Sheridan_QUESTIONS_AND_ANSWERS.pdf
PDF 64 KB Posted
- Attached to
- REPLACE REAR GATE
- Solicitation number
- IFBP06121500001
About this file
Questions and Answers
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Flap_C_Tab_1_-_Abstract.pdf | ||
| Flap_B_Tab_2_Amendment_0002_02052015.pdf | ||
| Meeting_Minutes.pdf | ||
| Flap_B_Tab_2_Amendment_0001_01142015.pdf | ||
| 3_-_SOW.pdf | ||
| 6_-_SF-24_Bid_Bond_Form.pdf | ||
| 2_-_Solicitation_12242014.pdf | ||
| 5_-_Wage_Rate_OR3212192014.pdf | ||
| 1_-_Coverletter.pdf | ||
| 7_-_NCIC_Form.pdf | ||
| 4_-_Official_Drawing.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FCI SHERIDAN – UPGRADE FDC REAR GATE
SOLICITATION IFBP06121500001 - PROJECT 6A8W
QUESTIONS and ANSWERS
SOUTHERN FOLGER:
1. Title of work is "Replace rear gate - FCI Sheridan". Page 1 of 7 Statement of Work - 1.A Description of duties says "replacing the rear gate operators and the vehicle and man gates on the perimeter fence." Also 1.B Scope of Work says "and the vehicle and man gates at FDC Sheridan." Page 4 of 7 II Technical Specifications 1.1 Summary says "replacement of two vehicle gate operators, two 12' x 14' vehicle gates and two pedestrian gates. The solicitation and the statement of work + the technical specifications don't match. Which one is correct?
CLARIFICATION: The title of this project is UPGRADE FDC REAR GATE ias stated on the first page of the solicitation, and is simply a singular title. The solicitation, the Statement of Work, and all contents draw under one title, which on the first page. No further clarification will be provided. All work stated in the solicitation and attachments is required.
2. Same problem exists between Page 1 of 29 the Solicitation Project Title and the statement "in accordance with the attached statement of work." Page 4 of 29 has the same conflict. If the new gate's control requirements and it's power requirements do not match up with the existing controls and power supply, who provides the new control and pulls the required power supply to the new gate operator. (Reference the electrical requirements on the bottom of the drawing provided).
CLARIFICATION: Page 1 of 29, and Page 4 of 29 should read “UPGRADE FDC REAR GATE”. For clarification, the contractor shall provide the necessary controls, and FCI Sheridan will provide the necessary power for the new controls.
File details come from the government source that posted it. Updated .