HTP-APP_Industry Day Presentation.pdf
PDF 3 MB Posted
- Attached to
- Microbial Molecular Phenotyping Capability (M2PC) – High-throughput Automated Phenotyping Platform (HTP-APP)
- Solicitation number
- HTP-APP_RFI-001
- Issued by
-
Department of Energy
About this file
This document is a Request for Information (RFI) and draft Request for Proposal (RFP) for the acquisition of a High-Throughput Automated Phenotyping Platform (HTP-APP) for the Microbial Molecular Phenotyping Capability (M2PC) at the Pacific Northwest National Laboratory (PNNL).
The RFI is seeking market research and input from interested contractors who have the capability to provide a fully functioning and operational HTP-APP system. The system must meet key performance parameters (KPPs) such as the ability to culture microbial isolates and consortia, conduct high-throughput assaying and phenotyping, and provide remote planning and operations capabilities. Stretch goals that exceed the threshold KPPs by up to 50% are also included. The draft RFP provides details on the acquisition strategy, which will be a two-step best value source selection with a firm fixed price contract between $40M and $50M. Responses to the RFI and draft RFP comments are due by June 11, 2024, and the final RFP is anticipated to be issued in Q1 2025.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
M2PC Project Overview
Sam Paulsen Project Manager
Agenda
Project Organization
Plan: Scope, schedule, and budget
Project Status
Challenges
Documentation to Review
Approved scope: Key performance parameters
*The planning basis was refined from CDR to align with the threshold KPPs
Description of Scope *Threshold KPP Objective KPP
Demonstrate HTP culturing of microbial isolates and consortia
Capacity to operate M2PC with 500 strain experiments per week
Capacity to operate M2PC with 2000 strain experiments per week
Capacity to operate M2PC with 100 microbiome experiments per week
Capacity to operate M2PC with 500 microbiome experiments per week
Demonstrate HTP assaying and phenotyping of microbial isolates and consortia
Capacity to operate M2PC to obtain 1,000,000 multimodal analytical measurements per month
Capacity to operate M2PC to obtain 3,000,000 multimodal analytical measurements per month
Provide capability for remote planning and operations
Demonstrate that remote users can run pre-defined EMSL protocols to be executed autonomously within M2PC across culturing, assaying, and analyses
Demonstrate that remote users can perform dynamic experimental intervention with help from EMSL staff by modifying an executed protocol during the experimental timeframe
Facility 24,500 sq. ft. 50,000 sq. ft.
Scope statement: Provide a high-throughput microbial molecular phenotyping capability and a facility that houses and supports the capability.
M2PC Acquisition Strategy (and Facility) – Procurement Lead Garrett Hyatt – Acquisition Lead Specialist
High-Throughput Phenotyping – Procurement Lead Samantha Ernst – Acquisition Lead Specialist
Integration of the two procurements is key Working to a single, integrated schedule
• High-throughput phenotyping specifications will include integration with design build contractor. Includes facility constraints.
• Design
• Install
• Facility specifications will include integration with the high-throughput phenotyping contractor. Defines facility constraints.
• Design
• Construction
M2PC requires two major procurements
The M2PC will be a single facility focused on microbial molecular phenotyping
It requires two major procurements to complete
Solicitations timed to support award shortly after CD 2/3
Automation laboratory facility coordination
N
Characteristic Value/Constraint Comments
Automation lab size 12,000 ft2
Utilities location Fed from Overhead
120V & 208V Power Defined density in P- Spec
Actual locations will be adjusted during design
Exotic power Not provided HTP-APP contractor would need to provide transformers for exotic power
CA, N2, Vac Defined density in P- Spec
Actual locations will be adjusted during design
Vacuum exhaust, direct exhaust, snorkels
Defined density in P- Spec
Actual locations will be adjusted during design
Heat load TBD BTU/hr Verified during design
Partnering with facility contractor
• Design & schedule
• Facility requirements for the system
Automation laboratory facility coordination
M2PC Project R&D Technical Overview
Theva Thevuthasan Project Manager
Performance Requirements
Agenda
Various Requirements
KPPs and KPPs - Stretch Goals
System Testing and Training
Performance Requirements/ Specifications
Key performance parameters requirements
Science core functions
General system requirements
Scheduling software requirements
Safety requirements
Testing, training and operations
Mission needs
Science workshop
Design Guiding Principles
Discussion w/ potential users
Conceptual design
Science Core Functions
Five dynamically interconnected core scientific functions are required as foundations to formulate the concept to achieve those KPPs:
• Media
• Cultivation
• Sample preparation
• Analytical capabilities
• Strain engineering
Project KPPs
KPP# KPP title KPP threshold, minimum requirement
KPP 1
Demonstrate HTP culturing of microbial isolates and consortia
(i)Capacity to operate M2PC with execution of 500 new strain experiments per week.
(ii)Capacity to operate M2PC with execution of 100 new microbiome experiments per week.
KPP 2
Demonstrate HTP assaying and phenotyping of microbial isolates and consortia.
Capacity to operate M2PC to obtain 1,000,000 multimodal analytical measurements per month.
KPP 3
Provide capability for remote planning and operations.
Demonstrate that remote users/operators can run pre-defined EMSL protocols to be executed autonomously within M2PC across culturing, assaying, and analyses.
Minimum throughputs required to meet the project scope requirements
KPPs Stretch Goals Increase throughputs within the available contract cost
Stretch Stretch Title Stretch Requirement
#1
Exceed Threshold KPP#1 and KPP#2 by 25%
KPP #1(i): Provide a minimum of 850 strain experiments per week
KPP #1(ii): Provide a minimum of 200 microbiome experiments per week
KPP #2: Provide a minimum of 1,500,000 multimodal analytical measurements per month.
#2
Exceed Threshold KPP#1 and KPP#2 by 50%
KPP #1(i): Provide a minimum of 1250 strain experiments per week
KPP #1(ii): Provide a minimum of 300 microbiome experiments per week
KPP #2: Provide a minimum of 2,000,000 multimodal analytical measurements per month
#3
Exceed Threshold KPP#1 and KPP#2 up to Objective KPPs
KPP #1(i): Provide 2000 strain experiments per week
KPP #1(ii): Provide 500 microbiome experiments per week
KPP #2: Provide 3,000,000 multimodal analytical measurements per month
KPP 1 Testing
Strain Experiments
•Constructing mutant plasmids to create a test panel
•Transforming plasmids to create engineered microbial strains
•Cultivating strains across different media, nutrient/metals & carbon sources, temperatures, pH, etc. - analyzing their growth
Example
•Construct 500 single or multiple gene knockout/up-regulated constructs
•Use 12 replicates of each
•Grow each in 4 media types with 2 different carbon sources
•Test growth at multiple time points
•Total of 500 “experiments” performed in 500 96-well plates at multiple time points
Microbiome Experiments
•Creating communities of one or more unique microbes in varying proportions and a variety of media/growth conditions
•Perturbations - temperature range, pH range, various metal ion concentrations, primary or secondary metabolites and different carbon and/or nitrogen sources.
KPP 2 Testing
Multimodal Analysis
• Capturing scientifically relevant data
- during the growth of microorganisms
- functional responses associated with experimental perturbations
- after sample processing/preparation
Example
• Various spectroscopy and spectrometry measurements can be carried out to characterize the growth and processed samples.
• Cell characteristics including cell size, cell count and cell cycle can be measured using spectral and image cytometry.
• Characterization using Gas chromatography (GC) or Liquid chromatography (LC) coupled with UV, fluorescence detection (FLD), mass spectrometry (MS), or refractive index detection (RID) to detect the chemical components.
• Characterization using automated microscopy.
General requirements Minimum requirements for the complete system
Modular
• Replace broken or old instruments
• Incorporate emerging technologies
• Minimize system downtime
Flexible
• Flexibility to move instruments
• Flexibility to move processes
Expandable
• Adaptable for future technologies
• Expand the components with minimum disturbance minimum
Scheduling software requirements
Scheduling Software
• Parameterization of protocols
• Interleaved dynamic scheduling – protocols run in parallel
• Error recovery – location of the error and remote resolutions
• Reconfiguring - updated accordingly within the software system within minutes
• Security and Safety - accessibility by operators and different classes of users
• High uptime and Simulation – should be able to simulate a workflow
• Operable with EMSL data management and LIMS system
Scheduling software needs to interact with:
• EMSL LIMS – L7 Enterprise Science Platfrom
• Experimental intention tools
• Design engine – combine LIMS information with experimental intentions
• Data processing engine - Data produced by the system would be ingested and processed before loading the results back into the LIMS
Safety measures
Environmental Safety and Health
Bio Safety - BSL-2
Robotics Safety (intrinsically safe per consensus standards)
Electrical safety
NRTL, UL, CSA … certified instruments and electrical components
Testing, training and operations
System testing
• Factory acceptance testing
• Functional testing (Installed)
• KPP verification testing (Witnessed by 3rd Party Commissioning Agent and Battelle team)
Training to our staff
• Number of staff
• Length
One-year operations
• Warranty for one year
• Consumables for one year
Hardware redundancy
• 5%?
RFI Overview
Samantha Ernst
HTP-APP RFI Package
• Request for Information (RFI)/Sources Sought
• Technical Brief
• DRAFT Request for Proposal (RFP) including Draft Contract
• Draft Proposal Submission Requirements
• Draft Evaluation Criteria
• Draft Price Proposal Worksheet
It is currently publicly posted to:
• SAM.gov
• PNNL’s Acquisition Supplier Portal (ASP)
Will be used to gather market research, gauge interest from potential offerors, and potentially refine our Request for Proposal (RFP) for the
M2PC HTP-APP
M2PC HTP-APP - RFI Overview
Acquisition Strategy & Characteristics
• Procure a fully operational system that is designed, fabricated, installed, and tested.
• System includes software, integration hardware, BSL-2 enclosure(s), OTS equipment
• HTP-APP and facility design proceeds concurrently, each informing the other throughout the design process
• Facility construction will have a “ready for equipment” milestone that triggers the ability to start installation of the
HTP-APP
• 3rd Party Commissioning Agent for HTP-APP to verify system meets capability and throughput requirements
• Procured by Battelle via separate subcontract
M2PC HTP-APP
Acquisition Strategy
Acquisition Strategy & Characteristics cont.
• Firm Fixed Price Contract with Set Price between $40M and $50M
• Minimum requirements plus stretch goals that can be met within the set contract amount are the basis for award
• Two-Step, Best Value, Source Selection
• Proposals Evaluated in accordance with an approved Source
Selection Plan (SSP) and established Evaluation Criteria in the
RFP
• 2 Phase Review and Approval required by DOE-PNSO &
DOE HCA-IRB
• Acquisition Plan & Request for Proposal
• Contract Award
M2PC HTP-APP
Acquisition Strategy
M2PC HTP-APP
Source Selection
Source Selection
Approach: Two-Step, “Best Value”, Source Selection
Step 1: Review and Evaluation of all Offerors Received Verify Mandatory Go/No-Go Requirements are Met Evaluate & Score Step 1 Technical Proposals – no concept Top 3 Offerors Advance to Step 2
Step 2: Evaluation of Highest Qualified Offerors Conduct Oral Presentations/Interviews Evaluate & Score Step 2 Technical (conceptual design) and Price
Proposals Stipends to the unsuccessful Step 2 Offerors
Basis of Award: Best Value Contract award will be made to the Offeror with the highest evaluated proposal for Step 2 who’s determined to be the “best value"
Draft Request for Proposal (RFP)
Key Elements and Structure Scope Overview Basis of Award o 2-Step, Source Selection o Stipends (for Step 2 Unsuccessful Offers) o Set Contract Price and Funding Profile
Proposal Submission Instructions Evaluation Criteria o Mandatory Go/No-Go Requirements o Technical o Pricing – Inclusion of Stretch Goals
Additional Instructions/Information Attachments – Not provided with Draft RFP o Performance Specification o General Requirements o Conceptual Design Report (Reference Only)
Draft Contract o Contract Clauses & Requirements o Terms and Conditions
M2PC HTP-APP
Draft Request for Proposal
RFP will be finalized following the receipt of RFI responses and Draft RFP comments
Following DOE approval of the RFP, it will be broadly shared & publicly posted via:
• SAM.gov
• PNNL’s Acquisition Supplier Portal (ASP)
• Email to RFI Respondents
Request for Proposal (RFP) / Solicitation
Challenges / Areas of Interest
• Interest and Capability Statements
• Commerciality
• Proposal Durations – 20 business days for Step 1 and 30 business days for Step 2 and validity period
• Stipends – amount
• Progress Payments –milestones vs.
schedule of values
• Evaluation Criteria – clear, sufficient and appropriate?
• Funding Constraints
• Stretch Goals – evaluation and pricing
RFI Response
• Thoroughly review the RFI and Technical Brief
• Provide company capability statement and responses to items 1 though 6
Draft RFP Comments
• Thoroughly review the Draft RFP and associated attachments
• Provide comments/responses to items 1 through 12
Submit via email to Samantha.Ernst@pnnl.gov
Due by 4:00pm Pacific Time on June 11, 2024
15 Page Maximum
RFI & Draft RFP Response Requirements mailto:Samantha.Ernst@pnnl.gov
| M2PC Project Overview |
| Agenda |
| Approved scope: Key performance parameters |
| M2PC requires two major procurements |
| Automation laboratory�facility coordination |
| Automation laboratory�facility coordination |
| M2PC Project R&D Technical Overview |
| Agenda |
| Performance Requirements/ Specifications |
| Science Core Functions |
| Project KPPs |
| KPPs Stretch Goals��Increase throughputs within the available contract cost |
| KPP 1 Testing |
| KPP 2 Testing |
| General requirements ��Minimum requirements for the complete system |
| Scheduling software requirements |
| Safety measures |
| Testing, training and operations |
| RFI Overview |
| M2PC HTP-APP - RFI Overview |
| Slide Number 21 |
| Slide Number 22 |
| M2PC HTP-APP���Source Selection |
| Slide Number 24 |
| Request for Proposal (RFP) / Solicitation |
| Challenges / Areas of Interest |
| RFI & Draft RFP Response Requirements |