SECTION F

F.1. 52.242-15 STOP-WORK ORDER (AUG 1989)

F.2. 52.242-15 I STOP-WORK ORDER (AUG 1989)--ALTERNATE I (APR 1984)

F.3. Period of Performance F.3.1. Base Period (November 1, 2013 to October 31, 2014): The Contractor shall begin transition-in activities and complete specific activities by the timelines specified in the TRICARE Operations Manual (TOM) Chapter 1, Section 7. All transition-in activities shall be completed by the date specified in the Contractor’s Start-Up/Transition Plan.

F.3.2. Option Periods 1 through 7 will be 12 months each if exercised.

Option Period 1: November 1, 2014 through October 31, 2015

Transition-Out Option (if applicable)

Option Period 2: November 1, 2015 through October 31, 2016 Transition-Out Option (if applicable)

Option Period 3: November 1, 2016 through October 31, 2017 Transition-Out Option (if applicable)

Option Period 4: November 1, 2017 through October 31, 2018 Transition-Out Option (if applicable)

Option Period 5: November 1, 2018 through October 31, 2019 Transition-Out Option (if applicable)

Option Period 6: November 1, 2019 through October 31, 2020 Transition-Out Option (if applicable) Option Period 7: November 1, 2020 through October 31, 2021 Transition-Out Option (if applicable) F.3.3. The option periods identified herein are hereby defined as the period of prescription delivery. The start of prescription delivery is the first day of Option Period 1. In order to meet the requirements of the contract for each option period, the Contractor will be performing incidental administrative tasks beyond that period.

F.3.4. The transition-out period may be exercised during any one of the periods of prescription delivery specified above. The Contractor will begin transition-out activities upon transition-out option exercise and complete the timelines as specified in TOM Chapter 1, Section 7. All transition-out activities shall be accomplished no later than xx days after the start of the period of prescription delivery of the subsequent contract.

F.4. Reports and Plans Checklist and Certification for Minimum Level of Enhanced Safeguarding for Unclassified DoD Information Within 30 calendar days after start of the base period, and again within 30 days after start of each option period exercised under this contract, the contractor shall provide to the COR a completed checklist and certification as described in paragraph H.4.2, using the Checklist and Certification for Minimum Level of Enhanced Safeguarding for Unclassified DoD Information (i.e. TMA Form ___).

Other files

File Type Posted
DRAFT_RFP_Section_X_Composite_-_Guarantee_(Oct_4 _2012).docx DOCX document
Attach5_SRP Sites.doc DOC document
Attach4_MTF Sites.xls XLS spreadsheet
Attach9_Specialty Clinical Services List.docx DOCX document
Attach6_Required Mailings.doc DOC document
DRAFT RFP Section B —
DRAFT RFP Section C —
Attach2_Deployed Prescription Volume.xls XLS spreadsheet
Attach7_Bulk Chemicals Used for Compounding Final Report 07 23 12.xlsx XLSX spreadsheet
Attach8__ Enhanced IA Standards Checklist IAW H4.pdf PDF
Attach1_Utilization Data.xls XLS spreadsheet
DRAFT RFP Section L —
DRAFT RFP Section H —
Attach3_MTF Workload.xls XLS spreadsheet
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .