About this file
Drawings
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Lex_Abstract.pdf | ||
| Questions_Response.pdf | ||
| Flap_B_Tab_2_-_Amendment_0002_to_Post.pdf | ||
| OneTouch_Apr_23 _2015_(6).PDF | ||
| Lexington_Final_Amend_0001.pdf | ||
| 2_-_Solicitation.pdf | ||
| 3_-_SOW.pdf | ||
| 6_-_SF-24_Bid_Bond_Form.pdf | ||
| 5_-_Wage_Rate_KY58_01302015.pdf | ||
| 7_-_NCIC_Form.pdf | ||
| 1_-_Coverletter.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
G A
T E
B
O V
E
G A
B
O V
E
MH 4
MH 3 A
A
MAIN
TUNNEL
(NO ASPHALT
LAYER REQ'D
UNDER RAMP)
POWERHOUSE TUNNEL-
NOT IN CONTRACT
MAIN
TUNNEL
MAIN
TUNNEL
MAIN
TUNNEL
A A
A A
B B
B B
A A
A B
A
C
A B
60'-3"60'-3"50'-0" 48'-0"
3'-6"
3'-6"
3'-6"
L A
U N
D R
Y
R
O O
M
A B
O V
E
10'-3"
S T
O R
A G
E
R
O O
M
A B
O V
E
190'-5" 212'-4"
LOADING
DOCK
STORAGE ROOM
EXIT
LOADING
DOCK
LAUNDRY ROOM
EXIT
10'-0"
10'-0"
BEGIN TUNNEL W/
CONC. TOP EXPOSED
TUNNEL W/ ASPH.
OVER CONC. TOP
AREA W/ NEW
LAYER OF ASPH.
ORIGINAL ASPH.
SURFACE
CONC. PAD FOR TRASH
COMPACTOR
UNISTRUT (1 3/4"D)
GALVANIZED
3/8" PIPE HANGER
RODS
3'-6"
4'-9"
UNISTRUT SUPPORT
L 2"x2"X1/4"x6"LONG
GALVANIZED
1/4" ±BEARING
PAD (TYP.)
11/2" PIPE
4'-9"
3'-6"
UNISTRUT (1 3/4"D)
GALVANIZED
3/8" PIPE HANGER
RODS
UNISTRUT SUPPORT
L 2"x2"X1/4"x6"LONG
GALVANIZED
1/4" ±BEARING
PAD (TYP.)
11/2" PIPE
SIDE TUNNEL 2&3 - 3 PIPES:
3 1/2" (7 1/2" w/INSULATION)
2 1/2" (5 1/2" w/INSULATION)
1 3/4" (5 1/2" w/INSULATION)
MH2 OR MH3
SIDE
TUNNEL
2 OR 3
MAIN
TUNNEL
MAIN TUNNEL - 3 PIPES:
7" ( 11" w/INSULATION)
4 1/2" ( 8" w/INSULATION)
3" (4 3/4" w/INSULATION)
MAIN TUNNEL - 3 PIPES:
7" ( 11" w/INSULATION)
4 1/2" ( 8" w/INSULATION)
3" (4 3/4" w/INSULATION)
SIDE TUNNEL 1 - 1 PIPE:
4 1/2" ( 8 " w/INSULATION)
1 3/4" (5 3/4" w/INSULATION)
MH1
SIDE
TUNNEL 1
MAIN
TUNNEL
NICHE
SCALE IN FEET
25' 50'
STEAM TUNNEL
CHECKED BY:
DATE:
DRAWN BY:
SHEET TITLE :
APPROVED BY:
DIVISION HEAD
PROJ. MANAGER
JOB NUMBER
PROJECT :
SHEETSCALE:
01/20/2015
AS
AS
CB
A
B
C
D
E
1 2 3 4 5
E
D
C
B
A
RELEASED FOR
CONSTRUCTION
6'
SCALE IN FEET
0 2' 4'
TYPICAL MAIN TUNNEL SECTION
A-A
6'
SCALE IN FEET
0 2' 4'
TYPICAL SIDE TUNNEL SECTION
B-B
6'
SCALE IN FEET
0 2' 4'
TYPICAL SECTION AT MAIN
TUNNEL/SIDE TUNNEL 2 OR 3
A-B
6'
SCALE IN FEET
0 2' 4'
TYPICAL SECTION AT MAIN
TUNNEL/SIDE TUNNEL 1
A-C
GENERAL NOTE:
ALTERNATE No. 1 - REMOVE AND REPLACE ALL PIPE INSULATION
SIDE TUNNEL 1
MAIN TUNNEL
S I D
E
T
U N
N E
L
M A
I N
U N
N E
L
G A
B
O V
E
5 6
23 24 25
26 28
POWERHOUSE TUNNEL-
NOT IN CONTRACT
POWERHOUSE TUNNEL
- NOT IN CONTRACT
59 60
S T
O R
A G
E
R
O O
M
A B
O V
E
MAIN TUNNEL
MAIN TUNNEL
±8'-0" ±8'-0"
±6'-0" ±6'-0"
STATIONS
109-111
STATION 29
STATIONS
1 & 4
LEGEND:
MAIN TUNNEL
M A
N
N E
L
S I D
E
T
U N
N E
L
G A
B
O V
E
MH 3
MH 4
SIDE TUNNEL 4
55 56
L A
U N
D R
Y
R
O O
M
A B
O V
±10'-0"±16'-0"±8'0"
±8'-0"
±25'-10" ±37'-2"
STATION 134
STATIONS
128-131
STATION 77 STATIONS
86-87
STATION 95
±3'-6"
SCALE IN FEET
8'0 32'16'
STEAM TUNNEL LOCATIONS
CHECKED BY:
DATE:
DRAWN BY:
SHEET TITLE :
APPROVED BY:
DIVISION HEAD
PROJ. MANAGER
JOB NUMBER
PROJECT :
SHEETSCALE:
01/20/2015
AS
AS
CB
A
B
C
D
E
1 2 3 4 5
E
D
C
B
A
RELEASED FOR
CONSTRUCTION
NOTES:
FOR PHOTOS SEE DRAWINGS
S104 THRU S109.
G
B
O V
E
POWERHOUSE TUNNEL-
NOT IN CONTRACT
MAIN
TUNNEL
60'-3" 48'-0"
3'-6"
3'-6"
S T
O R
A G
E
R
O O
M
A B
O V
E
212'-4"
Ø 7" PIPE
Ø 4 1/2" PIPE
Ø 3" PIPE
Ø 3" PIPE
Ø 4 1/2" PIPE
Ø 7" PIPE
Ø 4 1/2" PIPE
Ø 1 3/4" PIPE
Ø 1 3/4" PIPE
Ø 2 1/2" PIPE
Ø 3 1/2" PIPE
Ø 7" PIPE
Ø 4 1/2" PIPE
Ø 3" PIPE
PIPES INSULATION
UNDER STORAGE ROOM-
NOT IN CONTRACT
G A
B
O V
E
MH 4
MH 3
MAIN
TUNNEL
MAIN
TUNNEL
60'-3"
3'-6"
L A
U N
D R
Y
R
O O
M
A B
O V
E
10'-0"
190'-5"
Ø 3" PIPE
Ø 4 1/2" PIPE
Ø 7" PIPE
Ø 3 1/2" PIPE
Ø 2 1/2" PIPE
Ø 1 3/4" PIPE
Ø 3" PIPE
Ø 4 1/2" PIPE
Ø 7" PIPE
Ø 7" PIPE
Ø 4 1/2" PIPE
Ø 3" PIPE
PIPES INSULATION
UNDER LAUNDRY ROOM-
NOT IN CONTRACT
SCALE IN FEET
25' 50'
STEAM TUNNEL WITH
PIPE LAYOUT
CHECKED BY:
DATE:
DRAWN BY:
SHEET TITLE :
APPROVED BY:
DIVISION HEAD
PROJ. MANAGER
JOB NUMBER
PROJECT :
SHEETSCALE:
01/20/2015
AS
AS
CB
A
B
C
D
E
1 2 3 4 5
E
D
C
B
A
RELEASED FOR
CONSTRUCTION
GENERAL NOTE:
ALTERNATE No. 1 - REMOVE AND REPLACE ALL PIPE INSULATION, (EXCEPT PIPES UNDER STORAGE AND
LAUNDRY ROOM-NOT IN CONTRACT).
CHECKED BY:
DATE:
DRAWN BY:
SHEET TITLE :
APPROVED BY:
DIVISION HEAD
PROJ. MANAGER
JOB NUMBER
PROJECT :
SHEETSCALE:
01/20/2015
AS
AS
CB
A
B
C
D
E
1 2 3 4 5
E
D
C
B
A
RELEASED FOR
CONSTRUCTION
NOTE:
SEE DRAWING S102 FOR PHOTO LOCATIONS.
DRAWN BY:
SHEET TITLE :
APPROVED BY:
DIVISION HEAD
PROJ. MANAGER
JOB NUMBER
PROJECT :
SHEETSCALE:
01/20/2015
AS
AS
CB
A
B
C
D
E
1 2 3 4 5
E
D
C
B
A
RELEASED FOR
CONSTRUCTION
DRAWN BY:
SHEET TITLE :
APPROVED BY:
DIVISION HEAD
PROJ. MANAGER
JOB NUMBER
PROJECT :
SHEETSCALE:
01/20/2015
AS
AS
CB
A
B
C
D
E
1 2 3 4 5
E
D
C
B
A
RELEASED FOR
CONSTRUCTION
DRAWN BY:
SHEET TITLE :
APPROVED BY:
DIVISION HEAD
PROJ. MANAGER
JOB NUMBER
PROJECT :
SHEETSCALE:
01/20/2015
AS
AS
CB
A
B
C
D
E
1 2 3 4 5
E
D
C
B
A
RELEASED FOR
CONSTRUCTION
DRAWN BY:
SHEET TITLE :
APPROVED BY:
DIVISION HEAD
PROJ. MANAGER
JOB NUMBER
PROJECT :
SHEETSCALE:
01/20/2015
AS
AS
CB
A
B
C
D
E
1 2 3 4 5
E
D
C
B
A
RELEASED FOR
CONSTRUCTION
DRAWN BY:
SHEET TITLE :
APPROVED BY:
DIVISION HEAD
PROJ. MANAGER
JOB NUMBER
PROJECT :
SHEETSCALE:
01/20/2015
AS
AS
CB
A
B
C
D
E
1 2 3 4 5
E
D
C
B
A
RELEASED FOR
CONSTRUCTION
REPAIR ITEMS
DETAILITEM DESCRIPTION
1B. REPLACE EXIST. SLAB AND WALL
WITH NEW SLAB AND NEW WALL
DETAILS 1/S202, 2/S202,
3/S202 & 7/S202.
2. SHALLOW (< 2") SPALL REPAIR DETAIL 1/S201.
3. DEEP (>= 2") SPALL REPAIR DETAIL 2/S201.
4. NON-STRUCTURAL WALL CRACK INJECTION
FOR SHRINKAGE, THERMAL, ETC.
DETAIL 3/S201.
5. STRUCTURAL WALL OR SLAB CRACK
INJECTION FOR STRESS, SETTLEMENT, ETC.
DETAIL 4/S201.
6. REMOVE EXIST. PIPE HANGER AND
REPLACE WITH NEW PIPE HANGER
DETAIL 5/S202
& 6/S202.
7. SEALING TOP SLAB NON-STRUCTURAL
CRACK OR JOINT
DETAIL 4/S202.
8. REPLACE EXIST. MANHOLE COVER AND FRAME
WITH NEW WATERPROOFING MANHOLE COVER
AND FRAME
ABBREVIATION:
1. MT MAIN TUNNEL
2. ST SIDE TUNNEL
3. MH MANHOLE
4. SP SPALL
5. C CRACK
6. TS TOP SLAB
7. BS BOTTOM SLAB
8. SJ SLAB JOINT
9. PH PIPE HANGER
10. NW NORTH WALL
11. SW SOUTH WALL
12. EW EAST WALL
13. WW WEST WALL
DETAIL 1/S203,
2/S203
& 3/S203.
1A. REPLACE EXIST. SLAB WITH
NEW SLAB
DETAILS 1/S202, 2/S202,
& 3/S202.
QUANTITY
49 FT.
BASE BID
26 FT.
210 SF.
140 SF.
165 FT.
20 FT.
74 EA.
271 FT.
4 EA.
CHECKED BY:
DATE:
DRAWN BY:
SHEET TITLE :
APPROVED BY:
DIVISION HEAD
PROJ. MANAGER
JOB NUMBER
PROJECT :
SHEETSCALE:
01/20/2015
AS
AS
CB
A
B
C
D
E
1 2 3 4 5
E
D
C
B
A
RELEASED FOR
CONSTRUCTION
*** -SEE S102 FOR EXTENTS OF TOP SLAB AND WALL REPLACEMENTS.
DRAWN BY:
SHEET TITLE :
APPROVED BY:
DIVISION HEAD
PROJ. MANAGER
JOB NUMBER
PROJECT :
SHEETSCALE:
01/20/2015
AS
AS
CB
A
B
C
D
E
1 2 3 4 5
E
D
C
B
A
RELEASED FOR
CONSTRUCTION
NOTE:
** -DISCONNECT / RECONNECT POWERLINE (TO TRASH COMPACTOR)
AS REQUIRED FOR SLAB REPLACEMENT..
*** -SEE S102 FOR EXTENTS OF TOP SLAB AND WALL REPLACEMENTS.
1"
1/2" MIN.
TO W.W.F.
2" DEEP SPALL
MAX.
T
Y P
TO W.W.F.
1/2" MIN.
T
Y
P
NOT TO SCALE
PLAN VIEW
1A
NOT TO SCALE
EXISTING SPALL
1B
NOT TO SCALE
SECTION AT REPAIR
1C
NOT TO SCALE
TYPICAL SHALLOW (<=2") SPALL REPAIR
(WITHOUT EXPOSED REBARS)
NOT TO SCALE
PLAN VIEW
2A
NOT TO SCALE
REPAIR WITH SHOTCRETE
2B
NOT TO SCALE
SECTION AT REPAIR
2C
NOT TO SCALE
TYPICAL WALL CRACK PRESSURE INJECTION REPAIR (FOR
SHRINKAGE, THERMAL, NON-STRUCTURAL CRACKING, U.O.N.)
NOT TO SCALE
ELEVATION VIEW
3A
NOT TO SCALE
SECTION B-B
3B
NOT TO SCALE
TYPICAL WALL CRACK PRESSURE INJECTION REPAIR (FOR
STRESS, SETTLEMENT, STRUCTURAL CRACKING ONLY.)
NOT TO SCALE
ELEVATION VIEW
4A
NOT TO SCALE
SECTION C-C
4B
NOT TO SCALE
TYPICAL DEEP (>=2") SPALL REPAIR
(WITH EXPOSED REBARS)
CHECKED BY:
DATE:
DRAWN BY:
SHEET TITLE :
APPROVED BY:
DIVISION HEAD
PROJ. MANAGER
JOB NUMBER
PROJECT :
SHEETSCALE:
01/20/2015
AS
AS
CB
A
B
C
D
E
1 2 3 4 5
E
D
C
B
A
RELEASED FOR
CONSTRUCTION
3 3/4"
3'-6"
4'-9"
7 1/2" 7 1/2"
2" CL.
C
L
3" 3"
7 1/2" 7 1/2"
4'-9"
3'-6"
4'-9"
4'-9"
3/8" PIPE HANGER
RODS (GALV.)
(SCH. 40, GALV.)
1 1/2"Ø STD. PIPE
3"
C
L
O
C
E A
F
A C
E
T
Y P
7 1/2"
2" CL.
7 1/2"
4'-9"
3'-6"
3 3/4"
3"
C
L
4'-9"
3"
C
L
O
C
E A
F
A C
E
T
Y P
3"
3/8" PIPE HANGER
RODS (GALV.)
(SCH. 40, GALV.)
1 1/2"Ø STD. PIPE
4'-9"
7 1/2" 7 1/2"
4'-9"
3'-6"
1"
1"
C
L
C
L
EXIST. SLAB
EXIST. SLAB
M A
T C
H
E X
I S
T
E X
I S
T
M A
T C
H
VARIES
MATCH
EXIST.
MATCH
EXIST.
VARIES
EXIST. WALL
EXIST. WALL
C
L
C
L
3'
SCALE IN FEET
0 1' 2'
TYPICAL TUNNEL SECTIONS AT SLAB CRACKING
AND SLAB JOINTS
3'
SCALE IN FEET
0 1' 2'
TYPICAL TUNNEL SECTIONS AT PIPE SUPPORT
SYSTEM AT MAIN TUNNEL
3'
SCALE IN FEET
0 1' 2'
TYPICAL TUNNEL SECTIONS AT PIPE SUPPORT
SYSTEM AT SIDE TUNNEL
3'
SCALE IN FEET
0 1' 2'
TYPICAL TUNNEL SECTION WITH NEW WALL
3'
SCALE IN FEET
0 1' 2'
TYPICAL TUNNEL SECTION WITH NEW SLAB
3'
SCALE IN FEET
0 1' 2'
TYPICAL SIDE TUNNEL SECTION WITH
NEW SLAB AND NEW WALLS
3'
SCALE IN FEET
0 1' 2'
TYPICAL MAIN TUNNEL SECTION WITH
NEW SLAB AND NEW WALLS
6" 6"
1/2"
(TYP.)
(TYP.)
1/2"
6" 6"
1/2"Ø GALV. BOLT
(UNISTRUT TO ANGLE,
A307, GALV., TYP.)
A307, GALV., TYP.)
(UNISTRUT TO ANGLE,
1/2"Ø GALV. BOLT
2-1/2"Ø @ 3" O.C. ADHESIVE
WITH 3" EMBEDMENT (TYP.)
ANCHOR BOLTS (A307, GALV.)
2-1/2"Ø @ 3" O.C. ADHESIVE
WITH 3" EMBEDMENT (TYP.)
ANCHOR BOLTS (A307, GALV.)
6"
C
L
X I S
T
S
L A
B
T H
I C
K N
E S
S
O
F
NEW SLAB
THICK. TO
MATCH EXIST.
T
CHECKED BY:
DATE:
DRAWN BY:
SHEET TITLE :
APPROVED BY:
DIVISION HEAD
PROJ. MANAGER
JOB NUMBER
PROJECT :
SHEETSCALE:
01/20/2015
AS
AS
CB
A
B
C
D
E
1 2 3 4 5
E
D
C
B
A
7 1/2"7 1/2"
4'-9"
3'-6"
C
T
Y
P
T
Y
P
MANHOLE
OD
=29.5"±
M
A
N
N E
L
=29.5"±
OD
MANHOLE
T
Y
P
T
Y
P
C
3'-6"
7 1/2" 7 1/2"
S
I D
E
T
U N
N E
L
4'-9" MAIN TUNNEL
3'
SCALE IN FEET
0 1' 2'
TYPICAL PLAN OF TOP SLAB AT TUNNEL INTERSECTION (U.O.N.)
3'
SCALE IN FEET
0 1' 2'
TYPICAL PLAN OF TOP SLAB AT TUNNEL INTERSECTION (AT MH1)
1. ALL SAFETY REGULATIONS ARE TO BE FOLLOWED STRICTLY. METHODS OF CONSTRUCTION AND
ERECTION OF THE STRUCTURAL MATERIAL IS CONTRACTOR'S RESPONSIBILITY.
2. DESIGN LOAD : (2009 IBC - INTERNATIONALBUILDING CODE) STRUCTURE CATEGORY III
A. DEAD LOAD : ACTUAL WEIGHT OF MATERIAL.
B. LIVE LOAD :
BASIC WIND SPEED .....90 MPH (EXPOSURE C)
WIND LOAD IMPORTANCE FACTOR Iw = 1.15
SEISMIC DESIGN:
BUILDING OCCUPANCY CATEGORY III, SEISMIC LOAD IMPORTANCE FACTOR,
Ie = 1.25 SPECTRAL RESPONSE ACCELERATION SMS = 37.8%G, SM1 = 21.1%G
SDS = 25.2%G, SD1 = 14.07%G
SITE CLASSIFICATION "D"
SEISMIC DESIGN CATEGORY "C"
3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING ALL EXISTING DIMENSIONS AND CONDITIONS.
4. IN THE CASE OF CONFLICT BETWEEN THE NOTES AND DETAILS, THE MOST RIGID REQUIREMENTS SHALL
GOVERN.
5. THE CONTRACTOR SHALL MAKE NO DEVIATION FROM DESIGN DRAWINGS WITHOUT WRITTEN APPROVAL
OF THE STRUCTURAL ENGINEER.
6. THE CONTRACTOR SHALL BRING ALL NON-TYPICAL FIELD CONDITIONS NOT COVERED BY PLANS, DETAILS
AND SECTIONS CONTAINED IN THESE DRAWINGS TO THE IMMEDIATE ATTENTION OF THE STRUCTURAL
ENGINEER.
GENERAL
MISCELLANEOUS STEEL
1. ALL STEEL DETAILS AND CONNECTION SHALL BE IN ACCORDANCE WITH THE REQUIREMENT OF THE
LATEST A. I. S. C. SPECIFICATIONS WITH LATEST REVISIONS.
2. ALL STRUCTURAL PIPES SHALL BE ASTM A-53, FY = 35 K.S.I. MIN. ALL ANGLES, RODS AND PLATES
SHALL BE ASTM A-36 ,FY = 36 K.S.I. U.O.N. ALL MISCELLANEOUS STEEL SHALL BE ASTM A-36, FY = 36
K.S.I. U.O.N.
UNISTRUT SYSTEM
1. UNISTRUT SYSTEM IS A PART OF ATKORE INTERNATIONAL. UNISTRUT INSTALLATIONS AND THEIR
CONNECTIONS SHALL FOLLOW MANUFACTURER'S GUIDELINES AND PROCEDURES.
MISCELLANEOUS
1. SHOP DRAWINGS. CONTRACTORS SHALL SUBMIT SHOP DRAWINGS FOR CONCRETE,
REINFORCING STEEL, STRUCTURAL STEEL AND CONCRETE REPAIR MATERIALS TO THE
ENGINEER FOR APPROVAL.
2. THE INJECTION ADHESIVE ANCHORS SHALL MEET THE FOLLOWING LOAD REQUIREMENTS:
FOR 1/2"Ø ANCHORS WITH 3" EMBEDMENT IN CONCRETE
MINIMUM ALLOWABLE SHEAR = 2.7 KIPS. MINIMUM
ALLOWABLE TENSION = 1.4 KIPS.
3. ALL CONCRETE REPAIR METHODS AS OUTLINED ON SHEETS S201 & S202 SHOULD
STRICTLY FOLLOW MATERIAL MANUFACTURER RECOMMENDED REPAIR
PROCEDURES.
GENERAL NOTES
CONCRETE AND REINFORCING STEEL
1. ALL REINFORCEMENT SHALL BE A-615 GRADE 60 STEEL. ALL WELDED WIRE FABRIC SHALL
CONFORM TOASTM A1064.
2. ALL REINFORCEMENT SHOULD BE SECURELY HELD IN PLACE WHILE PLACING CONCRETE. IF
REQUIRED,ADDITIONAL BARS OR STIRRUPS SHALL BE PROVIDED BY THE CONTRACTOR TO
FURNISH SUPPORT FOR ALL BARS.
3. ALL REINFORCING BARS SHALL BE LAPPED 36 BAR DIAMETERS - 18" MIN., U.O.N.
4. MINIMUM CONCRETE COVER FOR REINFORCING STEEL SHALL BE 1" FOR SLABS AND WALLS.
ALL CONCRETE EXPOSED TO WEATHER OR EARTH SHALL HAVE MINIMUM CONCRETE COVER OF 2"
FOR BARS LARGER THAN #5, 1-1/2" FOR #5 BARS OR SMALLER, AND 3" FOR ALL CONCRETE
PLACED AGAINST EARTH.
5. PROVIDE CORNER BARS WITH 1'-6" IN EACH DIRECTION IN ALL WALLS AND FOOTINGS AND AT ALL
WALL INTERSECTIONS TO MATCH SIZE AND SPACING OF HORIZONTAL BARS IN THOSE WALLS AND
FOOTINGS.
6. ALL CONCRETE WORK SHALL CONFORM TO THE LATEST ACI CODE AND DETAILING MANUAL.
7. CONCRETE SHALL HAVE UNIT WEIGHT OF 150 PCF, F'C = 4,000 PSI COMPRESSIVE STRENGTH AT 28
DAYS AND SLUMP OF 4" MAX. U.O.N. USE 5% AIR ENTRAINING ADMIXTURE IN ALL CONCRETE.
TUNNEL TOP SLAB ...... AASHTO STANDARD H 20 TRUCK, MAX. WHEEL LOAD = 16 KIPS
SNOW ............................15 PSF, SNOW LOAD IMPORTANCE FACTOR Is = 1.10
*** 3'-5 1/2"ر
6"6"
2'-5 1/2"ر
(PER MANUF.)
2'-1 1/4"±
(PER MANUF.)
S L A
B
3'
SCALE IN FEET
0 1' 2'
TYPICAL SECTION AT MANHOLE
CHECKED BY:
DATE:
DRAWN BY:
SHEET TITLE :
APPROVED BY:
DIVISION HEAD
PROJ. MANAGER
JOB NUMBER
PROJECT :
SHEETSCALE:
01/20/2015
AS
AS
CB
A
B
C
D
E
1 2 3 4 5
E
D
C
B
A
File details come from the government source that posted it. Updated .