IFB T-1451-2240 R CBD 3 Interlockings.pdf
PDF 29 MB Posted
- Solicitation number
- BPM018808
- Issued by
- Baltimore City, Maryland
About this file
This document is an Invitation for Bids (IFB) from the Maryland Transit Administration (MTA) for the Light Rail Central Business District 3 Interlockings & 10 Curves Rehabilitation project. The project is located in Baltimore City, Maryland and involves the rehabilitation of 3 interlockings and 10 curves on the Light Rail system. The IFB provides details on the scope of work, project schedule, and bid submission requirements. Bids are due by a specific date and time, and a mandatory pre-bid conference is scheduled. The contract term is for a set duration with the possibility of renewal options.
The IFB includes pricing terms, disadvantaged business enterprise (DBE) requirements, and information on the incumbent contractor, if applicable. Funding for the project is provided through state and local sources, and bidders must comply with all relevant requirements. Additional details on the current environment, regulatory compliance, and other salient information are also included in the IFB document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| addendum 1.pdf | ||
| 1451-2240R_ Plans.pdf | ||
| Addendum 2.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF MARYLAND
MARYLAND DEPARTMENT OF TRANSPORTATION
MARYLAND TRANSIT ADMINISTRATION
Multi-Step Invitation for Bids
Light Rail CBD 3 Interlockings and 10 Curves Rehabilitation
CONTRACT NO. T-1451-2240R
DATE: March 23, 2020
NOTICE
A Prospective Bidder that has received this document from a source other than eMarylandMarketplace Advantage (eMMA) https://procurement.maryland.gov should register on eMMA. See Section 4.2.
MINORITY BUSINESS ENTERPRISES ARE ENCOURAGED
TO RESPOND TO THIS SOLICITATION.
T-1451-2240R TABLE OF CONTENTS
T-1451-2240R TOC 1 of 5
LIGHT RAIL CBD 3 INTERLOCKINGS
AND 10 CURVES REHABILITATION
CONTRACT NO. T-1451-2240R
CONTRACT SPECIFICATIONS BOOK
TABLE OF CONTENTS
VOLUME 1
DESCRIPTION PAGE NO.
TABLE OF CONTENTS..................................................................................... TOC 1 - 5
VENDOR COMMENTS ............................................................................................... VC1
NOTICE TO CONTRACTORS ........................................................................... NTC 1-11
BID FORM INCLUDING UNIT PRICE SCHEDULE ..........................................BF 4 – 13
BID BOND ................................................................................................................BB 1-2
AFFIDAVIT OF INDIVIDUAL SURETY & APPENDIX .....................................AIS 1-5
CONTRACTOR QUESTIONNAIRE .......................................................................CQ 1-6
BID/PROPOSAL AFFIDAVIT .............................................................................. BPA 1-7
BUY AMERICA CERTIFICATE ............................................................................. BAC 1
CERTIFICATION REGARDING LOBBYING ........................................................CRL 1
DBE REQUIREMENTS AND FORMS ................................................................ DBE 1-18
LIABILITY INSURANCE REQUIREMENTS ....................................................... IR 1-73
SUBCONTRACT UTILIZATION INFORMATION FORM .................................SUI 1-2
PAYMENT BY ELECTRONIC FUNDS TRANSFER .......................................... EFT 1-3
CONTRACT AGREEMENT .......................................................................................C 1-3
CONTRACT AFFIDAVIT ........................................................................................CA 1-4
SURETY BOND ASSISTANCE PROGRAM.........................................................SBAP 1
PAYMENTS OF EMPLOYEE HEALTH CARE EXPENSES.........................PECH 1
T-1451-2240R TOC 2 of 5
PAYMENT BOND.................................................................................................... PA 1-3
PERFORMANCE BOND...........................................................................................PE 1-3
BID PROTEST ..............................................................................................................BP 1
CERTIFICATION REGARDING INVESTMENT ACTIVITIES IN IRAN ...... IRAN 1-2
LOCATION OF THE PERFORMANCE OF SERVICES DISCLOSURE .............LPSD 1
MERCURY AFFIDAVIT............................................................................................ MA 1
CONFLICT OF INTEREST AFFIDAVIT ..................................................................COI 1
FEDERAL FUNDING ACKNOWLEDGEMENT & CLAUSES ...........................FF 1-19
CONTRACTOR SAFETY & HEALTH PLAN GUIDELINES ..................... CSHPG 1-33
GENERAL PROVISIONS FOR CONSTRUCTION CONTRACTS (MARYLAND
DOT) ................................................................................................................... GP 1-68
SUPPLEMENTAL GENERAL PROVISIONS FOR CONSTRUCTION CONTRACTS
(MTA) .................................................................................................................SGP 1-56
SPECIAL PROVISIONS
01110 SUMMARY OF WORK ......................................................................... SP 1 - 16
01130 CONSTRUCTION PROCEDURES ......................................................SP 17 - 26
01150 INTERFACE REQUIREMENTS .........................................................SP 27 - 37
01210 MISCELLANEOUS WORK ALLOWANCE ......................................SP 38 - 40
01300 SUBMITTALS .......................................................................................SP 41 - 55
01310 COORDINATION AND MEETINGS...................................................SP 56 - 58
01450 QUALITY ASSURANCE AND QUALITY CONTROL .....................SP 59 - 73
01500 TEMPORARY FACILITIES AND CONTROL................................... SP 74 - 80
01524 ENGINEER’S OFFICE .............................................................................. SP 81
01550 MAINTENANCE OF TRAFFIC ..........................................................SP 82 - 85
01562 TEMPORARY ORANGE CONSTRUCTION FENCE ........................SP 86 - 87
T-1451-2240R TOC 3 of 5
01570 ENVIRONMENTAL PROTECTION..................................................SP 88 - 106
01600 PRODUCTS .......................................................................................SP 107 - 108
01780 CONTRACT CLOSE OUT................................................................SP 109 - 113
01810 COMMISSIONING ...........................................................................SP 114 - 122
02060 6 INCH GRADED AGGREGATE BASE .........................................SP 123 - 132
02220 SITE DEMOLITION..........................................................................SP 133 - 138
02230 SITE CLEARING ..............................................................................SP 139 - 141
02316 EXCAVATION AND BACKFILL FOR UNDERGROUND
DUCT WORK ....................................................................................SP 142 - 145
02370 EROSION AND SEDIMENT CONTROL ........................................SP 146 - 150
02620 SUBDRAINAGE ...............................................................................SP 151 - 156
02630 STORM DRAINAGE ........................................................................SP 157 - 161
02636 STORMWATER MANAGEMENT STORM FILTER .....................SP 162 - 170
02725 SUBBALLAST ..................................................................................SP 171 - 174
02726 BALLAST ..........................................................................................SP 175 - 180
02750 CONCRETE CROSSWALK .............................................................SP 181 - 185
02770 CURB AND GUTTER.......................................................................SP 186 - 190
02920 TURF ESTABLISHMENT ................................................................SP 191 - 196
02999 BALLAST MATS ..............................................................................SP 197 - 199
03050 PORTLAND CEMENT CONCRETE .............................................. SP 200 - 222
03210 REINFORCING STEEL ....................................................................SP 223 - 228
03300 CAST-IN-PLACE CONCRETE ........................................................SP 229 - 247
03404 PRECAST PANEL CONCRETE GRADE CROSSING ON
CROSS TIES ......................................................................................SP 248 - 258
T-1451-2240R TOC 4 of 5
03410 MONOBLOCK CONCRETE CROSS TIES .................................... SP 259 - 307
03412 EMERGENCY GUARD RAIL CONCRETE TIES ..........................SP 308 - 353
05120 STRUCTURAL STEEL .....................................................................SP 354 - 369
05520 HANDRAILS AND RAILINGS........................................................SP 370 - 372
05650 GENERAL REQUIREMENTS FOR TRACK INSTALLATION ... SP 373 – 386
05651 RAIL WELDING ...............................................................................SP 387 - 397
05653 TRACK MATERIALS.......................................................................SP 398 - 403
05656 BONDED INSULATED JOINTS......................................................SP 404 - 411
05665 JOINTS AND JOINT BARS..............................................................SP 412 - 415
05671 BALLASTED TRACK INSTALLATION ........................................SP 416 - 427
05673 OPEN DECK TRACK RENEWAL...................................................SP 428 - 434
05674 DIRECT FIXATION TRACK RENEWAL.......................................SP 435 - 451
05681 BALLASTED SPECIAL TRACKWORK.........................................SP 452 - 461
05696 115 POUND RE RAIL .......................................................................SP 462 - 467
06135 TIMBER HEADBLOCK SWITCH TIES..........................................SP 468 - 473
09911 CLEANING AND PAINTING HANDRAIL AND
RAILINGS .........................................................................................SP 474 - 498
09920 COATING SYSTEMS FOR STRUCTURAL STEEL ......................SP 499 - 506
16111 DUCTS AND RACEWAYS ..............................................................SP 507 - 513
16116 UNDERGROUND CONDUITS ....................................................... SP 514 - 517
16600 SWITCH TRACK SNOWMELTER & NEGATIVE
RETURN BONDING.........................................................................SP 518 - 541
16647 TRACK-TO-EARTH RESISTANCE TESTING ..............................SP 542 - 560
16649 CATENARY-TO-EARTH RESISTANCE TESTS ...........................SP 561 - 566
T-1451-2240R TOC 5 of 5
17125 SWITCH AND LOCK MOVEMENT LAYOUTS .......................... SP 567 - 574
17301 OCS - GENERAL REQUIREMENTS ..............................................SP 575 - 581
17305 OCS - OVERHEAD CONTACT SYSTEM ..................................... SP 582 - 594
17311 OCS - FOUNDATIONS.....................................................................SP 595 - 610
17313 OCS - SUPPORT STRUCTURES.....................................................SP 611 - 622
17314 OCS - PAINTING OCS POLES ....................................................... SP 623 - 627
17317 OCS - CATHODIC PROTECTION ..................................................SP 628 - 634
17319 OCS - SUPPORT AND REGISTRATION DEVICES..................... SP 635 – 640
17327 OCS - INSULATORS ........................................................................SP 641 – 645
17333 OCS - FITTINGS AND HARDWARE ............................................ SP 646 - 651
APPENDIX A - LIST OF CONTRACT DRAWINGS
APPENDIX B - SPECIAL DETAILS – NOT USED
APPENDIX C - FEDERAL MINIMUM WAGE RATES
APPENDIX D - BUY AMERICA REQUIREMENTS
APPENDIX E - PERMITS/WAIVERS
APPENDIX F - CONTRACT DATA REQUIREMENT LIST (CDRL)
APPENDIX G - SOIL BORINGS – NOT USED
APPENDIX H - STANDARD OPERATING PROCEDURES FOR CONTRACTORS
WORKING ON BALTIMORE CENTRAL LIGHT RAIL LINE
APPENDIX I - STAGING AND STORAGE AREA
T-1451-2240R VC - 1
MARYLAND TRANSIT ADMINISTRATION
VENDOR COMMENTS
To help us improve the quality of State solicitations, and make our procurement process more responsive and business-friendly, we ask that you take a few minutes to complete this form.
Thank you for your assistance.
Bid/Proposal No.: T-1451-2240R
Contract Title: Light Rail Central Business District (CBD) 3 Interlockings and 10
Curves Rehabilitation
I. If you are not bidding, please indicate why:
Other commitments preclude our participation at this time.
The subject of the contract is not in our business line.
We lack experience in the work/commodities required.
The scope of work is beyond our current capacity.
We cannot be competitive. (Please explain below.)
The specifications are either unclear or too restrictive. (Please explain below.)
Bid/proposal requirements, other than specifications, are unreasonable or too risky. (Please explain below.)
Time for completion is insufficient.
Bonding/insurance requirements are prohibitive. (Please explain below.)
Doing business with government is simply too complicated.
Prior experience with State of Maryland contracts was unprofitable or otherwise unsatisfactory. (Please explain below.)
Other:
II. Please explain your response further, offer suggestions, or express concerns. (use the back for additional information.
Remarks:
OPTIONAL:
Vendor Name: Date:
Contact: Phone:
Address or e-mail:
THANK YOU !!!!!!!
Contract No. T-1451-2240R NTC 1 of 11
STATE OF MARYLAND DEPARTMENT OF TRANSPORTATION
NOTICE TO CONTRACTORS
Light Rail Central Business District 3 Interlockings & 10 Curves Rehabilitation
CONTRACT NO.: T-1451-2240R DATE: March 23, 2020
1. DESCRIPTION OF WORK
A. This Contract is for the reconstruction of three interlockings and restraining rail and concrete tie replacement along segments of curved track on the Central Light Rail Line and Penn Station Extension at the following locations:
1. North Avenue Interlocking – North
2. North Avenue Interlocking – South
3. Mount Royal Interlocking and adjacent curves
4. Site A - Curves N/E 23, N/E 25, N/W 22, and N/W 21 located south of the North Avenue Interlocking – South
5. Site B - Curve P/S 3 located between Mount Royal Interlocking and Penn Station
6. Site C - Curves S/E 1, S/E 2, S/W 1, S/W 2 and P/T 1 located north of Camden Yards Station.
B. The work at each location involves, but is not limited to the following:
1. North Avenue Interlocking - North
a. Demolition of mainline ballasted special trackwork on timber ties.
This work includes the removal and disposal of all existing special trackwork, and ballast, within the limits of construction indicated on the Contract Drawings and delivery to an MTA designated facility of existing switch machines, complete with hardware and rods. Demolition includes the following special track work units:
(1) Mainline Turnout No. 88-3A, which is an right hand No. 8 turnout.
(2) Mainline Turnout No. 88-1, which is an right hand No. 8
(3) Mainline Turnout No. 88-3B, which is an left hand No. 8
Contract No. T-1451-2240R NTC 2 of 11
b. Demolition of existing standard ballasted track on wood ties, within the limits shown on the Contract Drawings. This work includes removal and disposal of the existing timber ties, rail fasteners and ballast.
c. Removal of existing head block timber switch ties for Mainline
Turnouts Nos. 91-1 and 91-3.
d. Furnishing and installing new head block timber switch ties for
Mainline Turnouts Nos. 91-1 and 91-3.
e. Demolition, removal, disposal of existing curbing, pedestrian grade crossing and underdrain as indicated in the Contract Drawings.
f. Furnish and installation of ballast curb, underdrain, pedestrian grade crossing and stormwater management storm filter structure.
g. Conversion of existing drainage inlet to junction box.
h. Installation of 12” RCP storm drain pipe
i. Installation, maintenance during construction, and removal of erosion and sediment control measures in accordance with MDE requirements.
j. Demolition, removal and disposal of an existing OCS structure pole and foundation.
k. Installation of special trackwork consisting of two (2) No. 8 LH
Turnouts and one (1) No. 8 RH Turnout ballasted complete including all required ballast, concrete switch ties, special trackwork, signal cabling, electric switch layouts and equipment, crib heaters and switch heaters, crib and switch heater cabling and equipment, traction power cabling and equipment, and other facilities and systems as indicated by the Contract Drawings and the Special Provisions.
l. Removal of old, and in installation of new track heaters and track switch machines at Mainline Turnout Nos. 91-1 and 91-3.
Including all ballast and crib heaters, as required in Contract Drawings. Cables, junction boxes, and pedestals for heater elements shall remain and be protected for re-use with new heater elements. Heater elements and switch machines shall be supplied by the MTA to the contractor for installation.
m. Installation of new switch machines for all reconstructed
Contract No. T-1451-2240R NTC 3 of 11 switches, including complete hardware and rods.
n. Furnishing and installing Ballasted Track, which consists of running rails, restraining rails, concrete ties, and OTM’s as indicated on the Contract Drawings. Restraining rail concrete ties with fasteners will be provided by MTA.
o. Reconfigure existing 2-Wire OCS on the northbound and southbound tracks, and reconfigure existing Single Wire OCS on the crossover tracks, including furnishing and installing new OCS pole and foundation, new support and registration devices and assemblies, and modifying/adjusting existing OCS assemblies to remain.
p. Track to earth resistance testing.
q. Power and Signal Bonding test.
r. Catenary to Earth Resistance Testing
2. North Avenue Interlocking - South
a. Demolition of mainline ballasted special trackwork on timber ties. This work includes the removal and disposal of all existing special trackwork, and ballast, within the limits of construction indicated on the Contract Drawings and delivery to an MTA designated facility of existing switch machines, complete with hardware and rods. Demolition includes the following special
(1) Mainline Turnout No. 83-1B, which is a left-hand No. 8
(2) Mainline Turnout No. 83-3, which is a right-hand No. 8 turnout.
(3) Mainline Turnout No. 83-1A, which is an No. 5 equilateral turnout.
b. Demolition of existing standard ballasted track on wood ties, within the limits shown on the Contract Drawings. This work includes removal and disposal of the existing timber ties, rail fasteners and ballast.
c. Demolition, removal of existing pedestrian grade crossing as indicated in the Contract Drawings.
d. Furnish and installation of pedestrian grade crossing.
Contract No. T-1451-2240R NTC 4 of 11
e. Installation, maintenance during construction, and removal of erosion and sediment control measures in accordance with MDE requirements.
f. Installation of special trackwork consisting of one (1) No. 5
Equilateral Turnout, one (1) No. 8 RH Turnout and one (1) No.
8 LH Turnout ballasted complete including all required ballast, concrete/timber switch ties, special trackwork, signal cabling, electric switch layouts and equipment, crib heaters and switch heaters, crib and switch heater cabling and equipment, traction power cabling and bonding, signal bonding and other facilities and systems as indicated by the Contract Drawings and the Special Provisions.
g. Installation of new switch machines for all reconstructed switches, including complete hardware and rods.
h. Track to earth resistance testing.
i. Power and Signal Bonding test.
3. Mount Royal Interlocking
a. Demolition of mainline ballasted special trackwork on timber ties.
This work includes the removal and disposal of all existing special trackwork, and ballast, within the limits of construction indicated on the Contract Drawings and delivery to a MTA designated facility of existing switch machines, complete with hardware and rods Demolition includes the following special
(1) Switch 70-1A, Switch 70-3 and P/S crossing which includes two right hand turnouts and a crossing as a single unit.
b. Furnishing, installation, maintenance during construction, and removal of erosion and sediment control measures in accordance with MDE requirements.
c. Installation of ballasted special trackwork complex consisting of two (2) No. 8 RH turnouts and a crossing, complete including all required concrete switch ties, special trackwork, signal cabling, electric switch layouts and equipment, crib heaters and switch heaters, crib and switch heater cabling and equipment, traction power cabling and bonding, signal bonding and other facilities and systems as indicated by the Contract Drawings and the Special Provisions.
d. Installation of new switch machines for all reconstructed switches
Contract No. T-1451-2240R NTC 5 of 11 including removing and installing Switch 70-1B, including complete hardware and rods.
e. Installation of new direct fixation fasteners and repair of existing concrete plinths, removing and reinstalling existing rail and special work steel components within the direct fixation area, including removing and reinstalling existing or new, signal cabling, electric switch layouts and equipment, crib heaters and switch heaters, crib and switch heater cabling and equipment, traction power cabling, and other facilities and systems as indicated by the Contract Drawings and the Special Provisions.
f. Furnishing new track ballast for all reconstructed special trackwork.
g. Track to earth resistance testing.
h. Power and Signal Bonding test.
4. The work for the restraining rail and concrete tie replacement includes, but is not limited to, the following:
a. Installation, maintenance during construction, and removal of erosion and sediment control measures in accordance with MDE requirements.
b. Removal and disposal of existing running rails, restraining rails, restraining rail brackets, concrete ties, connecting hardware, and other track materials within designated track limits.
c. Removal and disposal of ballast to the limits shown on the
Contract Drawings.
d. Handling and installing new restraining rail concrete ties furnished by the Administration complete with new e-clips, insulators, and tie pads. A portion of the ties for curve P/S 3 will be furnished by the contractor.
e. Furnishing, installing, and pre-curving, 115RE restraining and running rails as shown on the Contract Drawings and specified herein. A portion of Curves N/E 25 and N/W 22 are located on existing open-deck timber track and will require insulated tie plates to be furnished by the Contractor. A portion of Curves N/E 23 and N/W 21 are located on Direct Fixation track. The existing U69 restraining rail will be modified as noted on the Contract Drawings and the existing fastening system will be removed, stored and reused.
f. Furnishing and installing separator blocks, hardware, and joint
Contract No. T-1451-2240R NTC 6 of 11 bars required for restraining rail assembly; modifying rail base of restraining rail to form restraining rail assembly as shown on the Contract Drawings and specified herein.
g. Thermite welding running rail strings to form continuous welded rail (CWR). Ultrasonic testing of welds in accordance with Section 05651 Rail Welding.
h. Lining and surfacing tracks including replenishment of ballast stone and restoration of track cross section.
i. Track-to-Earth resistance testing in accordance with Section
16647.
C. Estimated value for this work is in the range of Maryland DOT Terms & Conditions TC-2:01 Project Classification Cost Group “F” ($5,000,001 - $10,000,000).
2. DEADLINE FOR QUESTIONS
Questions regarding the work should be directed in writing to Heather Martin at the Administration Offices or via email address hmartin@mta.maryland.gov Facsimile messages will not be accepted unless accompanied by telephone notification at (410) 767-3352. Our fax number is (410) 333-4810. Questions directed to this office must be received no later than March 30, 2020 by 5:00pm. Questions should be submitted on company letterhead. No interpretations other than written shall be binding on the Administration.
3. PRE-BID MEETING & SITE VISIT
A Pre-Bid meeting and Site Visit will not be held.
4. BID DUE DATE & TIME
Sealed Bids addressed to the Maryland Transit Administration, Procurement Division, 6 St. Paul Street, Baltimore, Maryland 21202-1614, and marked “Bid for Contract No. T-1451-2240 R Light Rail Central Business District 3 Interlockings & 10 Curves Rehabilitation”, will be received at the above address until but not after 2:00 P.M. local time, April 14, 2020. Hand-delivered bids will be stamped in by Procurement staff, who will also give a bid receipt to the courier. Do not leave the office without a bid receipt. Any bids received after the date and time specified shall not be considered. No bids submitted through EMMA, fax, or email will be accepted.
5. MULTIPLE OR ALTERNATE BIDS
Multiple and/or alternate Bids will not be accepted.
mailto:hmartin@mta.maryland.gov
Contract No. T-1451-2240R NTC 7 of 11
6. BASIS FOR AWARD
The Contract shall be awarded to the responsible Bidder submitting a responsive Bid with the most favorable Total Bid Price (as referenced in COMAR 21.05.02.13) for providing the services as specified in this IFB. Determination of the most favorable Total Bid Price (low bid) will be based upon the total amount bid for “Basis of Award” Items 001 through 064.
7. TIE BIDS
Tie Bids will be handled in accordance with COMAR 21.05.02.14.
8. DURATION OF BID
Bids submitted in response to this IFB are irrevocable for 180 days following the closing date of the Bids. This period may be extended at the Procurement Officer’s request only with the Bidder’s written agreement.
9. ELECTRONIC VERSION OF BID DOCUMENTS
The bid documents will be available by electronic means. The Bidder acknowledges and accepts full responsibility to ensure that the Bidder has made no changes to the Administration’s bid documents. In the event of a conflict between the versions of the bid documents in the bidder’s possession and the version maintained by the Procurement Officer, the version maintained by the Procurement Officer shall govern.
10. AVAILABILITY OF DOCUMENTS
Specifications may be downloaded from eMaryland Marketplace Advantage (https://emma.maryland.gov). First-time users will be required to create a vendor account. Bidders must supply a valid email address in order to receive notice of all subsequent addenda.
TO OBTAIN THE SPECIFICATIONS: Please visit eMaryland Marketplace Advantage, login to your vendor account, and download the Specifications for this procurement under Bid # BPM018808.
DRAWINGS: Drawings are included within the IFB as Appendix A.
11. ADDENDA
Bidders are required to acknowledge all addenda with their bid package. Although the MTA endeavors to send out all addenda to this solicitation in a timely manner, it is the responsibility of the contractors to make sure they received all appropriate documents prior to the bid due date.
12. EMARYLAND MARKETPLACE REGULATIONS
https://emma.maryland.gov/
Contract No. T-1451-2240R NTC 8 of 11
Use of “e-Maryland Marketplace Advantage”
“e-Maryland Marketplace Advantage” or “eMMA” is an electronic commerce system administered by the Maryland Department of General Services. Registration is free and will provide a means for your business to receive e-mail notifications of upcoming contracting opportunities in specified areas of interest and expertise. This means that all such information is immediately available to subscribers to eMMA. Because of the instant access afforded by eMMA, it is recommended that all Bidders interested in doing business with Maryland State agencies subscribe to eMMA. For more eMMA registration information, visit the website: https://emma.maryland.gov.
13. BID BOND
Each bid exceeding $100,000 must be accompanied by a Bid Bond in the amount of five percent (5%) of the Bid Price. Bid, payment, and performance security may be in the form of: (1) a bond executed by a surety company authorized to do business in the State; (2) a bond executed by an individual surety that meets certain criteria; (3) another form of security required by State or federal law; or (4) another form of security satisfactory to the unit awarding the contract. Sections 13-207, 13-216, 17- 104 of the State Finance and Procurement Article, Annotated Code of Maryland.
14. PAYMENT AND PERFORMANCE BONDS
Payment and Performance Bonds in the amount of the Contract Price will be required by the awardee. Upon receiving notification of contract award, the Contractor shall deliver the bond to the MTA no later than the time the Contractor executes the contract. Bid, payment, and performance security may be in the form of: (1) a bond executed by a surety company authorized to do business in the State; (2) a bond executed by an individual surety that meets certain criteria; (3) another form of security required by State or federal law; or (4) another form of security satisfactory to the unit awarding the contract. Sections 13-207, 13-216, 17-104 of the State Finance and Procurement Article, Annotated Code of Maryland.
15. ELECTRONIC FUNDS TRANSFER
On every solicitation for a contract expected to exceed $200,000, the bidder will be required to accept payments by electronic funds transfer (EFT) unless the State Comptroller’s Office grants an exemption.
16. DISADVANTAGED BUSINESS ENTERPRISE PROGRAM
A. DISADVANTAGED BUSINESS ENTERPRISES ARE ENCOURAGED
TO RESPOND TO THIS SOLICITATION NOTICE.
B. The Maryland Transit Administration hereby notifies all bidders that, in regard to any Contract entered into pursuant to this advertisement, Disadvantaged Business Enterprises will be afforded full opportunity to submit Bids in response to this Notice, and will not be subjected to discrimination on the basis of political https://emma.maryland.gov/
Contract No. T-1451-2240R NTC 9 of 11 or religious opinion or affiliation, race color, creed, sex, age or national origin in consideration for an award.
C. It is the goal of the Administration that Disadvantaged Business Enterprises participate in all Contracts. Each Contract will contain goals for Disadvantaged Business Enterprise participation on a contract-to-contract basis. A subcontracting goal of twenty-seven percent (27%) has been established for this procurement. All bidders must submit with their bid a fully executed copy of the Certified DBE Utilization and Fair Solicitation Affidavit (MDOT DBE FORM A) and DBE Participation Schedule (MDOT DBE FORM B). If the bidder fails to submit these completed forms with the bid as required, the procurement officer shall deem the bid non-responsive or shall determine that the offer is not reasonably susceptible of being selected for award. ALL DBE FIRMS MUST
BE CERTIFIED BY THE MARYLAND DEPARTMENT OF
TRANSPORTATION. NO OTHER CERTIFICATIONS WILL BE
ACCEPTED.
D. A contractor may count toward its DBE goal sixty percent (60%) of its expenditures for materials and supplies required under the contract and obtained from a DBE regular dealer, and 100 percent of such expenditures to a DBE manufacturer. The DBE credited supplies may not exceed 60 percent of the entire contract goal.
E. New versions of Sections 13-103, 13-104 and 14-303 of the State Finance and
Procurement Article of the Maryland Code, relating to increased bid/proposal documentation of DBE commitments, are effective as of October 1, 2004. The Contract under this solicitation will be awarded in accordance with these new requirements. As a result, new bid submission requirements, including certain revised DBE documents, are in effect for this solicitation. These new requirements are set forth elsewhere in this solicitation.
F. As a result of the revisions to Sections 13-103, 13-104 and 14-303, certain existing portions of the Code of Maryland Regulations (COMAR) relating to post bid/proposal submission of DBE subcontractors are inconsistent with the revised statute. To the extent the provisions of COMAR relating to post bid identification of DBE subcontractors are inconsistent with the requirements of this solicitation, the requirements of this solicitation shall control the award of a Contract. Questions or concerns regarding the DBE requirements of this solicitation must be raised prior to the opening of bids or receipt of initial proposals
G. Effective on October 1, 2009, Minority Business Enterprise (MBE) firms may elect to be dually certification as woman-owned businesses and as members of an ethnic or racial category. For purposes of achieving any gender or ethnic/racial MBE participation subgoals in a particular contract, an MBE firm that has dual certification may participate in the contract either as a woman-owned business or as a business owned by a member of a racial or ethnic minority group, but not both.
Contract No. T-1451-2240R NTC 10 of 11
WARNING – PLEASE READ:
A firm must be listed in the MDOT MBE/DBE Directory with the gender category in order to be used to meet the gender subgoal.
A firm must be listed in the MDOT MBE/DBE Directory with an ethnic/racial category in order to be used to meet the ethnic/racial subgoal.
A firm must be listed in the MDOT MBE/DBE Directory with both the gender and ethnic/racial categories in order for a contractor to have the option of selecting which of those categories it will use for the firm on a State contract.
Contractors should designate whether the MBE firm will be used as a woman-owned business or as a business owned by a member of a racial/ethnic group before calculating the percentage of MBE participation goals and subgoals they intend to meet.
Maryland’s MBE/DBE Directory will reflect the dual certification status beginning October 1, 2009. You can access the MBE/DBE Directory at http://mbe.mdot.state.md.us. Firms with dual certification will now be listed as follows:
Example:
ABC Corporation, Inc.
123 Corporate Circle Hanover, MD 21076 Female/African American 00-000
17. AFFIRMATIVE ACTION REQUIREMENTS
Bidders on this Work will be required to comply with MTA Affirmative Action Requirements and all applicable Equal Employment Opportunity Laws and Regulations.
18. SUSPENSION AND DEBARMENT CERTIFICATION
All bidders will be required to certify that they are not on the GSA List of Parties Excluded from Procurement and the List of Contractors Suspended or Debarred from Contracting with the State of Maryland. All bidders must also be in good standing with the State Assessment & Taxation Department.
19. CONTRACTOR’S QUESTIONNAIRE
All Bidders shall submit a fully executed copy the Contractor’s Questionnaire Pre- Award Evaluation Data Form with the bid package.
http://mbe.mdot.state.md.us/
Contract No. T-1451-2240R NTC 11 of 11
20. INSURANCE REQUIREMENTS
The Administration has chosen to provide Workers’ Compensation, General Liability, Excess Liability, Builders Risk, Pollution Liability and Railroad Protective coverage on behalf of Contractors and subcontractors working on this project. This approach to project insurance is commonly called a wrap-up or owner controlled insurance program (OCIP). Specific information regarding Liability Insurance Requirements is contained in the IFB.
Please note that an Insurance Cost Worksheet must be included with each bid package.
21. USE OF BIDDER’S OWN FORCES
The bidder with his own forces shall perform not less than fifty percent (50%) of the work at the project site.
22. PROTESTS/DISPUTES
Any protest or dispute related, respectively, to this solicitation or the resulting Contract shall be subject to the provisions of COMAR 21.10 (Administrative and Civil Remedies).
23. CANCELLATION OR REJECTION OF BIDS
The “Notice to Contractors” may be canceled in accordance with State Procurement Regulations. The State (Administration) reserves the right to cancel this IFB, or accept or reject any and all Bids, in whole or in part and/or waive technical defects if, in its judgment, the interests of the Administration so require.
T-1451-2240R BF 1 of 12
MARYLAND TRANSIT ADMINISTRATION
BID FORM
FOR
CONTRACT NO.: T-1451-2240R
TO: MARYLAND TRANSIT ADMINISTRATION BID OPENING DATE:
ATTN: PROCUREMENT DIVISION April 14, 2020
6 SAINT PAUL STREET, 7TH FLOOR BID OPENING TIME:
BALTIMORE, MD 21202-1614 2:00 PM
BID OF:
(Bidder’s Name)
PROJECT DESCRIPTION:
1. This bid is hereby submitted to the Maryland Transit Administration (hereinafter sometimes called the “Administration”) in response to NOTICE TO CONTRACTORS dated .
2. The UNDERSIGNED has thoroughly examined, acknowledges receipt of, and is familiar with the Contract Documents as well as the various instructions, information, and requirements covering the same, all as mentioned herein and in said NOTICE TO
CONTRACTORS.
3. In compliance with said NOTICE TO CONTRACTORS the UNDERSIGNED hereby proposes to furnish all labor, equipment, and materials and perform all work described and in strict accordance with the provisions of the Contract Documents for the consideration of the amounts, lump sum and unit prices listed in the attached Unit Price Schedule, and agrees that, upon Notice of Award, within one hundred eighty(180) calendar days after the date of opening of bids, unless mutually extended, he will within ten (10) calendar days after receipt of the prescribed forms, execute the Contract and furnish a performance bond and payment bond (if such bonds are required by the Contract Documents) on forms furnished by the Administration with good and sufficient surety or sureties.
4. The UNDERSIGNED agrees and understands that the time of completion is as specified in the Special Provisions, unless the completion dates are extended as provided for in the Contract Documents.
5. The UNDERSIGNED agrees to pay liquidated damages in the amount specified in the Special Provisions for each and every calendar day after the completion date that the work remains incomplete unless an extension is granted as provided for in the Contract Documents.
6. The UNDERSIGNED hereby certifies that the (Bidder’s Name) / / is, / / is not (CHECK ONE) included on the GSA list of Parties Excluded from Procurement. AND
T-1451-2240R BF 2 of 12
The UNDERSIGNED hereby certifies that the (Bidder’s Name) / / is, / / is not (CHECK ONE) included on the List of Contractors Suspended or Debarred from Contracting with the State of Maryland.
7. The UNDERSIGNED, as the Contractor, will perform on the Site, with its own organization, percent ( %) of the total amount of work to be performed under this contract.
8. PARENT COMPANY
a, The UNDERSIGNED represents that it / / is, / / is not, (CHECK ONE) owned or controlled by a parent company. For this purpose a parent company is defined as one which either owns or controls the activities and basic business policies of the UNDERSIGNED. To own another company means the parent company must own at least a majority (more than 50 percent) of the voting rights in that company. To control another company such ownership is not required; if another company is able to formulate, determine or veto basic business policy decisions of the bidder, such other company is considered the parent of the bidder. This control may be exercised through the use of dominant minority voting rights, use of proxy voting, contractual arrangements, or otherwise.
b. If UNDERSIGNED is owned or controlled by a parent company, insert in the space below the name and main office address of the parent company
Name
Address
City, State Zip
9. ARREARAGES
By submitting a response to this solicitation, the undersigned shall be deemed to represent that it is not in arrears in the payment of any obligations due and owing the State of Maryland, including the payment of taxes and employee benefits, and that it shall not become so arrears during the term of the contract if selected for contract award.
10. CERTIFICATION OF NON-MARYLAND CORPORATION (FOREIGN
CORPORATION)
a. A corporation not incorporated in the State of Maryland is considered to be a foreign corporation and, therefore, is required to be registered with the Maryland State Department of Assessment and Taxation if awarded this contract.
b. Where a foreign corporation is currently registered with the Department of Assessments and Taxation, such a bidder shall submit with his bid a copy of the
T-1451-2240R BF 3 of 12 department's certification of his registration or qualification acknowledgment.
c. If a foreign corporation is not currently registered, such a bidder shall submit with his bid his certification that, if notified of his apparent award of the contract, he will register with the Maryland State Department of Assessments and Taxation and provide a copy of the department's certification of his registration or qualification acknowledgment along with the executed contract.
11. The Contractor shall, prior to the time of execution of the contract, obtain all applicable licenses and comply with all applicable laws and regulations in the Annotated Code of Maryland.
12. All bidders must submit with their bid the following documents fully executed in addition to the Excel Spreadsheet for Employee Health Care Expenses and Subcontractor Utilization Information Forms:
a. Bid Bond in the Amount of $ Or 5% of the bid price (if applicable).
or Individual Surety Bid Bond in the Amount of
$_____________________ Or 5% of the bid price (if applicable) and a executed Affidavit of Individual Surety (Attachment A) & Surety Affidavit (Attachment B).
b. Contractor’s Questionnaire Pre-Award Evaluation Data
c. Bid/Proposal Affidavit.
d. Buy America Certificate.
e. Certification Regarding Lobbying.
f. MDOT DBE Form A, “Certified DBE Utilization and Fair Solicitation
Affidavit”.
g. MDOT DBE Form B, “DBE Participation Schedule”.
h. Signed copy of the Cover Letter for each Addendum issued by MTA.
i. Completed Insurance Cost Worksheet
UNIT PRICE SCHEDULE BID FORM
T-1451-2240R BF-4 OF 13
Item Section Description Estimate of
Quantity
Unit Unit
Price
Total
Price
001 01130 Mobilization Fixed Price $839,000
002 01210 Miscellaneous Work
Allowance Allowance $420,000
003 01450 Quality Assurance and
Quality Control Allowance $252,000
01524
Engineer’s Field Office Allowance
$35,000
005 01550 Maintenance of Traffic 1 LS
006 01550 Temporary Traffic Signs 108 SF
007 01562 Temporary Orange Construction Fence
5,253 LF
008 02060 6 Inch Graded
Aggregate Base
85 SY
009 02220 Site Demolition 1 LS
010 02230 Site Clearing 1 LS
T-1451-2240R BF-5 OF 13
Item Section Description Estimate of
Quantity
Unit Unit
Price
Total
Price
011 02370 Stabilized Construction
Entrance
2 EA
012 02370 Temporary Seed 647 SY
013 02370 Temporary Mulch 647 SY
014 02370 Portable Sediment Tank 2 EA
015 02370 Super Silt Fence 342 LF
016 02370 Limits of Disturbance
(LOD) Markers
2278 LF
017 02370 At Grade Inlet
Protection (AGIP)
2 EA
018 02620 8 inch Perforated
Circular Pipe Underdrain
190 LF
019 02620 8 Inch Non-Perforated
Circular Pipe Underdrain Outlet
10 LF
020 02620 Underdrain Cleanout 3 EA
021 02630 12 Inch Reinforced
Concrete Pipe, Class IV
14 LF
T-1451-2240R BF-6 OF 13
Item Section Description Estimate of
Quantity
Unit Unit
Price
Total
Price
022 02630
24 Inch Reinforced Concrete Pipe, Class IV
30 LF
02630 Converting Existing Inlet to Junction Box
1 EA
024 02636 Stormwater
Management - Stormfilter SW-1
1 LS
025 02725 6 Inch Subballast 27 SY
026 02750
Concrete Crosswalk
SY
02750
Detectable Warning
Surface
SF
02770
Modified Type A Curb with 2 Feet Wide Gutter
180 LF
02770
Modified Type A Curb with 6 Inch Wide Gutter
11 LF
030 02920 Topsoil, Seeding and
Mulching for Permanent Stabilization
647 SY
031 02999 Ballast Mats 11 EA
T-1451-2240R BF-7 OF 13
Item Section Description Estimate of
Quantity
Unit Unit
Price
Total
Price
032 03404 Precast Panel Concrete
Pedestrian Grade Crossing on Cross Ties
3 EA
033 05520 Railing 35 LF
034 05656 Prefabricated Bonded
Insulated Joints, 27' long
13 EA
035 05671 Ballasted Track
Installation – Restraining Rail Ties
3078 TF
036 05671
Installation – Monoblock Ties
228 TF
037 05671
Installation –
Restraining/Emergency Guard Rail
32 TF
038 05673 Open Deck Renewal 1 LS
039 05674 Direct Fixation Track
Renewal
040 05674 Replacement of
Damaged Anchor Inserts
505 EA
041 05674 Plinth Replacement 9 SF
T-1451-2240R BF-8 OF 13
Item Section Description Estimate of
Quantity
Unit Unit
Price
Total
Price
042 05681 Install No. 8 Turnout
(Concrete Ties)
4 EA
043 05681 Install No. 8 Turnout
(Timber/Concrete Ties)
044 05681 Install No. 5 Equilateral Turnout (Concrete Ties)
045 05681 Install No. 8 Turnouts and P/S Crossing - Mount Royal
046 06135 Timber Headblock
Switch Ties
047 16111 Polymer Concrete
Handholes
048 16116 2” Schedule 80 Conduit 4,318 LF
049 16116 4” Schedule 80 Conduit 1,100 LF
050 16600 Switch Heater Assembly 11 EA
051 16600 Penn Station Aerial
Heater
T-1451-2240R BF-9 OF 13
Item Section Description Estimate of
Quantity
Unit Unit
Price
Total
Price
052 16600 Negative Return System 1 LS
053 16647 Track-to-Earth
Resistance Testing
054 17125 Switch and Lock
Movement Layouts
055 17305 OCS – Reprofile 1 LS
056 17305 OCS – New Cantilever
Assembly
057 17305 OCS – Modify
Headspan Assembly
5 EA
058 17305 OCS – Demolition and
Salvage
059 17305 OCS – Electrical
Testing and Acceptance
060 17311 OCS – Survey and Locate Foundations
061 17311 OCS – Pole Foundations 1 EA
T-1451-2240R BF-10 OF 13
Item Section Description Estimate of
Quantity
Unit Unit
Price
Total
Price
062 17313 OCS – Support
Structures
063 17317 OCS – Cathodic
Protection System (Contingent)
064 17305 OCS-Section Insulator
Assembly
Basis of Award: Total amount of items 001 thru 064 (figures)
(words)
Insurance Premium (Contingency)
LS LS
This amount will only be added to the base bid in the event that the bidder is excluded from the wrap-up insurance program or the program is terminated mid-term. The Insurance Premium Worksheet must be attached to the bid.
CONTRACT NO. T-1451-2240R BID FORM
T-1451-2240R BF 10 OF 12
A. CORPORATION BID: FEIN:
Name of Corporation
State in which Incorporated
Business Address
Telephone Number / Fax Number
ATTEST: By:
Secretary President or Vice President
Print Name Print Name
B. PARTNERSHIP BID: FEIN:
Name of Partnership
Names of each Partner:
Witness: By:
Signature Signature
T-1451-2240R BF 11 OF 12
C. INDIVIDUAL BID: S.S. No.:
Name
Witness: By:
Signature
D. JOINT VENTURE FEIN:
ATTEST By:
Print Name Print Names
FEIN:
T-1451-2240R BF 12 OF 12
FEIN:
A Joint Venture doing business as
* Each member of the Joint Venture must execute the Bid Form. A Corporate Officer must sign for each member of the joint venture. In the event that a Corporate Officer (President or Vice President) does not sign the Bid Form, a Power of Execution or Power of Attorney, must be submitted with the Bid Forms.
Contract No. T-1451-2240R Rev. 1/07 BB 1 of 2
BID BOND
Bond No. __________
We, _________________________________ as Principal, hereinafter called the Principal, and _______________________________, a corporation duly organized under the laws of the State of _________________, as Surety, hereinafter called the Surety, are held and firmly bound unto the State of Maryland, hereinafter called "State", for the sum of ________________ for the payment of which sum, the Principal and the Surety bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents.
WHEREAS, the Principal has submitted a bid for
___________________________ (Identify project by number and brief description):
NOW, THEREFORE, if the Principal, upon acceptance by the State of its bid identified above, within the period specified therein for acceptance (ninety (90) days, if no period is specified), shall execute such further contractual documents, if any, and give such bond(s) as may be required by the terms of the bid as accepted within the time specified (ten (10) days if no period is specified) after receipt of the forms, or in the event of failure so to execute such further contractual documents and give such bonds, if the Principal shall pay the State the difference not to exceed the penalty hereof between the amount specified in Principal's bid and such larger amount for which the State may in good faith contract with another party to perform the work covered by said bid, then the above obligation shall be void and of no effect.
The Surety executing this instrument hereby agrees that its obligation shall not be impaired by any extension(s) of the time for acceptance of the bid that the Principal may grant to the State, notice of which extension(s) to the Surety being hereby waived; provided that such waiver of notice shall apply only with respect to extensions aggregating not more than ninety (90) calendar days in addition to the period originally allowed for acceptance of the bid.
In Presence of: Individual Principal Witness (Name) ____________________________ as to
__________________________(SE
AL)
Contract No. T-1451-2240R Rev. 1/07 BB 2 of 2
In Presence of: Partnership Principal Witness:
(Name) ____________________________ as to _________________________
(SEAL)
(Partner) ____________________________ as to _________________________
(SEAL)
(Partner) ____________________________ as to _________________________
(SEAL)
(Partner) Attest: Corporate Principal (Name of Corporation) AFFIX By:___________________________ Secretary President SEAL (Surety) AFFIX Attest:
By:___________________________ _______________________________ Attorney-in-fact SEAL
Bonding Agent’s Name Agent’s Address_________________________________________________________ Approved as to form and legal sufficiency This ________________ day of ___________________ , 20 __
T-1451-2240R AIS Page 1 of 5
AFFIDAVIT OF INDIVIDUAL SURETY
(See instructions on reverse) (Type or print all answers)
Attachment A
County: State:
Social Security Number:
I, the undersigned, being duly sworn, depose and say that I am: (1) the surety to the attached bond(s); (2) a citizen of the United States; and of full age and legally competent. I also depose and say that, concerning any stocks or bonds included in the assets listed below, that there are no restrictions on the resale of these securities pursuant to the registration provisions of Section 5 of the Securities Act of 1933. I recognize that statements contained herein concern a matter within the jurisdiction of an agency of the State of Maryland and the making of a false, fictitious or fraudulent statement may render the maker subject to prosecution under the Criminal Law Article, §9-101, Annotated Code of Maryland and the State Finance and Procurement Article, §11-205.1, Annotated Code of Maryland.
This affidavit is made to induce the State of Maryland to accept me as surety on the attached bond.
Name (First, Middle, Last)
Home Address (Number, Street, City, State, Zip)
Type and Duration of Occupation
Name of Employer (if self-employed, so state)
Address of Employer
Name and Address of Individual Surety Broker Used (If any)
(Number, Street, City, State, Zip)
Telephone Number (Home) (Office)
T-1451-2240R AIS Page 2 of 5
The following is a true representation of the assets I have pledged to the State of Maryland in support of the attached Bond:
(a) Real estate (Include a legal description, street address and other identifying description; the market value: attach supporting certified documents including recorded lien; evidence of title and the current tax assessment of the property. For market value approach, also provide a current appraisal.)
(b) Assets other than real estate (describe the assets, the details of the escrow account, and attach certified evidence thereof).
Identify all mortgages, liens, judgments or any other encumbrances involving subject assets including real estate taxes due and…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .