PWS Fixed Wing - 3 Feb 10 with Security changes.doc

DOC document 100 KB Posted

Attached to
Afghanistan Fixed Wing Airlift Federal contract opportunity
Solicitation number
HTC711-10-R-R002
Issued by
Department of Defense United States Transportation Command

About this file

CENTCOM Draft PWS

View the file

Other files for this federal contract opportunity

Other files attached to Afghanistan Fixed Wing Airlift, newest first.
File Type Posted
Solicitation HTC711-10-R-R002 Questions Answers 66-68.pdf PDF
Solicitation HTC711-10-R-R002 Questions Answers 32-65.pdf PDF
HTC711-10-R-R002 Amendment 0002.pdf PDF
Solicitation HTC711-10-R-R002 Questions Answers 1-31.pdf PDF
HTC711-10-R-R002 Amendment 0001.pdf PDF
Attach 5_DD 254_Signed Final.pdf PDF
HTC711-10-R-R002.pdf PDF
Synopsis_Final.docx DOCX document
NGA PWS Fixed Wing - 3 Feb 10.doc DOC document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

3 Feb 10

PEFORMANCE WORK STATEMENT (PWS)

Commercial Airlift Services for US Central Command

TABLE OF CONTENTS

1. Description of Services

1.1 Scope of Contract

1.2 Aircraft Requirements

1.3 Personnel Requirements

1.4 Aircraft Maintenance

1.5 Passenger Service

1.6 Cargo Service

1.7 Transporting Hazardous Cargo

1.8 Passenger and Cargo Combination (COMBI) Service

1.9 Intransit Visibility (ITV)

2. Service Delivery Summary

3. Government Furnished Property and Services

3.1. Ramp Space

3.2. Utilities

3.3. Fuel

3.4. Billeting

3.5. Subsistence

3.6. Weather Reports

3.7. Base Transportation

3.8. Loading and Unloading

3.9. Maintenance Resources

3.10. Secure Communications

3.11 Office and Working Space

4. General Information

4.1 Project Management

4.2 Security

4.3 Force Protection

4.4 Quality Control

4.5 Passports

4.6 Communications

4.7 Aircrew Duty Day Requirements

4.8 Flying In Controlled Airspace

4.9 Fire Containment Covers

4.10 Safety Barriers

4.11 Authority to Leave Unsafe Aircraft

4.12 Workload Estimate

4.13 Required Reports

1. Description of Services.

1.1. Scope of Contract. Provide all fixed-wing aircraft, personnel, equipment, tools, material, maintenance, and supervision necessary to perform passenger, cargo, and combined Short Take-Off and Landing (STOL) air transportation services between locations in the Area of Responsibility (AOR) of Afghanistan, Kyrgystan, Pakistan and Uzbekistan. Specific locations will be provided at the time of mission scheduling, however, the International Civil Aeronautics Organization (ICAO) identifier for each location is listed below:

The pressurized aircraft can land at the following locations:

ICAO
Location
OAIX
Bagram
OAZ2
Deh Dadi
OAHR
Herat LZ
OPRN
Islamabad
OAJL
Jalalabad
OAKB
Kabul
OAKN
Kandahar
OPKC
Karachi
UTSL
Karshi-Khanabad
OAMS
Mazar I Sharif
OPQT
Quetta
OPSM
Shamsi
OASG
Sheberghan
OASD
Shindand
OAUZ
Konduz
OAFR
Farah
Total
16 Airfields

1.1.1. Missions will be scheduled at least twenty-four (24) hours in advance, unless otherwise agreed to by the contractor and Contracting Officer Representative (COR). Weather and aircraft maintenance will be considered when scheduling missions. Each aircraft will be expected to fly no more than ten (10) hours of flight time per day. If necessary and authorized by the COR, contractor is authorized to Remain Over Night (RON) at other locations. DOD is responsible for providing contractor support when RONing.

1.1.2. The contractor shall coordinate all airlift movements with the Joint Sustainment Command – Afghanistan (JSC-A) or their designated representative prior to any mission. Aircraft routes and altitudes are in accordance with the Republic of Afghanistan Aeronautical Information Publication (AIP) located at http://ramcc.dtic.mil/afgh.htm

1.1.3. The Government anticipates contracting approximately 150 hours per aircraft for 24 days per month (1800 hours per year) and allows 6 days per month for scheduled/unscheduled maintenance. Missions average six flight hours per day.

1.1.4. The contractor may refuse any mission for safety reasons. However, mission must be rescheduled and flown as agreed to by the COR and contractor.

1.1.5. Aircrew shall remain on flight plan filed, unless deviation for safety of flight is required.

1.1.6. Aircraft will only operate out of airfields approved on the United States Air Forces, United States Central Command Operation Enduring Freedom approved airfield matrix.

1.1.7. Aircraft are not to land in areas where there is active fighting. Only after the Task Force Commander has declared an area “CLEAR” will the contractor resume normal operations into an area where active fighting recently occurred.

1.1.8. Pilferage and Loss. The contractor shall maintain control of Government cargo, mail and passengers transported while conducting air operations. The contractor is liable for refunding the cost of any cargo lost while in possession of the carrier, except as a result of hostile action or defective U.S Government equipment. The contractor shall be liable for injury or death to passengers while those passengers are being transported by the contractor.

1.1.9 Operational Readiness

1.1.9.1 Operational Readiness. Each aircraft is allowed 6 days per month for scheduled/unscheduled maintenance. Each day the aircraft is NMC (Non Mission Capable) after the 6th day, payment will be prorated. Proration will be calculated by dividing the monthly service rate by the number of days in the month and then multiplying this amount by the number of NMC days. Billable days will be calculated by subtracting the 6 given maintenance days (if applicable) from the actual number of NMC days and then subtracting this total from the number of days in the month. The aircraft must be FMC (Fully Mission Capable) for a minimum of 20 days in order to get credit for the 6 paid maintenance days. If the aircraft fleet, per location, flies the maximum number of hours a month (# of aircraft x 150 hours a month) no deduction will be taken from the monthly rate for any aircraft. If any aircraft is not available for an entire month, no monthly service fee for that aircraft will be paid. If an aircraft becomes FMC after all flying/missions are completed for the day, no payment for monthly service will be paid for that aircraft for that day. Any day an aircraft is not FMC for carrier controlled reasons, no monthly service payment will be made for that day. An airframe is not to be considered available unless both the airframe is FMC and the aircrew is available as defined by the Federal Aviation Administration (FAA) or comparable regulations. If there are extenuating circumstances, the NMC days can be waived on a case-by-case basis.

1.1.10. Recovery. The contractor is responsible for recovering disabled, damaged, or destroyed aircraft. The US Government may, at its discretion, assist if resources and time are available. Any recoverable cargo will be returned to the Government. If an aircraft has been disabled in enemy territory and is likely to be seized by the enemy, the contractor shall make every effort to destroy the cargo to prevent it from being recovered by the enemy.

1.1.11. Replacement Aircraft. If an aircraft is inoperable and unable to complete missions, the contractor shall provide a replacement aircraft ready to fly missions within thirty days. The 30 day count begins as soon as the original aircraft is identified as not mission capable (NMC) during initial start of mission.

1.2. Aircraft Requirements.

1.2.1. The contractor shall provide pressurized aircraft that are multi-engine, fixed wing, and fully instrumented/equipped to fly under Instrument Flight Rules. Aircraft must be listed, maintained and operated in accordance with the air carrier’s Federal Aviation Regulation (FAR) 135 certificate.

1.2.2. The contractor shall provide passenger/cargo aircraft that are multi-engine, fixed wing, pressurized and have a capability of easy loading of palleted cargo 8 feet wide by 9.8 feet long (wide door). Aircraft must have the ability to hold a minimum of 19 passengers with an alternate configuration for cargo only. Aircraft shall have the capability to change configurations as required by USFOR-A. Aircraft will fly in the pax/cargo configuration for a minimum of 30 days before being changed to the cargo only configuration only or vice versa. All aircraft shall have the flexibility to transport cargo weighing a minimum of 4,000 lbs at +10C for a 400 mile stage length non-stop. Maximum load of aircraft will be 7500 lbs. Aircraft must operate from a 4,000 ft unimproved runway at 3000 Mean Sea Level (MSL).

1.2.3. Aircraft must be capable of transporting passenger/cargo loads in extreme hot and cold temperature conditions that include high altitudes with mountain ranges up to 15,000 ft Above Ground Level (AGL).

1.2.4. Aircraft must be configured with Ultra High Frequency (UHF) and Very High Frequency (VHF) radio, and Global Positioning Satellite (GPS). A Blue Force Tracker or similar real-time satellite device and Emergency Locater Transmitter (ELT) are required on each aircraft compatible with the theater and users search and rescue capabilities. All aircraft must have satellite communication capabilities. Operator’s responsibility to ensure additional survival equipment appropriate for the environment and mission they are operating in that meets or exceeds FAR Part 135.

1.2.5. DOD Approval and Additional Standards. The contractor operating the aircraft must be an approved DOD air carrier, as determined by HQ AMC/A3B and the Civil Airlift Review Board (CARB), and must maintain this approval throughout the performance of this contract. The contractor shall comply with all FAA requirements or equivalent Civil Aviation Administration (CAA) requirements, and with all DOD additional standards as published on the following web site: http://www.amc.af.mil/library/businesscustomers.asp

1.2.6. Aircraft Inspection. The Government reserves the right to inspect aircraft, maintenance records, and employee records at any time.

1.2.7. Aircraft Markings. Authorized marking on all aircraft will be the contractors name on each side as well as required markings such as tail numbers. Other identifying marking, such as “UN”, “ISAF”, “NATO” or “SFOR” are not allowed and must be removed. It is in the best interest of all parties that aircraft not be painted in a color that is close to military colors and paint schemes. Any color other than white should be reviewed and approved by the Government prior to deployment.

1.2.8. Insurance. The contractor shall procure and maintain a level of insurance coverage commensurate with the commercial standard and in accordance with the host nation’s statutory limits during the entire period of performance under this contract.

1.3. Personnel Requirements.

1.3.1. All aircrew and site managers performing under this contract are required to possess a Secret security clearance unless otherwise waived on a case-by-case basis. All personnel are required to speak English in a fluent and coherent manner. Personnel performing this contract are considered to be U.S. civilians serving with, employed by, or accompanying the Armed Forces of the United States and coalition forces. The contractor and its employees will adhere to General Order 1, and any supplements or any successor order.

1.3.2. Aircrew members shall be trained, qualified, and maintain proficiency in accordance with FAR 135, and 32 CFR 861.

1.3.3. Aircraft maintenance personnel shall be trained, qualified, and maintain proficiency in accordance with FAR 135.

1.3.4. Risk. The Government accepts no liability should any contractor be taken hostage or be killed during any mission or while under contract with the Government. The Government will provide assistance IAW DFARS 252.225-7040.

1.3.5 Training. Contract employees will be afforded the opportunity to attend code of Conduct training IAW DoDD 1300.7 dated 8 Dec 2000.

1.4. Aircraft Maintenance. Aircraft will be maintained and operated in accordance with FAR 135.

1.5. Passenger Service.

1.5.1. The actual number of passengers will be determined by the distance to and the altitude and temperature of the desired location. Planning weight for passengers plus their baggage is 400 lbs per person.

1.5.2. Bagram Passenger Services personnel will provide the contractor a passenger manifest prior to boarding. The contractor shall not permit any unauthorized personnel to board the aircraft. A copy of the passenger manifest will be left with the appropriate ground personnel at the departure airfield. The contractor will maintain passengers until mission is complete. Eligible passengers include military forces whose country has signed an Acquisition Cross-Servicing Agreement (ACSA) with the U.S. Department of Defense (DoD), including, but not limited to, the Afghanistan National Army and Coalition Forces, Afghanistan National Army Police (ANAP) and all subordinate elements, and Afghanistan Border Police (ABP) personnel, including U.S. Armed Forces personnel, including U.S. Armed Forces personnel suffering from medical emergencies in which life, limb or eyesight may be lost, U.S. military media and U.S./non-U.S. civilian media in support of U.S. DoD operational needs and personnel needing evacuation due to manmade or natural disasters. Local, provincial and national Government representatives are not authorized to utilize fixed wing services provided under this contract for personal transportation.

1.5.3. The contractor is ultimately responsible to determine passenger weight and cargo/baggage weight. If calibrated scales are not available or feasible, the contractor may elect to use hand held and portable type scales. If scales are not available, interrogated weights can be used if in compliance with applicable FAR’s.

1.5.4. All aircraft will utilize appropriate aviation restraining devices in order to ensure the safety transport of passengers. Contractor is not authorized to perform seats-out operations. Contractor is required to provide all aviation life support equipment required to transport all passengers.

1.5.5. Offloading shall be accomplished within 30 minutes or less to comply with Maximum on Ground (MOG) restrictions and safety considerations.

1.5.6. The contractor will ensure that all mission aircraft are operated by two pilots rated in the type, design, and series for the aircraft being flown. Failure to meet pilot requirements will be calculated into the operational readiness language in accordance with paragraph 1.1.9.

1.6. Cargo Service.

1.6.1. Provide cargo transportation in accordance with paragraphs 1.2.2 or 1.2.3 depending on the type of aircraft. Estimated largest piece is 8’ x 3’ x 3’ with gross weight of 300 lbs each.

1.6.2. The contractor will deliver cargo from origin to destination. Cargo may consist of CLASS I (Food and Water), CLASS II (General Supplies), CLASS III (Fuel), CLASS IV (Construction Materials), CLASS V (Ammunition—all caliber) CLASS VI (AAFES supplies), CLASS VII (Major End Items), CLASS VIII (Medical Supplies), CLASS IX (Repair Parts), or CLASS X (non-military goods such as humanitarian assistance items). The contractor will be notified by the Government prior to loading of any cargo of a hazardous, flammable, or explosive nature and any such cargo must be properly documented and certified as per applicable military transport standards.

1.6.3. Offloading shall be accomplished within 30 minutes or less to comply with Maximum on Ground (MOG) restrictions and safety considerations.

1.6.4. All cargo will be floor loaded or loaded on skids, where equipment is available.

1.6.5. Contractor shall verify cargo weight with calibrated scales. Cargo weights and hazardous documents will be verified by qualified DoD personnel.

1.6.6. The contractor will prohibit cargo that has not been properly manifested from flying on the aircraft.

1.7 Transporting Hazardous Cargo. The Government requires passengers to carry a full complement of munitions and explosives necessary to execute their mission as well as other HAZMAT. Contractor shall carry HAZMAT in accordance with their DOT approvals and exemptions. Contractor shall provide a copy of any DOT exemptions to the Contracting Officer. If contractor does not currently possess the necessary approvals and exemptions to carry such HAZMAT, contractor must act with due diligence to obtain an exemption and the Government will cooperate in all good faith to obtain such exemption. Contractor shall transport hazardous materials IAW AFMAN 24-204. Prior to passenger and cargo transportation, the government will verify that passengers can travel with the class of hazardous material being transported. Hazardous classes will be identified prior to personnel and cargo being scheduled for missions.

1.6.8. Shipping Document. When requested by Government representatives, contractors shall sign inventory documents for the loads they transport. This is to ensure that the same quantity and condition of cargo at origin, arrives intact at delivery destination.

1.8. Passenger and Cargo Combination (COMBI) Service.

1.8.1. Provide passenger and cargo combination service in accordance with the Performance Work Statement.

1.8.2. Receive FAA approval to operate in a combination mode.

1.8.3. Comply with FAA guidelines including cargo nets and placement of passengers.

1.8.4. Offloading shall be accomplished within 30 minutes or less to comply with Maximum on Ground (MOG) restrictions and safety considerations.

1.9. Intransit Visibility (ITV) Contractor will be required to provide to the Movement Control Battalion (MCB) or Command Post at Bagram departure and arrival notification at all locations via phone, radio, or satellite phone. If communication is not available, contractor will provide information through Bagram either in flight or upon return to home station.

2. Service Delivery Summary

Performance Objective
PWS Paragraph
Performance Threshold
Operational Readiness
Para. 1.1.9
Aircraft are available 80% of the month.
Maintain accurate records
Para 4.13
100% Accurate, Complete, and On Time
Contractor shall maintain Passenger Manifest until Mission Is Complete
Para. 1.5.2.
100% of Missions
Aircrew shall remain on flight plan filed, unless deviation for safety of flight is required
Para. 1.1.5
100% of Missions

3. Government Furnished Property and Services will be provided if available.

3.1. Ramp Space. Ramp space will be provided at each bed down location for contractor aircraft.

3.2. Utilities.

3.2.1. The Government will provide utilities for office and working space at each hub location. The utilities provided shall be equivalent to those provided to other military and tenant organizations—no special or unique requirements will be supported. Electricity, water (potable or non-potable), sewer and telephone will be provided at all hubs. Class A lines may not be available at all locations. Internet access and/or e-mail are available at all locations based on requirements and availability.

3.3. Fuel.

3.3.1. The Government will supply the same fuel US forces are using in current operations for all aircraft. The contractor can expect JP-8 fuel to be provided. The Government will not make accommodations for unique fuel requirements (i.e. TS-1) and will not supply filtration or other systems to support contract aircraft operations. Fuel will only be provided at the origin of the mission or other Government-designated bases, if available. Fuel may be dispensed at the destination FOBs or Combat Outposts with prior coordination or in other than hub areas. Fuel consumed as a result of the contractor’s determining to replace or swap out aircraft shall not be provided by the Government.

3.4. Billeting.

3.4.1. Billeting commensurate with that provided to US military forces shall be provided for contractor employees required to stay at military locations.

3.5. Subsistence

3.5.1. Class I subsistence for contractor employees required to stay at military locations.

3.6. Weather Reports.

3.6.1. The Government will provide current Intel, threat, and weather briefings to the contractor relevant to the impending flight path prior to departure.

3.7. Base Transportation

3.7.1. Base transportation (bus or shuttle) may not be available at all hub locations. The contractor may provide its own flightline (ATV or Gator-like) vehicles upon USFOR-A approval and will obey all published regulations, licensing and dispatching requirements regarding vehicle operations.

3.8. Loading and Unloading.

3.8.1. The Government may provide, at its discretion, loading and unloading assistance at all hubs. The contractor must be prepared to perform all loading and unloading in the absence of Government support.

3.9. Maintenance Resources

3.9.1 The Government will provide distilled or clean water for engine rinse and wash at all hubs.

3.9.2. Compressed nitrogen refills are possible at all hubs. Contractor must provide their own nitrogen containers/tanks.

3.9.3. The Government will provide a 60Hz power source at all hubs as available. Contractor is required to bring its own transformers or generators to provide desired power.

3.9.4. Memorandum of Understanding between contractor and the Aviation Task Force is required for the Government to provide the following:

(1) Access to an overhead crane assembly with a free clearance height of 25 feet and a rated working capacity of at least 3,500 pounds.

(2) Forklift capability with a height range of 18 feet and a lift capacity of 5,000 pounds

(3) Light sources for nighttime maintenance (some FOBs do not allow white light maintenance on the flightline, however an MOU will provide the equipment or contractor brings own equipment)

(4) Fresh water washing facilities at all operating hubs

3.10. Secure Communications.

3.10.1. Contractor will be provided access to secure communications pending verification of appropriate security clearances.

3.11. Office and Working Space.

3.11.1. If available, the Government will provide office and working space at each hub location. Due to limited office space at some hub airfields, the contractor may be responsible for providing its own office and working space under the non-recurring reimbursables CLIN. In this case the contractor shall coordinate with the local functional engineering team to obtain approval for its office/working space structure.

4. General Information

4.1. Project Management

4.1.1. The contractor will provide a point of contact within his or her company, fluent in English, to interface with the Contracting Officer, COR and ACOR on issues concerning fixed wing transport. Names, business address, phone numbers, and hours of operation are the minimum information requirements. Contractor shall provide a 24-hour contact number and e-mail address.

4.1.2. The government will assign a Contracting Officer Representative (COR)officer to oversee and inspect contractor flight operations to include quarterly familiarization flights on each aircraft and with various crews.

4.2. Security

4.2.1. Contractor Security: Government Security Forces (SF) and Quick Response Forces (QRF) personnel will provide security and force protection procedures for the contractor while on military installations and during contract performance. The contractor is responsible for providing resource protection to ensure the aircraft and cargo are secure when aircraft are parked outside of US Military installations. It is the contractor’s responsibility to obtain prior approval from the combatant commander to arm its personnel or install armament on its aircraft.

4.2.2. The contractor shall comply with the applicable DoD, USAF, AMC, and CENTCOM instructions, regarding Operational, Physical, and Communications Security as well as the Anti-terrorism/Force Protection Programs.

4.2.3. The contractor shall participate in Random Anti-Terrorism Measure (RAM) activities to the best of their ability. The contractor shall not add additional staff to perform RAMs.

4.2.4. The contractor shall ensure contractor personnel have all required badges, access cards and clearances.

4.2.5. Notify the CO and COR within twenty-four (24) hours of the employment and termination of any contractor personnel by providing an updated list of these personnel, which includes at a minimum the following information: name (last, first, middle initial), primary position title, level of investigation/security clearance as well as date of approval, and date of on-site employment or termination.

4.2.6. Within 30 calendar days after contract start, all employees shall complete Antiterrorism Level I training, as required by DODI 2000.16. Refresher Antiterrorism Level I training shall be completed and documented annually thereafter. New employees must complete the Antiterrorism Level I Training within the first 30 calendar days of their employment. The training is provided at https://atlevel1.dtic.mil/at/.

4.2.7. If the Government notifies the contractor that the employment or the continued employment of any contract employee is prejudicial to the interests or endangers the security of the United States of America, that person shall be removed and barred from the worksite. This includes security deviations/incidents and credible derogatory information on contract members during the course of the contract period. The contractor shall make any changes necessary in the appointment(s).

4.2.8. Non-Public Information. In performance of this contract, the contractor may obtain access to sensitive, non-public information. The contractor agrees (a) to use and protect such information from unauthorized disclosure in accordance with the FAR; (b) to use and disclose such information only for the purpose of performing this contract and to not use or disclose such information for any personal or commercial purpose; (c) to obtain permission of the Government PM before disclosing/discussing such information with a third party; (d) to return, upon Government request, any non-public, sensitive information no longer required for contractor performance; and (e) to advise the Government PM of any unauthorized release of such information. Upon request, the contractor shall have its employees assigned to this contract execute a non-disclosure agreement for delivery to the Government. The Government will require contractor personnel to sign a non-disclosure statement to protect non-public information of other contractors and/or the Government. This is also covered in the DD 254 for disclosure approvals authorities.

4.2.9. Security Regulation Compliance. The contractor shall comply with all security regulations and directives as identified herein and other security requirements in this contract specific to site locations of work.

Security Regulation Guidance:

Department of Defense (DoD):

2000.16 (DoD Antiterrorism (AT) Standards)

5200.1-R (DoD Information Security Program)

5200.2-R (DoD Personnel Security Program)

5200.08-R (DoD Physical Security Program)

5220.22-M (National Industrial Security Program)

8500.1 (Information Assurance (IA))

2000.12 (DoD Antiterrorism (AT) Program)

8500.2 (Information Assurance (IA) Implementation)

DoD regulations found at:

http://www.dtic.mil/whs/directives/corres/pub1.html

4.2.10. Military Installation Security: While on military installations or on military portions of commercial facilities, contractor, and subcontractor personnel shall comply with security regulations promulgated by the military installation or activity Commander. Security regulations are directive in nature and shall be adhered to by all contractor and subcontractor personnel.

4.2.11. Restricted Area Access: Where regular and frequent entry into restricted areas at a military installation is required by contractor or subcontractor personnel for ground handling of aircraft, the contractor or subcontractor personnel must meet the requirements established by AFI 31-101Applications for personnel security investigations shall be made to the local Chief, Security Forces.

4.2.12. Facility Security Clearance: This contract requires access to classified information, therefore the company must have a Facility Security Clearance (FCL) An FCL is an administrative determination that a company is eligible for access to classified information or award of a classified contract. Requirements are defined in the National Industrial Security Program Operating Manual, (NISPOM) DOD 5220.22-M. Contractors must inform the Contracting Officer of the correct address of any company agency requiring a facility clearance. A DD Form 254 is incorporated into the soliciation/contract.

4.2.13. Personnel Security Clearance: Upon contract award, security clearance applications for all required personnel shall be completed in accordance with DOD 5220.22-M and instructions received from the cognizant Defense Industrial Security Officer (DISO), Defense Security Service (DSS). All required clearance actions shall be forwarded to the cognizant DISO. Interim clearances will be accepted initially. All other personnel (maintenance, etc) are required to have a National Agency Check with Inquiries (NACI) or equivilant investigation for non-US companies, in order to be issued a CAC. Non-US companies must provide a proof of eligibility determination equal to the United States National Agency Check, Law-Check and Credit Check (NACLC) to obtain Secret Clearances.

4.2.14. Operations Security (OPSEC): The contractor shall be responsible for OPSEC procedures when operating missions for the DOD to include safeguarding critical information. Contractors must ensure employees receive OPSEC training upon initial assignment to a contract with OPSEC requirements. Information such as flight schedules, hotels where crews are staying, return trips, and other facts about the international mission shall be kept close hold and only communicated to persons who have a need to know this information and over secure communications channels. Flight crews should be aware of persons who are seeking information about the contractor, flights, etc. They should seek to maintain a low profile while operating DOD missions. If the contractor has questions about OPSEC they can be addressed to the COR. No imagery or verbal relays of U.S. forces or their positions is permitted.

4.2.15. Contractor Company Personnel And Company Facility Security Officer (FSO): The contractor will appoint a person as the company FSO. The contractor must establish appropriate safeguards to assure that the individuals who are not cleared do not gain access to classified information, material, and Government furnished communications security (COMSEC) equipment. Responsibility for security of classified information, material and COMSEC equipment rests with each individual who is authorized access. The FSO must work closely with the Defense Security Service (DSS) on DOD related security matters and ensure their Government furnished COMSEC equipment is stored, maintained, and operated properly. The company FSO shall maintain a current list of cleared personnel and flight deck aircrew personnel who are eligible for a secret clearance. This list shall be made available for verification during on-site surveys by DOD personnel who have a need to know, and will be provided to the COR when requested.

4.2.16. Authentication Materials: Aircrew members shall require certain authentication documents in order to perform missions. When appropriate, authentication materials and identification friend or foe (IFF)/selective identification feature (SIF) operating instructions shall be made available to flight deck aircrews at military Base Operations and Route Briefing sections provided they present proper identification. Initial issue of these documents shall be as required to cover elapsed time from departure station to destination and return, or to the first enroute station having the capability to provide additional distribution.

4.2.17. Aircraft Physical Security: Contractor aircraft at military installations will receive the same degree of physical security as provided military aircraft in like status. Ingress and egress procedures to and through control points and restricted or controlled areas shall be established to permit crewmembers access to their aircraft.

4.2.17.1. Aircraft Security: The contractor shall establish a program to prevent unlawful seizure of aircraft. At airports, bases, and air terminals where US forces are present and responsible for deployment or redeployment of forces, the military will be responsible for security processing of passengers at on- or off-load. At enroute or operational stops and at locations where there is no military presence, security processing of passengers shall be the responsibility of the contractor. At these locations, the contractor shall satisfy the requirements of the Transportation Security Administration (TSA) security program for charter operations in commercial service.

4.3. Force Protection

4.3.1. The contractor shall follow CENTCOM/CENTAF force protection recommendations when doing so will not alter the terms and conditions of this contract. If compliance with a CENTCOM/CENTAF force protection recommendation would alter the terms and conditions of the contract and/or give rise to a request for equitable adjustment, the contractor will inform the contracting officer and secure the contracting officer’s written agreement prior to incurring any expense. Any action taken or expense incurred prior to approval by the contracting officer will be deemed to be at the contractor’s expense.

4.3.2. Operational Risk Assessment. The contractor shall assess the current situation (weather, intel, NOTAMS, terrain, crew experience, and tactical situation to include surface to air threats and airfield attacks prior to launch to make an accurate risk assessment of each flight. The contractor shall keep the risk assessments on the file for 1 year. Contractor is responsible for coordinating with the cognizant military command to be sure ISOPREP is current and on-file.

4.3.3. USTRANSCOM Force Protection (Industrial Security) Points of Contact:

Patrick Collins or Steven Strait

508 Scott Drive

TCJ3-FP

Scott AFB, IL. 62225

Commercial: 618-229-7349/8287 (respectively)

Email at Patrick.Collins@ustranscom.mil or Steven.Strait@ustranscom.mil

4.4. Quality Control

4.4.1. The contractor shall develop and implement a commercial quality control plan to ensure safe and reliable air transportation in accordance with FAR 135 and 32 CFR 861. Operators are responsible for amending or supplementing their quality programs to assure management oversight in austere locations.

4.4.1.2. Assures risk management procedures are in place and effectively implemented.

4.5. Passports All company personnel shall have a current and valid passport.

4.6. Communications

4.6.1. When operating missions, the contractor’s operations center will be required to maintain secure voice communications with the Bagram Airbase Operations Centers.

4.7. Aircrew Duty Day Requirements

4.7.1. Crew duty day requirements are governed by Federal Aviation Regulation Part 135 or applicable CAA regulations.

4.8. Flying In Controlled Airspace

4.8.1. All contract flights shall fly over established airways, domestic or international, and in controlled airspace. Exceptions may be made to this requirement where it is impractical to follow airways or fly in controlled airspace, provided airways are intersected at the first practical point and departed at the last practical radio navigational fix near destination, or when area controller established airways do not exist within a flight information region. Economic considerations will not justify deviation from this procedure.

4.9. Fire Containment Covers

4.9.1. In accordance with Federal Aviation Administration Airworthiness Directive 93-07-15, fire containment covers (FCCs) must be placed on all cargo transported in the class B cargo compartment of combination aircraft. This Airworthiness Directive also stipulates for Alternate Compliance exempt certain items from the requirement to be covered by FCCs.

4.9.2. The contractor shall furnish, transport, repair and replace sufficient FCCs on each operational aircraft. An FCC shall be deemed unserviceable if it has damage in excess of any of the following:

4” x 4” L-shaped tear

8” long tear

2” diameter tear

4.9.3. The contractor will be responsible for covering and uncovering cargo with the FCCs. If FCC-covered cargo is taken away from the aircraft (assuming cargo are not covered and uncovered aboard the aircraft), the U.S. Government will ensure an adequate number of FCCs are returned to the aircraft prior to its next departure.

4.10. Safety Barriers

4.10.1. All passenger and cargo doors used for on-loading and off-loading of passengers, baggage, and cargo aboard contract aircraft shall be equipped with a safety barrier at chest or waist level. The safety barrier shall be in place when the cabin or cargo door is open except when actually on-loading or off-loading passengers/cargo or when loading stairs are positioned.

4.11. Authority To Leave Unsafe Aircraft: According to Section 2640, Chapter 157, 10 US Code, the following shall apply with regard to the authority to leave unsafe aircraft:

4.11.1. Determinations To Leave Unsafe Aircraft: AMC Air Carrier Survey Team members, ramp inspectors, the Military Surface Deployment and Distribution Command (SDDC), or such other agencies as may be designated by the Secretary of Defense (or if there is no such representative reasonably available, the senior officer on-board a contract mission) may order members of the armed forces to leave a contract mission if the representative (or officer) determines a condition exists on the aircraft which may endanger the safety of the passengers. If serious deficiencies exist, the appropriate USFOR-A representative will initiate an operational immediate message to the next higher headquarters with a copy to the USTRANSCOM/TCAQ-R Contracting Officer. In cases where such deficiencies exist, only the FAA representative has the authority to ground the commercial aircraft in question.

4.12. Workload Estimate. The Government’s estimate is 1,800 hours per aircraft per year.

4.13. Required Reports

4.13.1. Daily Log. The contractor will maintain a daily record of all scheduled and completed missions. The log shall be maintained by the contractor’s aircrew for each mission and shall detail the number of passengers moved and/or the internal cargo load information for each destination. This log will include entries that will code reasons missions were not performed as scheduled to include (weather, maintenance, threat, safety, etc) and who authorized the mission cancellation. The controllig Aviation Brigade in the contractor’s area of operations will provide the GO/NO GO Risk Assessment format to the contractor. This form will be filled out prior to every mission and kept on file for 30 days, then transferred to the COR or CO every 30 days or upon receipt/inspection. A Government representative will sign this log upon loading and unloading the aircraft, verifying the cargo was successfully transported. The contractor shall make these records available to the CO, COR and FAA on a regular basis as determined by the CO.

4.13.2. Notice Of Accidents -- DOD Missions: When a contractor’s aircraft is involved in an accident or incident in support of a DOD mission, as defined in 49 CFR, Part 830, the contractor shall transmit the following information by the most expeditious means available, to the JSC-A or their delegated authority and the COR. On the next business day, notification shall also be made to the CO, via facsimile letter to (618) 256-6419, or by e-mail.

(1) Contractor and trip number.

(2) Aircraft type and number.

(3) Date and time of the accident.

(4) Last point of departure and point of intended landing of the aircraft.

(5) Nature of the accident and the extent of damage to the aircraft so far as is known.

(6) Total number of crewmembers and passengers on board.

(7) Number of injured and fatalities aboard the aircraft.

(8) Condition of baggage or Government-owned material, if any, on board.

4.13.3. Notice Of Accidents -- All Carrier Operations: When a contractor’s aircraft is involved in any accident, DOD or otherwise, the contractor shall transmit the information in paragraph above to HQ AMC/A34B, Scott AFB IL (618) 229-4801. Incidents are reportable to HQ AMC/A34B only when they occur on a DOD charter. Accident and incident information should be provided on the next business day by the most expeditious means available. Accidents and incidents are defined in 49 CFR, Part 830.

4.13.4. Aircraft Medical Incidents: Report all aircraft medical incidents in flight, or while passengers are under the control of the pilot in command, to the first available COR/ACOR, at the next enroute station for in flight incidents, or the station where the incident occurs.

4.13.5. DOD Casualties: In cases where a death occurs on a contractor’s aircraft, the following information shall be furnished to the Air Mobility Division, Al-Udied, Qatar: Name, Social Security Account Number (SSAN), and component of service identified as Army-USA, Air Force-USAF, Navy-USN, Marine Corps-USMC, Coast Guard-USCG.

4.13.6. Hazard Reporting: The contractor shall report any condition involving cargo that constitutes a hazard to operations, the contractor, and airport safety personnel. This report should contain the following information: location; date and time (GMT); nomenclature of cargo (proper shipping name of hazardous cargo); shipper’s organization/unit and name of cargo representative; destination of cargo; TCN or bumper/increment number; facts and circumstances. Report this information to the Administrative Contracting Officer, USTRANSCOM/TCAQ.

4.13.7. Spotlighting and Hostile Event Reports: Timely threat reporting is essential to safe aircraft operations. In the event a contractor is illuminated or “spotlighted”, or is fired upon in the air or on the ground, the crew shall note the date, time, and approximate area from which the event originated. All incidents, including any hostile action (potential or realized) directed at the aircraft, shall be reported immediately to the cognizant air traffic control agency. Additionally, upon landing, at the first airfield or airbase with a US military presence, the crew shall notify the base operations center of the occurrence. The contractor shall also notify the COR immediately of any information regarding a threat to an aircraft, or of any attempts to elicit information from the crew on their mission or cargo. The contractor shall also report any incidents to USTRANSCOM/TCAQ during the next business day.

4.13.8 Daily SITREP. The contractor will maintain a daily record as a way to monitor the status of the aircraft in country, as well as verify the number of personnel working on site. The contractor shall make these records available to the CO, COR and ACOR on a daily basis. Example will be provided upon request.

4.13.9. Administrative Reporting. The contractor will provide the following reports to the COR: Aircraft Daily Status, Maintenance Flow Chart, Aircraft on Ground (AOG) Tracker and Test, Measurement and Diagnosis Equipment (TDME) Report, and weekly personnel accountability roll up to include billeting locations and upcoming rotations. The Government will utilize the reports for planning purposes to manage the tasking of aircraft prior to scheduled maintenance.

File details come from the government source that posted it. Updated .