HV-126-DM_SOW.docx

DOCX document 40 KB Posted

Attached to
2 Air Drum Wheel End Training System
Solicitation number
6100066721
Issued by
Dauphin County, Harveys Lake Borough, Pennsylvania

About this file

This Statement of Work outlines specifications for the Pennsylvania Department of Transportation's (PennDOT) procurement of two HV-126-DM Air Drum Wheel End Training Systems for instructional, maintenance, and technical training purposes. The procurement is designated as a no-substitute procurement with electronic bidding. The specified training system is a Consulab HV-126-DM model that includes a complete air brake drum assembly with operational duplication capabilities using shop air, featuring components such as Bendix air valves and boosters, Meritor slack adjusters, Macpek drum brakes, and related brake control valves. The system includes a mobile bench on casters and three pressure gauges. Delivery must occur within 120 days of purchase order receipt during PennDOT business hours (Monday-Friday, 7:30 AM to 2:00 PM EST). No specific response dates, bid due dates, bidder conferences, or award dates are identified in this document.

The vendor shall provide an electronic user manual with download link to PennDOT and deliver online instructor-led training for PennDOT personnel. The unit carries a one-year warranty covering all parts, labor, shipping, and travel, with warranty start date to be registered by the manufacturer. Contractors and grantees must comply with Executive Order 2021-06 and certify compliance with Pennsylvania state labor and workforce safety laws through submission of the Worker Protection and Investment Certification Form (BOP-2201) with their bid. No pricing information, set-asides, incumbent information, or funding sources are detailed in this Statement of Work.

View the file

Other files

File Type Posted
BOP-2201 EO 2021-06 Worker Protection Form BOP.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work Air Drum Wheel End Training System General Information Pennsylvania Department of Transportation (PennDOT) is soliciting electronic bids to procure HV-126-DM Air Drum Wheel End Training Systems for instructional, maintenance, and technical training needs. This will be a No-Substitute procurement.

Executive Order 2021-06, Worker Protection and Investment Pursuant to Executive Order 2021-06, Worker Protection and Investment (October 21, 2021), the Commonwealth is responsible for ensuring that every Pennsylvania worker has a safe and healthy work environment and the protections afforded them through labor laws. To that end, contractors and grantees of the Commonwealth must certify that they are in compliance with all applicable Pennsylvania state labor and workforce safety laws. Such certification shall be made through the Worker Protection and Investment Certification Form (BOP-2201) and submitted with the bid, proposal or quote.

Technical Specifications The proposed Air Drum Wheel End training System shall meet the follow requirements:

Ref: Consulab HV-126-DM – Air Drum Wheel End Training System with Cutaways.

Air Drum Wheel Requirements/Specifications The system must include the following components:

· Full visualization of drum‑type air brake assembly without requiring a complete vehicle.

· Operational duplication of actual air brake drum function using shop air.

· Complete, functioning drum brake assembly suitable for hands‑on training.

· Bendix air valves and booster

· Meritor slack adjuster

· Macpek drum brake and axle

· Bendix PP‑1 push‑pull control valve

· Bendix E2 foot brake valve

· Bendix R‑14 relay valve

· Bendix SR‑5 anti‑compound trailer spring brake valve

· Air reservoir with safety valve

· Three (3) pressure gauges

· One (1) mobile bench on casters (two fixed, two swivel)

The Air Drum Wheel End Training System includes a heavy-duty trailer drum assembly with air chamber and axle. Using shop air, the brakes can be applied, dismantled, adjusted, and measured. A sectional cutaway shows band adjustment.

Manuals Vendor shall provide an electronic user manual and download link to PennDOT.

Warranty Unit shall be warranted for one (1) year covering all parts, labor, shipping, and travel. Warranty start date must be correctly registered by the manufacturer.

Delivery All units must be delivered with in 120 days after receipt of the purchase order by the successful bidder and during PennDOT business hours: Monday–Friday, 7:30 AM–2:00 PM EST.

Training Vendor shall provide online instructor-led training for PennDOT personnel.

File details come from the government source that posted it. Updated .