This pre-proposal presentation outlines requirements for an air terminal and ground handling services contract in Kuwait. Offerors must provide staffing plans and management approaches to meet all personnel requirements detailed in the performance work statement. Technical proposals are limited to eight pages and will be evaluated on an acceptable/unacceptable basis for two subfactors relating to staffing integration and implementation approaches. Price proposals will be evaluated for completeness and fairness, with the technically acceptable lowest-priced offer receiving award. Past performance will be evaluated as more important than price, using up to three recent and relevant references covering contracts within the last three years valued at over $150,000. The pre-proposal conference is scheduled for January 28, 2020, with final proposals due February 11, 2020 and award anticipated by June 1, 2020. The contract will be awarded on a best-value tradeoff basis to a responsible offeror providing the best value to the government.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amend 0004 Solicitation Extension Date 20-R-C002.pdf | ||
| Amendment 0003.pdf | ||
| Kuwait PP conference minutes.pdf | ||
| KWI-5 PWS 2020.01.28 (PP Site Visit Ver).docx | DOCX document | |
| Copy of KWI-5 QA 2-74 Master Log 2020.02.06.xlsx | XLSX spreadsheet | |
| Amend 0002.pdf | ||
| 2020.01.29 KWI PWS.pdf | ||
| 2020.01.21 Q&A Master Log.xlsx | XLSX spreadsheet | |
| 2020.01.09 Q&A Master Log.xlsx | XLSX spreadsheet | |
| Amend 0001.pdf | ||
| Solicitation HTC711-20-R-C002.pdf | ||
| Attch 2 DD254.pdf | ||
| Attch 5 Contract Information Sheet.docx | DOCX document | |
| 2019.12.09 RFP Cover Letter.pdf | ||
| Attch 3 Mission Essential Contractor Services.pdf | ||
| Attch 4 Kuwait PP Survey.doc | DOC document | |
| Atch 1 2019.12.13 KWI PWS.pdf | ||
| Attch 4 PP survey cvr ltr.pdf |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
KUWAIT AIR TERMINAL AND GROUND HANDLING SERVICES
PREPROPOSAL SITE VISIT
28 January 2020
TCAQ-C
UNCLASSIFIED
Together, we deliver.
Introductions Proposal Submission Evaluation of Proposals Requirements Overview
Agenda
UNCLASSIFIED
TCAQ-C
AMC Program Management Office Other Government Attendees Introductions
Business Proposal All documents requiring signature/completion. Authorized official shall sign the offer and all certifications requiring original signature SF 1449 Solicitation/Contract Form. Complete blocks 12, 17a, and 30 a, b, c. Signature on SF 1449 constitutes an offer, which the Govt may accept Block 17b. If remittance address is different, such address must be registered in the System for Award Management (SAM) database Acknowledgement of Solicitation Amendments Company/division’s street address, county and facility code; CAGE code; DUNS code; and size of business (large or small) List of individuals authorized to negotiate/sign on behalf of the company with email addresses Fill out Reps and Certs IAW the directions listed in the RFP (page 37)
Proposal Preparation
Business Proposal rated as Acceptable or Unacceptable -An Acceptable proposal complies with all terms and conditions of the solicitation
Technical Proposal Subfactor A – Staffing and Management Integrated Plan to meet the requirements of the PWS. The plan shall describe proposed manning levels and skills mix necessary to ensure all required personnel resources are provided to successfully accomplish PWS requirements.
Organizational chart which addresses all on-site management and supervisory positions, and the number of personnel assigned to each of the functional areas; which positions are full-time or part-time, length of work shifts, and provide an example of a seven day shift schedule.
Names, if specific individuals, if submitted, will be removed prior to evaluation.
Subfactor B – Implementation Approach to deploy a workforce which is medically screened, trained, and equipped IAW the PWS; a plan which describes phases of implementation; a timeline chart/spreadsheet which identifies task start and completion dates The Technical Proposal can be no more than 8 pages
All Technical Proposals will be evaluated at the subfactor level on an Acceptable or Unacceptable basis.
Each subfactor must be rated as Acceptable/Unacceptable Subfactor is Acceptable if the proposal meets the requirements of the solicitation.
Unacceptable does not meet the requirements of the solicitation.
Proposals with “Unacceptable” technical rating(s) at the subfactor level will not be considered for award.
Pricing Proposal Rank all technically acceptable offers by price, including any option prices.
The Government will first multiply the quantities identified in the Schedule by the proposed unit price for each CLIN or SLIN to confirm the extended amount for each.
The sum of these extended prices for the base period, all options, and the 6-month extension will constitute the Total Proposed Price.
The Government will then evaluate the total proposed price to determine its completeness and if it is fair and reasonable.
Proposal Preparation Past Performance Proposal References No more than 3 Past Performance Questionnaires (PPQs) for the offeror for similar services A Contract Information Sheet must be submitted with your proposal for EACH PPQ and a copy of the corresponding PWS or relevant excerpts.
Recent: within 3 years of proposal submission The Government will give greater consideration to information on contracts deemed most relevant to the effort described in the RFP.
PPQ
Contract Information Sheet
Past Performance assigned an Overall confidence assessment rating Using PPQs Using other information independently obtained form Gov or commercial sources Determine recency and relevancy of each effort Assign a confidence assessment rating Offerors with no recent/relevant past performance given Unknown Confidence (Neutral) Treated neither favorably nor unfavorably
Best Value Source Selection Performance Price Trade Off Past Performance evaluated significantly more important than price Award Criteria Responsible IAW FAR Part 9 Acceptable Business Proposal, Technical Proposal Represents best value to the Government considering past performance and price
Source Selection
Milestones
| Event | Date |
| Pre-proposal Conference | 28 Jan 2020 |
| Final RFP | 23 Dec 2020 |
| Proposal Due Date | 11 Feb 2020 |
| Award Date | 1 Jun 2020 |
Review of the Air Terminal and Ground Handling Services on behalf of Air Mobility Command at Cargo City Kuwait International Airport, Kuwait, PWS performance requirements.
Requirements Overview
This concludes the Pre-proposal Site Visit, if there are no more questions, we will provide transportation back to the Sand Pit Parking Area at this time.
Questions image7.png image8.png image1.jpeg image2.gif image3.gif image4.gif image5.jpeg image6.jpeg
File details come from the government source that posted it. Updated .