AG-94TZ-S-10-0042-0002.pdf

PDF 37 KB Posted

Attached to
KAIBAB LAKE CAMPGROUND
Solicitation number
IFB-AG-94TZ-S-10-0042
Issued by

About this file

Amendment 0002 changing work to be performed by Prime Contractor from 50 to 25

View the file

Other files

File Type Posted
AG-94TZ-S-10-0042-000006 Schedule Change.pdf PDF
Page52reve.pdf PDF
AG-94TZ-S-10-0042-000005_Kaibab Lake CG pages 4-6.doc DOC document
Kaibab Lake CG Clarifications 08-23-10.doc DOC document
AG-94TZ-S-10-0042-000005.doc DOC document
Attendance Sheet - Pre-Bid.pdf PDF
PAGE56REV.pdf PDF
PAGE34REV.pdf PDF
AG-94TZ-S-10-0042-000004.pdf PDF
AG-94TZ-S-10-0042-000003.pdf PDF
AG-94TZ-S-10-0042-0001.pdf PDF
Solicitation AG-94TZ-S-10-0042.pdf PDF
Appendix B-2 Drawings PAGE 21-40.pdf PDF
Appendix C AZ100010 06-04-2010.doc DOC document
Appendix B-3 Drawings PAGE 41-65.pdf PDF
Appendix B-1 Drawings PAGE 1-20.pdf PDF
Appendix A - Specifications - 249 pages.doc DOC document
Complete.pdf PDF
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. CONTRAC ID CODE PAGE OF PAGES

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1 2

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO (IF APPLICABLE) 0002 07/28/2010 421463

6. ISSUED BY 7. ADMIISTERED BY ( IF OTHER THAN ITEM 6)

CODE CODE

USDA FOREST SERVICE

WESTERN ZONE CP

2324 E MCDOWELL ROAD

PHOENIX AZ 85006-2440

8. NAME AND ADDRESS OF CONTRACTOR (NO., STREET, COUNTY STATE AND ZIP CODE) 9A. AMENDMENT OF SOLICITATION NO.

AG-94TZ-S-10-0042

9B. DATED (SEE ITEM 11)

07/01/2010

10A. MODIFICATION OF CONTRACT NO.

10B DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of offers is extended is not extended

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing items 8 and 15 and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) by separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATE (IF REQUIRED)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS

IT MODIFIES THE CONTRACT/ORDER NO. DESCRIBED IN ITEM 14.

A.This change order is issued pursuant to: (Specify Authority) The changes set forth in item 14 are made in the contract order no. in item 10A

B. The above numbered contract/order is modified to reflect the administration changes (such as changes in paying office, appropriation data, etc.) set forth in item 14 pursuant to the authority of FAR 43.103(b)

C. This supplement agreement is entered in pursuant to authority of:

D. Other (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copies to the issuing office.

14. Description of amendment/modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Replace page 24 with supplied new page. Changes the requirement from 50% to 25% performance by the Prime Contractor.

Accept as provided herein, all terms and conditions of the document referenced in item 9A and 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (TYPE OR PRINT) 16a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR 15C. DATED SIGNED 16b. UNITED STATES OF AMERICA 16C. DATE SIGNED

(SIGNATURE OF PERSON AUTHORIZED TO SIGN) (SIGNATURE OF CONTRACTING OFFICER)

STANDARD FORM 30 (REV. 10-83)

CONSTRUCTION IFB SOL NO AG-94TZ-S-10-0042-0002

UNIT Kaibab NF

PROJ NAME Kaibab Lake Campground

A

M

E

N

D

(1) To unsuccessful bidders as soon as practicable after the opening of bids, and (2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.

(c) The amount of the bid guarantee shall be 20 percent of the bid.

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

FAR 52.236-1 Performance of Work by the Contractor (APR 1984)

The Contractor shall perform on the site, and with its own organization, work equivalent to at least 25 percent of the total amount of work to be performed under the contract. This percentage may be reduced by a supplemental agreement to this contract if, during performing the work, the Contractor requests a reduction and the Contracting Officer determines that the reduction would be to the advantage of the

Government.

AGAR 452.228-70 Alternative Forms of Security (NOV 1996)

If furnished as security, money orders, drafts, cashier's checks, or certified checks shall be drawn payable to: USDA Forest Service.

Order of Precedence--Construction

Any inconsistency in this solicitation or contract shall be resolved by giving precedence in the following order:

(1) The Schedule (excluding the specifications)

(2) Representations and Other Instructions

(3) Contract Clauses

(4) Other Documents, Exhibits, and Attachments

(5) The Specifications

(6) Drawings

AG-94TZ-S-10-0042-0002
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1 2

AG-94TZ-S-10-0042-0002 Page 24.pdf