General Decision Number.docx

DOCX document 21 KB Posted

Attached to
CRSCENT MOON RANCH WELL DRILLING
Solicitation number
IFB-AG-94TZ-S-09-0076
Issued by

About this file

WAGE DETERMINATION

View the file

Other files

File Type Posted
SF30.doc DOC document
amend2_page2.doc DOC document
SF30.docx DOCX document
Title_Page_Map.PDF PDF
SF 1442.PDF PDF
specs.doc DOC document
Wtr and Elec Lines sht4.pdf PDF
COCONINO FIRE PLAN.doc DOC document
Siteplan sht3.pdf PDF
Elect cb sht5.pdf PDF
AZ080010.doc DOC document
Solicitation.doc DOC document
Index wel dtl sht2.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

General Decision Number: AZ080009 08/07/2009 AZ9

Superseded General Decision Number: AZ20070011

State: Arizona

Construction Type: Heavy

Counties: Cochise, Gila, Graham, Greenlee, La Paz, Santa Cruz and Yavapai Counties in Arizona.

HEAVY CONSTRUCTION PROJECTS (excluding dam construction)

Modification Number Publication Date 0 02/08/2008 1 04/04/2008 2 04/18/2008 3 05/23/2008 4 07/11/2008 5 07/25/2008 6 08/08/2008 7 08/15/2008 8 08/22/2008 9 02/13/2009 10 02/27/2009 11 05/29/2009 12 06/26/2009 13 07/03/2009 14 07/10/2009 15 07/24/2009 16 08/07/2009

ASBE0073-002 08/01/2008

Rates Fringes

Asbestos Workers/Insulator (Includes the application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems).....$ 34.06 11.12

ASBE0073-004 02/16/2001

Rates Fringes

Asbestos Removal worker/hazardous material handler (Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems, whether they contain asbestos or not)....$ 20.18 5.87

BOIL0627-002 10/01/2008

Rates Fringes

BOILERMAKER (Including Containment Lining)..............$ 31.37 19.16

BRAZ0003-001 07/01/2008

GILA, LA PAZ, YAVAPAI, and the area of GRAHAM & GREENLEE COUNTIES located West and North of the San Francisco River to the Gila River

Rates Fringes

BRICKLAYER.......................$ 24.15 4.49

BRAZ0003-013 10/05/2007

COCHISE and SANTA CRUZ COUNTIES; and the area of GRAHAM and GREENLEE COUNTIES located East and South of the San Francisco River to the Gila River

BRICKLAYER.......................$ 18.90 4.09

CARP1914-001 09/01/2007

Rates Fringes

MILLWRIGHT

Zone 1......................$ 23.29 12.34 Zone 2......................$ 24.67 12.34 Zone 3......................$ 27.79 12.34

ZONE DEFINITIONS FOR MILLWRIGHTS: Mileage shall be calculated from the construction site to the City Hall in Phoenix or Tucson, or to the workmen's residence, whichever is less:

Zone 1: 0-30 miles Zone 2: 31-49 miles Zone 3: 50 miles and over

ELEC0518-003 07/01/2008

GILA COUNTY

Rates Fringes

ELECTRICIAN......................$ 24.05 12%+6.50

ELEC0570-005 06/01/2008

COCHISE, GRAHAM, LA PAZ, GREENLEE, AND SANTA CRUZ COUNTIES

Rates Fringes

ELECTRICIAN......................$ 21.65 18%+4.70

ZONE DEFINITIONS:

Zone 1: 0 to 29 miles radius from City Hall in the following cities: Tucson, Benson, Bisbee, Clifton, Douglas, Morenci, Nogales, Parker, Safford, Sierra Vista & Yuma.

Zone 2: Over 29 miles to 46 miles - add $1.25 to Zone 1 rate.

Zone 3: Over 46 miles - add $3.75 to Zone 1 rate.

ELEC0640-004 06/21/2008

YAVAPAI COUNTY

Rates Fringes

ELECTRICIAN......................$ 24.80 3%+7.09

ENGI0428-007 06/01/2009

Rates Fringes

Power Equipment Operator Group 1.....................$ 20.89 9.31 Group 2.....................$ 24.16 9.31 Group 3.....................$ 25.24 9.31 Group 4.....................$ 26.27 9.31

POWER EQUIPMENT OPERATORS CLASSIFICATIONS:

GROUP 1: Gin Truck; Loader 3.5 cu yd and under

GROUP 2: Backhoe, under 1 cu yd; ; Blade/Grader; Bulldozer;

Crane, under 15 tons; Driller; Field Equipment Service man; Loader over 3.5 cu yd but less than 6 cu yd; Oiler;

and Scraper

GROUP 3: Backhoe, up to 10 cu yd; Bending Machine; Crane, over 15 tons but less than 100 tons; Loader, over 6 cu yd but less than 10 cu yd; and Mechanic

GROUP 4: Backhoe, 10 cu yd and over; Crane, 100 tons and over; Loader, over 10 cu yd All Operators, Oilers, and Motor Crane Drivers on equipment with Booms, except concrete pumping truck booms, including Jibs, shall receive $0.01 per hour per foot over 80 ft in addition to regular rate of pay

* IRON0075-005 08/01/2009

Rates Fringes

IRONWORKER, STRUCTURAL

Zone 1:.....................$ 26.52 17.59

Zone 1: 0 to 50 miles from City Hall in Phoenix or Tucson Zone 2: 050 to 100 miles - Add $4.00 Zone 3: 100 to 150 miles - Add $5.00 Zone 4: 150 miles & over - Add $6.50

LABO0383-003 06/01/2009

Rates Fringes

Laborers:

(1) General.................$ 16.72 4.35

(2) Concrete Worker;

Guinea Chaser...............$ 17.70 4.35

(4) Jackhammer; Pipelayer...$ 18.46 4.35

PLAS0394-006 07/01/2007

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 21.34 8.07

PLUM0469-003 07/01/2009

ZONE A: LA PAZ & YAVAPAI COUNTIES

ZONE B: COCHISE, GILA, GRAHAM, GREENLEE, AND SANTA CRUZ

COUNTIES

PLUMBER/PIPEFITTER

Zone A......................$ 30.55 14.10 Zone B......................$ 27.28 13.85

INDUSTRIAL WORK: Add $6.00 to basic hourly rate

SUAZ1994-004 02/01/1994

Rates Fringes

CARPENTER (Including form work)............................$ 14.83 3.11

Landscape Laborer................$ 7.25 .38

Power Equipment Operator Roller......................$ 13.64 1.59

SPRINKLER FITTER (Irrigation)....$ 7.25

TRUCK DRIVER

Water Truck.................$ 8.43 2.87

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

File details come from the government source that posted it. Updated .