IFB1 PMAA 2027000013 - Drawing Set 2 of 2 CORRECTED.pdf
PDF 6 MB Posted
- Attached to
- Project Number: CC2501T11
- Solicitation number
- IFB1 PMAA 2027000013 3
- Issued by
- Denver County, Denver City, Colorado
About this file
This is a set of structural and landscape drawing sheets for the North Connector Pedestrian Bridge Replacement project (Project No. 25-104.01) in Colorado, prepared at the 90% design phase dated August 28, 2026. The project involves the replacement of a pedestrian bridge with a prefabricated steel truss bridge spanning approximately 100 feet, including two reinforced concrete abutments with drilled shaft foundations, approach slabs, and pedestrian railings. The bridge structure features an 8-foot clear width deck with 3-foot clearance on each side, a 6-foot horizontal clear span between abutments, and design specifications for a 100-year water surface elevation of 5,559.4 feet. Construction includes two 24-inch diameter drilled caissons with an estimated 48-foot pay length for each abutment, concrete approach slabs at 1.5% trail slope, riprap abutment protection, and comprehensive erosion control measures. The drawings specify anchor bolt details, bridge expansion joints, void-form materials, and wingwall-mounted pedestrian railings designed to match the bridge aesthetics.
The project site is located near East Lake View Road with access via Pipeline Trail and Wetland Loop Trail, and includes landscape restoration with riparian and upland seed mixes, topsoil management, and removal and replacement of 23 square yards of damaged concrete trail. Design documents reference compliance with Section 628 bridge requirements, geotechnical investigation reports for bedrock sounding procedures, and detailed specifications for void-form installation, decompaction of construction areas, and environmental protections including bird nest removal procedures and equipment disinfection protocols for aquatic invasive species prevention. Payment items identified include concrete approach slabs, drilled caissons, bridge girder and deck units with integrated railing and expansion joint components, erosion control installation, and landscape seeding and mulching work. The project imposes contractor responsibility for performing bedrock soundings to depths of 20 feet below assumed bedrock and maintaining void form quality and protective board installation throughout construction completion.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
6' -0
FL
O
W
102'-7"
BF ABUT 1 TO BF ABUT 2
3' -0
C
LR
3' -0
C
LR
100'-1"
C ABUT 1 TO C ABUT 2
90°
90°
1+
2+
1.5%
TRAIL HCLC ABUT 1L
C ABUT 2L
BF ABUT 2
2+02.55 N: 1656299.70 E: 3186471.84
WINGWALL (TYP)
L L
N58°00'02"E
C BRIDGE AND
ABUTMENT
L
EDGE OF TRAIL
(TYP.)
PREFABRICATED
STEEL TRUSS BRIDGE
BF ABUT 1
STA. 0+99.97
N:1656229.48 E:3186397.04
PEDESTRIAN RAILING TO
MATCH BRIDGE RAILING
APPROACH
SLAB (TYP)
100'-7"
102'-7"
1'-0" 1'-0"
1+00 2+00
FINAL GRADE
Ex Grade
DRILLED CAISSON
FOUNDATION (TYP.)
BF ABUT 1 TO BF ABUT 2
OUT-TO-OUT STEEL BRIDGE
BF ABUT 1
EL 5558.70
SEE TYPICAL SECTION
FOR MINIMUM LOW
CHORD ELEVATION
REQUIREMENTS
EL 5558.70
BF ABUT 2
APPROACH
SLAB (TYP)
100YR
WSEL = 5559.4
FINAL GRADE
10YR
WSEL = 5557.1
1.50%
TRAIL HORIZ.
CONTROL
LINE
PROFILE
GRADE LINE
REINFORCED CONCRETE SLAB PER
BRIDGE MANUFACTURER DESIGN
SAFETY
RAILS (TYP)
3'-0" 3'-0"
6'-0" (CLEAR)
8'-0"± OUT TO OUT TRUSSES
(ESTIMATED, TO BE VERIFIED BY TRUSS DESIGNER)
3' -6
M
IN
T.O. ABUT SEAT
(LEVEL)
2' -6
AT
BR
ID
G E
AN
D
TR
AI
L
HC
L
2' -9
3' -0
" HAND RAIL
BRACKET
HAND RAIL
WELDED STEEL
TRUSSES (TYP.)
MINIMUM LOW CHORD
ELEVATION = 5556.70
OUT-TO-OUT, DECK
(LIMITS OF PAYMENT FOR ITEM
515 "CONCRETE SEALER")
PROJECT NO. 25-104.01
DRAWING NO.
SHEET NO.
OF
SHEET REVISIONS
NO. DATE DESCRIPTION BY
PREPARED UNDER
THE SUPERVISION OF
DATEDESIGNED:
DRAWN:
CHECKED:
90% DESIGN
NORTH CONNECTOR BRIDGE REPLACEMENT
AMJ
ASP
BRS
S-2
8/28/2026
GENERAL LAYOUT
STRUCTURAL
PLAN
20'10'0'
LONGITUDINAL SECTION
NOTES:
FINISHED GRADE ELEVATION AT PROFILE GRADE LINE.
1. TRUSSES AND RAILING SHOWN ON THIS SHEET ARE A GENERAL
REPRESENTATION ONLY. REFERENCE SPECIFICATIONS, SECTION
628 FOR BRIDGE REQUIREMENTS.
2. SEE TRAIL PLAN AND TRAIL PROFILE SHEETS FOR HCL AND PGL
INFORMATION.
TYPICAL SECTION
PROFILE GRADE
EL
: 5
8.
EL
: 5
8.
100'-7"
.5
D
L C
AM
BE
R
AT
M
ID
SP
AN
-4.50% -4.50%
P:
\2
Pr oj ec ts
\2 5-
4.
N or th
C on ne ct or P ed es tri an
B rid ge R ep la ce m en t -
C
PW
\C
AD
\D ra w in gs \2
5-
4.
_S
TR
_G
EN
ER
AL
L
AY
O U
T.
dw g
(LOOKING AHEAD STATION)
9'- 6"
(TYP.)
2' -6
2'
-6
1' -8
BELOW BRIDGE SEATABOVE BRIDGE SEAT
BRIDGE AND
ABUTMENT
45°
2'-0" 2'-0
2'-6"
2' -0
(3) #5
B
B
SHT. S
-6
SHT. S
-6
A A
SH
T.
S -6
SH
T.
S -6
6"
(TYP.)
ABOVE SEAT
ORIENT APPROACH SLAB
REINF. ORTHOGONAL
WITH HCL, SEE SECTION
A, SHT. S-6
SEE SECTION A,
SHT. S-6 FOR TYP.
ABUT. REINF.
GRADE
BREAK
(TYP.)
3'-8" +/-*6" ± 3'-8" +/- *6" ±
4'-8"4'-8"10"10"
5'-6"5'-6"
3'-0"
8' -0
AP
PR
O
AC
H
S
LA
B
B.F. ABUT 1
STA. 0+99.97
SEE SECTION B,
SHT. S-6 FOR TYP.
WINGWALL REINF.
1'-0"(TYP)
CL
1'-6"
FRONT FACE CORNER BARS:
#5 @ 10"
(TYP.)
2'-4" 2'-4"
BACK FACE CORNER BARS:
#6 @ 10"
(TYP.)
BACKWALL
CONST JT, SEE
DWG NO S-6
FINISHED GRADE
T.O.W.
EL=5558.62
T.O.W.
EL=5558.78
B.O. ABUT
EL=5553.20
(LEVEL)
WALL CORNER (TYP)
9'-6" 9'-6"
T.O.W.
EL=5558.43
10"1'-0"7'-4"1'-0"
1.5%
11'-0"
10"
T.O. ABUT
EL=5558.70
T.O.W.
EL=5558.59
BRIDGE AND
ABUTMENT
24" CAISSONS (TYP)
BRIDGE SEAT
EL=5556.20
(LEVEL)
CL
PROJECT NO. 25-104.01
DRAWING NO.
SHEET NO.
OF
SHEET REVISIONS
NO. DATE DESCRIPTION BY
PREPARED UNDER
THE SUPERVISION OF
DATEDESIGNED:
DRAWN:
CHECKED:
90% DESIGN
NORTH CONNECTOR BRIDGE REPLACEMENT
AMJ
ASP
BRS
S-3
8/28/2026
ABUTMENT 1 LAYOUT
STRUCTURAL
ABUTMENT 1 - PLAN
P:
\2
Pr oj ec ts
\2 5-
4.
N or th
C on ne ct or P ed es tri an
B rid ge R ep la ce m en t -
C
PW
\C
AD
\D ra w in gs \2
5-
4.
_S
TR
_A
BU
T
LA
YO
U
T.
dw g
20'10'0'
ABUTMENT 1 - ELEVATION
* SEE TRUSS DRAWINGS FOR ANCHOR BOLT PLACEMENT
NOTES:
1. PEDESTRIAN RAILING (NOT SHOWN) REQUIRED ON
WINGWALLS. PEDESTRIAN RAILING SHALL MATCH THE
AESTHETICS OF THE BRIDGE.
2. THE COST FOR PEDESTRIAN RAILING SHALL BE INCLUDED IN
THE COST FOR ITEM 628: "BRIDGE GIRDER AND DECK UNIT".
9'-6" (TYP.)
2' -6
2'
-6
1' -8
BELOW BRIDGE SEAT ABOVE BRIDGE SEAT
BRIDGE AND
ABUTMENT
#5 @ 10"
(TYP.)
2'-0" 2'-0"
2'- 6"2'
-0
(3) #5
B
B
SHT. S-6
SHT. S-6
A A
SH
T.
S -6
SH
T.
S -6
6"
(T
YP
ABOVE SEAT
ORIENT APPROACH SLAB
REINF. ORTHOGONAL
WITH HCL, SEE SECTION
A, SHT. S-6
SEE SECTION A,
SHT. S-6 FOR
TYP. ABUT.
REINF.
GRADE
BREAK
(TYP.)
3'-8" +/- *6" ±3'-8" +/-*6" ±
4'-8"4'-8" 10"10"
5'-6"5'-6"
3'-0"
8' -0
AP
PR
O
AC
H
S
LA
B
B.F. ABUT 2
STA. 2+02.55
SEE SECTION B,
SHT. S-6 FOR TYP.
WINGWALL REINF.
1'- 0"
(TYP)
CL
1'-6"
BACK FACE CORNER BARS:
#6 , @ 10"
(TYP.)2'-4"
2'-4"
FRONT FACE CORNER BARS:
BACKWALL
CONST JT, SEE
DWG NO S-6
FINISHED GRADE
T.O.W.
EL=5558.62
T.O.W.
EL=5558.78
B.O. ABUT
EL=5553.20
(LEVEL)
WALL CORNER (TYP)
9'-6"9'-6"
T.O.W.
EL=5558.43
10" 1'-0" 7'-4" 1'-0"
1.5%
11'-0"
10"
T.O. ABUT
EL=5558.70
T.O.W.
EL=5558.59
BRIDGE AND
ABUTMENT
BRIDGE SEAT
EL=5556.20
(LEVEL)
24" CAISSONS (TYP)CL
PROJECT NO. 25-104.01
DRAWING NO.
SHEET NO.
OF
SHEET REVISIONS
NO. DATE DESCRIPTION BY
PREPARED UNDER
THE SUPERVISION OF
DATEDESIGNED:
DRAWN:
CHECKED:
90% DESIGN
NORTH CONNECTOR BRIDGE REPLACEMENT
AMJ
ASP
BRS
S-4
8/28/2026
ABUTMENT 2 LAYOUT
STRUCTURAL
ABUTMENT 2 - PLAN
P:
\2
Pr oj ec ts
\2 5-
4.
N or th
C on ne ct or P ed es tri an
B rid ge R ep la ce m en t -
C
PW
\C
AD
\D ra w in gs \2
5-
4.
_S
TR
_A
BU
T
LA
YO
U
T.
dw g
20'10'0'
ABUTMENT 2 - ELEVATION
* SEE TRUSS DRAWINGS FOR ANCHOR BOLT PLACEMENT
NOTES:
1. PEDESTRIAN RAILING (NOT SHOWN) REQUIRED ON
WINGWALLS. PEDESTRIAN RAILING SHALL MATCH THE
AESTHETICS OF THE BRIDGE.
2. THE COST FOR PEDESTRIAN RAILING SHALL BE INCLUDED IN
THE COST FOR ITEM 628: "BRIDGE GIRDER AND DECK UNIT".
1 (MIN)
DRILLED SHAFT
STRUCTURAL
BACKFILL (CLASS 1)
1'-6" 1'-6"
VOID-FORM MATERIAL
ABUTMENT SEAT
APPROACH SLAB
LIMITS OF STRUCTURE
EXCAVATION
BACKFILL SHALL BE
MAINTAINED AT EQUAL
ELEVATIONS ON THE FRONT
AND BACK FACES OF THE
ABUTMENT AND WINGWALLS
UNTIL FINISHED GRADE ON
THE FRONT FACE IS REACHED.
100'-1"
℄ ABUT. 1 &
℄ DRILLED SHAFT
℄ ABUT. 2 &
℄ DRILLED SHAFT
24" DRILLED
SHAFT (TYP.)
PEDESTRIAN
BRIDGE
WINGWALL (TYP.)
3' -8
3'
-8
3' -8
3'
-8
7' -4
7' -4
HCL
℄ STA. 2+01.30℄ STA 1+01.21
+/- 4" DIAMETER
TEST HOLE FOR
BEDROCK SOUNDING
RECORD AND REPORT
ELEVATION AT EACH
SOUNDING LOCATION
ACTUAL TOP OF BEDROCK
T.O. BEDROCK PER
GEOTECH AT BORING
TH-1, SEE
GEOTECHNICAL
REPORT
BOTTOM OF
ABUTMENT CAP/TOP
OF DRILLED SHAFT
- 1
0' -1
0"
RECORD AND REPORT
TOP OF HOLE ELEVATION
AND LOCATION
'-0
AS
SU
M
ED
ASSUMED TOP OF
BEDROCK FOR
BIDDING PURPOSES
(N O
TE
(ELEV TBD)
UNDISTURBED
BEDROCK
3" M
IN
2"
MIN
DRILLED
SHAFT
PROJECT NO. 25-104.01
DRAWING NO.
SHEET NO.
OF
SHEET REVISIONS
NO. DATE DESCRIPTION BY
PREPARED UNDER
THE SUPERVISION OF
DATEDESIGNED:
DRAWN:
CHECKED:
90% DESIGN
NORTH CONNECTOR BRIDGE REPLACEMENT
AMJ
ASP
BRS
S-5
8/28/2026
DRILLED SHAFT DETAILS
STRUCTURAL
BEDROCK SOUNDING NOTES:
1. BEDROCK SOUNDING TO BE PERFORMED AT EACH ABUTMENT UNTIL
BEDROCK IS REACHED. SEE GENERAL NOTES FOR ADDITIONAL INFO.
2. CONTRACTOR SHALL MOBILIZE DRILLING EQUIPMENT FOR BEDROCK
SOUNDING THAT IS CAPABLE OF DRILLING TO A DEPTH OF 20'-0"
BELOW THE ASSUMED TOP OF BEDROCK SHOWN HEREIN.
P:
\2
Pr oj ec ts
\2 5-
4.
N or th
C on ne ct or P ed es tri an
B rid ge R ep la ce m en t -
C
PW
\C
AD
\D ra w in gs \2
5-
4.
_S
TR
_A
BU
T D
ET
AI
LS
.d w g
DRILLED
CAISSON 24"
LI
M
IT
S
O F
PA
Y
LE
N
G
TH
F O
R
IT
EM
D
R
IL
LE
D
C
AI
SS
O
N (2
IN
C H
DRILLED SHAFT ELEVATION
(8) #7 BARS @
EQUAL SPACES
#4 @ 10"
1'-11" LAP (ROTATE LAP
180° IN ADJACENT BARS)
3"(CLR.)
SECTION
3" (C
LR
3" (C
LR
2' -0
M
IN
. E M
BE
D
T.O. BEDROCK
ABUT. &
CAISSONS
M
IN
. E M
BE
D
'-0
BOT. ABUT.
SEE ABUT. LAYOUT
DRAWINGS
2' -0
AA
ABRIDGE STRUCTURE EXCAVATION AND BACKFILL DETAIL
FOUNDATION PLAN
FOUNDATION DESIGN SUMMARY
ABUTMENT FOUNDATION
TYPE AND SIZE
ESTIMATED COMPETENT
BEDROCK ELEVATION
MINIMUM TIP
ELEVATION
MINIMUM PENETRATION INTO
COMPETENT BEDROCK (FEET)
ABUT. 1
ABUT. 2
24" DIA. DRILLED SHAFT
24" DIA. DRILLED SHAFT
TBD
TBD
TBD
TBD
8.0'
8.0'
90°(TYP.)
SH
EA
R R
IN
G
S A
T 2'
-0 " S
EE
D
ET
AI
L 2'
-0
ITEM 503 ESTIMATED PAY LENGTH
(FOR BIDDING PURPOSES)
48.0'
48.0'
BEDROCK SOUNDING ELEVATION
SHEAR RING DETAIL
DRILLED SHAFT NOTES:
1. SEE FOUNDATION NOTES AND REQUIREMENTS ON DWG NO S-1
2'-6" 8'-0"
10"1'-8"
1'-3"
1/2" EXPANSION
JOINT WITH SEALANT#6 @ 10", CONT. W/
WINGWALL REINF
#4 @ 1'-0"
0' -6
M
IN
.FINISHED GRADE
(SEE ABUTMENT
LAYOUTS)
#4 @
10" CONT.
2' -3
2' -3
#6 @ 10", CONT. W/
WINGWALL REINF
CONST. JOINT X
(4) #6 T&B
(8 TOTAL)
24" DRILLED CAISSON
(SEE FOUNDATION PLAN)
SEE DETAIL, DWG S-5, FOR
BACKFILL REQUIREMENTS
BEHIND THE ABUT.
#5 @ 8"#4 @ 1'-0" #4 E @ 1'-0"
2'-2"
3" C
LR
FINISHED
GRADE TRAIL
3' -0
2'-6"
2' -6
C O
F
AB
U T
BRG.
2' -0
" L
AP
M
IN
(2) #5 CONT.
X
SLOPE ABUTMENT SEAT AT 1/8"/FT.
BACKWALL SHALL BE CONSTRUCTED AFTER
BRIDGE HAS BEEN SET.
SEE BRIDGE EXPANSION
JOINT DETAIL, THIS DWG.
4" 3" C
LR
4" MAX. GAP
VOID FORM MATERIAL, CONT.
UNDER ABUTMENT AND
WINGWALLS (SEE NOTES)
1' -6
M
IN
BETWEEN RAILINGS
#5 x 4'-5" @ 1'-0"
#6 CONT. W/ WINGWALL REINF
1. APPROACH RAIL SHALL BE MANUFACTURED TO
MATCH THE AESTHETICS OF THE TRUSS. THE COST
OF THE APPROACH RAILING, INCLUDING THE ANCHOR
SYSTEM, SHALL BE INCLUDED IN ITEM 628 "BRIDGE
GIRDER AND DECK UNIT"
2. CORNER PLATE AND ARMORING ANGLE SHALL BE HOT
DIP GALVANIZED AFTER FABRICATION. BRIDGE
EXPANSION JOINT, INCLUDING ARMORING ANGLE,
COVER PLATE; AND ALL HARDWARE SHALL NOT BE
PAID SEPARATELY BUT SHALL BE INCLUDED IN THE
COST OF ITEM 628 "BRIDGE GIRDER AND DECK UNIT"
L
BOTTOM OF ABUT
WINGWALL-MOUNTED PEDESTRIAN
RAILING (TYP, ALL WINGWALLS)
F.F. OF WALL
(LAYOUT LINE)
#4 @1'-0" (TYP.)
TOP AND BOTTOM
#4 @ 1'-0"
#6 @ 10", CONT
W/ ABUTMENT REINF.
STRUCTURAL
BACKFILL (CLASS 1),
SEE DETAIL, DWG. S-5
#6 CONT.
W/ ABUTMENT
REINF.
TOP OF
WINGWALL
FINISHED
GRADE
PEDESTRIAN
RAILING
VOID FORM MATERIAL CONT.
UNDER ABUTMENT AND
WINGWALLS (SEE NOTES)
F.F. OF WALL
(LAYOUT LINE)
#4 @ 10", CONT
TOP OF
ABUTMENT SEAT
HEAVY HEX BOLT 1"Ø
GALVANIZED ASTM F1554
GR. 55 BOLTS WITH
(2)NUTS & (1) WASHER
51 2"
(M
IN
8"
(M
IN
NOTES:
1. HEAVY HEX BOLTS AND HARDWARE SHALL BE INCLUDED IN THE
COST OF THE BRIDGE GIRDER AND DECK UNIT.
2. ANCHOR BOLTS SHALL BE INSTALLED IN ACCORDANCE WITH
BRIDGE MANUFACTURERS REQUIREMENTS.
3. ANCHOR BOLT SIZE AND EMBEDMENT DEPTH SHALL BE VERIFIED
BASED ON THE FINAL PREFABRICATED BRIDGE DESIGN, AND
ADJUSTED AS NECESSARY.
BRIDGE
DECK
∠2"x2"x1/4"
1/2" EXPANSION
JOINT MATERIAL
ELASTOMETRIC
SEALANT
CONCRETE
APPROACH SLAB
LOOP FERRULE,
CAST IN DECK SPA.
WITH 3/8"Ø SCREWS
BACKER ROD
1/2"Øx2" LONG H.A.S @ 1'-0"
SHEAR DOWELS, SEE
SECTION A, DWG. S-6
PROJECT NO. 25-104.01
DRAWING NO.
SHEET NO.
OF
SHEET REVISIONS
NO. DATE DESCRIPTION BY
PREPARED UNDER
THE SUPERVISION OF
DATEDESIGNED:
DRAWN:
CHECKED:
90% DESIGN
NORTH CONNECTOR BRIDGE REPLACEMENT
AMJ
ASP
BRS
S-6
8/28/2026
ABUTMENT DETAILS
STRUCTURAL
P:
\2
Pr oj ec ts
\2 5-
4.
N or th
C on ne ct or P ed es tri an
B rid ge R ep la ce m en t -
C
PW
\C
AD
\D ra w in gs \2
5-
4.
_S
TR
_A
BU
T D
ET
AI
LS
.d w g
SECTION A
S-3 & S-4
BRIDGE EXPANSION JOINT DETAIL
ANCHOR BOLT DETAIL
6"
(M
IN
1'-0"
(TYP.)
3" C
LR
5' -7
(M
AX
SECTION B
S-3 & S-4
1' -0
4"
VOID-FORM NOTES:
1. VOID FORM SHALL BE AS MANUFACTURED BY SUREVOID PRODUCTS INC., OR APPROVED EQUAL.
2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING VOID SPACES OF FULL SIZE AND EXTENT SHOWN IN THE PLANS.
3. THE VOID FORMS SHALL BE PLACED IN THE LARGEST PIECES PRACTICAL AND SHALL BE ADEQUATELY SECURED IN PLACE WITH
JOINTS SEALED TO PREVENT LEAKAGE OF CONCRETE INTO THE VOID SPACES.
4. VOID FORMS SHALL BE SUFFICIENT STRENGTH TO SUPPORT WEIGHT OF WET CONCRETE AND ASSOCIATED CONSTRUCTION
LOADS UNTIL THE CONCRETE BECOMES SELF SUPPORTING.
5. VOID FORMS THAT ARE EXPOSED AFTER CONCRETE FORMWORK IS REMOVED MUST BE SHIELDED WITH PERMANENT PROTECTIVE BOARDS TO PREVENT THE MIGRATION OF BACKFILL MATERIAL INTO THE VOIDED AREA. PROTECTIVE BOARDS SHOULD BE COMPRISED OF MATERIAL SUFFICIENT IN STRENGTH TO WITHSTAND BACKFILLING OPERATIONS AND
DEGRADATION OVER TIME.
6. PAYMENT FOR VOID FORMS SHALL BE MADE UNDER ITEM 601-CONCRETE CLASS DF AND SHALL INCLUDE ALL MATERIALS AND
WORK NECESSARY TO INSTALL THE VOID FORMS, INCLUDING PROTECTIVE BOARDS.
NOTES:
8"
2"
GAP
2"
1 4"
3 1/2"
3' -6
(M
IN
X
X
X X
X X
X X w w w w w w w w w w w w w w
E . L ake V iew
R d.
C he rry C re ek
Shop Creek
55 5
5555 55
0+
1+00
2+00
3+
4+00
5+
5+
EARTHWORK BORROW AREA,
WEST SITE ACCESS VIA
PIPELINE TRAIL AND
WETLAND LOOP TRAIL
CLASS 6 AGGREGATE
BASE COURSE TRAIL
RIPRAP ABUTMENT
PROTECTION, TYP.
PEDESTRIAN BRIDGE
Existing Concrete Trail
Existing Crusher Fines Trail
RIPARIAN SEED
UPLAND SEED
LEGEND
50'25'0'
PL
O
TT
ED
: 8 /2
8/
0:
:3
AM
N
AM
E:
P :\2
PR
O
JE
C
TS
\2
5-
4.
N O
R
TH
C O
N N
EC
TO
R P
ED
ES
TR
IA
N B
R
ID
G E
R
EP
LA
C
EM
EN
T
- C
PW
\C
AD
\D
R
AW
IN
G
S\
-1
.0 1_
LA
N
D
SC
AP
E
PL
AN
.D W
G
CMH
JAY
CRV
L-1
8/28/2026
LANDSCAPE PLAN
LANDSCAPE
PROJECT NO. 25-104.01
DRAWING NO.
SHEET NO.
OF
SHEET REVISIONS
NO. DATE DESCRIPTION BY
PREPARED UNDER
THE SUPERVISION OF
DATEDESIGNED:
DRAWN:
CHECKED:
90% DESIGN
NORTH CONNECTOR BRIDGE REPLACEMENT
NOTE:
1. SEE LANDSCAPE NOTES ON DWG. L-2 FOR
SEED MIXES AND REQUIREMENTS FOR
TOPSOIL, SEEDING, AND MULCHING.
PL
O
TT
ED
: 8 /2
8/
0:
:4
AM
N
AM
E:
P :\2
PR
O
JE
C
TS
\2
5-
4.
N O
R
TH
C O
N N
EC
TO
R P
ED
ES
TR
IA
N B
R
ID
G E
R
EP
LA
C
EM
EN
T
- C
PW
\C
AD
\D
R
AW
IN
G
S\
-1
.0 1_
LA
N
D
SC
AP
E
N O
TE
S.
D W
G
LANDSCAPE NOTES:
1. CONTACT THE U.S. FISH AND WILDLIFE SERVICE, OFFICE OF MIGRATORY BIRDS, AT (303) 236-8171, FOR
PERMITTING REQUIREMENTS PRIOR TO THE REMOVAL OR DESTRUCTION OF ANY BIRD NEST.
2. IF HEAVY EQUIPMENT IS ACQUIRED THAT WAS PREVIOUSLY WORKING IN ANOTHER STREAM, RIVER, LAKE, POND, OR WETLAND, ONE OF THE FOLLOWING DISINFECTION PRACTICES IS NECESSARY PRIOR TO BRINGING ON-SITE TO PREVENT THE SPREAD OF NEW ZEALAND MUD SNAILS AND OTHER AQUATIC HITCHHIKERS INTO THIS DRAINAGEWAY. THESE PRACTICES ARE ALSO NECESSARY AFTER PROJECT COMPLETION, PRIOR TO THIS EQUIPMENT BEING USED IN ANOTHER STREAM, RIVER, LAKE, POND, OR WETLAND, FOR THE SAME
PURPOSE:
REMOVE ALL MUD AND DEBRIS FROM EQUIPMENT (TRACKS, TURRETS, BUCKETS, DRAGS, TEETH, ETC.) AND PAY/SOAK EQUIPMENT WITH A 1:15 SOLUTION OF DISINFECTION SOLUTION CONTAINING THE FOLLOWING
INGREDIENTS:
A. DIALKYL DIMETHYL AMMONIUM CHLORIDE (5-10% BY WEIGHT);
B. ALKYL DIEMETHYL BENZYL AMMONIUM CHLORIDE (5-10% BY WEIGHT);
C. NONYL PHENOL ETHOXYLATE (5-10% BY WEIGHT);
D. SODIUM SESQUICARBONATE (1-5%) AND,
E. TETRASODIUM ETHYLENE DIAMINETETRAACETATE (1-15%)
THE EQUIPMENT SHOULD BE KEPT MOIST FOR AT LEAST 10 MINUTES, AND RINSATE SHOULD BE MANAGED AS
A SOLID WASTE IN ACCORDANCE WITH LOCAL, COUNTY, STATE, OR FEDERAL REGULATIONS.
SMALL EQUIPMENT, HAND TOOLS, BOOTS AND ANY OTHER EQUIPMENT THAT WAS PREVIOUSLY USED IN A RIVER, STREAM, LAKE, POND, OR WETLAND PRIOR TO MOVING THE EQUIPMENT TO ANOTHER WATER BODY
MAY BE DISINFECTED USING THE FOLLOWING METHODS:
A. SPRAY/SOAK EQUIPMENT WITH WATER GREATER THAN 140 DEGREES FAHRENHEIT FOR AT LEAST 10
MINUTES.
B. SANITIZE WATER SUCTION HOSES AND WATER TRANSPORTATION TANKS (USING METHODS DESCRIBED
ABOVE) AND DISCARD RINSE WATER AT AN APPROPRIATELY PERMITTED DISPOSAL FACILITY.
3. WHERE THE PLANTING PLANS AND NOTES DIFFER FROM THE SPECIFICATIONS, THE PLANTING PLANS AND
NOTES GOVERN.
4. ECOLOGIST SHALL INSPECT SEED LOT ANALYSIS BEFORE SEED IS PURCHASED TO CHECK FOR UNDESIRABLE SPECIES AND WHETHER THE SEED HAS BEEN TESTED WITHIN 6 MONTHS OF PROJECT INITIATION.
5. THE CONTRACTOR SHALL CONFINE ALL OPERATIONS TO THE CONSTRUCTION LIMITS SHOWN INCLUDING
SEEDING, AND MULCHING.
6. ANY AREAS OUTSIDE THE CONSTRUCTION LIMITS DISTURBED BY CONSTRUCTION OPERATIONS, NOT DIRECTED BY AN OWNER'S REPRESENTATIVE, SHALL BE REPAIRED OR REPLACED AT THE CONTRACTOR'S
EXPENSE.
7. ALL MATERIALS AND METHODS TO BE SUBMITTED FOR APPROVAL BY THE OWNER'S REPRESENTATIVES
PRIOR TO CONSTRUCTION.
TOPSOIL MANAGEMENT:
1. TOPSOIL DEPTHS AND SALVAGE AREAS SHALL BE IDENTIFIED BY THE ENGINEER AND ECOLOGIST.
2. ALL SUBSOIL AREAS MUST BE RIPPED TO DECOMPACT AND ROUGHEN PRIOR TO TOPSOIL APPLICATION.
TRUCKS AND HEAVY EQUIPMENT SHALL NOT DRIVE ON THE DECOMPACTED SUBSOIL AREAS OR TOPSOILED AREAS AFTER DECOMPACTION OR APPLICATION OF TOPSOIL. ANY AREAS RE-COMPACTED FOLLOWING
PLACEMENT SHALL BE DECOMPACTED.
3. ALL HEAVILY COMPACTED AREAS SUCH AS, BUT NOT LIMITED TO, CONSTRUCTION ACCESS CORRIDORS AND STAGING AREAS SHALL BE RIPPED TO AT LEAST A DEPTH OF 18” PRIOR TO TOPSOIL APPLICATION.
ECOLOGIST AND ENGINEER SHALL INSPECT DECOMPACTED AREAS PRIOR TO TOPSOIL PLACEMENT.
4. SOILS SHALL NOT BE WORKED WHEN FROZEN, SNOW COVERED, WET, OR MUDDY.
SEEDING AND MULCHING:
1. ALL SEED BAGS SHALL BE LABELED AT ALL TIMES AND SHALL BE PROVIDED TO THE ECOLOGIST FOR REVIEW
AND DOCUMENTATION. SEED TAGS MUST SHOW JOB NAME, TOTAL POUNDS OF MIXTURE, AND ALL SCIENTIFIC
NAMES OF SPECIES.
2. ALL SEED FURNISHED SHALL BE WEED FREE. ECOLOGIST SHALL INSPECT SEED LOT ANALYSIS BEFORE SEED IS PURCHASED TO CHECK FOR UNDESIRABLE WEEDS AND OTHER SPECIES. THE CONTRACTOR SHALL FURNISH TO THE ECOLOGIST A SIGNED STATEMENT CERTIFYING THAT THE SEED FURNISHED IS FROM A LOT THAT HAS BEEN TESTED BY A RECOGNIZED LABORATORY. ANY WEEDS PRESENT SHALL BE REPORTED TO AND PRE-APPROVED BY ECOLOGIST PRIOR TO PURCHASE. SEED WHICH HAS BECOME WET, MOLDY, OR
OTHERWISE DAMAGED IN TRANSIT OR IN STORAGE WILL NOT BE ACCEPTABLE.
3. SEED MIX SHALL BE PLANTED BY BROADCAST METHOD. BROADCAST SEEDING CAN BE DONE BY DRIBBLING SEED FROM A MECHANICAL DRILL (LARGE AREAS) AND BY USING A WHIRLYBIRD TYPE SEEDER OR BY HAND (FOR SMALL AREAS). SEED SHALL NOT BE APPLIED WITH A HYDROSEEDER AS THIS MAY DAMAGE THE SEED.
BROADCAST SEED SHALL BE HARROWED OR RAKED LIGHTLY TO COVER SEED. WETLAND SEED SHALL BE BROADCAST ON MOIST CHANNEL BOTTOM AREAS BUT SHALL NOT BE BROADCAST INTO AREAS OF STANDING WATER. IT MAY NOT BE NECESSARY TO HARROW OR RAKE TO COVER SEED IN AREAS WHERE SOIL IS CONSISTENTLY WET. THIS WILL BE DETERMINED BY THE COLORADO PARKS AND WILDLIFE MANAGER.
PLS - PURE LIVE SEED IS THE AMOUNT OF SEED EXPECTED TO GROW BASED ON THE PURITY AND
GERMINATION RATE OF THE BULK SEED.
THE FORMULA USED FOR DETERMINING THE QUALITY OF PURE LIVE SEED (PLS) SHALL BE (POUNDS OF SEED)
X (PURITY) X (GERMINATION) = POUNDS OF PURE LIVE SEED (PLS)
4. IF THE SEED AVAILABLE ON THE MARKET DOES NOT MEET THE MINIMUM PURITY AND GERMINATION PERCENTAGES SPECIFIED, THE SUBCONTRACTOR MUST COMPENSATE FOR A LESSER PERCENTAGE OF PURITY OR GERMINATION BY FURNISHING SUFFICIENT ADDITIONAL SEED TO EQUAL THE SPECIFIED PRODUCT. THE TAGS FROM THE SEED MIXES MUST BE SUPPLIED TO THE COLORADO PARKS AND WILDLIFE
MANAGER.
5. ALL BLANKETED AREAS SHALL BE DECOMPACTED AND A LOOSE, RAKED SEEDBED PREPARED PRIOR TO SEEDING. ALL CLODS, ROCKS, DEPRESSIONS OR LUMPS OVER 2” SHALL BE PULVERIZED AND RAKED OUT OF ALL DISTURBED AREAS TO BE SEEDED. UNDER NO CIRCUMSTANCES SHALL THE TOPSOIL SURFACE BE
SMOOTH AND COMPACTED.
6. SEED SHALL BE APPLIED AT THE SPECIFIED RATES WITHIN 48 HOURS OF TOPSOIL PLACEMENT.
7. ADJACENT SEED MIXES SHALL OVERLAP BY FIVE FEET. SEEDING AREAS SHOWN ON PLANS DO NOT INCLUDE
OVERLAP. CONTRACTOR SHALL CALCULATE AND APPLY SEED QUANTITIES NECESSARY TO ACHIEVE 5'
OVERLAP.
8. SEEDING, SOIL PREPARATION, BLANKETING, OR MULCHING SHALL NOT OCCUR WHEN THE SOIL IS WET, SNOW COVERED OR FROZEN. IF THE PROJECT CALLS FOR HYDRAULIC MULCHING, IT SHALL NOT BE DONE IN THE
PRESENCE OF FREE SURFACE WATER AND SHALL BE APPIED 48 HOURS PRIOR TO ANTICIPATED
PRECIPITATION.
9. AREAS NOT PROPERLY MULCHED, OR AREAS DAMAGED DUE TO THE CONTRACTOR'S NEGLIENCE, SHALL BE REPAIRED AND REMULCHED AS DESCRIBED ABOVE, AT THE CONTRACTOR'S EXPENSE. MULCH MAY BE REMOVE BY CIRCUMSTANCES BEYOND THE CONTRACTOR'S CONTROL SHALL BE REPAIRED AND REMULCHED AS ORDERD. PAYMENT FOR THIS ORDERED CORRECTIVE WORK SHALL BE AT THE CONTRACT PRICES.
UPLAND SEED MIX
RIPARIAN SEED MIX
PROJECT NO. 25-104.01
DRAWING NO.
SHEET NO.
OF
SHEET REVISIONS
NO. DATE DESCRIPTION BY
PREPARED UNDER
THE SUPERVISION OF
DATEDESIGNED:
DRAWN:
CHECKED:
90% DESIGN
NORTH CONNECTOR BRIDGE REPLACEMENT
CMH
JAY
CRV
L-2
8/28/2026
LANDSCAPE NOTES
LANDSCAPE
X
X X
X X
X X w w w w w w w w w w w w w w
E . L ake V iew
R d.
C he rry C re ek
Shop Creek
55 5
5555 55
EARTHWORK BORROW AREA,
WEST SITE ACCESS VIA
PIPELINE TRAIL AND
WETLAND LOOP TRAIL
CF
INITIAL
ROPE
962 LF
CF
INITIAL
ROPE
482 LF
SCL
INITIAL
625 LF
VTC
INITIAL
CWA
INITIAL
CF
INITIAL
ORANGE PLASTIC
726 LF
SCL
INITIAL
317 LF
SCL
INITIAL
116 LF
SCL
INITIAL
255 LF
CF
INITIAL
ROPE
317 LF
CF
INITIAL
ORANGE PLASTIC
10 LF
INSTALL VTC AT
WEST ACCESS POINT
0+
1+00
2+00
3+
4+00
5+
5+
REMOVE AND REPLACE 23 SY OF
CONCRETE TRAIL DAMAGED
DURING CONSTRUCTION
Existing Concrete Trail
Existing Crusher Fines Trail
CLASS B AGGREGATE
BASE COURSE TRAIL
PEDESTRIAN BRIDGE
RIPRAP ABUTMENT
PROTECTION (TYP.)
50'25'0'
NOTES:
1. SEE THE GRADING, EROSION, AND SEDIMENT (GESC) STANDARD NOTES AND DETAILS SHEETS EC-2 TO EC-4.
2. DIRT AND DEBRIS TRACKED ONTO ROADS AND/OR TRAILS BY CONSTRUCTION TRAFFIC SHALL BE REMOVED
BY THE CONTRACTOR ON A DAILY BASIS.
3. CONSTRUCTION FENCE AND ROPE WITH T-POSTS SHALL BE INSTALLED AROUND A PORTION OF THE LIMITS
OF CONSTRUCTION AS DESIGNATED BY THE OWNER.
4. TOPSOIL SHALL BE STRIPPED FROM AREAS TO BE DISTURBED, STOCKPILED IN APPROVED AREAS, AND
RE-SPREAD OVER ALL AREAS TO BE RESEEDED WITH RIPARIAN AND UPLAND SEED.
5. SURFACE ROUGHEN ALL DISTURBED AREAS.
6. SEDIMENT CONTROL LOGS SHALL BE INSTALLED AROUND ALL TEMPORARY SOIL STOCKPILES WITHIN THE
STAGING AREAS.
7. ALL SEDIMENT CONTROL LOGS SHALL BE MADE WITH BIODEGRADABLE NETTING.
8. SLOPES STEEPER THAN 4:1 BEYOND THE LIMITS OF THE COIR MAT BANK PROTECTION SHALL BE STABILIZED
WITH COCONUT BLANKET.
9. SEE LANDSCAPE DETAILS, DWG. L-2, FOR SEED MIXES, SEEDING AND MULCHING REQUIREMENTS.
10. SEE LANDSCAPE PLAN DWG. L-1 FOR SEEDING AND MULCHING LIMITS WITHIN THE LIMITS OF CONSTRUCTION
PROJECT NO. 25-104.01
DRAWING NO.
SHEET NO.
OF
SHEET REVISIONS
NO. DATE DESCRIPTION BY
PREPARED UNDER
THE SUPERVISION OF
DATEDESIGNED:
DRAWN:
CHECKED:
90% DESIGN
NORTH CONNECTOR BRIDGE REPLACEMENT
CMH
JAY
CRV
EC-1
8/28/2026
EROSION CONTROL PLAN
EROSION CONTROL
File details come from the government source that posted it. Updated .