IFB_26-014-DN_DRAWINGS.pdf

PDF 9 MB Posted

Attached to
Taxilane Rehabilitation
Solicitation number
IFB 26-014-DN
Issued by
Orange County, Orlando City, Florida

About this file

This is a set of technical drawings and design specifications for a Taxilane Rehabilitation project at Leesburg International Airport in Florida, prepared by AVCON, Inc. (Engineers & Planners). The project encompasses the rehabilitation of five taxilanes (T-1, T-2, T-3, T-5, and T-6) and includes pavement demolition, minor grading, asphalt paving operations, utility relocations, and airfield pavement markings. The scope of work involves cold milling of existing asphalt pavements, full-depth reconstruction in select areas, placement of new asphalt surface and base courses, soil erosion and siltation control measures, and sodding of disturbed areas. The project is divided into four main work areas (A, B, C, and D) with specific phasing requirements, including separate sub-work areas with defined durations ranging from one to five consecutive calendar days. The total project duration is specified as 43 calendar days. The drawings include general notes, construction safety and phasing plans, existing conditions plans, civil demolition plans, geometry plans, grading and drainage plans, typical pavement sections, and marking plans with detailed specifications for materials, elevations, and construction sequencing.

The project is federally funded through FAA Airport Improvement Program (AIP) funding, as indicated by the FAA Project Number 3-12-0042-033-2025. All work must comply with current FDOT Standard Specifications for Road, Bridge and Utility Construction, FAA Advisory Circulars, and the City of Leesburg Land Development Code. Davis-Bacon wage rates apply to the project, requiring certified payrolls from all contractors and subcontractors. The contractor bears responsibility for locating and protecting existing utilities, obtaining necessary permits, coordinating with airport operations and tenants, and managing construction safety in the active airport environment. Contractor operations are restricted to nighttime hours (7:00 PM to 7:00 AM) for the majority of work, with coordination required between the contractor, Resident Project Representative (RPR), airport owner, and tenants. The contractor must provide airfield safety measures including barricades with lighting, Foreign Object Debris (FOD) management using approved friction mats, water trucks for dust control, and flaggers as necessary. All disturbed areas must be restored to original or better condition at contractor expense, and the contractor is responsible for any damage to existing facilities resulting from construction operations.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LEESBURG INTERNATIONAL AIRPORT

TAXILANE REHABILITATION

NO. DATE DESCRIPTION

REVISIONS

DATE

FAA AIG NO.

AVCON PROJ NO.

APRIL 2026

3-12-0042-033-2025

2025.236.04

VICINITY MAP

N.T.S.

LOCATION MAP

N

KEY WEST

FT.PIERCE

DAYTONA BEACH

TITUSVILLE

PANAMA CITY

PENSACOLA TALLAHASSEE

JACKSONVILLE

ORLANDO

TAMPA

ST.PETERSBURG

MIAMI

LOCATION OF PROJECT

N

N.T.S.

LEESBURG, FLORIDA.

GAINESVILLE

AVCON, INC.

ENGINEERS & PLANNERS

5555 MICHIGAN STREET, ORLANDO, FL. 32822

OFFICE: (407) 599-1122

www.avconinc.com

MELBOURNE

LEESBURG, FLORIDA

PROJECT

AREA

PROFESSIONAL SEAL

BID DOCUMENTS

SHEET INDEXB3

ABBREVIATIONSA3

SEAL

GENERAL NOTES,

SHEET INDEX AND

ABBREVIATIONS

GI002

ALB

JEG

JEG

GENERAL NOTESA1

GENERAL NOTES:

1. LOCATIONS, ELEVATIONS, AND DIMENSIONS OF EXISTING UTILITIES, STRUCTURES AND

OTHER FEATURES ARE SHOWN ACCORDING TO THE BEST INFORMATION AVAILABLE AT

THE TIME OF PREPARATION OF THESE PLANS. THE CONTRACTOR SHALL FIELD LOCATE,

VERIFY, AND FURTHER IDENTIFY THE LOCATIONS, ELEVATIONS, AND DIMENSIONS OF

ALL EXISTING UTILITIES, STRUCTURES, AND OTHER FEATURES (IDENTIFIED ON THE

PLANS OR NOT) AFFECTING ANY COMPONENT OF WORK HEREIN PRIOR TO THE START

OF ANY CONSTRUCTION. DISCREPANCIES, CONFLICTS, OR POTENTIAL DEVIATIONS

SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER PRIOR TO THE START OF

ANY CONSTRUCTION.

2. THE CONTRACTOR SHALL CHECK PLANS FOR CONFLICTS AND DISCREPANCIES PRIOR

TO THE START OF ANY CONSTRUCTION. SPECIAL ATTENTION SHALL BE TAKEN WITH

THOSE EXISTING UTILITIES, STRUCTURES OR FEATURES (IDENTIFIED ON THE PLANS OR

NOT) THAT MAY POTENTIALLY CONFLICT OR CROSS PROPOSED DESIGN COMPONENTS

(I.E., AIRFIELD ELECTRICAL, STORM SEWERS, SANITARY SEWERS, WATER MAINS,

COMMUNICATION LINES, HIGH POWER TRANSMISSION LINES, BUILDING FOUNDATIONS,

ETC) AND ANY DISCREPANCIES, CONFLICTS, OR POTENTIAL DEVIATIONS SHALL BE

BROUGHT TO THE ATTENTION OF THE ENGINEER PRIOR TO THE START OF ANY

CONSTRUCTION. ANY COST ASSOCIATED WITH THE LOCATION OF EXISTING UTILITIES

AS OUTLINED ABOVE IS THE RESPONSIBILITY OF THE CONTRACTOR.

3. ERRORS OR OMISSIONS - DO NOT TAKE ADVANTAGE OF ANY APPARENT ERROR OR

OMISSION DISCOVERED IN THE CONTRACT DOCUMENTS, BUT IMMEDIATELY NOTIFY THE

ENGINEER OF SUCH DISCOVERY. THE ENGINEER WILL THEN MAKE SUCH CORRECTIONS

AND INTERPRETATIONS AS NECESSARY TO REFLECT THE ACTUAL SPIRIT AND INTENT

OF THE CONTRACT DOCUMENTS.

4. THE CONTRACTOR SHALL EXERCISE EXTREME CAUTION IN AREAS OF BURIED UTILITIES

AND SHALL PROVIDE AT LEAST 48-HOURS NOTICE TO THE UTILITY COMPANIES PRIOR TO

CONSTRUCTION TO OBTAIN FIELD LOCATIONS OF EXISTING UNDERGROUND UTILITIES.

5. THE CONTRACTOR IS RESPONSIBLE FOR REPAIRING ANY DAMAGE TO EXISTING

FACILITIES, ABOVE OR BELOW GROUND, THAT MAY OCCUR AS A RESULT OF THE WORK

PERFORMED BY THE CONTRACTOR CALLED FOR IN THIS CONTRACT. CONTRACTOR

SHALL BE RESPONSIBLE FOR PROTECTING ALL EXISTING SURVEY MONUMENTATION,

AND ANY DISTURBED MONUMENTATION SHALL BE RESTORED AT CONTRACTOR'S

EXPENSE BY A SURVEYOR SELECTED BY THE OWNER.

6. IT IS THE CONTRACTOR'S RESPONSIBILITY TO BECOME FAMILIAR WITH THE PERMITS

AND INSPECTION REQUIREMENTS SPECIFIED BY THE VARIOUS GOVERNMENTAL

AGENCIES AND THE ENGINEER. THE CONTRACTOR SHALL OBTAIN ALL NECESSARY

PERMITS PRIOR TO CONSTRUCTION, AND SCHEDULE INSPECTIONS AND TESTING

ACCORDING TO AGENCY REQUIREMENTS.

7. ALL WORK PERFORMED SHALL COMPLY WITH THE CODES, STANDARDS, REGULATIONS

AND REQUIREMENTS OF THE CITY OF LEESBURG LAND DEVELOPMENT CODE AND

ENGINEERING STANDARDS, PLUS THE CURRENT EDITION OF THE FDOT STANDARD

SPECIFICATIONS FOR ROAD, BRIDGE AND UTILITY CONSTRUCTION, PLUS THE CURRENT

EDITION OF THE FAA ADVISORY CIRCULARS, PLUS THE REGULATIONS AND ORDINANCES

OF THE VARIOUS OTHER GOVERNMENTAL AGENCIES HAVING JURISDICTION OVER THE

WORK.

8. CONTRACTOR SHALL KEEP ENGINEER ADVISED OF CONSTRUCTION SCHEDULE

CHANGES SO THAT ENGINEER CAN PROVIDE CONSTRUCTION CERTIFICATIONS TO

JURISDICTIONAL AGENCIES.

9. SAFETY - DURING THE CONSTRUCTION AND/OR MAINTENANCE OF THIS PROJECT, ALL

SAFETY REGULATIONS ARE TO BE ENFORCED. THE CONTRACTOR OR THEIR

REPRESENTATIVE SHALL BE RESPONSIBLE FOR THE CONTROL AND SAFETY OF THE

TRAVELING PUBLIC AND THE SAFETY OF HIS PERSONNEL. LABOR SAFETY REGULATIONS

SHALL CONFORM TO THE PROVISIONS SET FORTH BY OSHA IN THE FEDERAL REGISTER

OF THE DEPARTMENT OF TRANSPORTATION.

10. "AS-BUILT" PLANS FOR THE PROPOSED CONSTRUCTION SHALL BE PROVIDED UPON

COMPLETION OF CONSTRUCTION, THE CONTRACTOR SHALL FURNISH THE OWNER'S

ENGINEER WITH COMPLETE "AS-BUILT" INFORMATION CERTIFIED BY A FLORIDA

REGISTERED PROFESSIONAL SURVEYOR.

11. THESE DRAWINGS HAVE BEEN PREPARED, IN PART, BASED UPON RECORD DRAWINGS

AND/OR CAD FILES FURNISHED BY OTHERS. WHILE THIS INFORMATION IS BELIEVED TO

BE RELIABLE, THOSE UTILIZING THE INFORMATION ON THESE DRAWINGS ARE ADVISED

TO OBTAIN INDEPENDENT VERIFICATION OF ITS ACCURACY BEFORE USING IT FOR ANY

PURPOSE.

12. ALL AREAS DISTURBED AS A RESULT OF THE CONTRACTOR'S STAGING AND

CONSTRUCTION OPERATIONS SHALL BE RESTORED EQUAL TO OR BETTER THAN

ORIGINAL CONDITION AT THE CONTRACTOR'S EXPENSE.

13. ALL DIRT, DUST, STONES AND LOOSE DEBRIS SHALL BE CONTINUOUSLY REMOVED

FROM ALL PAVED SURFACES DURING THIS CONTRACT.

14. THE CONTRACTOR SHALL CONSTRUCT AND MAINTAIN PROPOSED ASPHALT MILLINGS

ACCESS ROADS AT THE APPROXIMATE LOCATION SHOWN. PROPOSED ACCESS ROAD

MATERIAL SHALL BE MADE OF ASPHALT MILLINGS OR AN APPROVED EQUIVALENT.

15. ALL OF THE CONTRACTOR'S OPERATIONS SHALL REMAIN ON AIRPORT PROPERTY AT

ALL TIMES. UNDER NO CIRCUMSTANCES WILL THE CONTRACTOR BE ALLOWED ON

ADJACENT PROPERTY.

16. THE CONTRACT DOES NOT ALLOW FOR PRICE INCREASES DUE TO ESCALATION IN COST

OF UNIT BID ITEMS. THE CONTRACTOR SHALL TAKE THIS INTO CONSIDERATION WHEN

PREPARING UNIT PRICES FOR BID.

17. THE CITY OF LEESBURG RESERVES THE RIGHT TO ELIMINATE ANY ITEMS OF THE

CONTRACT AND PERFORM THESE ITEMS WITH COUNTY SUPPLIED FORCES AND

MATERIALS.

18. THE CONTRACTOR SHALL BE AWARE THAT OTHER CONCURRENT PROJECTS MAY BE

UNDER CONSTRUCTION ON THE AIRPORT. IT WILL BE THE CONTRACTOR'S

RESPONSIBILITY TO COORDINATE THEIR ACTIVITIES WITH THE OTHER CONTRACTORS

ON THE AIRPORT. THIS COORDINATION WILL NOT BE PAID SEPARATELY AND IS

CONSIDERED A NECESSARY AND INCIDENTAL PORTION OF THE WORK.

19. ALL ELEVATIONS REFERENCE NAVD 88 VERTICAL DATUM. COORDINATES REFERENCE

NAD 83 HORIZONTAL DATUM.

20. THE TOPOGRAPHIC FEATURES SHOWN HEREON WERE COMPILED FROM FIELD SURVEY

PERFORMED BY BOWMAN CONSULTING GROUP, LTD., INC. DATED 08-22-2025.

21. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PAYMENT OF ALL FAILED QUALITY

ASSURANCE TESTING.

GRADING NOTES:

1. SELECTIVE GRADING SHALL BE REQUIRED AS DIRECTED BY THE ENGINEER. GRADING

OPERATIONS FOR PLANNED WORK IS MINIMAL HOWEVER THIS PROJECT INCLUDES A

QUANTITY OF 50 CY OF UNCLASSIFIED EXCAVATION (ITEM P-152) AND AN ADDITIONAL 50

CY OF BORROW EXCAVATION (ITEM P-152), WHICH WILL BE USED ONLY WHEN DIRECTED

BY THE ENGINEER.

2. ALL SPOIL MATERIAL WHICH IS SUITABLE FOR EMBANKMENT AND EXCESS TOPSOIL

SHALL BE DISPOSED OF ON AIRPORT PROPERTY AS SHOWN ON THE CONTRACT

DRAWINGS, UNLESS OTHERWISE DIRECTED BY THE AIRPORT AUTHORITIES. SPOIL

MATERIAL WHICH IS NOT SUITABLE FOR EMBANKMENT SHALL BE DISPOSED OF OFF

AIRPORT.

3. EMBANKMENTS SHALL BE CONSTRUCTED WITH SUITABLE ON-SITE MATERIAL UNLESS

OTHERWISE DIRECTED BY THE ENGINEER.

4. THE LIMITS FOR SODDING ARE THE LIMITS OF GRADING SHOWN ON THE GRADING

PLANS. ALL AREAS OUTSIDE OF THE GRADING LIMITS WHICH ARE DISTURBED SHALL BE

RESTORED, WITH SOD, BY THE CONTRACTOR AT THEIR EXPENSE.

5. THE COST OF MEASURES AND PRACTICES FOR COMPLIANCE WITH POLLUTION,

EROSION, AND SILTATION CONTROL SUCH AS AIR POLLUTION PREVENTION, WATER

POLLUTION PREVENTION, TEMPORARY SEEDING, TEMPORARY MULCHING,

CONSTRUCTION ROAD STABILIZATION, DUST CONTROL, PROTECTING VEGETATION, AND

EROSION AND SILTATION CONTROL PRACTICES DUE TO THE CONTRACTOR'S MEANS

AND METHODS, SHALL BE INCLUDED IN ITEM C-102 UNDER PAYMENT FOR "TEMPORARY

AIR & WATER POLLUTION, SOIL EROSION, AND SILTATION CONTROL".

6. ALL SOIL EROSION AND SEDIMENT CONTROL DEVICES AND MATERIALS SHALL BE IN

PLACE PRIOR TO BEGINNING EARTHWORK OPERATIONS AND SHALL BE MAINTAINED

UNTIL THE NEW SLOPES ARE STABILIZED WITH SODDING AND/OR SLOPE PROTECTION.

7. ALL GRADING AREAS SHALL BE RESTORED WITH SOD. ALL AREAS OF SODDING SHALL

BE SMOOTH AND FREE OF RUTTING AT THE COMPLETION OF THE PROJECT.

8. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO ENSURE ADEQUATE GROWTH OF

GRASS FOR ALL AREAS RESTORED WITH SOD. CONTRACTOR SHALL WATER AND

MAINTAIN THE SOD AS NECESSARY TO ENSURE CURRENT AND FUTURE GROWTH.

9. THE CONTRACTOR SHALL RECEIVE A TRIANGULAR IRREGULAR NETWORK (TIN)

SURFACE TO ASSIST WITH PAVING AND GRADING OPERATIONS. THE CAD FILE

CONTAINING THE TIN SURFACE SHALL CONTAIN SPOT ELEVATIONS, BREAKLINES,

VERTICAL PROFILES AND SURFACE GRADIENTS. IT IS THE CONTRACTOR'S

RESPONSIBILITY TO PROVIDE A FINISH SURFACE IN ACCORDANCE WITH THE PLANS

AND SPECIFICATIONS. THE CONTRACTOR SHALL BE EQUIPPED WITH THE ABILITY TO

UTILIZE GPS MACHINE-CONTROL SYSTEMS TO EFFICIENTLY PERFORM PAVING AND

EARTHWORK OPERATIONS IN ACCORDANCE WITH THE PLANS AND SPECIFICATIONS.

THE CONTRACTOR SHALL NOTIFY THE ENGINEER OF RECORD PRIOR TO

CONSTRUCTION IF THERE IS ANY UNDERGROUND UTILITY CONFLICT THAT INTERFERES

WITH THE PROPOSED GRADING PLANS.

PAVING NOTES:

1. ALL AREAS TO BE PAVED SHALL BE PREPARED IN ACCORDANCE WITH ITEM P-101, "COLD

MILLING EXISTING PAVEMENT, FULL DEPTH".

2. EMULSIFIED ASPHALT TACK COAT, ITEM P-603, SHALL BE APPLIED PRIOR TO PLACING

EACH LIFT OF PAVEMENT, UNLESS OTHERWISE DIRECTED BY THE ENGINEER.

3. IN CASES OTHER THAN CENTERLINE JOINTS, LONGITUDINAL PAVING JOINTS IN ONE

LAYER SHALL BE OFFSET FROM THAT IN THE PREVIOUS LAYER BY AT LEAST ONE FOOT.

THE JOINT AT THE CENTERLINE OF THE PAVEMENT SHALL LINE UP WITH PREVIOUS

LAYER CENTERLINE JOINTS.

STORMWATER SYSTEM NOTES:

1. THE CONTRACTOR SHALL MAKE ALL NECESSARY PROVISIONS TO MAINTAIN EXISTING

STORM SEWER SYSTEM IN SERVICE.

2. SURFACE DRAINAGE SHALL BE DIVERTED FROM EXCAVATIONS, AND STOCKPILE AREAS

SUCH THAT PROPER SITE CONDITIONS ARE MAINTAINED AND EROSION DUE TO RAIN

RUN-OFF OR SEEPAGE IS PREVENTED OR MINIMIZED.

ABAN. - ABANDONED

APPROX. - APPROXIMATE

ASPH. - ASPHALT

BL - BASELINE

BLDG. - BUILDING

BM - BENCHMARK

CL - CENTERLINE

CCR - CONSTANT CURRENT REGULATOR

CIP - CAST IRON PIPE

CMP - CORRUGATED METAL PIPE

CONC. - CONCRETE

CSP - CORRUGATED STEEL PIPE

D - DIAMETER

E - EASTING

ELL - ELBOW/ARM

ELEV, - ELEVATION

FND. - FOUNDATION

HP - HIGH POINT

INV. - INVERT

JCP - JUNCTION CAN PLAZA

LT - LEFT

LP - LOW POINT

MAX. - MAXIMUM

MES - MITERED END SECTION

M.E.G. - MEET EXISTING GRADE

MIN. - MINIMUM

N - NORTHING

NA - NOT ACCEPTABLE

NFPA - NATIONAL FIRE PROTECTION

ASSOCIATION

OFA - OBJECT FREE AREA

O.C - ON CENTER

PAV'T - PAVEMENT

PC - POINT OF CURVATURE

PCC - PORTLAND CEMENT CONCRETE

PAVEMENT

PI - POINT OF INTERSECTION

PL - PROPERTY LINE

PVI - POINT OF VERTICAL INTERSECTION

PVC - POLYVINYL CHLORIDE PIPE

PET - CROSSLINKED POLYETHYLENE

PRESSURE TUBING

PVT - POINT OF TANGENCY (VERTICAL

CURVE)

R - RADIUS

RCP - REINFORCED CONCRETE PIPE

RGS - RIGID GALVANIZED STEEL

ROFA - RUNWAY OBJECT FREE AREA

RSA - RUNWAY SAFETY AREA

ROW - RIGHT OF WAY

RPZ - RUNWAY PROTECTION ZONE

RT - RIGHT

RWY - RUNWAY

SHDR - SHOULDER

SICPP - SMOOTH INTERIOR CORRUGATED

POLYETHYLENE PIPE

STA - STATION

TLOFA - TAXILANE OBJECT FREE AREA

TOFA - TAXIWAY OBJECT FREE AREA

TSA - TAXIWAY SAFETY AREA

TWY - TAXIWAY

TYP - TYPICAL

UG - UNDERGROUND

ATTENTION:

THIS DOCUMENT CONTAINS PRIVILEGED AND PROPRIETARY

INFORMATION, ALL OF WHICH IS EXPRESSLY PROVIDED BY AVCON, INC.,

FOR USE BY THE INTENDED RECIPIENT, AND FOR A SPECIFIC PURPOSE.

WITHOUT THE EXPRESS WRITTEN CONSENT OF AVCON, INC. ANY

DISTRIBUTION, REPRODUCTION, OR OTHER USE OF THIS DOCUMENT, IN

WHOLE OR IN PART, IS STRICTLY PROHIBITED

V:

\2

5\

.2

.0

- L

EE

T ax ila ne

R eh ab \2

5.

6.

C

AD

D \2

_G I_

Se rie s.

dw g 4/

/2

7:

P M

LEESBURG INTERNATIONAL

AIRPORT

LEESBURG, FLORIDA

TAXILANE

REHABILITATION

XR

EF

S:

x

4_

St an da rd

_t b 202523604_GI_SERIES

PROFESSIONAL SEAL

CLIENT LOGO

B

ID

D O

C U

M

EN

TS CADD:

AVCON PROJECT NO.

FAA AIP NO. 3-12-0042-033-2025

2025.236.04

DRAWING

DATE:

APPROVED BY:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

APRIL 2026

ALB

SCALE (US SVY FT): GRAPHIC

NO. DATE BY DESCRIPTION

REVISIONS:

AVCON, INC.

ENGINEERS & PLANNERS

5555 E. MICHIGAN ST., SUITE 200 - ORLANDO, FL 32822-2779

OFFICE: (407) 599-1122 - FAX: (407) 599-1133

CORPORATE CERTIFICATE OF AUTHORIZATION NUMBER: 5057

www.avconinc.com

Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.

This item has been digitally signed and sealed by:

A

B

C

1 2 3 4

A

B

C

1 2 3 4

TH

IS

S H

EE

T

SH

A

LL

B

E

PR

IN

TE

D

IN

C O

LO

R

, S H

EE

TS

N O

T

PR

IN

TE

D

IN

C O

LO

R

A R

E

IN

VA

LI

D

SHEET INDEX TABLE

SHEET

NUMBER SHEET TITLE

GI001 COVER SHEET

GI002 GENERAL NOTES, SHEET INDEX AND ABBREVIATIONS

GC101 GENERAL PLAN

GC102 CONSTRUCTION SAFETY AND PHASING PLAN - WORK AREA A

GC103 CONSTRUCTION SAFETY AND PHASING PLAN - WORK AREA B

GC104 CONSTRUCTION SAFETY AND PHASING PLAN - WORK AREA C

GC105 CONSTRUCTION SAFETY AND PHASING PLAN - WORK AREA D

GC501 CONSTRUCTION SAFETY AND PHASING PLAN DETAILS

CE101 EXISTING CONDITIONS PLAN

CE102 EXISTING CONDITIONS PLAN

CE103 EXISTING CONDITIONS PLAN

CD101 CIVIL DEMOLITION PLAN

CD102 CIVIL DEMOLITION PLAN

CD103 CIVIL DEMOLITION PLAN

CS101 GEOMETRY PLAN

CS102 GEOMETRY PLAN

CS103 GEOMETRY PLAN

CS501 GEOMETRY PLAN DETAILS

CG101 GRADING, DRAINAGE, AND SOIL EROSION CONTROL PLAN

CG102 GRADING, DRAINAGE, AND SOIL EROSION CONROL PLAN

CG103 GRADING, DRAINAGE AND SOIL EROSION CONTROL PLAN

CG301 TYPICAL SECTIONS AND DETAILS

CM101 MARKING PLAN

CM102 MARKING PLAN

CM103 MARKING PLAN

CM501 MARKING PLAN DETAILS

abroger Snapshot

TLOFA

TO

FA

TO

FA

TOFA

TOFA

TOFA

TOFA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TOFA

TOFA

R

SA

R

SA

R

SA

R

SA

R

SA

R

SA

R

SA

R

SA

R

SA

R

SA

R O

FA

R O

FA

R O

FA

R O

FA

R O

FA

R O

FA

ROFA

E

E

R O

FZ

R O

FZ

R O

FZ

R O

FZ

R O

FZ

ROFZ

R O

FZ

TLOFA

TL

O

FA

TLOFA

TLOFA TL

O

FA

TLOFA

TLOFA TLOFA

TL

O

FA

TLOFA

TLOFA

TLOFA

TLOFA

TLOFA

TOFA

TO

FA

TO

FA

TOFA

TLOFA

TL

O

FA

TL

O

FA

TLOFA TLOFA

TLOFA TLOFA

TLOFA

TLOFA

TLOFA

TLOFA

TLO

FA

TL

O

FA

TL

O

FA

TL

O

FA

TL

O

FA

TL

O

FA

TL

O

FA

SHEET LEGENDA1

ATTENTION:

THIS DOCUMENT CONTAINS PRIVILEGED AND PROPRIETARY

INFORMATION, ALL OF WHICH IS EXPRESSLY PROVIDED BY AVCON, INC.,

FOR USE BY THE INTENDED RECIPIENT, AND FOR A SPECIFIC PURPOSE.

WITHOUT THE EXPRESS WRITTEN CONSENT OF AVCON, INC. ANY

DISTRIBUTION, REPRODUCTION, OR OTHER USE OF THIS DOCUMENT, IN

WHOLE OR IN PART, IS STRICTLY PROHIBITED

V:

\2

5\

.2

.0

- L

EE

T ax ila ne

R eh ab \2

5.

6.

C

AD

D \2

_G C

_S er ie s.

dw g

4/

/2

3:

P

M

LEESBURG INTERNATIONAL

AIRPORT

LEESBURG, FLORIDA

TAXILANE

REHABILITATION

XR

EF

S:

x

4_

St an da rd

_t b x2

_E xB as em ap x

4_

C

SP

P x2

_P ro pG eo m et ry

_V x2

_M ar ki ng s

202523604_GC_SERIES

PROFESSIONAL SEAL

CLIENT LOGO

B

ID

D O

C U

M

EN

TS CADD:

AVCON PROJECT NO.

FAA AIP NO. 3-12-0042-033-2025

2025.236.04

DRAWING

DATE:

APPROVED BY:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

APRIL 2026

ALB

SCALE (US SVY FT): GRAPHIC

NO. DATE BY DESCRIPTION

REVISIONS:

AVCON, INC.

ENGINEERS & PLANNERS

5555 E. MICHIGAN ST., SUITE 200 - ORLANDO, FL 32822-2779

OFFICE: (407) 599-1122 - FAX: (407) 599-1133

CORPORATE CERTIFICATE OF AUTHORIZATION NUMBER: 5057

www.avconinc.com

Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.

This item has been digitally signed and sealed by:

A

B

C

1 2 3 4

A

B

C

1 2 3 4

TH

IS

S H

EE

T

SH

A

LL

B

E

PR

IN

TE

D

IN

C O

LO

R

, S H

EE

TS

N O

T

PR

IN

TE

D

IN

C O

LO

R

A R

E

IN

VA

LI

D

GENERAL PLANB1

GRAPHIC SCALE (FT)

200'100'50'

NORTH

SHEET NOTESA2

EXISTING FENCE

LINE, (TYP.)

EXISTING

AIRCRAFT

PARKING

APRON

TA

XI

W

AY

B

EXISTING AIRPORT

PROPERTY LINE, (TYP.)

TA

XI

W

AY

B

RUNWAY OBJECT

FREE AREA, (TYP.)

RUNWAY OBJECT

FREE ZONE, (TYP.)

RUNWAY

SAFETY AREA,

(TYP.)

TA

XI

W

AY

B

TAXIWAY A

W

ILC

O D

R

W

ILCO

DR

US HWY 441

US HWY 441

US HWY 441

US HWY 441

US HWY 441

US HWY 441

US HWY 441

EC

H

O D

R

ECHO

DR

EC

H

O D

R

AIRPORT BLVD AIRPORT BLVD

AIRPORT BLVD

HANGAR

HANGAR

HANGAR

HANGAR

HANGAR

EXISTING

POND

BUILDING

HANGAR

HANGAR

HANGAR

HANGAR

HANGAR

HANGAR

TAXIWAY B

HANGAR

HANGAR

HANGAR

HANGAR

HANGAR

HANGAR

HANGARHANGAR

HANGAR

HANGAR

BUILDING

HANGAR

HANGAR

HANGAR HANGAR

BUILDING

TAXILANE (T-3)

TAXILANE( T-2)

TAXILANE (T-1)

TAXILANE (T-4)

TAXILANE (T-5)

TA

XI

LA

N

E (T

-6

TA

XI

LA

N

E (T

-6

TA

XI

LA

N

E (T

-5

TA

XI

LA

N

E (T

-5

TAXIWAY J

R U

N W

AY

-2

(4

7' X

AIRCRAFT

TIE-DOWN,

(TYP.)

EXISTING TREE

LINE, (TYP.)

TAXILANE

TAXILANE

TAXILANE

TAXILANE

TAXILANE OBJECT

FREE AREA, (TYP.)

TAXIWAY OBJECT

FREE AREA, (TYP.)

TAXILANE (T-1)

AIRPORT

ADMINISTRATION

BUILDING

TA

XI

W

AY

A3

GENERAL PLAN

GC101

ALB

JEG

JEG

NEW ASPHALT PAVEMENT AREA, (TYP.). SEE CS SERIES FOR

MORE INFORMATION.

TLOFA PROPOSED TAXILANE OBJECT FREE AREA, (TYP.).

1. THE PROPOSED TAXILANE REHABILITATION PROJECT SHALL HAVE A TOTAL DURATION OF

43 CALENDAR DAYS. IT IS THE CONTRACTOR'S RESPONSIBILITY TO ADHERE TO THE

SEQUENCING, PHASING AND SAFETY REQUIREMENTS SHOWN ON SHEETS GC101-GC501

AT ALL TIMES UNLESS STATED OTHERWISE.

2. THE PROPOSED TAXILANE REHABILITATION PROJECT GENERALLY INCLUDES, PAVEMENT

DEMOLITION, PAVING, MINOR GRADING, AND MARKING OPERATIONS ASSOCIATED WITH

THE REHABILITATION OF TAXILANES T-1, T-2, T-3, T-5 AND T-6 AS DEPICTED ABOVE. THIS

PROJECT INCLUDES BUT IS NOT LIMITED TO PAVEMENT DEMOLITION, MINOR EARTHWORK

AND GRADING OPERATIONS, MISCELLANEOUS UTILITY STRUCTURE RELOCATIONS,

ASPHALT PAVING OPERATIONS, THE CONNECTION AND EXTENSION OF ASPHALT AREAS

FOR THE PURPOSES OF TYING INTO EXISTING CONCRETE APRONS, ACCESS ROADS, AND

GRAVEL AREAS AND FINAL PAVEMENT MARKING OPERATIONS.

3. ANY FILL MATERIAL TRANSFERRED ON SITE SHALL BE STOCKPILED WITHIN THE

CONTRACTOR'S DESIGNATED STAGING AREAS AS SHOWN ON SHEETS GC102-GC105. ANY

STOCKPILE MATERIAL ON SITE SHALL NOT EXCEED 25' IN HEIGHT.

4. THE CONTRACTOR SHALL KEEP ALL ACTIVE PAVEMENT SURFACES (AIRSIDE AND

LANDSIDE) CLEAN AND FREE OF DEBRIS. A POWER BROOM AND/OR SWEEPER TRUCK

SHALL BE ON SITE AND AVAILABLE AT ALL TIMES FOR CLEANING OF PAVEMENT

SURFACES. NO DIRECT PAYMENT SHALL BE MADE FOR THE CLEANING AND MAINTAINING

OF EXISTING PAVEMENT SURFACES, AS IT IS A NECESSARY AND INCIDENTAL PORTION OF

THE WORK. THE CONTRACTOR SHALL ALSO BE REQUIRED TO HAVE AND USE A "FOD

BOSS" THROUGHOUT THE DURATION OF THE PROJECT FOR ADDED FOREIGN DEBRIS

REMOVAL AND CONTROL.

5. THE CONTRACTOR SHALL PROVIDE A WATER TRUCK AS NEEDED, AND AS DIRECTED BY

THE ENGINEER FOR DUST CONTROL. NO DIRECT PAYMENT SHALL BE MADE FOR

CONSTRUCTION SITE DUST CONTROL, AS IT IS A NECESSARY AND INCIDENTAL PORTION

OF THE WORK. THE CONTRACTOR SHALL BE REQUIRED TO COORDINATE WITH THE CITY

TO ACQUIRE A CONSTRUCTION WATER METER. PAYMENTS FOR WATER USED SHALL BE

MADE DIRECTLY TO THE OWNER. NO COMPENSATION SHALL BE MADE SPECIFICALLY FOR

WATER USAGE. THE COST FOR WATER SHALL BE INCLUDED IN THE CONTRACT UNIT PRICE

FOR ITEM GP-80, CONSTRUCTION SAFETY PHASING PLAN.

6. IN THE EVENT THAT BARRICADING, TEMPORARY FENCING, AND PROVIDING ESCORTS ARE

INSUFFICIENT IN RESTRICTING MOVEMENT OF CONSTRUCTION VEHICLES AND

PERSONNEL TO PERMITTED CONSTRUCTION AREAS, FLAGGERS MAY BE NECESSARY. IN

SUCH EVENT, FLAGGERS SHALL BE AS REQUIRED BY THE OWNER AND FAA ADVISORY

CIRCULARS. DEPENDING ON THE EXTENT OF WORK SCHEDULED BY THE CONTRACTOR,

FLAGGERS MAY BE REQUIRED BY THE ENGINEER. THE COST FOR PROVIDING FLAGGERS

SHALL BE INCIDENTAL TO ITEM GP-80, CONSTRUCTION SAFETY AND PHASING PLAN.

7. ANY CONTRACTOR VEHICLES PRESENT ON THE CONSTRUCTION SITE WILL BE REQUIRED

TO HAVE THEIR VEHICLES EQUIPPED WITH RADIOS, THE APPROPRIATE VEHICLE LIGHTING,

AND VEHICLE IDENTIFYING MARKING IN ACCORDANCE WITH THE CONTRACT AND

CONSTRUCTION SAFETY AND PHASING PLAN DOCUMENT.

8. THIS PROJECT SHALL REQUIRE COORDINATION BETWEEN THE CONTRACTOR, RPR,

OWNER AND THE AIRPORT'S TENANTS. IT IS THE CONTRACTOR'S RESPONSIBILITY TO

CONSTANTLY UPDATE THE RPR/OWNER SO THAT THE APPROPRIATE STEPS MAY TAKE

PLACE TO KEEP THE AIRPORT RUNNING SAFELY, AND EFFICIENTLY.

9. THE MAJORITY OF THIS WORK IS SCHEDULED TO TAKE PLACE FROM THE HOURS OF 7:00

PM - 7:00 AM. IT IS THE CONTRACTOR'S RESPONSIBILITY TO INSPECT THE CURRENT

WORK AREA AT LEAST 1 HOUR PRIOR TO LEAVING THE SITE TO ENSURE NO ADVERSE

AFFECTS OCCUR TO THE ADJACENT AIRFIELD AREAS.

10. FOR ALL NIGHTTIME CONSTRUCTION, THE CONTRACTOR SHALL PROVIDE A NIGHTTIME

LIGHTING PLAN TO BE APPROVED BY THE ENGINEER. THE LIGHTING PLAN SHALL

ADHERE TO REQUIREMENTS SET FORTH IN FAA AIRPORT CIRCULAR 150-5370-2G.

LIGHTING EQUIPMENT SHALL BE POSITIONED CORRECTLY TO PROPERLY ILLUMINATE

THE INTENDED WORK AREA AND AVOID ANY ACTIVE AIRPORT OPERATION AREAS.

PROPOSED TAXILANE

OBJECT FREE AREA, (TYP.)

PROPOSED ASPHALT

EXTENSION TO EXISTING

CONCRETE APRON LIMITS

PROPOSED ASPHALT

EXTENSION TO EXISTING

CONCRETE DRIVEWAY

LIMITS

PROPOSED ASPHALT

EXTENSION TO

EXISTING CONCRETE

APRON LIMITS

PROPOSED TAXILANE

CENTERLINE MARKINGS, (TYP.)

PROPOSED REHABILITATION

LIMITS. SEE CD SERIES FOR

MORE INFORMATION.

PROPOSED

REHABILITATION LIMITS.

SEE CD SERIES FOR

MORE INFORMATION.

PROPOSED

REHABILITATION LIMITS.

SEE CD SERIES FOR

MORE INFORMATION.

PROPOSED

REHABILITATION LIMITS.

SEE CD SERIES FOR

MORE INFORMATION.

EXISTING AIRFIELD

ELECTRICAL VAULT,

(TYP.)

PROPOSED ASPHALT

EXTENSION TO EXISTING

GRAVEL AREA LIMITS

PROPOSED ASPHALT

EXTENSION TO EXISTING

ACCESS ROAD

PROPOSED ASPHALT

EXTENSION TO EXISTING

ASPHALT APRON LIMITS

TO

FA

TO

FA

TOFA

TOFA

TOFA

TOFA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TOFA

TOFA

R

SA

R

SA

R

SA

R

SA

R

SA

R

SA

R

SA

R

SA

R

SA

R

SA

R O

FA

R O

FA

R O

FA

R O

FA

R O

FA

R O

FA

ROFA

E

E

R O

FZ

R O

FZ

R O

FZ

R O

FZ

R O

FZ

ROFZ

R O

FZ

TLOFA

TL

O

FA

TLOFA

TLOFA TL

O

FA

TLOFA

TLOFA TLOFA

TL

O

FA

TLOFA

TLOFA

TLOFA

TLOFA

TLOFA

TOFA

TO

FA

TO

FA

TOFA

TLOFA

SHEET NOTESA2

ATTENTION:

THIS DOCUMENT CONTAINS PRIVILEGED AND PROPRIETARY

INFORMATION, ALL OF WHICH IS EXPRESSLY PROVIDED BY AVCON, INC.,

FOR USE BY THE INTENDED RECIPIENT, AND FOR A SPECIFIC PURPOSE.

WITHOUT THE EXPRESS WRITTEN CONSENT OF AVCON, INC. ANY

DISTRIBUTION, REPRODUCTION, OR OTHER USE OF THIS DOCUMENT, IN

WHOLE OR IN PART, IS STRICTLY PROHIBITED

V:

\2

5\

.2

.0

- L

EE

T ax ila ne

R eh ab \2

5.

6.

C

AD

D \2

_G C

_S er ie s.

dw g

4/

/2

3:

P

M

LEESBURG INTERNATIONAL

AIRPORT

LEESBURG, FLORIDA

TAXILANE

REHABILITATION

XR

EF

S:

x

4_

St an da rd

_t b x2

_E xB as em ap x

4_

C

SP

P x2

_P ro pG eo m et ry

_V x2

_M ar ki ng s

202523604_GC_SERIES

PROFESSIONAL SEAL

CLIENT LOGO

B

ID

D O

C U

M

EN

TS CADD:

AVCON PROJECT NO.

FAA AIP NO. 3-12-0042-033-2025

2025.236.04

DRAWING

DATE:

APPROVED BY:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

APRIL 2026

ALB

SCALE (US SVY FT): GRAPHIC

NO. DATE BY DESCRIPTION

REVISIONS:

AVCON, INC.

ENGINEERS & PLANNERS

5555 E. MICHIGAN ST., SUITE 200 - ORLANDO, FL 32822-2779

OFFICE: (407) 599-1122 - FAX: (407) 599-1133

CORPORATE CERTIFICATE OF AUTHORIZATION NUMBER: 5057

www.avconinc.com

Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.

This item has been digitally signed and sealed by:

A

B

C

1 2 3 4

A

B

C

1 2 3 4

TH

IS

S H

EE

T

SH

A

LL

B

E

PR

IN

TE

D

IN

C O

LO

R

, S H

EE

TS

N O

T

PR

IN

TE

D

IN

C O

LO

R

A R

E

IN

VA

LI

D

B1

GRAPHIC SCALE (FT)

200'100'50'

NORTH

LOW PROFILE BARRICADE FOR WORK

AREA A, SEE DETAIL A3/GC501 FOR

ADDITIONAL INFORMATION.

SHEET LEGENDA1

CONSTRUCTION SAFETY PHASING PLAN - WORK AREA A

EXISTING FENCE

LINE, (TYP.)

EXISTING

AIRCRAFT

PARKING

APRON

TA

XI

W

AY

B

EXISTING AIRPORT

PROPERTY LINE, (TYP.)

TA

XI

W

AY

B

RUNWAY OBJECT

FREE AREA, (TYP.)

RUNWAY OBJECT

FREE ZONE, (TYP.)

RUNWAY

SAFETY AREA,

(TYP.)

TA

XI

W

AY

B

TA

XI

W

AY

TAXIWAY A

W

ILC

O D

R

W

ILCO

DR

US HWY 441

US HWY 441

US HWY 441

US HWY 441

US HWY 441

US HWY 441

US HWY 441

EC

H

O D

R

ECHO

DR

EC

H

O D

R

AIRPORT BLVD AIRPORT BLVD

AIRPORT BLVD

HANGAR

HANGAR

HANGAR

HANGAR

HANGAR

EXISTING

POND

BUILDING

HANGAR

HANGAR

HANGAR

HANGAR

HANGAR

HANGAR

TAXIWAY B

HANGAR

HANGAR

HANGAR

HANGAR

HANGAR

HANGAR

HANGARHANGAR

HANGAR

HANGAR

BUILDING

HANGAR

HANGAR

HANGAR HANGAR

BUILDING

TAXIWAY J

R U

N W

AY

-2

(4

7' X

EXISTING TREE

LINE, (TYP.)

TAXILANE

TAXILANE

TAXILANE

TAXILANE

TAXIWAY OBJECT

FREE AREA, (TYP.)

TAXILANE (T-3)

TAXILANE( T-2)

TAXILANE (T-1)

TAXILANE (T-4)

TAXILANE (T-5)

TA

XI

LA

N

E (T

-6

TA

XI

LA

N

E (T

-6

TA

XI

LA

N

E (T

-5

TA

XI

LA

N

E (T

-5

TAXILANE (T-1)

TAXILANE OBJECT

FREE AREA, (TYP.)

WORK AREA A1 BOUNDARY,

(TYP.)

AIRPORT

ADMINISTRATION

BUILDING

AIRCRAFT

TIE-DOWN,

(TYP.)

CONTRACTOR ACCESS

ROUTE, (TYP.)

CONTRACTOR ACCESS

SHALL BE THROUGH AN

EXISTING AUTOMATIC

SWING GATE.

A3

CONSTRUCTION

SAFETY AND

PHASING PLAN -

WORK AREA A

GC102

ALB

JEG

JEG

WORK AREA A2 BOUNDARY,

(TYP.)

WORK AREA A3 BOUNDARY,

(TYP.)

WORK AREA A4 BOUNDARY,

(TYP.)

AIRCRAFT TAXI ROUTES,

(TYP.). FOR WORK

AREAS A1, A2, AND A3.

SEE DETAIL A2, THIS

SHEET FOR MORE

INFORMATION ON

AVAILABLE AIRCRAFT

TAXI ROUTES.

1. CONTRACTOR SHALL BE REQUIRED TO MAINTAIN A SAFE AND SECURE JOB SITE AT ALL

TIMES.

2. CONTRACTOR VEHICLES AND CONSTRUCTION EQUIPMENT SHALL YIELD TO AIRCRAFT AT

ALL TIMES.

3. UNDER NO CIRCUMSTANCE SHALL THE CONTRACTOR ENTER ANY ACTIVE PORTION OF THE

AIRFIELD WITHOUT PRIOR COORDINATION WITH THE ENGINEER, RPR, AND OWNER.

UNAUTHORIZED ACCESS TO ACTIVE AOA AREAS MAY RESULT IN PERMANENT EXPULSION

FROM THE AIRPORT.

4. CONTRACTOR SHALL TAKE NOTE OF THE EXISTING CONDITIONS OF ANY AIRPORT OWNED

ACCESS GATE THAT IS USED FOR CONSTRUCTION ACCESS. IF DAMAGED, ANY EXISTING

AIRPORT GATE SHALL BE REPLACED OR RESTORED TO ITS ORIGINAL CONDITIONS.

5. WORK IN WORK AREA A SHALL BE SEPARATED INTO FOUR SEPARATE WORK AREAS. WORK

IN WORK AREA A1 SHALL BE LIMITED TO 5 CONSECUTIVE CALENDAR DAYS, WORK IN

WORK AREA A2 SHALL BE LIMITED TO 5 CONSECUTIVE CALENDAR DAYS, WORK IN WORK

AREA A3 SHALL BE LIMITED TO 5 CONSECUTIVE CALENDAR DAYS AND WORK IN WORK

AREA A4 SHALL BE LIMITED TO 1 CALENDAR DAY. WORK CONDUCTED IN WORK AREAS A1,

A2, A3 AND A4 SHALL BE SCHEDULED AND COORDINATED BETWEEN THE CONTRACTOR,

ENGINEER OF RECORD, AND THE OWNER. THE CONTRACTOR WILL NOT BE PERMITTED TO

COMPLETE THE SUBSEQUENT SUB-WORK AREA PRIOR TO COMPLETING THE CURRENT

SUB-WORK AREA STARTING WITH WORK AREA A1.

6. WORK AREA A SHALL CONSIST OF ALL CIVIL SCOPE INCLUDING BUT NOT LIMITED TO

PAVEMENT REMOVAL, ASPHALT MILLING, MINOR GRADING, PAVING OPERATIONS, MINOR

UTILITY RELOCATIONS AND AIRFIELD PAVEMENT MARKINGS OPERATIONS.

7. CONTRACTOR'S PERSONAL VEHICLES SHALL NOT BE PERMITTED, UNDER ANY

CIRCUMSTANCES WITHIN THE AOA. ONLY PROPERLY MARKED AND LIGHTED CONTRACTOR

VEHICLES OR CONSTRUCTION VEHICLES SHALL BE PERMITTED IN THE AOA OR THE ACTIVE

WORK AREA UNLESS OTHERWISE APPROVED BY THE RPR.

8. ANY FILL OR BASE MATERIAL TRANSFERRED ON SITE SHALL BE STOCKPILED WITHIN THE

CONTRACTOR'S DESIGNATED STAGING AREAS AS SHOWN ON THIS SHEET. ANY MATERIAL

STOCKPILE ON SITE SHALL NOT EXCEED 25' IN HEIGHT.

9. BARRICADES SHALL BE PLACED IN THE LOCATIONS IDENTIFIED ON THE PLANS AND

APPROVED BY THE RPR. ADDITIONAL BARRICADES SHALL BE MADE AVAILABLE FOR USE

FOR ADDED SAFETY MEASURES, AS NECESSARY.

10. ACTIVE AIRFIELD PAVEMENTS ADJACENT TO ACTIVE WORK AREAS SHALL BE CONTINUALLY

SWEPT AND MAINTAINED BY THE CONTRACTOR TO ENSURE THAT ACTIVE AIRFIELD

PAVEMENT SURFACES ARE CLEAR AND FREE OF CONSTRUCTION DEBRIS, DUST, OR FOD.

SELECTIVE SWEEPING AND AIRFIELD PAVEMENT MAINTENANCE MAY BE DIRECTED BY THE

RPR AND SHALL BE INCIDENTAL TO ITEM GP-80, CONSTRUCTION SAFETY AND PHASING

PLAN.

11. CONTRACTOR SHALL BE REQUIRED TO IMPLEMENT FOD MANAGEMENT PRACTICES AT THE

END OF EACH DAY WHICH SHALL INCLUDE UTILIZATION OF THE FOD-RAZOR FRICTION MAT,

OR APPROVED EQUIVALENT. THE NUMBER OF PASSES AND AREAS TO BE MAINTAINED

USING THE FOD-RAZOR FRICTION MAT SHALL BE AT THE DISCRETION OF THE RPR. NO

ADDITIONAL MEASUREMENT OR PAYMENT SHALL BE MADE FOR USE OF THE FOD-RAZOR

FRICTION MAT AS IT IS INCIDENTAL TO ITEM GP-80, CONSTRUCTION AND SAFETY PHASING

PLAN.

12. DURING WORK WITHIN WORK AREA A1, TAXILANE T- 3 SHALL BE CLOSED AND TAXILANE 1

SHALL BE PARTIALLY CLOSED. THE CONTRACTOR SHALL POSITION FLAG PERSONNEL AS

NECESSARY TO ACCOMMODATE AIRCRAFT TAXIING VIA TAXILANE T-2 AND TAXILANE T-1

EAST TO TAXILANES T-5 AND T-6 AND TO FACILITATE SAFE AND EFFICIENT CONTRACTOR

ACCESS TO THE RESPECTIVE WORK AREA. THE CONTRACTOR SHALL NOTIFY THE AIRPORT

AT LEAST 72 HOURS PRIOR TO THE BEGINNING OF WORK AREA A1.

13. DURING WORK WITHIN WORK AREA A2 TAXILANE T-2 SHALL BE CLOSED. THE

CONTRACTOR SHALL POSITION AND USE FLAG PERSONNEL AS NECESSARY TO

ACCOMMODATE AIRCRAFT TAXIING VIA TAXILANES T-1 AND T-3 EAST TO TAXILANES T-5

AND T-6 AND TO FACILITATE SAFE AND EFFICIENT CONTRACTOR ACCESS TO THE

RESPECTIVE WORK AREA. THE CONTRACTOR SHALL NOTIFY THE AIRPORT AT LEAST 72

HOURS PRIOR TO THE BEGINNING OF WORK AREA A2.

14. DURING WORK WITHIN WORK AREA A3, TAXILANE T-1 SHALL BE PARTIALLY CLOSED. THE

CONTRACTOR SHALL POSITION AND USE FLAG PERSONNEL AS NECESSARY TO

ACCOMMODATE AIRCRAFT TAXIING VIA TAXILANE T-2 AND T-3 EAST TO TAXILANES T-5 AND

T-6 AND TO FACILITATE SAFE AND EFFICIENT CONTRACTOR ACCESS TO THE RESPECTIVE

WORK AREA. THE CONTRACTOR SHALL NOTIFY THE AIRPORT AT LEAST 72 HOURS PRIOR

TO THE BEGINNING OF WORK AREA A3.

15. DURING WORK WITHIN WORK AREA A4 TAXILANES T-2, AND T-3 SHALL BE CLOSED, WHILE

TAXILANE T-1 SHALL BE PARTIALLY CLOSED. THE CONTRACTOR SHALL NOTIFY THE

AIRPORT AT LEAST ONE WEEK PRIOR TO THE BEGINNING OF WORK AREA A4.

CONTRACTOR STAGING, LAY-DOWN,

STORAGE, AND PARKING AREA,

(TYP.)

SEE SHEET NOTE 12,

DETAIL A2, THIS SHEET.

SEE SHEET NOTE 13,

DETAIL A2, THIS SHEET.

SEE SHEET NOTE 14,

DETAIL A2, THIS SHEET.

SEE SHEET NOTE 165,

DETAIL A2, THIS SHEET.

EXISTING

AIRFIELD

ELECTRICAL

VAULT

ALTERNATE ACCESS #1

CONTRACTOR ACCESS SHALL

BE THROUGH AN EXISTING

AUTOMATIC CANTILEVER GATE.

TO

FA

TO

FA

TOFA

TOFA

TOFA

TOFA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TOFA

TOFA

R

SA

R

SA

R

SA

R

SA

R

SA

R

SA

R

SA

R

SA

R

SA

R

SA

R O

FA

R O

FA

R O

FA

R O

FA

R O

FA

R O

FA

ROFA

E

E

R O

FZ

R O

FZ

R O

FZ

R O

FZ

R O

FZ

ROFZ

R O

FZ

TLOFA

TL

O

FA

TLOFA

TLOFA TL

O

FA

TLOFA

TLOFA TLOFA

TL

O

FA

TLOFA

TLOFA

TLOFA

TLOFA

TLOFA

TOFA

TO

FA

TO

FA

TOFA

TLOFA

A1

ATTENTION:

THIS DOCUMENT CONTAINS PRIVILEGED AND PROPRIETARY

INFORMATION, ALL OF WHICH IS EXPRESSLY PROVIDED BY AVCON, INC.,

FOR USE BY THE INTENDED RECIPIENT, AND FOR A SPECIFIC PURPOSE.

WITHOUT THE EXPRESS WRITTEN CONSENT OF AVCON, INC. ANY

DISTRIBUTION, REPRODUCTION, OR OTHER USE OF THIS DOCUMENT, IN

WHOLE OR IN PART, IS STRICTLY PROHIBITED

V:

\2

5\

.2

.0

- L

EE

T ax ila ne

R eh ab \2

5.

6.

C

AD

D \2

_G C

_S er ie s.

dw g

4/

/2

3:

P

M

LEESBURG INTERNATIONAL

AIRPORT

LEESBURG, FLORIDA

TAXILANE

REHABILITATION

XR

EF

S:

x

4_

St an da rd

_t b x2

_E xB as em ap x

4_

C

SP

P x2

_P ro pG eo m et ry

_V x2

_M ar ki ng s

202523604_GC_SERIES

PROFESSIONAL SEAL

CLIENT LOGO

B

ID

D O

C U

M

EN

TS CADD:

AVCON PROJECT NO.

FAA AIP NO. 3-12-0042-033-2025

2025.236.04

DRAWING

DATE:

APPROVED BY:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

APRIL 2026

ALB

SCALE (US SVY FT): GRAPHIC

NO. DATE BY DESCRIPTION

REVISIONS:

AVCON, INC.

ENGINEERS & PLANNERS

5555 E. MICHIGAN ST., SUITE 200 - ORLANDO, FL 32822-2779

OFFICE: (407) 599-1122 - FAX: (407) 599-1133

CORPORATE CERTIFICATE OF AUTHORIZATION NUMBER: 5057

www.avconinc.com

Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.

This item has been digitally signed and sealed by:

A

B

C

1 2 3 4

A

B

C

1 2 3 4

TH

IS

S H

EE

T

SH

A

LL

B

E

PR

IN

TE

D

IN

C O

LO

R

, S H

EE

TS

N O

T

PR

IN

TE

D

IN

C O

LO

R

A R

E

IN

VA

LI

D

B1

GRAPHIC SCALE (FT)

200'100'50'

NORTH

SHEET NOTESA2SHEET LEGENDA1

CONSTRUCTION SAFETY PHASING PLAN - WORK AREA B

EXISTING FENCE

LINE, (TYP.)

EXISTING

AIRCRAFT

PARKING

APRON

TA

XI

W

AY

B

EXISTING AIRPORT

PROPERTY LINE, (TYP.)

TA

XI

W

AY

B

RUNWAY OBJECT

FREE AREA, (TYP.)

RUNWAY OBJECT

FREE ZONE, (TYP.)

RUNWAY

SAFETY AREA,

(TYP.)

TA

XI

W

AY

B

TAXIWAY A

W

ILC

O D

R

W

ILCO

DR

US HWY 441

US HWY 441

US HWY 441

US HWY 441

US HWY 441

US HWY 441

US HWY 441

EC

H

O D

R

ECHO

DR

EC

H

O D

R

AIRPORT BLVD AIRPORT BLVD

AIRPORT BLVD

HANGAR

HANGAR

HANGAR

HANGAR

HANGAR

EXISTING

POND

BUILDING

HANGAR

HANGAR

HANGAR

HANGAR

HANGAR

HANGAR

TAXIWAY B

HANGAR

HANGAR

HANGAR

HANGAR

HANGAR

HANGAR

HANGARHANGAR

HANGAR

HANGAR

BUILDING

HANGAR

HANGAR

HANGAR HANGAR

BUILDING

TAXIWAY J

R U

N W

AY

-2

(4

7' X

EXISTING TREE

LINE, (TYP.)

TAXILANE

TAXILANE

TAXILANE

TAXILANE

TAXIWAY OBJECT

FREE AREA, (TYP.)

TAXILANE (T-3)

TAXILANE( T-2)

TAXILANE (T-1)

TAXILANE (T-4)

TAXILANE (T-5)

TA

XI

LA

N

E (T

-6

TA

XI

LA

N

E (T

-5

TA

XI

LA

N

E (T

-5

TAXILANE (T-1)

TAXILANE OBJECT

FREE AREA, (TYP.)

AIRPORT

ADMINISTRATION

BUILDING

AIRCRAFT

TIE-DOWN,

(TYP.)

CONTRACTOR ACCESS

SHALL BE THROUGH AN

EXISTING AUTOMATIC

SWING GATE.

TA

XI

W

AY

A3

PROPOSED TAXILANE

PAVEMENT (TYP.). SEE

CS SERIES FOR MORE

INFORMATION.

PROPOSED TAXILANE

CENTERLINE MARKING,

(TYP.). SEE CS SERIES

FOR MORE

INFORMATION.

CONSTRUCTION

SAFETY AND

PHASING PLAN -

WORK AREA B

GC103

ALB

JEG

JEG

LOW PROFILE BARRICADE FOR WORK

AREA B, SEE DETAIL A3/GC501 FOR

ADDITIONAL INFORMATION.

WORK AREA B1 BOUNDARY,

(TYP.)

CONTRACTOR ACCESS

ROUTE, (TYP.)

WORK AREA B2 BOUNDARY,

(TYP.)

WORK AREA B3 BOUNDARY,

(TYP.)

WORK AREA B4 BOUNDARY,

(TYP.)

AIRCRAFT TAXI

ROUTES, (TYP.). FOR

WORK AREAS B1, B2,

B3 AND B4. SEE DETAIL

A2, THIS SHEET FOR

MORE INFORMATION

ON AVAILABLE

AIRCRAFT TAXI

ROUTES.

FLAG PERSON

LOCATION, (TYP.)

1. CONTRACTOR SHALL BE REQUIRED TO MAINTAIN A SAFE AND SECURE JOB SITE AT ALL

TIMES.

2. CONTRACTOR VEHICLES AND CONSTRUCTION EQUIPMENT SHALL YIELD TO AIRCRAFT AT

ALL TIMES.

3. UNDER NO CIRCUMSTANCE SHALL THE CONTRACTOR ENTER ANY ACTIVE PORTION OF THE

AIRFIELD WITHOUT PRIOR COORDINATION WITH THE ENGINEER, RPR, AND OWNER.

UNAUTHORIZED ACCESS TO ACTIVE AOA AREAS MAY RESULT IN PERMANENT EXPULSION

FROM THE AIRPORT.

4. CONTRACTOR SHALL TAKE NOTE OF THE EXISTING CONDITIONS OF ANY AIRPORT OWNED

ACCESS GATE THAT IS USED FOR CONSTRUCTION ACCESS. IF DAMAGED, ANY EXISTING

AIRPORT GATE SHALL BE REPLACED OR RESTORED TO ITS ORIGINAL CONDITIONS.

5. WORK IN WORK AREA B SHALL BE SEPARATED INTO FOUR SEPARATE WORK AREAS. WORK

IN WORK AREA B1 SHALL BE LIMITED TO 5 CONSECUTIVE CALENDAR DAYS, WORK IN

WORK AREA B2 SHALL BE LIMITED TO 1 CONSECUTIVE CALENDAR DAY, WORK IN WORK

AREA B3 SHALL BE LIMITED TO 5 CONSECUTIVE CALENDAR DAYS AND WORK IN WORK

AREA B4 SHALL BE LIMITED TO 5 CALENDAR DAYS. WORK CONDUCTED IN WORK AREAS

B1, B2, B3 AND B4 SHALL BE SCHEDULED AND COORDINATED BETWEEN THE CONTRACTOR,

ENGINEER OF RECORD, AND THE OWNER. THE CONTRACTOR WILL NOT BE PERMITTED TO

COMPLETE THE SUBSEQUENT SUB-WORK AREA PRIOR TO COMPLETING THE CURRENT

SUB-WORK AREA STARTING WITH WORK AREA B1.

6. WORK AREA B SHALL CONSIST OF ALL CIVIL SCOPE INCLUDING BUT NOT LIMITED TO

PAVEMENT REMOVAL, ASPHALT MILLING, MINOR GRADING, PAVING OPERATIONS, AND

AIRFIELD PAVEMENT MARKINGS OPERATIONS.

7. CONTRACTOR'S PERSONAL VEHICLES SHALL NOT BE PERMITTED, UNDER ANY

CIRCUMSTANCES WITHIN THE AOA. ONLY PROPERLY MARKED AND LIGHTED CONTRACTOR

VEHICLES OR CONSTRUCTION VEHICLES SHALL BE PERMITTED IN THE AOA OR THE ACTIVE

WORK AREA UNLESS OTHERWISE APPROVED BY THE RPR.

8. ANY FILL OR BASE MATERIAL TRANSFERRED ON SITE SHALL BE STOCKPILED WITHIN THE

CONTRACTOR'S DESIGNATED STAGING AREAS AS SHOWN ON THIS SHEET. ANY MATERIAL

STOCKPILE ON SITE SHALL NOT EXCEED 25' IN HEIGHT.

9. BARRICADES SHALL BE PLACED IN THE LOCATIONS IDENTIFIED ON THE PLANS AND

APPROVED BY THE RPR. ADDITIONAL BARRICADES SHALL BE MADE AVAILABLE FOR USE

FOR ADDED SAFETY MEASURES, AS NECESSARY.

10. CONTRACTOR SHALL BE REQUIRED TO IMPLEMENT FOD MANAGEMENT PRACTICES AT THE

END OF EACH DAY WHICH SHALL INCLUDE UTILIZATION OF THE FOD-RAZOR FRICTION MAT,

OR APPROVED EQUIVALENT. THE NUMBER OF PASSES AND AREAS TO BE MAINTAINED

USING THE FOD-RAZOR FRICTION MAT SHALL BE AT THE DISCRETION OF THE RPR. NO

ADDITIONAL MEASUREMENT OR PAYMENT SHALL BE MADE FOR USE OF THE FOD-RAZOR

FRICTION MAT AND SHALL BE CONSIDERED INCIDENTAL TO ITEM GP-80, CONSTRUCTION

AND SAFETY PHASING PLAN COMPLIANCE.

11. DURING WORK WITHIN WORK AREA B1, TAXILANE T- 6 SHALL BE PARTIALLY CLOSED. THE

CONTRACTOR SHALL POSITION FLAG PERSONNEL AS NECESSARY TO ACCOMMODATE

AIRCRAFT TAXIING VIA TAXILANES T-1, T-2 AND TAXILANE T-3 EAST TO TAXILANE T-5 AND

AND TO FACILITATE SAFE AND EFFICIENT CONTRACTOR ACCESS TO THE RESPECTIVE

WORK AREA. THE CONTRACTOR SHALL NOTIFY THE AIRPORT AT LEAST 72 HOURS PRIOR

TO THE BEGINNING OF WORK AREA B1.

12. DURING WORK WITHIN WORK AREA B2, TAXILANE T-6 SHALL BE PARTIALLY CLOSED.

ADDITIONALLY THE CONTRACTOR TAKE THE NECESSARY PRECAUTIONS TO CLOSE THE

INTERSECTION OF AIRPORT BOULEVARD AND TAXILANE T-6 IN ACCORDANCE WITH THE

STANDARDS SET FORTH BY THE FDOT TEMPROARY TRAFFIC CONTROL (MAINTENANCE OF

TRAFFIC HANDBOOK (CURRENT EDITION). THE CONTRACTOR SHALL POSITION FLAG

PERSONNEL AS NECESSARY TO ACCOMMODATE AIRCRAFT TAXIING VIA TAXILANES T-1,

T-2, AND TAXILANE T-3 EAST TO TAXILANE T-5 AND TO FACILITATE SAFE AND EFFICIENT

CONTRACTOR ACCESS TO THE RESPECTIVE WORK AREA. THE CONTRACTOR SHALL

NOTIFY THE AIRPORT AT LEAST 72 HOURS PRIOR TO THE BEGINNING OF WORK AREA B2.

13. DURING WORK WITHIN WORK AREA B3, TAXILANE T-6 SHALL BE PARTIALLY CLOSED. THE

CONTRACTOR SHALL POSITION FLAG PERSONNEL AS NECESSARY TO ACCOMMODATE

AIRCRAFT TAXIING VIA TAXILANES T-1, T-2, AND TAXILANE T-3 EAST TO TAXILANE T-5 AND

TO FACILITATE SAFE AND EFFICIENT CONTRACTOR ACCESS TO THE RESPECTIVE WORK

AREA. THE CONTRACTOR SHALL NOTIFY THE AIRPORT AT LEAST 72 HOURS PRIOR TO THE

BEGINNING OF WORK AREA B3.

14. DURING WORK WITHIN WORK AREA B4 TAXILANE T-6 SHALL BE PARTIALLY CLOSED. THE

CONTRACTOR SHALL POSITION FLAG PERSONNEL AS NECESSARY TO ACCOMMODATE

AIRCRAFT TAXIING VIA TAXILANES T-1, T-2, AND TAXILANE T-3 EAST TO TAXILANE T-5 AS

WELL AS AIRCRAFT TRAVELING NORTH ON TAXILANE T-6 AND THEN EAST ON TAXILANE

T-1, HEADING TO TAXILANE T-5 TO ENTER THE AIRCRAFT PARKING APRON. THE

DESIGNATED FLAG PERSONNEL SHALL ALSO FACILITATE SAFE AND EFFICIENT

CONTRACTOR ACCESS TO THE RESPECTIVE WORK AREA. THE CONTRACTOR SHALL

NOTIFY THE AIRPORT AT LEAST 72 HOURS PRIOR TO THE BEGINNING OF WORK AREA B4.

CONTRACTOR STAGING, LAY-DOWN,

STORAGE, AND PARKING AREA,

(TYP.)

SEE SHEET NOTE 11,

DETAIL A2, THIS SHEET.

SEE SHEET NOTE 12,

DETAIL A2, THIS SHEET.

SEE SHEET NOTE 13,

DETAIL A2, THIS SHEET.

SEE SHEET NOTE 14,

DETAIL A2, THIS SHEET.

EXISTING

AIRFIELD

ELECTRICAL

VAULT

ALTERNATE ACCESS #1

CONTRACTOR ACCESS SHALL

BE THROUGH AN EXISTING

AUTOMATIC CANTILEVER GATE.

TO

FA

TO

FA

TOFA

TOFA

TOFA

TOFA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TOFA

TOFA

R

SA

R

SA

R

SA

R

SA

R

SA

R

SA

R

SA

R

SA

R

SA

R

SA

R O

FA

R O

FA

R O

FA

R O

FA

R O

FA

R O

FA

ROFA

E

E

R O

FZ

R O

FZ

R O

FZ

R O

FZ

R O

FZ

ROFZ

R O

FZ

TLOFA

TL

O

FA

TLOFA

TLOFA TL

O

FA

TLOFA

TLOFA TLOFA

TL

O

FA

TLOFA

TLOFA

TLOFA

TLOFA

TLOFA

TOFA

TO

FA

TO

FA

TOFA

III IIIIII

III

TLOFA

TL

O

FA

TL

O

FA

TLOFA TLOFA

TLOFA TLOFA

TLOFA

TLOFA

TLOFA

TLOFA

TLO

FA

TL

O

FA

TL

O

FA

ATTENTION:

THIS DOCUMENT CONTAINS PRIVILEGED AND PROPRIETARY

INFORMATION, ALL OF WHICH IS EXPRESSLY PROVIDED BY AVCON, INC.,

FOR USE BY THE INTENDED RECIPIENT, AND FOR A SPECIFIC PURPOSE.

WITHOUT THE EXPRESS WRITTEN CONSENT OF AVCON, INC. ANY

DISTRIBUTION, REPRODUCTION, OR OTHER USE OF THIS DOCUMENT, IN

WHOLE OR IN PART, IS STRICTLY PROHIBITED

V:

\2

5\

.2

.0

- L

EE

T ax ila ne

R eh ab \2

5.

6.

C

AD

D \2

_G C

_S er ie s.

dw g

4/

/2

3:

P

M

LEESBURG INTERNATIONAL

AIRPORT

LEESBURG, FLORIDA

TAXILANE

REHABILITATION

XR

EF

S:

x

4_

St an da rd

_t b x2

_E xB as em ap x

4_

C

SP

P x2

_P ro pG eo m et ry

_V x2

_M ar ki ng s

202523604_GC_SERIES

PROFESSIONAL SEAL

CLIENT LOGO

B

ID

D O

C U

M

EN

TS CADD:

AVCON PROJECT NO.

FAA AIP NO. 3-12-0042-033-2025

2025.236.04

DRAWING

DATE:

APPROVED BY:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

APRIL 2026

ALB

SCALE (US SVY FT): GRAPHIC

NO. DATE BY DESCRIPTION

REVISIONS:

AVCON, INC.

ENGINEERS & PLANNERS

5555 E. MICHIGAN ST., SUITE 200 - ORLANDO, FL 32822-2779

OFFICE: (407) 599-1122 - FAX: (407) 599-1133

CORPORATE CERTIFICATE OF AUTHORIZATION NUMBER: 5057

www.avconinc.com

Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.

This item has been digitally signed and sealed by:

A

B

C

1 2 3 4

A

B

C

1 2 3 4

TH

IS

S H

EE

T

SH

A

LL

B

E

PR

IN

TE

D

IN

C O

LO

R

, S H

EE

TS

N O

T

PR

IN

TE

D

IN

C O

LO

R

A R

E

IN

VA

LI

D

B1

GRAPHIC SCALE (FT)

200'100'50'

NORTH

SHEET NOTESA2SHEET LEGENDA1

CONSTRUCTION SAFETY PHASING PLAN - WORK AREA C

EXISTING FENCE

LINE, (TYP.)

EXISTING

AIRCRAFT

PARKING

APRON

TA

XI

W

AY

B

EXISTING AIRPORT

PROPERTY LINE, (TYP.)

TA

XI

W

AY

B

RUNWAY OBJECT

FREE AREA, (TYP.)

RUNWAY OBJECT

FREE ZONE, (TYP.)

RUNWAY

SAFETY AREA,

(TYP.)

TA

XI

W

AY

B

TAXIWAY A

W

ILC

O D

R

W

ILCO

DR

US HWY 441

US HWY 441

US HWY 441

US HWY 441

US HWY 441

US HWY 441

US HWY 441

EC

H

O D

R

ECHO

DR

EC

H

O D

R

AIRPORT BLVD AIRPORT BLVD

AIRPORT BLVD

HANGAR

HANGAR

HANGAR

HANGAR

HANGAR

EXISTING

POND

BUILDING

HANGAR

HANGAR

HANGAR

HANGAR

HANGAR

HANGAR

TAXIWAY B

HANGAR

HANGAR

HANGAR

HANGAR

HANGAR

HANGAR

HANGARHANGAR

HANGAR

HANGAR

BUILDING

HANGAR

HANGAR

HANGAR HANGAR

BUILDING

TAXIWAY J

R U

N W

AY

-2

(4

7' X

EXISTING TREE

LINE, (TYP.)

TAXILANE

TAXILANE

TAXILANE

TAXILANE

TAXIWAY OBJECT

FREE AREA, (TYP.)

TAXILANE (T-3)

TAXILANE( T-2)

TAXILANE (T-1)

TAXILANE (T-4)

TAXILANE (T-5)

TA

XI

LA

N

E (T

-6

TA

XI

LA

N

E (T

-6

TA

XI

LA

N

E (T

-5

TA

XI

LA

N

E (T

-5

TAXILANE (T-1)

TAXILANE OBJECT

FREE AREA, (TYP.)

AIRPORT

ADMINISTRATION

BUILDING

AIRCRAFT

TIE-DOWN,

(TYP.)

CONTRACTOR ACCESS

SHALL BE THROUGH AN

EXISTING AUTOMATIC

SWING GATE.

TA

XI

W

AY

A3

PROPOSED TAXILANE

PAVEMENT (TYP.). SEE

CS SERIES FOR MORE

INFORMATION.

PROPOSED TAXILANE

CENTERLINE MARKING,

(TYP.). SEE CS SERIES

FOR MORE

INFORMATION.

CONSTRUCTION

SAFETY AND

PHASING PLAN -

WORK AREA C

GC104

ALB

JEG

JEG

1. CONTRACTOR SHALL BE REQUIRED TO MAINTAIN A SAFE AND SECURE JOB SITE AT ALL

TIMES.

2. CONTRACTOR VEHICLES AND CONSTRUCTION EQUIPMENT SHALL YIELD TO AIRCRAFT AT

ALL TIMES.

3. UNDER NO CIRCUMSTANCE SHALL THE CONTRACTOR ENTER ANY ACTIVE PORTION OF THE

AIRFIELD WITHOUT PRIOR COORDINATION WITH THE ENGINEER, RPR, AND OWNER.

UNAUTHORIZED ACCESS TO ACTIVE AOA AREAS MAY RESULT IN PERMANENT EXPULSION

FROM THE AIRPORT.

4. CONTRACTOR SHALL TAKE NOTE OF THE EXISTING CONDITIONS OF ANY AIRPORT OWNED

ACCESS GATE THAT IS USED FOR CONSTRUCTION ACCESS. IF DAMAGED, ANY EXISTING

AIRPORT GATE SHALL BE REPLACED OR RESTORED TO ITS ORIGINAL CONDITIONS.

5. WORK IN WORK AREA C SHALL BE SEPARATED INTO TWO SEPARATE WORK AREAS. WORK

IN WORK AREA C1 SHALL BE LIMITED TO 5 CONSECUTIVE CALENDAR DAYS, AND WORK IN

WORK AREA C2 SHALL BE LIMITED TO 5 CONSECUTIVE CALENDAR DAYS. WORK

CONDUCTED IN WORK AREAS C1, AND C2 SHALL BE SCHEDULED AND COORDINATED

BETWEEN THE CONTRACTOR, ENGINEER OF RECORD, AND THE OWNER. THE

CONTRACTOR WILL NOT BE PERMITTED TO COMPLETE THE SUBSEQUENT SUB-WORK

AREA PRIOR TO COMPLETING THE CURRENT SUB-WORK AREA STARTING WITH WORK

AREA C1.

6. WORK AREA C SHALL CONSIST OF ALL CIVIL SCOPE INCLUDING BUT NOT LIMITED TO

PAVEMENT REMOVAL, ASPHALT MILLING, MINOR GRADING, PAVING OPERATIONS, MINOR

UTILITY RELOCATIONS AND AIRFIELD PAVEMENT MARKINGS OPERATIONS.

7. CONTRACTOR'S PERSONAL VEHICLES SHALL NOT BE PERMITTED, UNDER ANY

CIRCUMSTANCES WITHIN THE AOA. ONLY PROPERLY MARKED AND LIGHTED CONTRACTOR

VEHICLES OR CONSTRUCTION VEHICLES SHALL BE PERMITTED IN THE AOA OR THE ACTIVE

WORK AREA UNLESS OTHERWISE APPROVED BY THE RPR.

8. ANY FILL OR BASE MATERIAL TRANSFERRED ON SITE SHALL BE STOCKPILED WITHIN THE

CONTRACTOR'S DESIGNATED STAGING AREAS AS SHOWN ON THIS SHEET. ANY MATERIAL

STOCKPILE ON SITE SHALL NOT EXCEED 25' IN HEIGHT.

9. BARRICADES SHALL BE PLACED IN THE LOCATIONS IDENTIFIED ON THE PLANS AND

APPROVED BY THE RPR. ADDITIONAL BARRICADES SHALL BE MADE AVAILABLE FOR USE

FOR ADDED SAFETY MEASURES, AS NECESSARY.

10. ACTIVE AIRFIELD PAVEMENTS ADJACENT TO ACTIVE WORK AREAS SHALL BE CONTINUALLY

SWEPT AND MAINTAINED BY THE CONTRACTOR TO ENSURE THAT ACTIVE AIRFIELD

PAVEMENT SURFACES ARE CLEAR AND FREE OF CONSTRUCTION DEBRIS, DUST, OR FOD.

SELECTIVE SWEEPING AND AIRFIELD PAVEMENT MAINTENANCE MAY BE DIRECTED BY THE

RPR AND SHALL BE INCIDENTAL TO ITEM GP-80, CONSTRUCTION SAFETY AND PHASING

PLAN.

11. CONTRACTOR SHALL BE REQUIRED TO IMPLEMENT FOD MANAGEMENT PRACTICES AT THE

END OF EACH DAY WHICH SHALL INCLUDE UTILIZATION OF THE FOD-RAZOR FRICTION MAT,

OR APPROVED EQUIVALENT. THE NUMBER OF PASSES AND AREAS TO BE MAINTAINED

USING THE FOD-RAZOR FRICTION MAT SHALL BE AT THE DISCRETION OF THE RPR. NO

ADDITIONAL MEASUREMENT OR PAYMENT SHALL BE MADE FOR USE OF THE FOD-RAZOR

FRICTION MAT AND SHALL BE CONSIDERED INCIDENTAL TO ITEM GP-80, CONSTRUCTION

AND SAFETY PHASING PLAN.

12. DURING WORK WITHIN WORK AREA C1, TAXILANE T-5 SHALL BE PARTIALLY CLOSED. THE

CONTRACTOR SHALL POSITION FLAG PERSONNEL AS NECESSARY TO ACCOMMODATE

AIRCRAFT TAXIING VIA TAXILANES T-1, T-2, AND TAXILANE T-3 EAST TO TAXILANE T-6 AND

TO FACILITATE SAFE AND EFFICIENT CONTRACTOR ACCESS TO THE RESPECTIVE WORK

AREA. THE CONTRACTOR SHALL NOTIFY THE AIRPORT AT LEAST 72 HOURS PRIOR TO THE

BEGINNING OF WORK AREA C1.

13. DURING WORK WITHIN WORK AREA C2, TAXILANE T-5 SHALL BE PARTIALLY CLOSED. THE

CONTRACTOR SHALL POSITION FLAG PERSONNEL AS NECESSARY TO ACCOMMODATE

AIRCRAFT TAXIING VIA TAXILANES T-1, T-2, AND TAXILANE T-3 EAST TO TAXILANE T-5 AS

WELL AS AIRCRAFT TAXIING VIA TAXILANE T-5 NORTH OF WORK AREA C2, HEADING WEST

ON TAXILANE T-1 AND SOUTH ON TAXILANE T-5. THE DESIGNATED FLAG PERSONNEL

SHALL ALSO FACILITATE SAFE AND EFFICIENT CONTRACTOR ACCESS TO RESPECTIVE

WORK AREA. THE CONTRACTOR SHALL NOTIFY THE AIRPORT AT LEAST 72 HOURS PRIOR

TO THE BEGINNING OF WORK AREA C2.LOW PROFILE BARRICADE FOR

WORK AREA C, SEE DETAIL

A3/GC501 FOR ADDITIONAL

INFORMATION.

WORK AREA C1 BOUNDARY,

(TYP.)

CONTRACTOR ACCESS

ROUTE, (TYP.)

WORK AREA C2 BOUNDARY,

(TYP.)

CONTRACTOR STAGING,

LAY-DOWN, STORAGE, AND

PARKING AREA,

(TYP.)

AIRCRAFT TAXI

ROUTES, (TYP.). FOR

WORK AREAS C1, AND

C2. SEE DETAIL A2,

THIS SHEET FOR MORE

INFORMATION ON

AVAILABLE AIRCRAFT

TAXI ROUTES.

SEE SHEET NOTE 12,

DETAIL A2, THIS SHEET.

SEE SHEET NOTE 13,

DETAIL A2, THIS SHEET.

FLAG PERSON

LOCATION, (TYP.)

EXISTING

AIRFIELD

ELECTRICAL

VAULT

ALTERNATE ACCESS #1

CONTRACTOR ACCESS SHALL

BE THROUGH AN EXISTING

AUTOMATIC CANTILEVER GATE.

PROPOSED ASPHALT

EXTENSION TO EXISTING

CONCRETE APRON LIMITS

PROPOSED ASPHALT

EXTENSION TO EXISTING

CONCRETE DRIVEWAY

LIMITS

PROPOSED ASPHALT

EXTENSION TO

EXISTING GRAVEL

AREA LIMITS

PROPOSED ASPHALT

TO

FA

TO

FA

TOFA

TOFA

TOFA

TOFA

TO

FA

TO

FA

TO

FA

TO

FA

TO

FA

TOFA

TOFA

R

SA

R

SA

R

SA

R

SA

R

SA

R

SA

R

SA

R

SA

R

SA

R

SA

R O

FA

R O

FA

R O

FA

R O

FA

R O

FA

R O

FA

ROFA

E

E

R O

FZ

R O

FZ

R O

FZ

R O

FZ

R O

FZ

ROFZ

R O

FZ

TLOFA

TL

O

FA

TLOFA

TLOFA TL

O

FA

TLOFA

TLOFA TLOFA

TL

O

FA

TLOFA

TLOFA

TLOFA

TLOFA

TLOFA

TOFA

TO

FA

TO

FA

TOFA

III IIIIII

III

TLOFA

TL

O

FA

TL

O

FA

TLOFA TLOFA

TLOFA TLOFA

TLOFA

TLOFA

TLOFA

TLOFA

TLO

FA

TL

O

FA

TL

O

FA

TL

O

FA

TL

O

FA

TL

O

FA

TL

O

FA

ATTENTION:

THIS DOCUMENT CONTAINS PRIVILEGED AND PROPRIETARY

INFORMATION, ALL OF WHICH IS EXPRESSLY PROVIDED BY AVCON, INC.,

FOR USE BY THE INTENDED RECIPIENT, AND FOR A SPECIFIC PURPOSE.

WITHOUT THE EXPRESS WRITTEN CONSENT OF AVCON, INC. ANY

DISTRIBUTION, REPRODUCTION, OR OTHER USE OF THIS DOCUMENT, IN

WHOLE OR IN PART, IS STRICTLY PROHIBITED

V:

\2

5\

.2

.0

- L

EE

T ax ila ne

R eh ab \2

5.

6.

C

AD

D \2

_G C

_S er ie s.

dw g

4/

/2

3:

P

M

LEESBURG INTERNATIONAL

AIRPORT

LEESBURG, FLORIDA

TAXILANE

REHABILITATION

XR

EF

S:

x

4_

St an da rd

_t b x2

_E xB as em ap x

4_

C

SP

P x2

_P ro pG eo m et ry

_V x2

_M ar ki ng s

202523604_GC_SERIES

PROFESSIONAL SEAL

CLIENT LOGO

B

ID

D O

C U

M

EN

TS CADD:

AVCON PROJECT NO.

FAA AIP NO. 3-12-0042-033-2025

2025.236.04

DRAWING

DATE:

APPROVED BY:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

APRIL 2026

ALB

SCALE (US SVY FT): GRAPHIC

NO. DATE BY DESCRIPTION

REVISIONS:

AVCON, INC.

ENGINEERS & PLANNERS

5555 E. MICHIGAN ST., SUITE 200 - ORLANDO, FL 32822-2779

OFFICE: (407) 599-1122 - FAX: (407) 599-1133

CORPORATE CERTIFICATE OF AUTHORIZATION NUMBER: 5057

www.avconinc.com

Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.

This item has been digitally signed and sealed by:

A

B

C

1 2 3 4

A

B

C

1 2 3 4

TH

IS

S H

EE

T

SH

A

LL

B

E

PR

IN

TE

D

IN

C O

LO

R

, S H

EE

TS

N O

T

PR

IN

TE

D

IN

C O

LO

R

A R

E

IN

VA

LI

D

B1

GRAPHIC SCALE (FT)

200'100'50'

NORTH

SHEET NOTESA2SHEET LEGENDA1

CONSTRUCTION SAFETY PHASING PLAN - WORK AREA D

EXISTING FENCE

LINE, (TYP.)

EXISTING

AIRCRAFT

PARKING

APRON

TA

XI

W

AY

B

EXISTING AIRPORT

PROPERTY LINE, (TYP.)

TA

XI

W

AY

B

RUNWAY OBJECT

FREE AREA, (TYP.)

RUNWAY OBJECT

FREE ZONE, (TYP.)

RUNWAY

SAFETY AREA,

(TYP.)

TA

XI

W

AY

B

TAXIWAY A

W

ILC

O D

R

W

ILCO

DR

US HWY 441

US HWY 441

US HWY 441

US HWY 441

US HWY 441

US HWY 441

US HWY 441

EC

H

O D

R

ECHO

DR

EC

H

O D

R

AIRPORT BLVD AIRPORT BLVD

AIRPORT BLVD

HANGAR

HANGAR

HANGAR

HANGAR

HANGAR

EXISTING

POND

BUILDING

HANGAR

HANGAR

HANGAR

HANGAR

HANGAR

HANGAR

TAXIWAY B

HANGAR

HANGAR

HANGAR

HANGAR

HANGAR

HANGAR

HANGARHANGAR

HANGAR

HANGAR

BUILDING

HANGAR

HANGAR

HANGAR HANGAR

BUILDING

TAXIWAY J

R U

N W

AY

-2

(4

7' X

EXISTING TREE

LINE, (TYP.)

TAXILANE

TAXILANE

TAXILANE

TAXILANE

TAXIWAY OBJECT

FREE AREA, (TYP.)

TAXILANE (T-3)

TAXILANE( T-2)

TAXILANE (T-1)

TAXILANE (T-4)

TAXILANE (T-5)

TA

XI

LA

N

E (T

-6

TA

XI

LA

N

E (T

-6

TA

XI

LA

N

E (T

-5

TAXILANE (T-1)

TAXILANE OBJECT

FREE AREA, (TYP.)

AIRPORT

ADMINISTRATION

BUILDING

AIRCRAFT

TIE-DOWN,

(TYP.)

CONTRACTOR ACCESS

SHALL BE THROUGH AN

EXISTING AUTOMATIC

SWING GATE.

TA

XI

W

AY

A3

PROPOSED TAXILANE

PAVEMENT (TYP.). SEE

CS SERIES FOR MORE

INFORMATION.

PROPOSED TAXILANE

CENTERLINE MARKING,

(TYP.). SEE CS SERIES

FOR MORE

INFORMATION.

CONSTRUCTION

SAFETY AND

PHASING PLAN -

WORK AREA D

GC105

ALB

JEG

JEG

1. CONTRACTOR SHALL BE REQUIRED TO MAINTAIN A SAFE AND SECURE JOB SITE AT ALL

TIMES.

2. CONTRACTOR VEHICLES AND CONSTRUCTION EQUIPMENT SHALL YIELD TO AIRCRAFT AT

ALL TIMES.

3. UNDER NO CIRCUMSTANCE SHALL THE CONTRACTOR ENTER ANY ACTIVE PORTION OF THE

AIRFIELD WITHOUT PRIOR COORDINATION WITH THE ENGINEER, RPR, AND OWNER.

UNAUTHORIZED ACCESS TO ACTIVE AOA AREAS MAY RESULT IN PERMANENT EXPULSION

FROM THE AIRPORT.

4. CONTRACTOR SHALL TAKE NOTE OF THE EXISTING CONDITIONS OF ANY AIRPORT OWNED

ACCESS GATE THAT IS USED FOR CONSTRUCTION ACCESS. IF DAMAGED, ANY EXISTING

AIRPORT GATE SHALL BE REPLACED OR RESTORED TO ITS ORIGINAL CONDITIONS.

5. WORK AREA D SHALL BE LIMITED TO 1 CALENDAR DAY. WORK CONDUCTED IN WORK

AREA D SHALL BE SCHEDULED AND COORDINATED BETWEEN THE CONTRACTOR,

ENGINEER OF RECORD, AND THE OWNER.

6. WORK AREA C SHALL CONSIST OF ALL CIVIL SCOPE INCLUDING BUT NOT LIMITED TO

AIRFIELD PAVEMENT MARKINGS OPERATIONS. THE CONTRACTOR SHALL COORDINATE

WORK WITH THE ENGINEER, AIRPORT AND OWNER AS NECESSARY TO FACILITATE SAFE

AND EFFICIENT PAVEMENT MARKING OPERATIONS. PAVEMENT MARKING OPERATIONS

SHALL TAKE PLACE ONLY AFTER THE FINAL ASPHALT PLACEMENT HAS CURED FOR PERIOD

OF 30 DAYS.

7. THE CONTRACTOR SHALL NOT BE PERMITTED TO BEGIN WORK IN SUBSEQUENT WORK

AREAS UNTIL ALL WORK WITHIN WORK AREA C IS SUBSTANTIALLY COMPLETED AND

APPROVED BY THE RPR AND OWNER. FOD CHECKS AND LIGHT CHECKS SHALL BE

COMPLETED PRIOR TO COMPLETING A WORK AREA AND TURNING BACK OVER TO THE

OWNER AND ATCT FOR AIRCRAFT USE.

8. CONTRACTOR'S PERSONAL VEHICLES SHALL NOT BE PERMITTED, UNDER ANY

CIRCUMSTANCES WITHIN THE AOA. ONLY PROPERLY MARKED AND LIGHTED CONTRACTOR

VEHICLES OR CONSTRUCTION VEHICLES SHALL BE PERMITTED IN THE AOA OR THE ACTIVE

WORK AREA UNLESS OTHERWISE APPROVED BY THE RPR.

9. ANY FILL OR BASE MATERIAL TRANSFERRED ON SITE SHALL BE STOCKPILED WITHIN THE

CONTRACTOR'S DESIGNATED STAGING AREAS AS SHOWN ON THIS SHEET. ANY MATERIAL

STOCKPILE ON SITE SHALL NOT EXCEED 25' IN HEIGHT.

10. BARRICADES SHALL BE PLACED IN THE LOCATIONS IDENTIFIED ON THE PLANS AND

APPROVED BY THE RPR. ADDITIONAL BARRICADES SHALL BE MADE AVAILABLE FOR USE

FOR ADDED SAFETY MEASURES, AS NECESSARY. BARRICADES SHALL BE WATER FILLED

OR WEIGHTED IN A MANNER ACCEPTABLE TO THE OWNER OR RPR. 2 LIGHTS PER

BARRICADE SHALL BE REQUIRED, WITHOUT EXCEPTION, AND MAXIMUM SPACING BETWEEN

BARRICADES SHALL NOT EXCEED THE LENGTH OF 1 FULL BARRICADE.

11. ACTIVE AIRFIELD PAVEMENTS ADJACENT TO ACTIVE WORK AREAS SHALL BE CONTINUALLY

SWEPT AND MAINTAINED BY THE CONTRACTOR TO ENSURE THAT ACTIVE AIRFIELD

PAVEMENT SURFACES ARE CLEAR AND FREE OF CONSTRUCTION DEBRIS, DUST, OR FOD.

SELECTIVE SWEEPING AND AIRFIELD PAVEMENT MAINTENANCE MAY BE DIRECTED BY THE

RPR AND SHALL BE INCIDENTAL TO ITEM GP-80, CONSTRUCTION SAFETY AND PHASING

PLAN.

12. CONTRACTOR SHALL BE REQUIRED TO IMPLEMENT FOD MANAGEMENT PRACTICES AT THE

END OF EACH DAY WHICH SHALL INCLUDE UTILIZATION OF THE FOD-RAZOR FRICTION MAT,

OR APPROVED EQUIVALENT. THE NUMBER OF PASSES AND AREAS TO BE MAINTAINED

USING THE FOD-RAZOR FRICTION MAT SHALL BE AT THE DISCRETION OF THE RPR. NO

ADDITIONAL MEASUREMENT OR PAYMENT SHALL BE MADE FOR USE OF THE FOD-RAZOR

FRICTION MAT AND SHALL BE CONSIDERED INCIDENTAL TO ITEM GP-80, CONSTRUCTION

AND SAFETY PHASING PLAN…