This document is Addendum No. 1 to Contract I-26-2038 issued by the Illinois State Toll Highway Authority for the Tri-State Tollway (I-294). The contract involves the installation of Intelligent Transportation Systems (ITS) equipment, Automated Traffic Management (ATM) systems, and fiber optic infrastructure along a 22.3-mile segment of the tollway from the 95th Street to Balmoral Avenue. The project encompasses multiple work packages and involves coordination with various state agencies, engineering firms (including Lakeside Engineers and HNTB), equipment manufacturers (Daktronics and Ledstar), and construction contractors.
Addendum 1, dated May 5, 2026, modifies the original contract requirements through 15 specific changes affecting the schedule of prices, special provisions, and contract drawings. The primary modification reduces the quantity for pay item JT740300 (Storage of ITS Gantry Frame) from 4,797 calendar days to 465 calendar days, reflecting a revised method of measurement. The addendum includes revised pricing pages (P-15R and P-18R), updated special provision pages (J-4R, J-399R, J-437R, J-438R, J-450R, J-467R, and J-609R), and revised contract drawings across both volumes. The contract establishes a base bid structure comprising core work, contingency work valued at $3,700,000, and a contractor quality program with an $820,000 allowance. Compliance goals include 20% Disadvantaged Business Enterprise (DBE), 1.5% Veteran-Owned Small Business Program (VOSB), and 16% Equal Employment Opportunity (EEO) workforce requirements. The anticipated Notice-to-Proceed is August 17, 2026, with a substantial completion date of June 21, 2028, and final contract completion by October 1, 2028. Bid opening is scheduled for May 19, 2026, at 10:30 a.m.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Illinois State Toll Highway Authority Contract No. I-26-2038 Addendum 1 Page 1 of 3 5/5/2026
ADDENDUM NO. 1
TO
CONTRACT REQUIREMENTS
FOR CONTRACT I-26-2038
ILLINOIS STATE TOLL HIGHWAY AUTHORITY
Date: 5/5/2026
For which proposals will be received by the Illinois State Toll Highway Authority through electronic bidding via BidBuy until 10:30:00 A.M. local time, May 19, 2026
NOTICE OF REVISION TO CONTRACT
NOTES:
1. A complete set of Schedule of Prices is included with this Addendum and must be inserted into the Contract Bid by the Bidder. The Bidder’s attention is called to page P-15R and P-18R which has been revised and included as part of the Schedule of Prices.
2. The following revised Special Provision pages are included in the Contract with this Addendum: J-4, J-399 R, J- 437R, J-438R, J-450R, J-467R and J-609R.
3. The following revised Contract Drawings are included in this Addendum:
Volume 1- Drawings 3, 6, 7, 8, 11, and 112 Volume 2- Drawings 395 and 766
4. Revised Contract Drawing 11 will be issued to the successful Bidder. The revised drawing will reflect the quantity change shown in the “Summary of Revisions to Pay Item Quantities” table included in this addendum.
5. The minutes and sign-in sheet from the Optional Pre-Bid Meeting held on April 22, 2026 are included in this Addendum.
Addendum 1 Page 2 of 3 5/5/2026
CHANGES TO THE CONTRACT REQUIREMENTS
CHANGES TO THE SCHEDULE OF PRICES
SUMMARY OF REVISIONS TO PAY ITEMS QUANTITIES
SP.
PROV.
PAY ITEM
NO.
DESCRIPTION UNIT
ORIGINAL
QUANTITY
CHANGE
NEW
QUANTITY
* JT740300
STORAGE OF ITS GANTRY FRAME (STEEL),
SINGLE SPAN
CAL DAY 4797 -4332 465
* Denotes Special Provision
Change #1 Contract Requirements, Volume I, replace page P-15 with page P-15R. This replacement contains the following revisions (attached):
1.1. Reduced quantity on pay item STORAGE OF ITS GANTRY FRAME (STEEL), SINGLE SPAN.
Change #2 Contract Requirements, Volume I, replace page P-18 with page P-18R. This replacement contains the
2.1. Change of the unit price of NON-COMPLIANCE WITH EROSION AND SEDIMENT CONTROL PER TOLLWAY
SUPPL. SPEC 280.02 (2) (1).
CHANGES TO THE CONTRACT SPECIAL PROVISIONS
Change #3 Contract Requirements, Volume III, replace page J-4 with page J4R. These replacements contain the following revisions (attached):
3.1. Revised table of Illinois Tollway Standard Drawings.
Change #4 Contract Requirements, Volume III, replace page J-399 with page J399R. These replacements contain the following revisions (attached):
4.1. Revised language of JT132180, CONDUIT TRAY SYSTEM to provide guidance on locating rebar.
Change #5 Contract Requirements, Volume III, replace page J-437 with page J-437R. These replacements
5.1. Revised to provide a complete form.
Change #6 Contract Requirements, Volume III, replace page J-438 with page J-438R. These replacements
6.1. Revised to provide a complete form.
Change #7 Contract Requirements, Volume III, replace page J-450 with page J-45R. These replacements
7.1. Revised to provide a complete form.
Addendum 1 Page 3 of 3 5/5/2026
Change #8 Contract Requirements, Volume III, replace page J-467 with page J-467R. These replacements
8.1. Revised to provide a complete form.
Change #9 Contract Requirements, Volume III, replace page J-609 with page J-609R. These replacements
9.1. Revised special provision for STORAGE OF ITS GANTRY FRAME (STEEL), SINGLE SPAN to change method of measurement.
CHANGES TO THE CONTRACT DRAWINGS
Change #10 Contract Plans, Volume 1, Drawing 3. Index of Drawings and List of Standards. These drawings contain
10.1. Revised list of Illinois Tollway Standard Drawings.
Change #11 Contract Plans, Volume1, Drawings 6, 7, and 8. Suggested Progress Schedule. These drawings contain
11.1. Revised schedule header to correct project ID and correct calendar alignment.
Change #12 Contract Plans, Volume 1, Drawing number 11. Summary of Quantities. This drawing contains the following revisions (issued to the successful bidder):
12.1. Revised quantity of Storage of Gantry Frame (Steel), Single Span to reflect revised method of measurement included in this Addendum.
Change #13 Contract Plans, Volume 1, Drawing 112. Maintenance of Traffic Application. This drawing contains the
13.1. Revised summary table of applicable IDOT traffic control standards to be used.
Change #14 Contract Plans, Volume 2 Drawing 395. Index of Drawings and List of Standards. These drawings contain
14.1. Revised list of Illinois Tollway Standard Drawings.
Change #15 Contract Plans, Volume2, Drawing 766. ITS Cross Section. This drawing contains the following revisions
(attached):
15.1. Revised cross section to include noise abatement wall and drainage sewer line relocated as a construction revision in another contract. There is no impact to ITS equipment at this location due to the revision.
END OF ADDENDUM CHANGES
S.P.
PAY ITEM
NO.
DESIGNATION UNIT QUANTITY
UNIT PRICE
DOLLAR
AMOUNT
DOLLAR
* 20100110 TREE REMOVAL (6 TO 15 UNITS DIAMETER) UNIT 40
20101400 NITROGEN FERTILIZER NUTRIENT POUND 43
20101600 POTASSIUM FERTILIZER NUTRIENT POUND 116
* 20200100 EARTH EXCAVATION CU YD 115
21400100 GRADING AND SHAPING DITCHES FOOT 50
25000750 MOWING ACRE 0.25
25100630 EROSION CONTROL BLANKET SQ YD 6,222
31101200 SUBBASE GRANULAR MATERIAL, TYPE B 4" SQ YD 19
* 40600275 BITUMINOUS MATERIALS (PRIME COAT) POUND 777
42001300 PROTECTIVE COAT SQ YD 49
42400200
PORTLAND CEMENT CONCRETE SIDEWALK
5 INCH
SQ FT 167
42400800 DETECTABLE WARNINGS SQ FT 10
44000300 CURB REMOVAL FOOT 20
44000500
COMBINATION CURB AND GUTTER
REMOVAL
FOOT 85
* 44213000 PATCHING REINFORCEMENT SQ YD 34
SCHEDULE OF PRICES
THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY
CONTRACT I-26-2038
TRI-STATE TOLLWAY (I-294)
ATM SYSTEMS, ITS DEVICE AND FIBER INSTALLATION
MILE POST 17.5 TO MILE POST 39.8
95TH STREET TO BALMORAL AVENUE
Contract I-26-2038 Addendum 1 P - 5 May 5, 2026
NO.
DESIGNATION UNIT QUANTITY
UNIT PRICE
DOLLAR
AMOUNT
DOLLAR
SCHEDULE OF PRICES
THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY
CONTRACT I-26-2038
TRI-STATE TOLLWAY (I-294)
ATM SYSTEMS, ITS DEVICE AND FIBER INSTALLATION
MILE POST 17.5 TO MILE POST 39.8
95TH STREET TO BALMORAL AVENUE
* 44213200 SAW CUTS FOOT 60
* 44213204 TIE BARS 3/4" EACH 30
60250200 CATCH BASINS TO BE ADJUSTED EACH 1
* 66900530 SOIL DISPOSAL ANALYSIS EACH 14
70600280
IMPACT ATTENUATORS, TEMPORARY
(SEVERE USE, NARROW), TEST LEVEL 3
EACH 2
87900205 DRILL EXISTING HEAVY DUTY HANDHOLE EACH 39
89502300 REMOVE ELECTRIC CABLE FROM CONDUIT FOOT 28,546
89502380 REMOVE EXISTING HANDHOLE EACH 3
* X7010216
TRAFFIC CONTROL AND PROTECTION,
(SPECIAL)
L SUM 1
D1 X7011015
TRAFFIC CONTROL AND PROTECTION,
(EXPRESSWAYS)
L SUM 1
* X8710039
FIBER OPTIC CABLE 144 FIBERS, SINGLE
MODE
FOOT 4,200
* X8951011 REMOVE AERIAL CABLE FOOT 12,793
* JI211110 TOPSOIL EXCAVATION AND PLACEMENT CU YD 50
* JI211112 TOPSOIL EXCAVATION AND DISPOSAL CU YD 100
* JI406107 ASPHALT TACK COAT POUND 155
Addendum 1 P - 6 May 5, 2026
NO.
DESIGNATION UNIT QUANTITY
UNIT PRICE
DOLLAR
AMOUNT
DOLLAR
SCHEDULE OF PRICES
THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY
CONTRACT I-26-2038
TRI-STATE TOLLWAY (I-294)
ATM SYSTEMS, ITS DEVICE AND FIBER INSTALLATION
MILE POST 17.5 TO MILE POST 39.8
95TH STREET TO BALMORAL AVENUE
* JI442836
ACCELERATED PORTLAND CEMENT
CONCRETE PATCHING, CLASS A, TYPE IV,
12 INCHES
SQ YD 34
* JI481130
AGGREGATE SHOULDERS WITH FILTER
FABRIC, TYPE B 4"
SQ YD 178
* JI482104 WARM-MIX ASPHALT SHOULDERS (6 IN.) SQ YD 358
* JI602530 CATCH BASIN TO BE ADJUSTED (SPECIAL) EACH 1
* JI606030 GUTTER, TYPE G-3, MODIFIED FOOT 85
* JI637300
CONCRETE BARRIER REMOVAL AND
REPLACEMENT (SPECIAL)
FOOT 50
* JI664402 FENCE TO BE REMOVED AND RE-ERECTED FOOT 80
* Jl669016
REGULATED SUBSTANCES MONITORING
AND FIELD SCREENING
CAL DAY 14
* JI704001
TEMPORARY CONCRETE BARRIER, CROSS-
BOLT CONNECTION
FOOT 560
** JS107360 DUST CONTROL WATERING UNIT 5
** JS120101
TRAILER MOUNTED FULL MATRIX
PORTABLE CHANGEABLE MESSAGE SIGNS
EACH/WEEK 20
** JS250220 SEEDING, CLASS 2E ACRE 0.25
** JS250221 SEEDING, CLASS 2F ACRE 0.25
** JS250318 SEEDING, CLASS 4F ACRE 1.25
** JS250320 SEEDING, CLASS 5 ACRE 1.25
Addendum 1 P - 7 May 5, 2026
NO.
DESIGNATION UNIT QUANTITY
UNIT PRICE
DOLLAR
AMOUNT
DOLLAR
SCHEDULE OF PRICES
THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY
CONTRACT I-26-2038
TRI-STATE TOLLWAY (I-294)
ATM SYSTEMS, ITS DEVICE AND FIBER INSTALLATION
MILE POST 17.5 TO MILE POST 39.8
95TH STREET TO BALMORAL AVENUE
** JS280020
MANAGEMENT OF EROSION AND SEDIMENT
CONTROL
CAL MO 3
** JS280050 SILT FENCE FOOT 159
** JS280051 RE-ERECT SILT FENCE FOOT 159
** JS280070 STABILIZED CONSTRUCTION ENTRANCE SQ YD 200
** JS280120 TREE PROTECTION FOOT 15
** JS280150
TEMPORARY STABILIZATION WITH STRAW
MULCH
ACRE 0.25
** JS280151 SAME-DAY STABILIZATION SQ YD 135
** JS280180 RECTANGULAR INLET PROTECTION EACH 2
** JS280210
FILTER FABRIC INLET PROTECTION,
BASKET TYPE
EACH 3
** JS280305 TEMPORARY DITCH CHECKS FOOT 40
** JS664305 RIGHT-OF-WAY FENCE, TYPE 1, 6' FOOT 485
** JS664310
CORNER POST, RIGHT-OF-WAY FENCE,
TYPE 1
EACH 1
** JS664335
DOUBLE VEHICLE GATE, RIGHT-OF-WAY
FENCE, TYPE 1
EACH 1
** JS664400 RIGHT-OF-WAY FENCE REMOVAL FOOT 491
** JS670B00 FIELD OFFICE, TYPE B CAL MO 28
Addendum 1 P - 8 May 5, 2026
NO.
DESIGNATION UNIT QUANTITY
UNIT PRICE
DOLLAR
AMOUNT
DOLLAR
SCHEDULE OF PRICES
THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY
CONTRACT I-26-2038
TRI-STATE TOLLWAY (I-294)
ATM SYSTEMS, ITS DEVICE AND FIBER INSTALLATION
MILE POST 17.5 TO MILE POST 39.8
95TH STREET TO BALMORAL AVENUE
** JS671020 MOBILIZATION, TOLLWAY (MODIFIED) L SUM 1
* JS701010 MAINTENANCE OF TRAFFIC L SUM 1
* JS740110
ITS GANTRY FRAME (STEEL), SPANS LESS
THAN OR EQUAL TO 110'
FOOT 1,074
* JS740130
ITS GANTRY FRAME (STEEL), SPANS
GREATER THAN 110' AND LESS THAN OR
EQUAL TO 130'
FOOT 362
* JS740150
ITS GANTRY FRAME (STEEL), SPANS
GREATER THAN 130' AND LESS THAN OR
EQUAL TO 150'
FOOT 141
* JS782022 BARRIER WALL REFLECTORS TYPE C EACH 112
** JS804100 ELECTRIC SERVICE INSTALLATION EACH 1
** JS810879
UNDERGROUND CONDUIT, COILABLE
NONMETALLIC CONDUIT, 4" DIA.
FOOT 65
** JS814002 HEAVY-DUTY HANDHOLE, TOLLWAY EACH 3
** JS816078
UNIT DUCT, WITH 4-1/C NO. 4 AND 1/C NO.
6 GROUND, 600V (XLP-TYPE USE), 2" DIA.
CNC
FOOT 2,305
** JS817212
ELECTRIC CABLE IN CONDUIT, 600V (XLP-
TYPE USE) 1/C NO. 8
FOOT 359,876
** JS817213
ELECTRIC CABLE IN CONDUIT, 600V (XLP-
TYPE USE) 1/C NO. 6
FOOT 100,639
** JS817214
ELECTRIC CABLE IN CONDUIT, 600V (XLP-
TYPE USE) 1/C NO. 4
FOOT 74,833
** JS817215
ELECTRIC CABLE IN CONDUIT, 600V (XLP-
TYPE USE) 1/C NO. 2
FOOT 13,244
** JS817219
ELECTRIC CABLE IN CONDUIT, 600V (XLP-
TYPE USE) 1/C NO. 4/0
FOOT 3,960
Addendum 1 P - 9 May 5, 2026
NO.
DESIGNATION UNIT QUANTITY
UNIT PRICE
DOLLAR
AMOUNT
DOLLAR
SCHEDULE OF PRICES
THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY
CONTRACT I-26-2038
TRI-STATE TOLLWAY (I-294)
ATM SYSTEMS, ITS DEVICE AND FIBER INSTALLATION
MILE POST 17.5 TO MILE POST 39.8
95TH STREET TO BALMORAL AVENUE
** JS817222
ELECTRIC CABLE IN CONDUIT, 600V (XLP-
TYPE USE) 1/C 350MCM
FOOT 800
** JS817224
ELECTRIC CABLE IN CONDUIT, 600V (XLP-
TYPE USE) 1/C 500MCM
FOOT 800
** JS821100 LUMINAIRE, LED, HORIZONTAL MOUNT EACH 1
** JS825004 LIGHTING CONTROLLER, 200 AMPERE EACH 1
** JS830003
GROUND MOUNTED LIGHT POLE,
ALUMINUM, 50 FT., 15 FT. MAST ARM
EACH 1
** JS836002
LIGHT POLE FOUNDATION (ROADWAY)
STEEL HELIX (10 FT)
EACH 1
** JS842080
REMOVAL OF EXISTING LIGHTING UNIT,
SALVAGE
EACH 1
** JS842105 POLE FOUNDATION, REMOVED EACH 1
** JS845011 REMOVAL OF LIGHTING CONTROLLER EACH 4
** JS845012
REMOVAL OF ELECTRIC SERVICE
INSTALLATION
EACH 5
** JS845013
REMOVAL OF LIGHTING CONTROLLER
FOUNDATION
EACH 2
** JS846001 MAINTAIN LIGHTING SYSTEM L SUM 1
* JT130745
PRECAST CONCRETE INTERMEDIATE
POWER DISTRIBUTION AND
COMMUNICATION FACILITY
EACH 1
* JT130748
ELECTRIC WORK, INTERMEDIATE POWER
AND COMMUNICATION DISTRIBUTION
FACILITY, ITS ONLY
EACH 6
* JT130752
CONCRETE FOUNDATION, INTERMEDIATE
POWER DISTRIBUTION AND
COMMUNICATION FACILITY
EACH 1
Addendum 1 P - 10 May 5, 2026
NO.
DESIGNATION UNIT QUANTITY
UNIT PRICE
DOLLAR
AMOUNT
DOLLAR
SCHEDULE OF PRICES
THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY
CONTRACT I-26-2038
TRI-STATE TOLLWAY (I-294)
ATM SYSTEMS, ITS DEVICE AND FIBER INSTALLATION
MILE POST 17.5 TO MILE POST 39.8
95TH STREET TO BALMORAL AVENUE
* JT130754
ELECTRIC WORK, INTERMEDIATE POWER
DISTRIBUTION AND COMMUNICATION
FACILITY
EACH 1
* JT131317 REMOVE BLUETOOTH TRAFFIC SENSOR EACH 17
* JT131800
PLAZA COMMUNICATION WORK, LOCATION
L SUM 1
* JT131801
PLAZA COMMUNICATION WORK, LOCATION
L SUM 1
* JT131802
PLAZA COMMUNICATION WORK, LOCATION
L SUM 1
* JT132040 DYNAMIC MESSAGE SIGN - TYPE 1 EACH 2
* JT132047 DYNAMIC MESSAGE SIGN – FRONT ACCESS EACH 7
* JT132050
DYNAMIC MESSAGE SIGN -TYPE 1
(TRAINING)
L SUM 1
* JT132057
DYNAMIC MESSAGE SIGN – FRONT ACCESS
(TRAINING)
L SUM 1
* JT132060
DYNAMIC MESSAGE SIGN - TYPE 1 (SPARE
PARTS)
EACH 1
* JT132071
DYNAMIC MESSAGE SIGN – FRONT ACCESS
(SPARE PARTS)
EACH 1
* JT132072
DYNAMIC MESSAGE SIGN - TYPE 2 (9
CHARACTERS)
EACH 29
* JT132074
DYNAMIC MESSAGE SIGN - TYPE 2 (9
CHARACTERS) (TRAINING)
L SUM 1
* JT132075
DYNAMIC MESSAGE SIGN - TYPE 2 (9
CHARACTERS) (SPARE PARTS)
EACH 1
* JT132090 ATM LANE CONTROL SIGN - TYPE 1 EACH 55
Addendum 1 P - 11 May 5, 2026
NO.
DESIGNATION UNIT QUANTITY
UNIT PRICE
DOLLAR
AMOUNT
DOLLAR
SCHEDULE OF PRICES
THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY
CONTRACT I-26-2038
TRI-STATE TOLLWAY (I-294)
ATM SYSTEMS, ITS DEVICE AND FIBER INSTALLATION
MILE POST 17.5 TO MILE POST 39.8
95TH STREET TO BALMORAL AVENUE
* JT132091
ATM LANE CONTROL SIGN - TYPE 1 (SPARE
PARTS)
EACH 1
* JT132092 ATM LANE CONTROL SIGN - TYPE 2 EACH 308
* JT132093
ATM LANE CONTROL SIGN - TYPE 2 (SPARE
PARTS)
EACH 1
* JT132094
ATM LANE CONTROL SIGN - TYPE 1
(SPECIAL)
EACH 1
* JT132096
ATM LANE CONTROL SIGN - TYPE 2
(SPECIAL)
EACH 5
* JT132098 ATM LANE CONTROL SIGN (TRAINING) L SUM 1
* JT132099
ATM TEST GANTRY WITH LANE CONTROL
SIGNS AND DMS TYPE 2
EACH 1
* JT132180 CONDUIT TRAY SYSTEM FOOT 400
* JT132621 DMS ELECTRICAL WORK - TYPE 1 EACH 2
* JT132800 REMOVE ITS POLE MOUNTED ENCLOSURE EACH 10
* JT132810
ITS POLE MOUNTED ENCLOSURE (CCTV OR
MVDS)
EACH 27
* JT132814 ITS DISCONNECT SWITCH ASSEMBLY EACH 27
* JT132820 CCTV CAMERA, ITS ASSEMBLY EACH 43
* JT132830
FIBER OPTIC COMMUNICATIONS, ITS
ASSEMBLY
EACH 95
* JT132845
MICROWAVE VEHICLE DETECTION SYSTEM
(MVDS), ITS ASSEMBLY
EACH 5
Addendum 1 P - 12 May 5, 2026
NO.
DESIGNATION UNIT QUANTITY
UNIT PRICE
DOLLAR
AMOUNT
DOLLAR
SCHEDULE OF PRICES
THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY
CONTRACT I-26-2038
TRI-STATE TOLLWAY (I-294)
ATM SYSTEMS, ITS DEVICE AND FIBER INSTALLATION
MILE POST 17.5 TO MILE POST 39.8
95TH STREET TO BALMORAL AVENUE
* JT132852 ITS WALL MOUNTED ENCLOSURE EACH 10
* JT132853
ITS DISCONNECT SWITCH ASSEMBLY WALL
MOUNTED
EACH 10
* JT134037
ITS ELEMENT SITE GROUNDING - POLE
MOUNTED ASSEMBLY
EACH 37
* JT134048
ITS ELEMENT SITE GROUNDING - ATM
EQUIPMENT CABINETS
EACH 6
* JT135006
REMOVE MICROWAVE VEHICLE DETECTION
ASSEMBLY
EACH 2
* JT135095 GANTRY ONLY ELECTRICAL WORK EACH 56
* JT135097 REMOVE CCTV CAMERA, POLE MOUNTED EACH 10
* JT135100 CONCRETE FILLED PIPE BOLLARDS EACH 5
* JT136200
ON-SITE BREATHING WORK ZONE AIR
QUALITY MONITORING
CAL DAY 40
* JT160099
HANDHOLE FOR SINGLE MODE FIBER OPTIC
CABLE, TORSION ASSIST, 48"X72"X36"
EACH 4
* JT160217 LOCATE POST FOR FIBER OPTIC CABLE EACH 4
* JT160218
CABLE MARKER WARNING SIGN, WITH
POST, FOR FIBER OPTIC CABLE
EACH 29
* JT160225
SINGLE MODE FIBER OPTIC CABLE
REMOVAL, SALVAGE
FOOT 134,436
* JT160226
SINGLE MODE FIBER OPTIC CABLE
REMOVAL, NO SALVAGE
FOOT 93,735
* JT160251
HANDHOLE REMOVAL FOR SINGLE MODE
FIBER OPTIC CABLE, NO SALVAGE
EACH 44
Addendum 1 P - 13 May 5, 2026
NO.
DESIGNATION UNIT QUANTITY
UNIT PRICE
DOLLAR
AMOUNT
DOLLAR
SCHEDULE OF PRICES
THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY
CONTRACT I-26-2038
TRI-STATE TOLLWAY (I-294)
ATM SYSTEMS, ITS DEVICE AND FIBER INSTALLATION
MILE POST 17.5 TO MILE POST 39.8
95TH STREET TO BALMORAL AVENUE
* JT160266 WOOD POLE REMOVAL, NO SALVAGE EACH 207
* JT160295
CLEAN AND PROOF EXISTING CONDUIT
(UNDERGROUND)
FOOT 3,585
* JT160296
CLEAN AND PROOF EXISTING CONDUIT
(ATTACHED TO STRUCTURE)
FOOT 3,270
* JT160297
CLEAN AND PROOF EXISTING CONDUIT
(EMBEDDED IN STRUCTURE)
FOOT 194,850
* JT160319
FIBER OPTIC CABLE, SINGLE MODE,
ARMORED, 240 FIBERS, USX
FOOT 7,020
* JT160324
FIBER OPTIC CABLE, SINGLE MODE,
ARMORED, 144 FIBERS
FOOT 75,300
* JT160328
FIBER OPTIC CABLE, SINGLE MODE,
ARMORED, 432 FIBERS
FOOT 65,520
* JT160340
FIBER OPTIC CONNECTION HARDWARE,
TYPE 1
EACH 86
* JT160345
FIBER OPTIC CONNECTION HARDWARE,
TYPE 2
EACH 10
* JT160348
INSTALL FIBER OPTIC CABLE, SINGLE
MODE, 432 FIBERS, AT&T, FURNISHED BY
OTHERS
FOOT 11,250
* JT160364
FIBER OPTIC CABLE, SINGLE MODE, NON-
ARMORED, 144 FIBERS
FOOT 126,377
* JT160367 INSTALL FIBER DISTRIBUTION PANEL EACH 2
* JT160382
FIBER OPTIC CABLE, SINGLE MODE, NON-
ARMORED, 48 FIBERS
FOOT 5,450
* JT160383
FIBER OPTIC CABLE, SINGLE MODE, NON-
ARMORED, 72 FIBERS
FOOT 6,550
* JT160386
FIBER OPTIC CABLE, SINGLE MODE,
ARMORED, 288 FIBERS, VERIZON
FOOT 18,990
Addendum 1 P - 14 May 5, 2026
NO.
DESIGNATION UNIT QUANTITY
UNIT PRICE
DOLLAR
AMOUNT
DOLLAR
SCHEDULE OF PRICES
THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY
CONTRACT I-26-2038
TRI-STATE TOLLWAY (I-294)
ATM SYSTEMS, ITS DEVICE AND FIBER INSTALLATION
MILE POST 17.5 TO MILE POST 39.8
95TH STREET TO BALMORAL AVENUE
* JT160387
FIBER OPTIC CABLE, SINGLE MODE,
ARMORED, 288 FIBERS, OVATION
FOOT 11,580
* JT160388
FIBER OPTIC CABLE, SINGLE MODE
ARMORED, 864 FIBERS, LIGHTOWER
FOOT 18,270
* JT160389
FIBER OPTIC CABLE, SINGLE MODE,
ARMORED, 864 FIBERS, ZAYO
FOOT 12,210
* JT202009 NON-SPECIAL WASTE DISPOSAL, TYPE 1 CU YD 103
* JT211A11 SUBGRADE AGGREGATE 12 IN. CU YD 128
* JT669100 LANDFILL GAS MONITORING WORK PLAN L SUM 1
* JT733402
OVERHEAD SIGN STRUCTURE (REMOVE
ONLY)
EACH 2
* JT733403
OVERHEAD SIGN STRUCTURE (INSTALL
ONLY)
EACH 2
* JT740200
ITS GANTRY FRAME (STEEL), SINGLE SPAN
(INSTALL ONLY)
EACH 41
* JT740220
ITS GANTRY FRAME (STEEL), SINGLE SPAN
(REMOVE ONLY)
EACH 41
* JT740230
REMOVE AND REPLACE ITS GANTRY
COLUMN
EACH 1
* JT740300
STORAGE OF GANTRY FRAME (STEEL),
SINGLE SPAN
CAL DAY 465
* JT804005 ELECTRIC SERVICE INSTALLATION - ITS EACH 1
* JT810874
UNDERGROUND CONDUIT, COILABLE
NONMETALLIC CONDUIT, SDR 11, 1 1/2" DIA.
FOOT 3,295
* JT810876
UNDERGROUND CONDUIT, COILABLE
NONMETALLIC CONDUIT, SDR 11, 2" DIA.
FOOT 5,420
Addendum 1 P - 15R May 5, 2026
NO.
DESIGNATION UNIT QUANTITY
UNIT PRICE
DOLLAR
AMOUNT
DOLLAR
SCHEDULE OF PRICES
THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY
CONTRACT I-26-2038
TRI-STATE TOLLWAY (I-294)
ATM SYSTEMS, ITS DEVICE AND FIBER INSTALLATION
MILE POST 17.5 TO MILE POST 39.8
95TH STREET TO BALMORAL AVENUE
* JT810878
UNDERGROUND CONDUIT, COILABLE
NONMETALLIC CONDUIT, SDR 11, 3" DIA.
FOOT 1,215
* JT810879
UNDERGROUND CONDUIT, COILABLE
NONMETALLIC CONDUIT, SDR 11, 4" DIA.
FOOT 870
* JT810881
UNDERGROUND CONDUIT, COILABLE
NONMETALLIC CONDUIT, SDR 11, 6" DIA.
FOOT 45
* JT830051
GROUND MOUNTED LIGHT POLE,
GALVANIZED STEEL, 50 FT., WITHOUT MAST
ARM
EACH 27
* JT830070
WALL MOUNTED LIGHT POLE, GALVANIZED
STEEL, 50 FT., WITHOUT MAST ARM
EACH 10
* JT836020
ITS ELEMENT POLE FOUNDATION STEEL
HELIX (12 FT)
EACH 25
* JT836027 ITS CONCRETE SERVICE PAD, TYPE A EACH 15
* JT836028 ITS CONCRETE SERVICE PAD, TYPE B EACH 8
* JT836029 ITS CONCRETE SERVICE PAD, TYPE C EACH 4
* JT895009 REMOVAL OF CONDUIT FROM STRUCTURE FOOT 832
* JT901056 LOCATOR TRACER WIRE FOOT 3,575
TOTAL AMOUNT OF CORE WORK
* JT155001 CONTRACTOR'S QUALITY PROGRAM L SUM 1 $ 820,000.00 $ 820,000.00
Addendum 1 P - 16 May 5, 2026
NO.
DESIGNATION UNIT QUANTITY
UNIT PRICE
DOLLAR
AMOUNT
DOLLAR
SCHEDULE OF PRICES
THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY
CONTRACT I-26-2038
TRI-STATE TOLLWAY (I-294)
ATM SYSTEMS, ITS DEVICE AND FIBER INSTALLATION
MILE POST 17.5 TO MILE POST 39.8
95TH STREET TO BALMORAL AVENUE
* JT154008
UNFORESEEN ADDITIONAL MAINTENANCE OF
TRAFFIC
UNIT 200,000 1.00 $ 200,000.00
* JT154016
ALLOWANCE FOR UNFORESEEN EROSION
CONTROL MEASURES
UNIT 20,000 1.00 $ 20,000.00
* JT154032
CONTRACT ALLOWANCE FOR ADDITIONAL
ITS WORK
UNIT 1,000,000 1.00 $ 1,000,000.00
* JT154067
CONTRACT ALLOWANCE FOR
CONSTRUCTIONWORKS APPRENTICES
UNIT 100,000 1.00 $ 100,000.00
* JT154079
CONTRACT ALLOWANCE FOR ILLINOIS STATE
POLICE SERVICES
UNIT 10,000 1.00 $ 10,000.00
* JT154092
CONTRACT ALLOWANCE FOR UNFORESEEN
STRUCTURE WORK
UNIT 100,000 1.00 $ 100,000.00
* JT154096
CONTRACT ALLOWANCE FOR MAINTAIN
INTELLIGENT TRANSPORTATION SYSTEMS
UNIT 100,000 1.00 $ 100,000.00
* JT154108
ALLOWANCE FOR MISCELLANEOUS ITS
COMPONENTS
UNIT 150,000 1.00 $ 150,000.00
* JT154112
ALLOWANCE FOR ADDITIONAL ELECTRICAL
AND COMMUNICATION WORK
UNIT 200,000 1.00 $ 200,000.00
* JT154198
ALLOWANCE FOR RAILROAD DIRECTED
WORK
UNIT 1,000,000 1.00 $ 1,000,000.00
999NEG04
NON-COMPLIANCE WITH TOLLWAY
MAINTENANCE OF TRAFFIC PER TOLLWAY
SUPPL. SPEC. 701.08(a)
INC/DAY (2,500.00)$
999NEG05
FAILURE TO RESPOND TO RE-ESTABLISH
DEVICES PER TOLLWAY SUPPL. SPEC.
701.08(b)
OCCUR (2,500.00)$
999NEG06
FAILURE TO REPAIR IMPACT ATTENUATORS,
TEMPORARY PER TOLLWAY SUPPL. SPEC.
701.08(c)
OCCUR (2,500.00)$
NEGATIVE
Addendum 1 P - 17 May 5, 2026
NO.
DESIGNATION UNIT QUANTITY
UNIT PRICE
DOLLAR
AMOUNT
DOLLAR
SCHEDULE OF PRICES
THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY
CONTRACT I-26-2038
TRI-STATE TOLLWAY (I-294)
ATM SYSTEMS, ITS DEVICE AND FIBER INSTALLATION
MILE POST 17.5 TO MILE POST 39.8
95TH STREET TO BALMORAL AVENUE
999NEG07
LOSS OR DAMAGE TO TOLLWAY OWNED
DEVICES PER TOLLWAY SUPPL. SPEC.
701.08(d)
SQ FT (100.00)$
999NEG08
FAILURE TO OPEN TRAFFIC LANES TO
TRAFFIC PER TOLLWAY SUPPL. SPEC.
701.08(e)(a)
15 MINUTES (3,000.00)$
999NEG09
FAILURE TO OPEN TRAFFIC LANES TO
TRAFFIC PER TOLLWAY SUPPL. SPEC.
701.08(e)(b)
15 MINUTES (5,000.00)$
999NEG20
DAMAGES TO ILLINOIS TOLLWAY'S
OPERATIONAL FACILITIES PER S.P. 115.5 - TRI-
STATE
OCCUR (10,000.00)$
999NEG30
DAMAGES TO ILLINOIS TOLLWAY'S
OPERATIONAL FACILITIES PER S.P. 115.5 -
ALL ROADWAYS OFF-PEAK
OCCUR (2,000.00)$
999NEG31
DAMAGE TO ELECTRICAL FACILITIES PER
TOLLWAY SUPPL. SPEC. 107.30(b)
INC/DAY (1,000.00)$
999NEG32
LIQUIDATED DAMAGES FOR DELAY IN
SUBMITTAL OF PROGRESS SCHEDULE PER
TOLLWAY SUPPL. SPEC. 108.02(e)
DAY (300.00)$
999NEG33
NON-COMPLIANCE WITH EROSION AND
SEDIMENT CONTROL PER TOLLWAY SUPPL.
SPEC 280.02 (2) (1)
INC/DAY (5,000.00)$
999NEG34
NON-COMPLIANCE WITH RESPONSIBILITY
FOR CONSTRUCTION HAULING EQUIPMENT
PER TOLLWAY SUPPL. SPEC. 105.15
DAY (1,000.00)$
999NEG35
FAILURE TO RESPOND TO REGULATORY
AGENCY REQUESTS, PER TOLLWAY SUPPL.
SPEC. 280.02 (2) (2)
OCCUR (25,000.00)$
Addendum 1 P - 18R May 5, 2026
NO.
DESIGNATION UNIT QUANTITY
UNIT PRICE
DOLLAR
AMOUNT
DOLLAR
SCHEDULE OF PRICES
THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY
CONTRACT I-26-2038
TRI-STATE TOLLWAY (I-294)
ATM SYSTEMS, ITS DEVICE AND FIBER INSTALLATION
MILE POST 17.5 TO MILE POST 39.8
95TH STREET TO BALMORAL AVENUE
999NEG42
NON-COMPLIANCE WITH MAINTAIN LIGHTING
SYSTEM, PER TOLLWAY SUPPL. SPEC. 846.06
(a)
INC/DAY (2,000.00)$
999NEG43
FAILURE TO RESPOND TO MAINTAIN
LIGHTING SYSTEM, PER TOLLWAY SUPPL.
SPEC. 846.06 (b)
OCCUR (5,000.00)$
999NEG44
LIQUIDATED DAMAGES FOR NON-
COMPLETION PER S.P. 105.1.1
CAL DAY (11,000.00)$
999NEG45
LIQUIDATED DAMAGES FOR NON-
COMPLETION PER S.P. 105.1.2
CAL DAY (15,000.00)$
999NEG46
LIQUIDATED DAMAGES FOR NON-
COMPLETION PER S.P. 105.1.3
CAL DAY (1,100.00)$
999NEG47
LIQUIDATED DAMAGES FOR NON-
COMPLETION PER S.P. 105.1.4
CAL DAY (2,400.00)$
999NEG48
LIQUIDATED DAMAGES FOR NON-
COMPLETION PER S.P. 105.1.5
CAL DAY (2,400.00)$
999NEG49
DAMAGE TO FIBER OPTIC UTILITIES, PER S.P.
115.3
OCCUR (10,000.00)$
999NEG53
NON-COMPLIANCE WITH CONTRACTOR
QUALITY PROGRAM SPECIAL PROVISION
OCCUR (1,000.00)$
999NEG54
DAMAGE TO TOLLWAY MULTI-MODE CABLE,
DMS SIGNS, CAMERAS,
TELECOMMUNICATION, CABLE, ELECTRICAL,
WATER and SEWER PER S.P. 115.4
OCCUR (9,000.00)$
Addendum 1 P - 19 May 5, 2026
NO.
DESIGNATION UNIT QUANTITY
UNIT PRICE
DOLLAR
AMOUNT
DOLLAR
SCHEDULE OF PRICES
THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY
CONTRACT I-26-2038
TRI-STATE TOLLWAY (I-294)
ATM SYSTEMS, ITS DEVICE AND FIBER INSTALLATION
MILE POST 17.5 TO MILE POST 39.8
95TH STREET TO BALMORAL AVENUE
999NEG59
FAILURE TO PROTECT TREES AND SHRUBS
PER PROTECTION OF EXISTING TREES
SPECIAL PROVISION
OCCUR (2,000.00)$
999NEG60
LIQUIDATED DAMAGES FOR NON-
COMPLETION PER S.P. 105.1.6
CAL DAY (2,900.00)$
999NED61
LIQUIDATED DAMAGES FOR NON-
COMPLETION PER S.P. 105.1.7
CAL DAY (2,400.00)$
999NEG71
FAILURE TO RECONNECT THE DYNAMIC
MESSAGE SIGN PER RECONNECT EXISTING
DYNAMIC MESSAGE SIGN SPECIAL
PROVISION
OCCUR (2,000.00)$
999NEG72
FAILURE TO RESPOND TO MAINTAIN ITS PER
MAINTAIN INTELLIGENT TRANSPORTATION
SYSTEMS SPECIAL PROVISION
OCCUR (2,000.00)$
999NEG73
NON-COMPLIANCE WITH ITS PER MAINTAIN
INTELLIGENT TRANSPORTATION SYSTEMS
SPECIAL PROVISION
OCCUR (2,000.00)$
999NEG74
FAILURE TO REPAIR TO MAINTAIN ITS PER
MAINTAIN INTELLIGENT TRANSPORTATION
SYSTEMS SPECIAL PROVISION
OCCUR (2,000.00)$
999NEG77
NON-COMPLIANCE WITH MOWING (SPECIAL)
SPECIAL PROVISION
DAY (1,000.00)$
* 999ADJ45
CONSTRUCTIONWORKS APPRENTICES
WAGE RATE PAYMENT
HOUR $ 15.00
POSITIVE
ADJUSTMENTS
Addendum 1 P - 20 May 5, 2026
NO.
DESIGNATION UNIT QUANTITY
UNIT PRICE
DOLLAR
AMOUNT
DOLLAR
SCHEDULE OF PRICES
THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY
CONTRACT I-26-2038
TRI-STATE TOLLWAY (I-294)
ATM SYSTEMS, ITS DEVICE AND FIBER INSTALLATION
MILE POST 17.5 TO MILE POST 39.8
95TH STREET TO BALMORAL AVENUE
* 999ADJ46 ARROW BOARD EACH $ 13.32
* 999ADJ48 TYPE I OR TYPE II BARRICADE EACH $ 1.00
* 999ADJ50 TYPE III BARRICADE EACH $ 2.35
* 999ADJ52 PLASTIC DRUM EACH $ 1.25
* 999ADJ54 FLASHER LIGHT EACH $ 0.20
* 999ADJ56 STEADY BURN LIGHT EACH $ 0.30
* 999ADJ58 HI-INTENSITY LIGHT, SIGN MOUNTED EACH $ 1.70
* 999ADJ60 CMS, SOLAR POWERED EACH $ 45.70
* 999ADJ62 SIGNS, WORK ZONE EACH $ 2.00
* 999ADJ64
TEMPORARY MODULAR GLARE SCREEN (12.5
FT. SECTION)
UNIT $ 0.60
* 999ADJ65
TEMPORARY CONCRETE BARRIER (12.5 FT.
SECTION)
UNIT $ 0.83
* 999ADJ66
TEMPORARY CONCRETE BARRIER (10.0 FT.
SECTION)
UNIT $ 0.50
* 999ADJ67
TEMPORARY CONCRETE BARRIER, CROSS
BOLT CONNECTION (12.5 FT. SECTION)
UNIT $ 1.47
* 999ADJ68 TEMPORARY SAND MODULE ATTENUATOR EACH $ 18.33
Addendum 1 P - 21 May 5, 2026
NO.
DESIGNATION UNIT QUANTITY
UNIT PRICE
DOLLAR
AMOUNT
DOLLAR
SCHEDULE OF PRICES
THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY
CONTRACT I-26-2038
TRI-STATE TOLLWAY (I-294)
ATM SYSTEMS, ITS DEVICE AND FIBER INSTALLATION
MILE POST 17.5 TO MILE POST 39.8
95TH STREET TO BALMORAL AVENUE
* 999ADJ69
IMPACT ATTENUATOR, TEMPORARY (SEVERE
USE, NARROW), TEST LEVEL 3
EACH $ 18.33
* 999ADJ70
IMPACT ATTENUATOR, TEMPORARY (SEVERE
USE, WIDE), TEST LEVEL 3
EACH $ 18.33
* 999ADJ71
TEMPORARY INFORMATION SIGNING-
GROUND MOUNTED, 24 SQ FT IN AREA OR
LESS
SQ FT $ 0.25
* 999ADJ72
TEMPORARY INFORMATION SIGNING-
GROUND MOUNTED, GREATER THAN 24 SQ
FT IN AREA
SQ FT $ 0.25
* 999ADJ73
TEMPORARY INFORMATION SIGNING-
OVERHEAD, 24 SQ FT IN AREA OR LESS
SQ FT $ 0.25
* 999ADJ74
TEMPORARY INFORMATION SIGNING-
OVERHEAD, GREATER THAN 24 SQ FT IN
AREA
SQ FT $ 0.25
TOTAL AMOUNT OF CONTINGENCY WORK + CONTRACTOR'S QUALITY PROGRAM (CQP) $ 3,700,000.00
BID CREDIT
AWARD CRITERIA
S.P. COLUMN LEGEND
* INDICATES SPECIAL PROVISION (PROJECT SPECIFIC OR TOLLWAY STANDARD)
** INDICATES TOLLWAY SUPPLEMENTAL SPECIFICATIONS
D1 INDICATES DISTRICT 1 SPECIAL PROVISION
TOTAL AMOUNT OF CORE WORK + TOTAL AMOUNT OF CONTINGENCY WORK +
CONTRACTOR'S QUALITY PROGRAM = TOTAL AMOUNT OF BASE BID
Addendum 1 P - 22 May 5, 2026
Contract I-26-2038 J-4R May 5, 2026
ILLINOIS TOLLWAY STANDARD DRAWINGS
STANDARD
NO. TITLE
SECTION B - DRAINAGE STRUCTURES, CURBS, CURBS & GUTTER
B1-12 GUTTER AND CURB DETAILS
B8-10 CATCH BASINS TYPE G AND TYPE G-3 MODIFIED, FRAMES AND GRATES
SECTION D - ROADWAY
D1-07 RIGHT OF WAY FENCE
D4-10 ROADWAY DELINEATORS AND REFLECTORS
D10-04 TEMPORARY CONCRETE BARRIER WITH CROSS-BOLT
SECTION E - MAINTENANCE OF TRAFFIC TABLE
E1-08 CONSTRUCTION SIGNS
E2-13 LANE CLOSURE DETAILS
E3-12 SHOULDER CLOSURE DETAILS
E5-12 CONNECTION TEMPORARY GORE DETAILS
E6-10 CONTRACTOR ACCESS TO WORK AREA
SECTION H - LIGHTING
H4-06 HEAVY-DUTY HANDHOLE AND BURIED WIRING DETAILS
SECTION K - EROSION CONTROL AND LANDSCAPE
K1-15 EROSION CONTROL AND LANDSCAPE
SECTION L - FIBER OPOTIC
L1-08 FIBER OPTIC SYSTEM TYPICALS AND DRAWINGS
L2-04 FIBER OPTIC SPLICING DETAILS
Addendum 1
J-399R May 5, 2026 determine the length of the FRE carrier conduits that must be removed to expose all innerducts.
The length of removal in each direction from the junction box shall be the same for all FRE carrier conduits so that the remaining ends are flush with each end of the new wireway to be installed. The FRE carrier conduits shall be disconnected from the existing junction box. The ends of the FRE carrier conduits shall be cut square and thoroughly reamed to remove all burrs and rough edges.
Removal of the existing junction box and sections of the FRE carrier conduits shall be done with care and shall avoid damage to all innerducts inside. Further care shall be given to avoiding damage to all existing cables inside innerducts. The junction box and FRE carrier conduits shall be cut to allow for removal around existing cables as needed. The total gap length after removal of the section of the FRE carrier conduits shall be measured and used to size the new wireway and to quantify the support hanger assemblies. The wireway size shall allow the ends of the FRE carrier conduits to enter into each end of the wireway as shown on the plans to accommodate threading and bushings. Support hanger assemblies for the wireway shall be installed at a 5-foot maximum spacing. The Contractor shall utilize Ground Penetrating Radar to locate the position of rebar prior to installation of anchors for hanger assemblies.
The Contractor shall identify and record the matching ends of all existing innerducts. The gap between corresponding existing innerduct ends shall be connected with a new conduit. The length of the new conduit shall match the gap length. The new conduit shall be securely fastened to each existing innerduct end using a conduit split coupler.
For innerduct that has existing cabling inside, the gap between the corresponding existing innerduct ends shall be connected with a new split conduit. The split conduit shall be placed around the existing cable without damaging the cable. The length of the new split conduit shall match the gap length. The new split conduit shall be securely fastened to each existing innerduct end using a conduit split coupler.
All FRE carrier conduits inserted into the wireway shall have the ends threaded. Lock nuts and bushings shall be installed to secure the conduits to the wireway.
The wireway may be a single manufactured unit for shorter, manageable lengths. For longer lengths, the wireway may be comprised of segments that are securely connected together as segments are mounted to the support hangers. The overall length of the combined wireway segments shall match the measured gap length and field cutting shall not be required. Any unforeseen field cutting of the wireway shall have all rough edges completely filed smooth.
All screws used to secure wireway segments together shall be inserted from the inside to avoid leaving the sharp ends of the screws protruding inward and posing damage to the innerducts. All joints shall be sealed watertight.
All removed items, including junction box, carrier conduits, and support hangers, shall be disposed of in accordance with Article 202.03 of the Standard Specifications.
The details of the wireway attached to structure are shown on the Plans and are provided as a basis for the Contractor’s bidding. The Contractor shall submit details of the final proposed solution.
Design computations, working drawings, and shop drawings, signed and seal by an Illinois Licensed Structural Engineer, shall be submitted by the Contractor according to Article 105.04 of the Illinois Tollway Supplemental Specifications. The Contractor shall be responsible for all stability aspects of the wireway design and shall submit to the Engineer computations for each wireway.
Contract I-26-2038 J-437R May 5, 2026 Contract I-26
J-438R
J-439R
J-451R
J-468R
Addendum 1 J-610R May 5, 2026
STORAGE OF ITS GANTRY FRAME (STEEL)
Description. This work shall consist of the storage of steel beams and hardware for ITS Gantry Frames.
CONSTRUCTION REQUIREMENTS
The ontractor shall store the ITS Gantry Frames at an offsite location to be approved by the Engineer. The Contractor shall be responsible for the care of the ITS Gantry Frames during transportation to and from the site during storage. Galvanized steel components shall be handled and stored in a manner that protects the galvanized coating. Any damaged or lost materials shall be replaced in kind by the Contractor at no additional cost to the Illinois Tollway.
All materials or equipment required to load, unload, secure, and store the ITS Gantry Frames shall be furnished by the Contractor.
The storage period will be considered to begin when the first ITS Gantry Frame is removed and stored and considered to be concluded with the completion of the ATM Burn-In period.
Method of Measurement. This work will be measured in calendar days.
Basis of Payment. This work will be paid for at the contract unit price per calendar day, for
STORAGE OF ITS GANTRY FRAME (STEEL), SINGLE SPAN.
Pay Item Number
Designation Unit of Measure
JT740300 STORAGE OF ITS GANTRY FRAME (STEEL),
SINGLE SPAN
CAL DAY
P L
O T
D A
T E
P L
O T
T
IM
E
:1
:1
P
M
P L
O T
S C
A L
E i n
F
IL
E N
A M
E p w
/w s p u s p w
.b e n tl e y .c o m
:w s p u s p w
/D o c u m e n ts
/6 C e n tr a l
T r i-
S ta te D
C M
/0 W o r k P a c k a g e s /I
D
U R
/7
T /0
D G
N /1
S H
T /4
S
H T
I N
D L
A K
.d g n
DRAWN BY
CHECKED BY
DATE
DATE
THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY
I L L I N O I S 6 0 5 1 5
D O W N E R S G R O V E, 2 7 0 0 O G D E N A V E N U E
NO. DATE DESCRIPTION
REVISIONS
CONTRACT NO.
OF
DRAWING NO.
VVR
TJB 809
I-26-2038
GENERAL PLANS
VOLUME 1
SUMMARY OF QUANTITIES
COV-01
IND-01
9 TO 11
TITLE SHEET - VOLUME 11
3 INDEX OF DRAWINGS AND LIST OF STANDARDS
MOT-01
MAINTENANCE OF TRAFFIC
12 TO 107
SOQ-01 TO SOQ-03
MOT-02 TO MOT-07
ALIGNMENT, TIES, AND BENCHMARKS
109 TO 114
TJB
INDEX OF DRAWINGS
AND LIST OF STANDARDS
IND-01
05/05/2026
05/05/2026
VVR
115 TO 118 MOT-08 TO MOT-11
GEN-01
6 TO 8
AT-01 TO AT-96
MOT-12 TO MOT-31119 TO 138
ITS DETAILS
ITS CROSS SECTIONS
PS-01 TO PS-03 SUGGESTED PROGRESS SCHEDULE
GENERAL NOTES AND PROJECT JURISDICTIONS
MAINTENANCE OF TRAFFIC GENERAL NOTES
MAINTENANCE OF TRAFFIC APPLICATION
MAINTENANCE OF TRAFFIC DETAILS
MAINTENANCE OF TRAFFIC PLAN
TRAFFIC CONTROL DEVICES701901-11
SIDEWALK, CORNER OR CROSSWALK CLOSURE701801-06
URBAN LANE CLOSURE, MULTILANE, 2W WITH MOUNTABLE MEDIAN701606-10
URBAN LANE CLOSURE, MULTILANE, 1W OR 2W WITH NONTRAVERSABLE MEDIAN701601-09
TWO LANE CLOSURE, FREEWAY/EXPRESSWAY701446-11
TRAFFIC CONTROL, SETUP AND REMOVAL, FREEWAY/EXPRESSWAY701428-01
LANE CLOSURE, MULTILANE, INTERMITTENT OR MOVING OPERATION, FOR SPEEDS ≤ 40 MPH701427-05 LANE CLOSURE, MULTILANE, INTERMITTENT OR MOVING OPERATION, FOR SPEEDS > 45 MPH701426-09 LANE CLOSURE, MULTILANE, DAY OPERATIONS ONLY, FOR SPEEDS > 45 MPH TO 55 MPH701421-08
LANE CLOSURE, MULTILANE, AT ENTRANCE OR EXIT RAMP, FOR SPEEDS > 45 MPH701411-09
LANE CLOSURE, FREEWAY/EXPRESSWAY, DAY OPERATIONS ONLY701406-13
LANE CLOSURE, FREEWAY/EXPRESSWAY701401-13
APPROACH TO LANE CLOSURE, FREEWAY/EXPRESSWAY701400-12
LANE CLOSURE, 2L, 2W, MOVING OPERATIONS - DAY ONLY701311-03
LANE CLOSURE, 2L, 2W, SHORT TIME OPERATIONS701301-04
OFF-ROAD OPERATIONS, MULTILANE, MORE THAN 15’ (4.5 M) AWAY701106-02
OFF-ROAD OPERATIONS, MULTILANE, 15’ (4.5 M) TO 24” (600 MM) FROM PAVEMENT EDGE701101-05
OFF-ROAD MOVING OPERATIONS, 2L, 2W, DAY ONLY701011-04
OFF-ROAD OPERATIONS, 2L, 2W, 15’ (4.5 M) TO 24” (600 MM) FROM PAVEMENT EDGE701006-05
OFF-ROAD OPERATIONS, 2L, 2W, MORE THAN 15’ (4.5 M) AWAY701001-02
CLASS A PATCHES442001-04
PAVEMENT JOINTS420001-11
TEMPORARY EROSION CONTROL SYSTEM280001-07
5 KEY-01 KEY MAP OVERVIEW
DYNAMIC MESSAGE SIGN STRUCTURE CROSS SECTIONS
ATM STRUCTURE CROSS SECTIONS
ITS DEVICE POLE AND ATM/DMS CABINET CROSS SECTIONS
DMS-XS-01
ATM-XS-01 TO ATM-XS-28
ITS-XS-01 TO ITS-XS-25
GANTRIES
781 to 808 756 to 780
ATM GANTRY STRUCTURAL DETAILS GAN-01 TO GAN-23158 TO 180
ITS CONSTRUCTION DETAILSITS-D-01 TO ITS D-44
ITS DETAILS
PLAZA COMMUNICATIONS DETAILS
IPDC DETAILS
POWER SINGLE LINE DIAGRAMS
IPDC/ PLAZA COMMUNICATION TERMINATION DIAGRAMS
CABINET COMMUNICATIONS TERMINATION DIAGRAMS
FIBER OPTIC CABLE SPLICE DIAGRAMS
SPLICE DIAGRAM LEGEND AND SYMBOLS
FOC SINGLE LINE DIAGRAM THIRD PARTY –PROPOSED
FOC SINGLE LINE DIAGRAM ISTHA –PROPOSED
FOC SINGLE LINE DIAGRAM ISTHA & THIRD PARTY – REMOVAL
COMMUNICATIONS NETWORK OVERVIEW
COMMUNICATIONS NETWORK OVERVIEW AND SINGLE LINE DIAGRAM LEGEND
ATM & DMS SYSTEM SCHEMATICS
PLZ-01 TO PLZ-15
IPDC-01 TO IPDC-38
ITS-PLD-01
PTD-01 TO PTD-19
CTD-01 TO CTD-95
SPL-02 TO SPL-83
SPL-1
ITS-FOC-46 TO ITS-FOC-53
ITS-FOC-14 TO ITS-FOC-45
ITS-FOC-01 TO ITS-FOC-13
ITS-COM-02 TO ITS-COM-08
ITS-COM-01
ITS-SCH-01 TO ITS-SCH-04
LIGHTING PLANS
EROSION AND SEDIMENT CONTROL PLAN
EROSION CONTROL GENERAL NOTES & SCHEDULE
FENCING PLAN
SCHEDULE OF QUANTITIES -FENCING
LANDSCAPING PLAN
LANDSCAPING SCHEDULE OF QUANTITIES
PROPOSED DRAINAGE PLAN
PROPOSED DRAINAGE NOTES
GRADING PLAN
ROADWAY DETAILS- IPDC BUILDING SITE PLAN
REMOVAL PLAN
EARTHWORK SCHEDULE AND NOTES
153 TO 157
149 TO 150
139 TO 140
LGT-01 TO LGT-05
ECP-02
ECP-01
FEN-02 TO FEN-03
FEN-01
LSC-02
LSC-01
PDP-01
DGEN-01
GRD-01
RDY-01
REM-01
EW-01 TO EW-02
ANCILLARY PLANS
ITS PLANS
ATM GANTRY DETAILS
ATM SITE PLAN DETAILS
ITS PROPOSED PLAN
ITS PROPOSED LEGEND
ITS REMOVAL PLAN
ITS REMOVAL LEGEND
ATM /DMS PROPOSED EQUIPMENT SCHEDULE
ITS PROPOSED EQUIPMENT SCHEDULE
ITS REMOVAL EQUIPMENT SCHEDULE
ITS GENERAL NOTES
ITS-ATM-16 TO ITS-ATM-63
ITS-ATM-01 TO ITS-ATM-15
ITS-P-01 TO ITS-P-88
ITS-P-00
ITS-R-01 TO ITS-R-56
ITS-R-00
ITS-G-03
ITS-G-02
ITS-G-01
ITS-G-00
346 TO 393
331 TO 345
243 TO 330
186 TO 241
VOLUME 2
SS-012 SEALS AND SIGNATURE
GENERAL PLANS
COV-02
IND-02
TITLE SHEET - VOLUME 2
INDEX OF DRAWINGS AND LIST OF STANDARDS395
697 TO 711
659 TO 696
639 TO 657
544 TO 638
462 TO 543
453 TO 460
421 TO 452
408 TO 420
401 TO 407
396 TO 399
712 TO 755
FIBER OPTIC SPLICING DETAILS
FIBER OPTIC SYSTEM TYPICALS AND DRAWINGS
EROSION CONTROL AND LANDSCAPE
HEAVY-DUTY HANDHOLE AND BURIED WIRING DETAILS
CONTRACTOR ACCESS TO WORK AREA
TEMPORARY GORE DETAILS
SHOULDER CLOSURE DETAILS
LANE CLOSURE DETAILS
CONSTRUCTION SIGNS
TEMPORARY CONCRETE BARRIER WITH CROSS-BOLT CONNECTION
ROADWAY DELINEATORS AND REFLECTORS
RIGHT OF WAY FENCE
CATCH BASINS TYPE G AND TYPE G-3 MODIFIED, FRAMES AND GRATES
GUTTER AND CURB DETAILS
L2-04 L1-08
SECTION L - FIBER OPOTIC
K1-15
SECTION K - EROSION CONTROL AND LANDSCAPE
H4-06
SECTION H - LIGHTING
E6-10 E5-12 E3-12 E2-13 E1-08
SECTION E - MAINTENANCE OF TRAFFIC
D10-04 D4-10 D1-07
SECTION D - ROADWAY
B8-10 B1-12
SECTION B - DRAINAGE STRUCTURES, CURBS, CURBS & GUTTER
05/05/2026 ADDENDUM NO.1 11
Lakeside
ENGINEERS
INDEX OF DRAWINGS
DRAWING NO. SHEET NO. DESCRIPTION
STANDARD NO. TITLE
STANDARD NO. TITLE
IDOT HIGHWAY STANDARDS
SUGGESTED PROGRESS SCHEDULE
PS-01
6TJB
05/05/2026
05/05/2026 809
I-26-2038
05/05/2026 ADDENDUM NO.1
O T
D A
T E
P L
O T
T
IM
E
/2
/2
:5
:3
P
M
P L
O T
S C
A L
E
.9 i n
F
IL
E
N A
M E p w
/w s p u s p w .b e n tl e y
.c o m :w s p u s p w
/D o c u m e n ts /6
C e n tr a l
T r i-
S ta te D
C M
/0
W o r k
P a c k a g e s /I
D
U R
/7
T
/0
D
G N
/1
S
H T
/4
S
H T
S
C H
E D
U L
E L
A K
.d g n
DRAWN BY
CHECKED BY
DATE
DATE
THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY
I L L I N O I S 6 0 5 1 5
D O W N E R S G R O V E, 2 7 0 0 O G D E N A V E N U E
NO. DATE DESCRIPTION
REVISIONS
CONTRACT NO.
Lakeside
ENGINEERS
PS-02
7TJB
05/05/2026
05/05/2026 809
I-26-2038
O T
D A
T E
P L
O T
T
IM
E
/2
/2
:0
:1
P
M
P L
O T
S C
A L
E
.8 i n
F
IL
E N
A M
E p w
/w s p u s p w
.b e n tl e y .c o m
:w s p u s p w
/D o c u m e n ts
/6 C e n tr a l
T r i-
S ta te D
C M
/0 W o r k P a c k a g e s /I
D
U R
/7
T /0
D G
N /1
S H
T /4
S
H T
S
C H
E D
U L
E L
A K
.d g n
DRAWN BY
CHECKED BY
DATE
DATE
THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY
I L L I N O I S 6 0 5 1 5
D O W N E R S G R O V E, 2 7 0 0 O G D E N A V E N U E
NO. DATE DESCRIPTION
REVISIONS
CONTRACT NO.
PS-03
8TJB
05/05/2026
05/05/2026 809
I-26-2038
O T
D A
T E
P L
O T
T
IM
E
/2
/2
:1
:0
P
M
P L
O T
S C
A L
E
.9 i n
F
IL
E N
A M
E p w
/w s p u s p w .b e n tl e y
.c o m :w s p u s p w
/D o c u m e n ts /6
C e n tr a l
T r i-
S ta te D
C M
/0
W o r k
P a c k a g e s /I
D
U R
/7
T
/0
D
G N
/1
S
H T
/4
S
H T
S
C H
E D
U L
E L
A K
.d g n
DRAWN BY
CHECKED BY
DATE
DATE
THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY
I L L I N O I S 6 0 5 1 5
D O W N E R S G R O V E, 2 7 0 0 O G D E N A V E N U E
NO. DATE DESCRIPTION
REVISIONS
CONTRACT NO.
MAINTENANCE OF TRAFFIC
MOT-05
112TJB 05/05/2026 809
05/05/2026
APPLICATION
NOTE:
* INCLUDED IN PLANS AS MOT-11
L
O T
D A
T E
P L
O T
T
IM
E
/2
/2
:4
:1
A
M
P L
O T
S C
A L
E
.9 i n
F
IL
E N
A M
E p w
/w s p u s p w
.b e n tl e y .c o m
:w s p u s p w
/D o c u m e n ts
/6 C e n tr a l
T r i-
S ta te D
C M
/0 W o r k P a c k a g e s /I
D
U R
/7
T /0
D G
N /1
S H
T /4
S
H T
M
O T
L
A K
.d g n
DRAWN BY
CHECKED BY
DATE
DATE
THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY
I L L I N O I S 6 0 5 1 5
D O W N E R S G R O V E, 2 7 0 0 O G D E N A V E N U E
NO. DATE DESCRIPTION
REVISIONS
CONTRACT NO.
O T
D A
T E
P L
O T
T
IM
E
:1
:4
P
M
P L
O T
S C
A L
E i n
F
IL
E
N A
M E p w
/w s p u s p w
.b e n tl e y .c o m
:w s p u s p w
/D o c u m e n ts
/6 C e n tr a l
T r i-
S ta te D
C M
/0 W o r k P a c k a g e s /I
D
U R
/7
T /0
D G
N /1
S H
T /4
S
H T
I N
D L
A K
.d g n
DRAWN BY
CHECKED BY
DATE
DATE
THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY
I L L I N O I S 6 0 5 1 5
D O W N E R S G R O V E, 2 7 0 0 O G D E N A V E N U E
NO. DATE DESCRIPTION
REVISIONS
CONTRACT NO.
GENERAL PLANS
VOLUME 1
SUMMARY OF QUANTITIES
COV-01
IND-01
9 TO 11
TITLE SHEET - VOLUME 11
3 INDEX OF DRAWINGS AND LIST OF STANDARDS
MOT-01
MAINTENANCE OF TRAFFIC
12 TO 107
SOQ-01 TO SOQ-03
MOT-02 TO MOT-07
ALIGNMENT, TIES, AND BENCHMARKS
109 TO 114
115 TO 118 MOT-08 TO MOT-11
GEN-01
6 TO 8
AT-01 TO AT-96
MOT-12 TO MOT-31119 TO 138
ITS DETAILS
ITS CROSS SECTIONS
PS-01 TO PS-03 SUGGESTED PROGRESS SCHEDULE
GENERAL NOTES AND PROJECT JURISDICTIONS
MAINTENANCE OF TRAFFIC GENERAL NOTES
MAINTENANCE OF TRAFFIC APPLICATION
MAINTENANCE OF TRAFFIC DETAILS
MAINTENANCE OF TRAFFIC PLAN
TRAFFIC CONTROL DEVICES701901-11
SIDEWALK, CORNER OR CROSSWALK CLOSURE701801-06
URBAN LANE CLOSURE, MULTILANE, 2W WITH MOUNTABLE MEDIAN701606-10
URBAN LANE CLOSURE, MULTILANE, 1W OR 2W WITH NONTRAVERSABLE MEDIAN701601-09
TWO LANE CLOSURE, FREEWAY/EXPRESSWAY701446-11
TRAFFIC CONTROL, SETUP AND REMOVAL, FREEWAY/EXPRESSWAY701428-01
LANE CLOSURE, MULTILANE, INTERMITTENT OR MOVING OPERATION, FOR SPEEDS ≤ 40 MPH701427-05 LANE CLOSURE, MULTILANE, INTERMITTENT OR MOVING OPERATION, FOR SPEEDS > 45 MPH701426-09 LANE CLOSURE, MULTILANE, DAY OPERATIONS ONLY, FOR SPEEDS > 45 MPH TO 55 MPH701421-08
LANE CLOSURE, MULTILANE, AT ENTRANCE OR EXIT RAMP, FOR SPEEDS > 45 MPH701411-09
LANE CLOSURE, FREEWAY/EXPRESSWAY, DAY OPERATIONS ONLY701406-13
LANE CLOSURE, FREEWAY/EXPRESSWAY701401-13
APPROACH TO LANE CLOSURE, FREEWAY/EXPRESSWAY701400-12
LANE CLOSURE, 2L, 2W, MOVING OPERATIONS - DAY ONLY701311-03
LANE CLOSURE, 2L, 2W, SHORT TIME OPERATIONS701301-04
OFF-ROAD OPERATIONS, MULTILANE, MORE THAN 15’ (4.5 M) AWAY701106-02
OFF-ROAD OPERATIONS, MULTILANE, 15’ (4.5 M) TO 24” (600 MM) FROM PAVEMENT EDGE701101-05
OFF-ROAD MOVING OPERATIONS, 2L, 2W, DAY ONLY701011-04
OFF-ROAD OPERATIONS, 2L, 2W, 15’ (4.5 M) TO 24” (600 MM) FROM PAVEMENT EDGE701006-05
OFF-ROAD OPERATIONS, 2L, 2W, MORE THAN 15’ (4.5 M) AWAY701001-02
CLASS A PATCHES442001-04
PAVEMENT JOINTS420001-11
TEMPORARY EROSION CONTROL SYSTEM280001-07
5 KEY-01 KEY MAP OVERVIEW
DYNAMIC MESSAGE SIGN STRUCTURE CROSS SECTIONS
ATM STRUCTURE CROSS SECTIONS
ITS DEVICE POLE AND ATM/DMS CABINET CROSS SECTIONS
DMS-XS-01
ATM-XS-01 TO ATM-XS-28
ITS-XS-01 TO ITS-XS-25
GANTRIES
781 to 808 756 to 780
ATM GANTRY STRUCTURAL DETAILS GAN-01 TO GAN-23158 TO 180
ITS CONSTRUCTION DETAILSITS-D-01 TO ITS D-44
ITS DETAILS
PLAZA COMMUNICATIONS DETAILS
IPDC DETAILS
POWER SINGLE LINE DIAGRAMS
IPDC/ PLAZA COMMUNICATION TERMINATION DIAGRAMS
CABINET COMMUNICATIONS TERMINATION DIAGRAMS
FIBER OPTIC CABLE SPLICE DIAGRAMS
SPLICE DIAGRAM LEGEND AND SYMBOLS
FOC SINGLE LINE DIAGRAM THIRD PARTY –PROPOSED
FOC SINGLE LINE DIAGRAM ISTHA –PROPOSED
FOC SINGLE LINE DIAGRAM ISTHA & THIRD PARTY – REMOVAL
COMMUNICATIONS NETWORK OVERVIEW
COMMUNICATIONS NETWORK OVERVIEW AND SINGLE LINE DIAGRAM LEGEND
ATM & DMS SYSTEM SCHEMATICS
PLZ-01 TO PLZ-15
IPDC-01 TO IPDC-38
ITS-PLD-01
PTD-01 TO PTD-19
CTD-01 TO CTD-95
SPL-02 TO SPL-83
SPL-1
ITS-FOC-46 TO ITS-FOC-53
ITS-FOC-14 TO ITS-FOC-45
ITS-FOC-01 TO ITS-FOC-13
ITS-COM-02 TO ITS-COM-08
ITS-COM-01
ITS-SCH-01 TO ITS-SCH-04
LIGHTING PLANS
EROSION AND SEDIMENT CONTROL PLAN
EROSION CONTROL GENERAL NOTES & SCHEDULE
FENCING PLAN
SCHEDULE OF QUANTITIES -FENCING
LANDSCAPING PLAN
LANDSCAPING SCHEDULE OF QUANTITIES
PROPOSED DRAINAGE PLAN
PROPOSED DRAINAGE NOTES
GRADING PLAN
ROADWAY DETAILS- IPDC BUILDING SITE PLAN
REMOVAL PLAN
EARTHWORK SCHEDULE AND NOTES
153 TO 157
149 TO 150
139 TO 140
LGT-01 TO LGT-05
ECP-02
ECP-01
FEN-02 TO FEN-03
FEN-01
LSC-02
LSC-01
PDP-01
DGEN-01
GRD-01
RDY-01
REM-01
EW-01 TO EW-02
ANCILLARY PLANS
ITS PLANS
ATM GANTRY DETAILS
ATM SITE PLAN DETAILS
ITS PROPOSED PLAN
ITS PROPOSED LEGEND
ITS REMOVAL PLAN
ITS REMOVAL LEGEND
ATM /DMS PROPOSED EQUIPMENT SCHEDULE
ITS PROPOSED EQUIPMENT SCHEDULE
ITS REMOVAL EQUIPMENT SCHEDULE
ITS GENERAL NOTES
ITS-ATM-16 TO ITS-ATM-63
ITS-ATM-01 TO ITS-ATM-15
ITS-P-01 TO ITS-P-88
ITS-P-00
ITS-R-01 TO ITS-R-56
ITS-R-00
ITS-G-03
ITS-G-02
ITS-G-01
ITS-G-00
346 TO 393
331 TO 345
243 TO 330
186 TO 241
VOLUME 2
SS-012 SEALS AND SIGNATURE
GENERAL PLANS
COV-02
IND-02
TITLE SHEET - VOLUME 2
INDEX OF DRAWINGS AND LIST OF STANDARDS395
697 TO 711
659 TO 696
639 TO 657
544 TO 638
462 TO 543
453 TO 460
421 TO 452
408 TO 420
401 TO 407
396 TO 399
712 TO 755
FIBER OPTIC SPLICING DETAILS
FIBER OPTIC SYSTEM TYPICALS AND DRAWINGS
EROSION CONTROL AND LANDSCAPE
HEAVY-DUTY HANDHOLE AND BURIED WIRING DETAILS
CONTRACTOR ACCESS TO WORK AREA
TEMPORARY GORE DETAILS
SHOULDER CLOSURE DETAILS
LANE CLOSURE DETAILS
CONSTRUCTION SIGNS
TEMPORARY CONCRETE BARRIER WITH CROSS-BOLT CONNECTION
ROADWAY DELINEATORS AND REFLECTORS
RIGHT OF WAY FENCE
CATCH BASINS TYPE G AND TYPE G-3 MODIFIED, FRAMES AND GRATES
GUTTER AND CURB DETAILS
L2-04 L1-08
SECTION L - FIBER OPOTIC
K1-15
SECTION K - EROSION CONTROL AND LANDSCAPE
H4-06
SECTION H - LIGHTING
E6-10 E5-12 E3-12 E2-13 E1-08
SECTION E - MAINTENANCE OF TRAFFIC
D10-04 D4-10 D1-07
SECTION D - ROADWAY
B8-10 B1-12
SECTION B - DRAINAGE STRUCTURES, CURBS, CURBS & GUTTER
TJB
INDEX OF DRAWINGS
AND LIST OF STANDARDS
IND-02I-26-2038
05/05/2026
05/05/2026
VVR
809395
ADDENDUM NO.1 11 05/05/2026 ADDENDUM NO.1 11 Lakeside
ENGINEERS
INDEX OF DRAWINGS
DRAWING NO. SHEET NO. DESCRIPTION
STANDARD NO. TITLE
STANDARD NO. TITLE
IDOT HIGHWAY STANDARDS
O T
D A
T E
P L
I
M E
:1
:5
M
F I
E
N
M E p w w s p u s p w .b e n t l e y .c o m :w s p u s p w
D o c u m e n t s
C e n t r a l
T r i S t a t e
C
M
W o r k a c k a g e s I
M S
T I T
S
I T
S
(C
C
G
N
S
H T I T
S P l a n S h e e t s
X S e c t i o n s
C
C S
H T I T
S
X S J
E G .d g n
DRAWN BY
CHECKED BY
DATE
DATE
THE ILLINOIS STATE TOLL HIGHWAY AUTHORITY
I L L I N O I S 6 0 5 1 5
D O W N E R S G R O V E, 2 7 0 0 O G D E N A V E N U E
NO. DATE DESCRIPTION
REVISIONS
CONTRACT NO.
OF
DRAWING NO.
P L
S C
A L
E
.0 i n
Fax: 312.251.3015
Telephone: 312.251.3000
Chicago, Illinois 60661
525 W. Monroe Suite 1600
¡ I-294 (TRI-STATE TOLLWAY)
STA 1376+08 LOOKING NORTH STA 1384+10 LOOKING SOUTH
STA 1384+23 LOOKING NORTH
S
S
S
S
¡ I-294 (TRI-STATE TOLLWAY)
A B
A N
D O
N E
D G
S F
IB
E R O
P T
IC
A B
A N
D O
N E
D G
S F
IB
E R O
P T
IC
S
S
S
S
S
S
¡ I-294 (TRI-STATE TOLLWAY)
S
S
STA 1395+00 LOOKING SOUTH
¡ I-294 (TRI-STATE TOLLWAY)
ITS CABINET FOUNDATION (E)
DMS CONTROLLER CABINET (I)
ATM CABINET FOUNDATION (E)
CCTV CAMERA (I)
ITS POLE, 50', WM (I)
ITS ENCLOSURE, WM (I)
ITS POLE FOUNDATION (E)
CCTV CAMERA (I)
ITS POLE, 50', GM (I)
12' STEEL HELIX FOUNDATION (I)
ITS ENCLOSURE, PM (I)
ITS SERVICE PAD, TYPE A (I)
ATM COMM. CABINET (I)
1:6
E X R
O W
E X R
O W
P R R
O W
MM
JJ
ITS-XS-11
ITS CROSS SECTION
3/9/2026
3/9/2026 766
ADDENDUM NO 105/05/20261
Addendum 1 1 of 6 May 5, 2026
Capital Program
PRE-BID MEETING MINUTES
MEETING PURPOSE: Optional Pre-Bid Meeting - Contract I-26-2038
MEETING DATE: April 22, 2026
MEETING TIME: 9:00 am
CHAIRPERSON: Jim Mondel Senior Contract Negotiator
LOCATION: Illinois Tollway Microsoft Teams
TO:
Names Initials Organization / Title
Eric Occomy EO Procurement / Chief of Contract Services Maria Campuzano MC Procurement / Deputy Chief of Procurement Sainey Jobe SJ Procurement / Deputy Chief of Contract Compliance Danna Hall DH Procurement/Contract Services Manager Jim Mondel JM Procurement / Senior Contract Negotiator Ruth Howe RH Procurement/Contract Analyst Anthony Aladham AA Engineering / Project Manager Susan Paulus SP Design Section Engineer Donielle Hines DH Compliance Alexander Kaliharlios AK Diversity
TOPICS TO BE DISCUSSED:
1.0 Open: Welcome; Self-introduction by Procurement Representative
2.0 Self-Introduction of Attendees – State name and affiliation loudly for all to hear (Please sign-in using the provided sign-in sheet)
2.1 Tollway Procurement – Contract Services
2.2 Tollway Procurement – Contract Compliance
2.3 Tollway- Diversity
2.4 Tollway- Engineering Project Manager
2.5 Design Section Engineer
2.6 Other Attendees
3.0 Brief Project Description (by Procurement Representative)
The work under this contract includes but is not limited to: Installation of the Intelligent Transportation System (ITS) equipment at the Intermediate Power Distribution and Communication (IPDC) facility buildings, ITS equipment cabinets, Furnish and installation of ATM structures and lane control signs (LCS), Dynamic message signs (DMS), Closed Circuit Television cameras (CCTV), Microwave Vehicle Detection Systems (MVDS), ITS galvanized steel poles, All communication and power equipment and wiring to operate the ITS equipment, Removal of existing temporary ITS equipment, New fiber optic communication cable and network switches for the Illinois Tollway's ITS and IT system, Third Party fiber optic cable installation, Connection to the existing IT system via the Plazas, Maintenance of Traffic, and All other appurtenances and miscellaneous construction shown on the plans and within these special provisions.
Addendum 1 2 of 6 May 5, 2026
Capital Program
PRE-BID MEETING MINUTES
4.0 Advertisement Schedules (by Procurement Representative)
4.1 Plan Holder questions should be provided to 4852D.2038_Questions@docs.e-builder.net as identified on Page A-1
4.2 Final Date for Plan Holder Questions – April 28, 2026 at 2:00 p.m.
4.3 Bid Opening Date – May 19, 2026 at 10:30 a.m.
5.0 Compliance Goals (by Procurement Compliance)
5.1 Disadvantaged Business Enterprise Program (DBE) – 20%
5.2 Veteran-Owned Small Business Program (VOSB) – 1.5%
5.3 Workforce
5.3.1 Equal Employment Opportunity (EEO) - 16%
• Minority 16.1%
• Female 6.9%
6.0 Diversity Programs – Overview of Available Programs (by Diversity Representative)
6.1 Earned Credit Program (ECP) Bid Credit Cap - $375,000
6.2 Technical Assistance Program
6.3 Partnering for Growth (P4G)
6.4 Small Business Initiative (if applicable)
6.5 Construction Works
7.0 Project Schedule (by Engineering Project Manager)
7.1 Anticipated Notice-to-Proceed – August 17, 2026
7.2 Substantial Completion Date –June 21, 2028
7.3 Contract Completion Date – October 1, 2028
8.0 Special Items to Note (by Design Section Engineer)
8.1 Item JT740300 Storage of ITS Gantry Frame (Steel) will have a change to the method of measurement in Addendum 1. Currently it is measured as each calendar day per gantry frame stored and will been revised to each calendar day when at least one…