Attch 4 Kuwait PP Survey.doc

DOC document 46 KB Posted

Attached to
Air Terminal & Ground Handling Services in Kuwait Federal contract opportunity
Solicitation number
HTC711-20-R-C002
Issued by
Department of Defense United States Transportation Command

About this file

This document contains a past performance survey for a contractor providing air terminal and ground handling services at Kuwait International Airport. The contractor is required to provide processing and handling of passengers, baggage, cargo, mail and hazardous materials, as well as loading and unloading aircraft. Additional requirements include operating material handling and ground support equipment, maintaining safety and security programs, completing documentation, and following all directives and manuals. The survey requests ratings on quality of service, on-time departure reliability, business relations, and customer service. It also asks whether issues arose requiring cure notices, and whether the agency would award future contracts to this contractor. Respondents are advised to provide rationale for any marginal or unsatisfactory ratings or responses indicating unwillingness to award future contracts.

View the file

Other files for this federal contract opportunity

Other files attached to Air Terminal & Ground Handling Services in Kuwait, newest first.
File Type Posted
Amend 0004 Solicitation Extension Date 20-R-C002.pdf PDF
Amendment 0003.pdf PDF
Kuwait PP conference minutes.pdf PDF
2020.01.14 Preproposal Conference.pptx PPTX presentation
KWI-5 PWS 2020.01.28 (PP Site Visit Ver).docx DOCX document
Copy of KWI-5 QA 2-74 Master Log 2020.02.06.xlsx XLSX spreadsheet
Amend 0002.pdf PDF
2020.01.29 KWI PWS.pdf PDF
2020.01.21 Q&A Master Log.xlsx XLSX spreadsheet
2020.01.09 Q&A Master Log.xlsx XLSX spreadsheet
Amend 0001.pdf PDF
Attch 2 DD254.pdf PDF
Solicitation HTC711-20-R-C002.pdf PDF
Attch 5 Contract Information Sheet.docx DOCX document
2019.12.09 RFP Cover Letter.pdf PDF
Attch 3 Mission Essential Contractor Services.pdf PDF
Atch 1 2019.12.13 KWI PWS.pdf PDF
Attch 4 PP survey cvr ltr.pdf PDF
Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PAST PERFORMANCE SURVEY

When Filled In This Document is Source Selection Sensitive

Information IAW FAR 3.104 & 2.101

REQUEST INFORMATION BE TYPED TO ENSURE READABILITY

A. CONTRACT INFORMATION FOR PRESENT OR PAST PERFORMANCE EFFORT BEING

SUBMITTED FOR CONSIDERATION: (To be completed by Offeror) Offeror’s Company Name: ________________________________________________________________ Address:__________________________________ Telephone Number:____________________________

Offeror Point of Contact/Email Address:_____________________________________________________

Project Title:___________________________________________________________________________

Contract Number:_______________________________________________________________________

Annual Dollar Amount: $________________________________________________________________

Total Dollar Amount of Overall Effort (to include all options) $__________________________________

Place of Performance:___________________________________________________________________

Contract Start Date:_____________Contract End Date (to include all options) ______________________

Did the offeror perform services as the ____ Prime Contractor or as a ____ Sub-Contractor on the above referenced effort?

If performed as a Sub-Contractor, please provide a description of the tasks performed:

Annual Dollar Amount of Sub-Contracted tasks performed: $____________________________________ B. RESPONDENT INFORMATION (To be completed by Respondent) Note: If any of the information in Section A is incorrect, please make necessary changes.

Detailed Description of Services provided: (Must be completed by Respondent – not the Offeror)

Also, please provide a copy of the Performance Work Statement (PWS) or portion of the PWS you believe to be relevant to this acquisition:

Name of Respondent:______________________________________ Title:_______________________________________ Address:____________________________________________________________________________________________

DSN Telephone Number:_______________________________________________________________________________

Comm. Telephone Number:_____________________________________________________________________________

Fax Number:__________________________ Email Address:__________________________________________________

C. E-MAIL COMPLETED SURVEY FORM TO:

Meggan DeBrobander – (618) 220-7974 or E-mail meggan.a.debrobander.civ@mail.mil

When Filled In This Document Is Source Selection Sensitive IAW FAR 2.101 and 3.104 Has CPARS been completed for this contract?

YES

NO

N/A NOTE: Although you may have filed a Contractor Performance Assessment Report (CPARS) for the contract listed, we would appreciate your response to this survey because some of the questions relate to areas not covered by CPARS.

D. PERFORMANCE INFORMATION: (Please circle response. Do not “highlight”)

The contractor:

1. Worked with established sequence of events checklist to facilitate on-time aircraft departures ensuring maximum aircraft utilization and tracked delays to determine the root cause.

N/A

2. Provided processing and handling for:

a. Passengers

N/A (If yes, provide average # of passengers per month and year________________)

b. Baggage

N/A

c. Cargo and Mail

(If yes, provide average # of tons per month and year _____________)

d. Hazardous cargo shipments

3. Load/unload cargo and passenger aircraft.

N/A (If yes, provide average # of aircraft per month and year _______)

4. Communicated with aircraft via UHF/VHF radio, maintained airflow to allow effective utilization of resources, and developed a functional aircraft parking plan.

N/A

5. Maintained “customer furnished” materials, vehicles, equipment, and facilities.

YES

NO

6. Operated, maintained, and repaired Material Handling Equipment

N/A

(MHE) and Aerospace Ground Equipment (AGE).

7. Maintained an adequate and effective safety and security program.

8. Completed transportation manifests for cargo/mail and passengers.

9. Completed reports and maintained records, both in terms of timeliness and accuracy.

NO

N/A

10. Followed written directives, instructions, and manuals in performance of the contract.

YES

NO

N/A

11. Provided quality control and/or inspection procedures to ensure performance requirements were consistently met.

N/A

12. Provided equipment, resources and personnel to meet contract start-up and performance requirements.

N/A

13. Hired, maintained, and replaced, if necessary qualified personnel during the contract period, ensuring attrition did not result in a degradation of services.

14. Provided experienced managers and supervisors with the technical and administrative abilities needed to meet contract requirements.

15. Reacted to and overcame stressful situations caused by unforeseen events.

16. Provided timely resolution of contract discrepancies.

N/A

17. Was the contractor ever issued a cure or show cause notice under the referenced contract?

If yes, explain outcome below.

18. Would you award another contract to this contractor? If not, explain below.

UNSATISFACTORY
MARGINAL
SATISFACTORY
VERY GOOD
EXCEPTIONAL
NEUTRAL
Performance did not meet most contractual requirements. There were serious problems and the contractor’s corrective actions were ineffective.
Performance did not meet some contractual requirements. There were problems, some of a serious nature, for which corrective action was only marginally effective.
Performance met contract al requirements. There were some minor problems and corrective actions taken by the contractor were satisfactory.
Performance met all contract requirements and exceeded some to the customer’s benefit. There were a few minor problems which the contractor resolved in a timely, effective manner.
Performance met all contract requirements and exceeded many to the customer’s benefit. Problems, if any, were negligible and were resolved in a timely, highly effective manner.
No record of performance or the record is inconclusive.

USING THE ABOVE DEFINITIONS, PLEASE RATE THE FOLLOWING:

1. Contractor’s quality of service: _______________________________________________________

2. Contractor’s aircraft on-time departure reliability: ____________________________________________________

3. Contractor’s business relations: _______________________________________________________

4. Contractor’s customer service:______________________________________________

REMARKS:

PLEASE PROVIDE A NARRATIVE EXPLANATION SUPPORTING YOUR ABOVE RATINGS AND AN EXPLANATION OF ANY RATING OF MARGINAL OR UNSATISFACTORY. ADDITIONALY, PROVIDE YOUR RATIONALE FOR WHY YOU WOULD OR WOULD NOT AWARD A FUTURE CONTRACT TO THEM.

Evaluator’s Signature/Date

THANK YOU FOR YOUR PROMPT RESPONSE AND ASSISTANCE!

ATTACHMENT 4

SOLICITATION HTC711-20-R-C002

File details come from the government source that posted it. Updated .