IFB_693JF721B000002.pdf
PDF 469 KB Posted
- Solicitation number
- 693JF721B000002
About this file
This invitation for bid solicits proposals for an artificial turf replacement project at the United States Merchant Marine Academy in Kings Point, New York. The solicitation requires bidders to remove the existing turf and replace it along with new goal posts in accordance with the attached statement of work and drawings. Bids are due by April 26, 2021 with a public opening scheduled for the same date. The total small business set-aside contract value is estimated between $500,000 and $1,000,000. The solicitation instructs bidders on requirements for pricing, bonds, certifications, site visits, and questions. The period of performance is 30 calendar days from notice to proceed.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
CALL:
FOR
SEALED BID (IFB)
NEGOTIATED (RFP)
MMAPR520721000079
US DOT MARITIME ADMINISTRATION
OFFICE OF ACQUISITION MAR-380
1200 NEW JERSEY AVENUE SE
MAIL STOP W-28-201
693JF7
WASHINGTON DC 20590-0001
US Merchant Marine Academy Procure
US DOT/Maritime Administration 300 Steamboat Road Kings Point, NY 11024-1699 USA
JUEBILINE MBANDI
x
03/26/2021
693JF721B000002
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
This is a solicitation notice pursuant to FAR 36.213-3. Department of Transportation/Maritime Administration (MARAD) issues this Invitation for Bids (IFB) for an artificial turf replacement construction project. The work shall be performed at the United States Merchant Marine Academy (USMMA), 300 Steamboat Road, Kings Point, NY (NASSAU COUNTY).
The magnitude of the project is between $500,000 and $1,000,000.
This is a Total Small Business set-aside. The applicable NAICS code is 238990
(Commercial and Institutional Building Construction). The small business size standard is $16.5 Million.
A bid bond is required in the amount of 20% of the bid price.
The Miller Act is applicable and payment and performance bonds in a penal amount equal to 100% of the contract price and any increases are required.
The period of performance is 30 calendar days.
Continued ...
11. The Contractor shall begin performance
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and is not required.is, b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
d. Offers providing less than
12b. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in Item 12b.)
10 30 calendar days and complete it within ________________ ________________ calendar days after receiving
04/26/2021
NSN 7540-01-155-3212
x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________
STANDARD FORM 1442 (Rev. 4-85)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
CODE FACILITY CODE
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
OFFER (Must be fully completed by offeror)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document and return (Contractor is not required to sign this document.)
Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.
No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE
BY
2PAGE OF
Lachelle Johnson
28. NEGOTIATED AGREEMENT 29. AWARD
Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, copies to issuing office.)
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
STANDARD FORM 1442 (REV. 4-85) BACK
Continued...
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
3 32
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
693JF721B000002
The IFB as well as any amendments will be available to the public at the Government-Wide Point of Entry (https://beta.Sam.gov).
Drawings will also be available at no charge at the Government-Wide Point of Entry
(https://beta.Sam.gov). No paper copies will be mailed. Responses to this notice are not offers and cannot be accepted by the U.S Government to form a binding contract.
It is the responsibility of the interested parties to monitor the Government-Wide Point of Entry (https://beta.Sam.gov) website for additional information pertaining to this Solicitation Notice, to include changes and/or updates/amendments.
Invitation for Bid (IFB) is due by 11:00 AM on April 26, 2021, with a public bid opening at 2:00 PM on April 26, 2021. Site visits are tentatively scheduled for April 6, 2021 and April 13, 2021.
Final dates and times will be specified in the
IFB.
All bidders must be registered with an "active" profile in the System for Award Management (SAM) in order to be eligible to receive an award from any Government solicitation; the SAM website is www.SAM.gov.
Questions, inquiries or requests for information (RFI) should be sent by e-mail to juebiline.mbandi@dot.gov by April 14, 2021 and the government will make a reasonable attempt to answer by April 19, 2021. For questions, inquiries or requests for information (RFI) received after April 19, 2021, the Government will make a reasonable attempt to answer prior to the bid opening date. We will provide official responses to inquiries received in writing.
Delivery Location Code: MARAD-00095
US Merchant Marine Academy Procure
US DOT/Maritime Administration
300 Steamboat Road
Kings Point, NY 11024-1699 USA
Delivery: 30 Days After Notice to Proceed Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
ITEM NO.
(A)
SUPPLIES/SERVICES
(B)
QUANTITY
(C)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
NAME OF OFFEROR OR CONTRACTOR
4 32
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
693JF721B000002
Delivery Location Code: MARAD-00095
USMERCHANT MARINE ACADEMY PROCURE
US DOTMARITIME ADMINISTRATION
300 STEAMBOAT ROAD
KINGS POINT NY 11024-1699 USA
Period of Performance: 07/01/2021 to 08/01/2021
00001 Tomb Field turf and goal post replacement
Synthetic turf is at the end of its useful life.
Turf and goal posts to be replaced as per the
Statement of Work.
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
Solicitation #: 693JF721B000002
INVITATION FOR BIDS
SOLICITATION NUMBER: 693JF721B000002
ISSUED: March 26, 2021
QUESTIONS DUE: April 14, 2021 at 5PM Easter Standard Time (EST) RESPONSES TO QUESTIONS: Approximately April 19, 2021 by 5PM EST (posted to https:beta.Sam.gov)
BIDS DUE: April 26, 2021 at 11AM EST
FOR: ARTIFICIAL TURF REPLACEMENT PROJECT
IMPORTANT - NOTICE TO BIDDERS
1. Read the ENTIRE solicitation (Sections A through M,)
a) See Section L for instructions
b) Sign and return ONE original of the entire solicitation form (see SF 1442, Section B, Section I and Section K for applicable fill-in information). Provide a detailed price breakdown by discipline/spec. section.
2. Before submitting your bid, please recheck the following:
a) Does your bid set forth full, accurate, and complete information as required by this solicitation, including all attachments and acknowledging all amendments?
b) Have you rechecked your figures, including calculations on your work sheets?
c) Have you completed and signed all required documents?
d) Have you included a bid guarantee? A 20% bid guarantee (SF 24) is required. A copy of an SF 24 can be retrieve from https://www.gsa.gov/forms-library/bid-bond
3. Bidders offering less than 120 calendar days for acceptance WILL NOT BE considered and
WILL BE rejected.
4. Telegraphic, telephonic, or facsimile bids will NOT be accepted.
5. All information pertaining to this IFB, including pertinent changes/amendments, will be posted on-line at https:beta.Sam.gov.
6. This solicitation is issued as a 100% Total Small Business Set-aside, pursuant to FAR Parts 5, 14, & 19.
7. Bidder shall include all APPLICABLE Federal, State, and Local taxes in their bid price. A tax-exempt number will not be provided.
8. Performance Bonds and Payment Bonds will be required for 100% of the total award amount.
9. All bidders are required to be registered with an active status at www.SAM.gov. Accounts shall remain active for the entire performance period of the resulting contract.
https://www.gsa.gov/forms-library/bid-bond http://www.fbo.gov/ http://www.sam.gov/
SECTION A
SOLICITATION/CONTRACT FORM
TABLE OF CONTENTS
DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
| A | SOLICITATION/CONTRACT FORM 6
| B | SUPPLIES OR SERVICES AND PRICES/COSTS 7
| C | DESCRIPTION/SPECS/WORK STATEMENT 8
| D | PACKAGING AND MARKING 8
| E | INSPECTION AND ACCEPTANCE 8
| F | DELIVERIES OR PERFORMANCE 8
| G | CONTRACT ADMINISTRATION DATA 10
| H | SPECIAL CONTRACT REQUIREMENTS 11
PART II - CONTRACT CLAUSES
| I |CONTRACT CLAUSES 15
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER
ATTACHMENTS
| J |LIST OF ATTACHMENTS 21
PART IV - REPRESENTATIONS AND INSTRUCTIONS
| K
|REPRESENTATIONS, CERTIFICATIONS AND OTHER
|STATEMENTS OF OFFERORS 22
| L |INST., CONDITIONS, AND NOTICES TO OFFERORS 27
| M |EVALUATION FACTORS FOR AWARD 32
SECTION B
SUPPLIES OR SERVICES AND PRICES/COSTS
GENERAL SCOPE OF WORK:
The contractor (also referred to as “vendor” throughout) shall provide all labor, materials, equipment, supervision, transportation, and disposal required for the complete replacement of the artificial turf on Tomb Field at the U.S. Merchant Marine Academy (USMMA), located at 300 Steamboat Road, Kings Point, NY 11024.
Work tasks include, but are not limited to, the following:
Removal of existing turf Inspection and testing Preparing the base Designing the field Installing the new turf Replacing the goalpost
All work shall be accomplished in accordance with the Statement of Work, Drawings, and the applicable wage rates incorporated herein (see Section J).
Vendor shall include a proposed monthly progress payment schedule in accordance with FAR clause 52.232-5, based on the estimates of work to be accomplished per the draft project schedule.
ITEM 0001: BASE BID ITEM
Artificial turf replacement in accordance to the Statement of Work, Drawings and applicable wage rates.
TOTAL LUMP SUM PRICE
SECTION C
DESCRIPTION/SPECIFICATION/WORK STATEMENT
All work shall be accomplished in accordance with contract terms and conditions, as well as the documents listed in Section J.
SECTION D
PACKAGING AND MARKING
This section is not applicable.
SECTION E
INSPECTION AND ACCEPTANCE
FAR 52.246-12 INSPECTION OF CONSTRUCTION (AUG 1996). This clause is incorporated by reference.
E. Electronic Submission of Payment Requests.
ELECTRONIC SUBMISSION OF PAYMENT REQUESTS
(a) Definitions. As used in this clause—
(1) Contract financing payment has the meaning given in FAR 32.001.
(2) Payment request means a bill, voucher, invoice, or request for contract financing payment or invoice payment with associated supporting documentation. The payment request must comply with the requirements identified in FAR 32.905(b), “Content of Invoices,” this clause, and the applicable Payment clause included in this contract.
(3) Electronic form means an automated system transmitting information electronically according to the accepted electronic data transmission methods and formats identified in paragraph (c) of this clause.
Facsimile, email, and scanned documents are not acceptable electronic forms for submission of payment requests.
(4) Invoice payment has the meaning given in FAR 32.001.
(b) Electronic payment requests. Except as provided in paragraph (e) of this clause, the contractor shall submit payment requests in electronic form. Purchases paid with a Governmentwide commercial purchase card are considered to be an electronic transaction for purposes of this rule, and therefore no additional electronic invoice submission is required.
(c) The Department of Transportation utilizes the Delphi eInvoicing web-portal for processing invoices.
For vendors submitting invoices, and certain grantees submitting payment requests, they will be required to submit invoices via Delphi eInvoicing which is accessed and and authenticated via www.login.gov
(d) The following FAR section applies (32.905 Payment documentation and process). In order to receive payment and in accordance with the Prompt Payment Act, all invoices submitted as attachments in the Delphi eInvoicing web-portal shall contain the following:
(a) General. Payment will be based on receipt of a proper invoice and satisfactory contract performance.
(b) Content of invoices.
(1) A PROPER INVOICE MUST INCLUDE THE FOLLOWING ITEMS (except for interim payments on cost reimbursement contracts for services):
(i) Name and address of the contractor.
(ii) Invoice date and invoice number. (Date invoices as close as possible to the date of mailing or transmission.)
(iii) Contract number or other authorization for supplies delivered or services performed (including order number and contract line item number).
(iv) Description, quantity, unit of measure, unit price and extended price of supplies delivered or services performed.
(v) Shipping and payment terms (e.g., shipment number and date of shipment, discount for prompt payment terms). Bill of lading number and weight of shipment will be shown for shipments on Government bills of lading.
(vi) Name and address of contractor official to whom payment is to be sent (must be the same as that in the contract or in a proper notice of assignment).
(vii) Name (where practicable), title, phone number and mailing address of person to notify in the event of a defective invoice.
(e) Payment system registration. All persons accessing the Delphi eInvoicing web-portal will be required to have their own unique user Delphi eInvoicing ID and password and be credentialed through login.gov.
(1) Electronic authentication. See www.login.gov for instructions. Click on the following link for instructions on establishing a login.gov account: https://login.gov/help/creating-an-account/how-do-i-create-an-account-with-logingov/.
(2) To create a login.gov account, the user will need a valid email address and a working phone number.
The user will create a password and then login.gov will reply with an email confirming the email address.
(3) Agency POC’s will be responsible for communicating with vendor POC’s to initiate the Delphi eInvoicing account creation process. Vendor POC’s who will require access to the eInvoicing web-portal for invoice submission and payment tracking purposes will be required to provide their full name, valid email address, and current phone number to the agency POC to initiate the Delphi eInvoicing web-portal account. Vendor users and the agency POC will be notified via e-mail when the account is created. The vendor user will be provided detailed instructions for logging into their Delphi eInvoicing account.
(4) Training on Delphi. To facilitate use of DELPHI, comprehensive user information is available at http://einvoice.esc.gov
(5) Account Management. Vendors are responsible to contact the Delphi Help Desk when their firm’s points of contacts will no longer be submitting invoices so they can be removed from the system. Instructions for contacting the Delphi Help Desk can be found at http://einvoice.esc.gov.
SECTION F
DELIVERIES OR PERFORMANCE
F.1 PLACE OF PERFORMANCE
All work to be performed for the replacement of the artificial turf will be at the USMMA’s Tomb Field, located at 300 Steamboat Road, Kings Point, NY 11024
F.2 PERIOD OF PERFORMANCE
The period of performance will be 30 days from the date the Notice to Proceed (NTP) is issued to the contractor.
Work shall be performed during normal business hours of 7:00AM-4:30PM, Monday through Friday. If the Contractor desires to work during periods other than above, the Program Manager must notify the Contracting Officer (CO) five (5) working days in advance of the intention to work during other periods to allow assignment of additional inspection forces. When the CO determines that they are reasonably available, she may authorize the Contractor to perform work during periods other than normal duty hours/days. However, if inspectors are required to perform in excess of their normal duty hours/days solely for the benefit of the Contractor, the actual cost of the inspection, at overtime rates, will be charged to the Contractor and will be deducted from the final payment of the contract amount.
F.3 FAR 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 30 calendar days* after the date the Contractor receives the notice to proceed. The time stated for completion shall include final cleanup of the premises.
F.4 FAR 52.242-14 SUSPENSION OF WORK (APR 1984). This clause is incorporated by reference.
F.5 52.211-12 LIQUIDATED DAMAGES-- CONSTRUCTION (SEP 2000)
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $14,000.00 or .01% of the amount due for the last invoice payment scheduled (whichever is greater), for each calendar day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
(End of clause)
F.4 1252.237-73 KEY PERSONNEL (APR 2005)
(a) The personnel as specified below are considered essential to the work being performed under this contract and may, with the consent of the contracting parties, be changed from time to time during the course of the contract by adding or deleting personnel, as appropriate.
(b) Before removing, replacing, or diverting any of the specified individuals, the Contractor shall notify the contracting officer, in writing, before the change becomes effective. The Contractor shall submit information to support the proposed action to enable the contracting officer to evaluate the potential impact of the change on the contract. The Contractor shall not remove or replace personnel under this contract until the Contracting Officer approves the change.
The Key Personnel under this Contract are:
1. Project Manager
2. Construction Superintendent
3. Safety and Health Officer
(End of Clause)
SECTION G
CONTRACT ADMINISTRATION DATA
G.1 CONTRACT ADMINISTRATION
All matters related to the contractual obligations, and general correspondence, shall be coordinated with and directed to the Contracting Officer and/or Contract Specialist at:
Juebiline Mbandi Contract Specialist U.S. Department of Transportation Maritime Administration Office of Acquisition, MAR380 1200 New Jersey Avenue, S.E.
W26-444 Washington, DC 20590 Office: (202) 366-1913 E-mail: juebiline.mbandi@dot.gov
LaChelle Johnson Contracting Officer U.S. Department of Transportation Maritime Administration Office of Acquisition, MAR380 1200 New Jersey Avenue, S.E.
W26-444 Washington, DC 20590 Office: (202) 366-9551 E-mail: lachelle.johnson@dot.gov
The Contracting Officer’s Representative (COR):
Paul Buhse United States Merchant Marine Academy Capital Improvement Office 300 Steamboat Road Kings Point, NY 11024 Email: buhsep@USMMA.edu
SECTION H
SPECIAL CONTRACT REQUIREMENTS
H.1 REQUIREMENT FOR INSURANCE
In accordance with the provisions of FAR Clause 52.228-5, "Insurance - Work on a Government Installation (1997)," the Contractor shall furnish to the Contracting Officer a certificate of insurance, identified by contract number, as evidence of the existence of the following minimum insurance coverages. The contractor shall, at its own expense, provide at least the kinds and minimum amounts of insurance required below:
mailto:juebiline.mbandi@dot.gov mailto:lachelle.johnson@dot.gov mailto:buhsep@usmma.edu
Type of Accident Comprehensive
Per Person Coverage Per Accident Property
General Liability $500,000 (aggregate for bodily injury)
$150,000
Automobile Liability $200,000 $500,000 $150,000
Workmen's Compensation--As required by Federal and State Law.
In accordance with FAR Clause 52.228-5, "Insurance - Work on a Government Installation," the certificate of insurance shall also indicate that a 30-day notice of cancellation applies. Any cancellation or material change, adversely affecting the Government’s interest, shall not be effective until 30 days after the insurer or Contractor gives written notice to the Contracting Officer.
A certificate of insurance must be presented to the Contracting Officer within ten (10) calendar days after award of the contract.
H.2 SUBCONTRACT DATA
The Contractor shall submit an executed Statement and Acknowledgement (Standard Form 1413), to the Contracting Officer for every subcontractor (including every subcontractor of the second or lower tier) that will be performing work at the construction site. This shall be done before the subcontractor begins work. This form provides an acknowledgement by the subcontractor that mandatory "flow-down" contract clauses have been included in his/her contract in accordance with FAR Clause 52.222-
11. A copy of Form SF 1413 will be given to the Contractor at time of award. Completing this form creates no contractual relationship between the subcontractor and the Government.
H.3 MODIFICATION PROPOSALS - PRICE BREAKDOWN
The Contractor shall furnish a detailed Proposal for all Contract Modification Requests (CMR's) from the Contracting Officer. All Proposals shall reach the Contracting Officer within 10 calendar days after receipt of the CMR unless otherwise directed by the Contracting Officer. The Proposal shall comprise an itemized price breakdown in sufficient detail to permit an analysis of all materials, labor, equipment, overhead and profit, at both the prime and subcontracting levels and shall cover all work involved in the modification whether such work was deleted, added or changed. In addition, if the Proposal includes a request to extend time it shall show the effect on the approved schedule. Contractor-initiated requests, for changes to the contract (other than corrective), shall be considered by the Government only if they meet all of the following conditions:
(1) The request shall be submitted to the Contracting Officer by separate correspondence signed by an authorized representative of the Contractor.
(2) The request shall state how the proposed change would be incorporated into the schedule;
whether or not a time extension will be necessary, and the calendar date that the Contractor must receive approval or disapproval so as not to affect the existing schedule.
(3) The request shall include a complete listing of existing labor, materials and equipment costs and proposed change as well as all indirect costs, and delays. It shall include a listing with telephone number, of all sources necessary for Government verification of costs and the Contractor's offer. The Government will reject any request that does not provide ALL of the above information in a single submission. The Contractor shall submit supporting data for claimed overhead rates to the Contracting Officer. In connection with the negotiation of any change or other modification of this contract that involves aggregate increase or decrease in costs, plus applicable profits (as explained in FAR 15.804-2), in excess of $100,000, and that is not based on adequate price competition, established catalog or market prices of commercial items sold in substantial quantities to the general public, or prices set by law or regulation, the Contractor shall furnish cost or pricing data; and, as soon as practicable after agreement is reached on price, shall furnish a Certificate of Current Cost or Pricing Data.
H.4 PRICING OF ADJUSTMENTS
When costs are a factor in any determination of a contract price adjustment pursuant to the Changes clause or any other provision of this contract such costs shall be in accordance with the contract cost principles and procedures in Federal Acquisition Regulation Part 31.
H.5 TAR 1252.228-73 NOTIFICATION OF MILLER ACT PAYMENT BOND PROTECTION (APR
2005)
This notice clause shall be inserted by first tier subcontractors in all their subcontracts and shall contain the surety which has provided the payment bond under the prime contract.
(a) The prime contract is subject to the Miller Act (40 USC 270), under which the prime Contractor has obtained a payment bond. This payment bond may provide certain unpaid employees, suppliers, and subcontractors a right to sue the bonding surety under the Miller Act for amounts owed for work performed and materials delivered under the prime contract.
(b) Persons believing that they have legal remedies under the Miller Act should consult their legal advisor regarding the proper steps to take to obtain these remedies. This notice clause does not provide any party any rights against the Federal Government, or create any relationship, contractual or otherwise, between the Federal Government and any private party.
(c) The surety who has provided the payment bond under the prime contract is:
(Name) (Street Address) (City, State, Zip Code) (Contact and Telephone No.)
H.6 GREEN PURCHASING
Pursuant to Executive Order 13423, Strengthening Federal Environmental, Energy and Transportation Management, and 13514, Federal Leadership in Environmental, Energy, and Economic Performance, the Maritime Administration promotes managing its facilities in an environmentally preferable manner that will promote the natural environment and protect the health and well-being of its Federal employees and contractor service providers. In the performance of work under this contract, the Contractor shall exert its best efforts to provide its services in a manner that will promote the natural environment and protect the health and well-being of Federal employees, contract service providers and visitors using the facility. Green purchasing or environmentally preferable contracting has several interacting initiatives which are described at the following Government or Industry Internet sites:
Recycled Products are described at http://epa.gov/cpg Biobased Products are described at http://www.biopreferred.gov/ Energy efficient products are at http://energystar.gov/products for Energy Star products Energy efficient products are at http://www.eere.energy.gov/femp/procurement for FEMP designated products Environmentally Preferable Computers are at http://www.epeat.net Non-Ozone Depleting Alternative Products are at http://www.epa.gov/ozone/strathome.html Water efficient plumbing products are at http://epa.gov/watersense
To the extent that the services provided by the Contractor require provision of any of the above types of products, the Contractor is expected to provide the environmentally preferable type of product unless that type of product is not available competitively within a reasonable time, at a reasonable price, is not life cycle cost efficient in the case of energy consuming products, or does not meet http://epa.gov/cpg http://www.biopreferred.gov/ http://energystar.gov/products http://www.eere.energy.gov/femp/procurement http://www.epeat.net/ http://www.epa.gov/ozone/strathome.html http://epa.gov/watersense reasonable performance standards.
H. 7 SECURITY
The contractor shall be solely responsible for the security of its materials and equipment.
H. 8 CONTRACT SPECIFICATIONS AND DRAWINGS
(a) The Government will provide to the Contractor, without charge, applicable drawings and specifications related to this requirement upon request.
(b) Omissions from the drawings or specifications or the mis-description of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work.
H. 9 CONSTRUCTION SITE DOCUMENTATION
Contractor shall keep all permits and other documents required to be on the job site in a 3-ring binder or posted on a bulletin board within the construction area.
SECTION I
CONTRACT CLAUSES
I.1 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available.
Also, the full text of a clause may be accessed electronically at this address:
https://acquisition.gov/browse/index/far
52.202-1 Definitions JUN 2020 52.203-3 Gratuities APR 1984 52.203-5 Covenant Against Contingent Fees MAY 2014 52.203-6 Restrictions on Subcontractor Sales to the Government JUN 2020 52.203-12 Limitation on Payments to Influence Certain Federal Transactions JUN 2020 52.203-17 Contractor Employee Whistleblower Rights JUN 2020 52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper MAY 2011 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards JUN 2020 52.204-13 Systems for Award Management Maintenance OCT 2018 52.204-14 Service Contract Reporting Requirement OCT 2016 52.204-18 Commercial and Government Entity Code Maintenance AUG 2020 52.209-6 Protecting the Government's Interest when Subcontracting With
Contractors Debarred, Suspended, or Proposed for Debarment
JUN 2020
52.209-9 Updates of Publicly Available Information Regarding Responsibility OCT 2018
52.209-10 Matters Prohibition on Contracting with Inverted Domestic Corporations NOV 2015
52.211-13 Time Extensions SEPT 2000 52.211-18 Variation in Estimated Quantity APR 1984 52.214-26 Audit and Records – Sealed Bidding Alternate I JUN 2020
52.219-6 Notice of Total Small Business Set-Aside NOV 2020 52.219-8 Utilization of Small Business Concerns OCT 2018 52.219-14 Limitations on Subcontracting MAR 2020 52.219-28 Post-Award Small Business Program Re-representation NOV 2020 52.222-3 Convict Labor JUN 2003
52.222-4 Contract Work Hours and Safety Standards Act – Overtime MAY 2018
52.222-6 Compensation Construction Wage Rate Requirements AUG 2018
52.222-7 Withholding of Funds MAY 2014 52.222-8 Payrolls and Basic Records AUG 2018 52.222-9 Apprentices and Trainees JUL 2005 52.222-10 Compliance with Copeland Act Requirement FEB 1988 52.222-11 Subcontracts (Labor Standards) MAY 2014 52.222-12 Contract Termination – Debarment MAY 2014 52.222-13 Compliance with Construction Wage Rate Requirements and Related MAY 2014
52.222-14 Regulations Disputes Concerning Labor Standards FEB 1988
52.222-15 Certification of Eligibility MAY 2014 52.222-21 Prohibition of Segregated Facilities APR 2015 52.222-26 Equal Opportunity SEP 2016 52.222-27 Affirmative Action Compliance Requirements for Construction APR 2015 52.222-35 Equal Opportunity for Veterans JUN 2020 52.222-36 Equal Opportunity for Workers with Disabilities JUN 2020 52.222-37 Employment Reports on Veterans JUN 2020 52.222-40 Notification of Employee Rights under the National Labor Relations Act DEC 2010 52.222-50 Combating Trafficking in Persons OCT 2020 52.222-54 Employment Eligibility Verification OCT 2015 52.222-55 Minimum Wages Under Executive Order 13658 NOV 2020 52.223-2 Affirmative Procurement of Biobased Products Under Service and
Construction Contracts SEP 2013 52.223-5 Pollution Prevention and Right-to-Know Information MAY 2011 52.223-6 Drug-Free Workplace MAY 2001 52.223-18 Encouraging Contractor Policies to Ban Text Messaging While Driving JUN 2020 52.225-13 Restrictions on Certain Foreign Purchases FEB 2021 52.228-1 Bid Guarantee (20%, use form SF24) (Perf & Pay Bonds 100% of SEP 1996
52.228-2 Award) Additional Bond Security OCT 1997
52.228-5 Insurance - Work on a Government Installation JAN 1997 52.228-11 Individual Surety-Pledges of Assets FEB 2021 52.228-12 Prospective Subcontractor Requests For Bonds MAY 2014 52.228-14 Irrevocable Letter of Credit NOV 2014 52.228-15 Performance & Payment Bonds – Construction OCT 2010 52.229-3 Federal, State, and Local Taxes FEB 2013 52.232-5 Payments under Fixed-Price Construction Contracts MAY 2014 52.232-17 Interest MAY 2014 52.232-23 Assignment of Claims MAY 2014 52.232-27 Prompt Payment For Construction Contracts paragraph (a)(1)(i)(A)
(“30 days” in lieu of “14 days”) JAN 2017 52.232-33 Payment by Electronic Funds Transfer – System for Award Management OCT 2018 52.232-39 Unenforceability of Unauthorized Obligations JUN 2013 52.232-40 Providing Accelerated Payments to Small Business Contractors DEC 2013 52.233-1 Disputes (Alternate I) (Dec 1991) MAY 2014 52.233-3 Protest After Award AUG 1996 52.233-4 Applicable Law for Breach of Contract Claim OCT 2004 52.236-2 Differing Site Conditions APR 1984 52.236-3 Site Investigation and Conditions Affecting the Work APR 1984 52.236-5 Material and Workmanship APR 1984 52.236-6 Superintendence by the Contractor APR 1984
52.236-7 Permits and Responsibilities NOV 1991 52.236-8 Other Contracts APR 1984 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, & APR 1984
52.236-10 Improvements Operations and Storage Areas APR 1984
52.236-11 Use and Possession Prior to Completion APR 1984 52.236-12 Cleaning Up APR 1984 52.236-13 Accident Prevention NOV 1991 52.236-14 Availability and Use of Utility Services APR 1984
52.236-15 Schedules for Construction Contracts APR 1984
52.236-17 Layout of Work APR 1984 52.236-21 Specifications and Drawings for Construction (ALT I APR 1984) FEB 1997 52.236-26 Preconstruction Conference FEB 1995 52.242-13 Bankruptcy JUL 1995 52.242-14 Suspension of Work APR 1984 52.243-4 Changes JUN 2007 52.246-12 Inspection of Construction AUG 1996 52.246-21 Warranty of Construction MAR 1994 52.248-3 Value Engineering – Construction OCT 2020 52.249-2 Termination for Convenience of the Government (Fixed-Price) (ALT I APR 2012
52.249-10
SEP 1996)
Default (Fixed-Price Construction) APR 1984
52.253-1 Computer Generated Forms JAN 1991
TAR
1252.223-70
Removal or Disposal of Hazardous Substances—Applicable Licenses and Permits
DEC 1997
TAR Seat belt use policies and programs APR 2005 1252.223-73 TAR Notification of Miller Act payment bond protection APR 2005 1252.228-73 TAR Contracting officer’s technical representative OCT 1994 1252.242-73
CLAUSES INCORPORATED BY FULL TEXT
I.1 FAR 52.225-9 BUY AMERICAN - CONSTRUCTION MATERIALS (FEB 2021)
(a) Definitions. As used in this clause— Commercially available off-the-shelf (COTS) item—
(1) Means any item of supply (including construction material) that is–
(i) A commercial item (as defined in paragraph (1) of the definition at Federal Acquisition
Regulation (FAR) 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.
"Construction material" means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
Cost of components means—
(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
Domestic construction material means—
(1) For construction material that does not consist wholly or predominantly of iron or steel or a combination of both-
(i) An unmanufactured construction material mined or produced in the United States; or
(ii) A construction material manufactured in the United States, if–
(A) The cost of its components mined, produced, or manufactured in the United States exceeds 55 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic. Components of unknown origin are treated as foreign; or
(B) The construction material is a COTS item; or
(2) For construction material that consists wholly or predominantly of iron or steel or a combination of both, a construction material manufactured in the United States if the cost of foreign iron and steel constitutes less than 5 percent of the cost of all components used in such construction material.
The cost of foreign iron and steel includes but is not limited to the cost of foreign iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the construction material and a good faith estimate of the cost of all foreign iron or steel components excluding COTS fasteners. Iron or steel components of unknown origin are treated as foreign. If the construction material contains multiple components, the cost of all the materials used in such construction material is calculated in accordance with the definition of "cost of components".
Fastener means a hardware device that mechanically joins or affixes two or more objects together.
Examples of fasteners are nuts, bolts, pins, rivets, nails, clips, and screws.
Foreign construction material means a construction material other than a domestic construction https://www.acquisition.gov/far/2.101#FAR_2_101 material.
Foreign iron and steel means iron or steel products not produced in the United States. Produced in the United States means that all manufacturing processes of the iron or steel must take place in the United States, from the initial melting stage through the application of coatings, except metallurgical processes involving refinement of steel additives. The origin of the elements of the iron or steel is not relevant to the determination of whether it is domestic or foreign.
Predominantly of iron or steel or a combination of both means that the cost of the iron and steel content exceeds 50 percent of the total cost of all its components. The cost of iron and steel is the cost of the iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the product and a good faith estimate of the cost of iron or steel components excluding COTS fasteners.
Steel means an alloy that includes at least 50 percent iron, between 0.02 and 2 percent carbon, and may include other elements.
"United States" means the 50 States, the District of Columbia, and outlying areas.
(b) Domestic preference.
(1) This clause implements 41 U.S.C.chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the domestic content test of the Buy American statute is waived for construction material that is a COTS item, except that for construction material that consists wholly or predominantly of iron or steel or a combination of both, the domestic content test is applied only to the iron and steel content of the construction materials, excluding COTS fasteners. (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.
(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows:
________________________________________________[Contracting Officer to list applicable excepted materials or indicate "none"]
(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that-
(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 20 percent;
(ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or
(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.
(c) Request for determination of inapplicability of the Buy American statute.
(1)
(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including-
(A) A description of the foreign and domestic construction materials;
(B) Unit of measure;
(C) Quantity;
(D) Price;
(E) Time of delivery or availability;
(F) Location of the construction project;
(G) Name and address of the proposed supplier; and
(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.
(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.
(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).
(iv) Any Contractor request for a determination submitted after contract award shall explain why http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/12.505#FAR_12_505 the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.
(2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.
(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute.
(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:
Foreign and Domestic Construction Materials Price Comparison Construction Material Description
Unit of Measure Quantity Price
(dollars)* Item1:
Foreign construction material _______ _______ _______ Domestic construction material _______ _______ _______
Item2: _______ _______ _______ Foreign construction material _______ _______ _______ Domestic construction material
[* Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued)].
[List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.] [Include other applicable supporting information.] (End of clause)
I.2 FAR 52.236-4 PHYSICAL DATA (APR 1984)
Data and information furnished or referred to below is for the Contractor's information.
The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.
(a) The indications of physical conditions on the drawings and in the specifications are the result of site investigations by the Federal Government through an Architectural and Engineering (A&E) firm.
(End of clause)
SECTION J
LIST OF ATTACHMENTS
1. Artificial Turf Replacement SOW
2. Wage Determination: Davis Bacon Act WD # NY20210012
3. Question & Answer Response Form
SECTION K
REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS OF OFFERORS
K.1 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (FAR 52.204-8) (MAR 2020)
(a) (1) The North American Industry Classification System (NAICS) code for this acquisition is___238990__ .
(2) The small business size standard is _____$16.5____.
(3) The small business size standard for a concern which submits an offer in its own name, other than on a construction or service contract, but which proposes to furnish a product which it did not itself manufacture, is 500 employees.
(b)
(1) If the provision at 52.204-7, System for Award Management, is included in this solicitation, paragraph (d) of this provision applies.
(2) If the provision at 52.204-7, System for Award Management, is not included in this solicitation, and the Offeror has an active registration in the System for Award Management (SAM), the Offeror may choose to use paragraph (d) of this provision instead of completing the corresponding individual representations and certifications in the solicitation. The Offeror shall indicate which option applies by checking one of the following boxes:
(i) □ Paragraph (d) applies.
(ii) □ Paragraph (d) does not apply and the offeror has completed the individual representations and certifications in the solicitation.
(c)
(1) The following representations or certifications in SAM are applicable to this solicitation as indicated:
(i) 52.203-2, Certificate of Independent Price Determination. This provision applies to solicitations when a firm-fixed-price contract or fixed-price contract with economic price adjustment is contemplated, unless–
(A) The acquisition is to be made under the simplified acquisition procedures in part 13;
(B) The solicitation is a request for technical proposals under two-step sealed bidding procedures; or
(C) The solicitation is for utility services for which rates are set by law or regulation.
(ii) 52.203-11, Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions. This provision applies to solicitations expected to exceed $150,000.
(iii) 52.203-18, Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements or Statements-Representation. This provision applies to all solicitations.
(iv) 52.204-3, Taxpayer Identification. This provision applies to solicitations that do not include the provision at 52.204-7, System for Award Management.
https://www.acquisition.gov/far/52.204-7#FAR_52_204_7 https://www.acquisition.gov/far/52.204-7#FAR_52_204_7 https://www.acquisition.gov/far/52.203-2#FAR_52_203_2 https://www.acquisition.gov/far/part-13#FAR_Part_13 https://www.acquisition.gov/far/52.203-11#FAR_52_203_11 https://www.acquisition.gov/far/52.203-18#FAR_52_203_18 https://www.acquisition.gov/far/52.204-3#FAR_52_204_3 https://www.acquisition.gov/far/52.204-7#FAR_52_204_7
(v) 52.204-5, Women-Owned Business (Other Than Small Business). This provision applies to solicitations that-
(A) Are not set aside for small business concerns;
(B) Exceed the…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .