Sheridan_QUESTIONS_AND_ANSWERS.pdf

PDF 64 KB Posted

Attached to
REPLACE REAR GATE
Solicitation number
IFBP06121500001
Issued by

About this file

Questions and Answers

View the file

Other files

File Type Posted
Flap_C_Tab_1_-_Abstract.pdf PDF
Flap_B_Tab_2_Amendment_0002_02052015.pdf PDF
Meeting_Minutes.pdf PDF
Flap_B_Tab_2_Amendment_0001_01142015.pdf PDF
3_-_SOW.pdf PDF
6_-_SF-24_Bid_Bond_Form.pdf PDF
2_-_Solicitation_12242014.pdf PDF
5_-_Wage_Rate_OR3212192014.pdf PDF
1_-_Coverletter.pdf PDF
7_-_NCIC_Form.pdf PDF
4_-_Official_Drawing.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FCI SHERIDAN – UPGRADE FDC REAR GATE

SOLICITATION IFBP06121500001 - PROJECT 6A8W

QUESTIONS and ANSWERS

SOUTHERN FOLGER:

1. Title of work is "Replace rear gate - FCI Sheridan". Page 1 of 7 Statement of Work - 1.A Description of duties says "replacing the rear gate operators and the vehicle and man gates on the perimeter fence." Also 1.B Scope of Work says "and the vehicle and man gates at FDC Sheridan." Page 4 of 7 II Technical Specifications 1.1 Summary says "replacement of two vehicle gate operators, two 12' x 14' vehicle gates and two pedestrian gates. The solicitation and the statement of work + the technical specifications don't match. Which one is correct?

CLARIFICATION: The title of this project is UPGRADE FDC REAR GATE ias stated on the first page of the solicitation, and is simply a singular title. The solicitation, the Statement of Work, and all contents draw under one title, which on the first page. No further clarification will be provided. All work stated in the solicitation and attachments is required.

2. Same problem exists between Page 1 of 29 the Solicitation Project Title and the statement "in accordance with the attached statement of work." Page 4 of 29 has the same conflict. If the new gate's control requirements and it's power requirements do not match up with the existing controls and power supply, who provides the new control and pulls the required power supply to the new gate operator. (Reference the electrical requirements on the bottom of the drawing provided).

CLARIFICATION: Page 1 of 29, and Page 4 of 29 should read “UPGRADE FDC REAR GATE”. For clarification, the contractor shall provide the necessary controls, and FCI Sheridan will provide the necessary power for the new controls.