asphalt Density Tester who has successfully completed the Department's "Nuclear Density Testing” course to run all nuclear density tests on the job site.”

Add Article 1030.06(d)(3) to the Standard Specifications to read:

“(3) The Contractor shall take possession of any Department unused backup or dispute resolution HMA mixture samples or density specimens upon notification by the Engineer.

The Contractor shall collect the HMA mixture samples or density specimens from the location designated by the Engineer and may add these materials to RAP stockpiles according to Section 1031.”

Revise the second paragraph of Articles 1030.07(a)(11) and 1030.08(a)(9) of the Standard Specifications to read:

“When establishing the target density, the HMA maximum theoretical specific gravity (Gmm) will be based on the running average of four available Department test results for that project. If less than four Gmm test results are available, an average of all available Department test results for that project will be used. The initial Gmm will be the last available Department test result from a QMP project.