I.B.08 EXHIBIT 3 - QASP.PDF

PDF 77 KB Posted

Attached to
Emerging Environmental Requirements Acquisition (EERA) Federal contract opportunity
Solicitation number
W912DY19R0037
Issued by
Department of the Army Corps of Engineers Engineering Support Center Huntsville

About this file

This document contains a Quality Assurance Surveillance Plan (QASP) for a Multiple Award Task Order Contract solicitation to provide Military Munitions Response Program services, Environmental Compliance and Remediation Services, and Other Munitions-Related Services. The services include safely locating, identifying, recovering, evaluating, assessing, packaging, transporting, managing, and disposing of Munitions and Explosives of Concern, Chemical Warfare Materiel, and Hazardous, Toxic and Radioactive Waste at active defense sites, formerly used defense sites, and other federally controlled sites. Work may include project planning, assessments, inspections, surveys, investigations, studies, engineering evaluations, cost analyses, remedial or removal actions, spill response, sampling and analysis, engineering containment and filtration, recovery, storage, transportation, and disposal of Investigation Derived Waste, Munitions Constituents, and Hazardous, Toxic and Radioactive Waste. Services may also include anomaly avoidance, incidental construction support, range clearance, and use of robotic or innovative technology where feasible. The QASP describes quality assurance surveillance methods including customer feedback, 100% inspection, periodic inspection, and random monitoring to be used for issued task orders.

View the file

Other files for this federal contract opportunity

Other files attached to Emerging Environmental Requirements Acquisition (EERA), newest first.
File Type Posted
I.B.08 ATTACHMENT A - Past Performance Questionnaire.doc DOC document
I.B.08 EXHIBIT 5 - CDRL 2 of 3.pdf PDF
I.B.08 ATTACHMENT D - Key Personnel Resume.doc DOC document
I.B.08 EXHIBIT 5 - CDRL 3 of 3.pdf PDF
I.B.08 ATTACHMENT F - Letter of Commitment of Key Subcontractor.doc DOC document
I.B.08 ATTACHMENT E - Letter of Commitment for Key Personnel.doc DOC document
I.B.08 EERA Solicitation.pdf PDF
I.B.08 ATTACHMENT C - Sample Task Order 9.14.2020.pdf PDF
I.B.08 ATTACHMENT B - EXPERIENCE_PP REFERENCE.DOC DOC document
I.B.08 EXHIBIT 7 - SBPCD.PDF PDF
I.B.08 EXHIBIT 1 - DIDs 9.14.2020.pdf PDF
I.B.08 EXHIBIT 5 - CDRL 1 of 3.pdf PDF
I.B.08 EXHIBIT 2 - PRS.PDF PDF
I.B.08 EXHIBIT 6 - Key Subs and Personnel.pdf PDF
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT 3

QUALITY ASSURANCE SURVEILLANCE PLAN

FOR

MILITARY MUNITIONS RESPONSE AND

ENVIRONMENTAL REMEDIATION SERVICES

INTRODUCTION

This Quality Assurance Surveillance Plan (QASP) is a general discussion of Quality Assurance (QA) Surveillance that may be performed in each Task Order. A working QASP will be created for each Task Order under this contract. The QASP is designed to provide an effective surveillance method of monitoring contractor performance for each listed objective in the services contract.

This QASP is based on the premise that the government desires to maintain a quality standard in Military Munitions Response Program (MMRP) responses involving conventional munitions, Chemical Warfare Materiel (CWM); Biological Waste and Biological Warfare Materiel (BWM);

Rapid Response Services; Environmental Compliance and Remediation Services (ECRS); and Other Munitions-Related Services (OMRS) located in the United States, including Alaska and Hawaii, the U.S. territories, Outlying areas as defined by FAR 2.101, and Territorial waters.

The contractor, not the government, is responsible for management and quality control actions to meet the terms of the contract. The role of the government is quality assurance to ensure contract standards are achieved.

In the contract, the quality control program is the driver for product quality. The contractor is required to develop a comprehensive program of inspections and monitoring actions. The first major step to ensuring a “self-correcting” contract is to ensure that the quality control program accepted at the beginning of the contract provides the measures needed to lead the contractor to success.

Once the quality control program is accepted, careful application of the process and standards presented in the remainder of this document will ensure a robust quality assurance program.

The oversight provided for in the contract and in this plan shall ensure service levels reach and maintain the required levels throughout the contract term. The Task Order QASP shall provide the Contracting Officer, or their designated representative, with a proactive way to avoid unacceptable or deficient performance, and provide verifiable input for the required annual past performance evaluations.

RESPONSIBILITIES

The Government resources shall have responsibilities for the implementation of this QASP as follows:

Contracting Officer – The Contracting Officer ensures performance of all necessary actions for effective contracting, ensures compliance with the terms of the contract and safeguards the interests of the United States in the contractual relationship. It is the Contracting Officer that assures the Contractor receives impartial, fair, and equitable treatment under the contract. The Contracting Officer is ultimately responsible for the final determination of the adequacy of the Contractor’s performance.

Project Manager - The Project Manager is responsible for overall project direction, including technical, contracting and customer-related issues and assures proper Government surveillance of the Contractor’s performance. The Project Manager is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf. Any changes that the Contractor deems may affect contract, price, terms, or conditions shall be referred to the Contracting Officer for action.

Project Team – The project team may include but is not limited to the Technical Manager, Chemist, Geophysicist, and Safety Specialist. The Project Team will provide detailed technical oversight of the Contractor’s performance and reports his or her findings to the Project Manager in a timely, complete and impartial fashion to support the Project Manager’s technical administration activities. While the Project Team may serve as a direct conduit to provide Government guidance and feedback to the Contractor on technical matters, he or she is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf. Any changes that the Contractor deems may affect contract, price, terms, or conditions shall be referred to the Contracting Officer for action.

METHODS OF QA SURVEILLANCE

The following list provides methods of surveillance that may be used in the administration of this contract. In addition to specific instructions that may be mentioned, the appropriate and standardized form that is to be used for documentation of QA surveillance may include but is not limited to the Quality Assurance Surveillance Table and the Surveillance Activity Check list prepared on a Task Order basis.

Customer Feedback – Customer feedback may be obtained either from the results of formal customer satisfaction surveys or from random customer complaints. Customer complaints, to be considered valid, must set forth clearly and in writing the detailed nature of the complaint, must be signed and must be forwarded to the Project Manager. The Project Manager shall maintain a summary log of all formally received customer complaints as well as a copy of each complaint in a documentation file. The Project Manager shall also keep the tabulated results of all customer satisfaction surveys on file and shall enter the summary results into the Contractor Performance Assessment Reporting System (CPARS).

100% Inspection - This level of inspection shall be accomplished by monitoring and documentation. The Project Manager, or if so designated the appropriate Technical Monitor, shall review the generated documentation and enter summary results into the CPARS at the mid-point and the end of each task.

Periodic Inspection - Periodic inspections shall be conducted if and when specified in individual task orders in the Quality Assurance Surveillance Table or as shown in the Performance Response Summary (PRS). For the potential tasks that have been identified so far and included in this QASP, the appropriate Technical Monitor typically performs the periodic inspection on a daily, weekly or monthly basis.

Random Monitoring - Random monitoring shall be conducted if and when specified in individual task orders. For the potential tasks that have been identified so far and included in this QASP, the random monitoring shall be performed by the Project Manager or by the appropriate designated Project Team member.

IDENTIFIED QA SURVEILLANCE TASKS

The Performance-Based Service Contract surveillance tasks are identified within the QASP for each Task Order. General Performance Metrics are provided in Section C, Chapter 17.0. Specific Performance Metrics will be provided by Task Order.

STANDARD: The performance thresholds established for each of the performance objectives are the number of defects permitted before the contracting officer’s representative (COR) notifies the contracting officer for appropriate action in accordance with 52.246-5 Inspection of Services

- Cost or FAR 52.246-4, Inspection of Services – Fixed Price, as appropriate.