Statement of Work for 8 foot wall construction.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 201602100853.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Page | 1
STATEMENT OF WORK
INTERMODAL TRAINING AREA
TRANSPORTATION SECURITY ADMINISTRATION TRAINING CENTER
REAL ESTATE LEASING DIVISION
WILLIAM J. HUGHES FAA TECHNICAL CENTER
ATLANTIC CITY, NJ 08405
BUILDING 360 – HANGER AREA
PART 1 – SCOPE OF WORK:
GENERAL: The work to be performed under this contract and in accordance with this Statement of Work shall consist of building new 8 foot tall uninsulated non-load bearing walls. The walls shall be primarily for aesthetic/visual purposes, being used to hang a wallpaper mural of the interior of an airport to create the ambiance in the training space. However the wall will have multiple door openings in it and needs to be built strong enough to withstand the lateral forces put open it from people leaning against it and/or hand to hand combat against it. Work to include all parts, labor and material for a complete operating system.
HOURS OF WORK:
All work shall be completed during normal working hours. Normal working hours are defined as Monday through Friday, 7:00 A.M. to 5:30 P.M., except Federal Holidays. Before starting the project, the contractor shall submit an installation schedule for the Contracting Officer’s Representative (COR) for approval. Prior to, or during, the project the COR reserves the right to adjust the installation schedule for the convenience of the government LOCATION: All services will be rendered at the Transportation Security Training Center buildings located on the William J. Hughes FAA Technical Center complex.
Building 360 – Hanger Area SUPPLIES: Supplies can be stored prior to installation in building, location set by COR.
QUALITY ASSURANCE: Installer Qualifications: At least 5 years successful experience in commercial lighting installations similar in size and type to the requirements of the project.
WORK MANAGEMENT PLAN: The contractor shall submit a Work Management Plan, prior to beginning any work, for approval. Plan to detail how the Contractor intends to perform the work required in the contract, including but not limited to area protection, area security, safety and application schedule.
WORK AREA ACCESS: Government escorts are required while within the confines of the William J. Hughes Technical Center. Each morning of scheduled work, a government representative will meet you at the main entrance, in the parking lot of the WJHTC Security Operations Center. Temporary badges and vehicle passes will be provided and the Contractor and his\her vehicles will be escorted to the work site.
SAFETY: All Contractor operations shall be conducted and performed in accordance with Department of Labor, OSHA requirements found in 29 CFR 1910 (1910.146 and 1910.147) and 29 CFR 1926. The Contractor shall ensure that all work is performed in accordance with project identified national standards, instructions, pamphlets, and handbooks, and with the edition in effect on the date of this solicitation of the US Armory Corps of Engineers (USACE) Safety Manual 385-1-1. Hard hats required for when working with all overhead equipment. Contractor to utilize all safety barricades, cones, caution tape, etc. when using bucket trucks, scissor lifts and service equipment.
Job sites are subject to inspections by the Department of Labor, FAMS Inspector and the Federal Aviation Administration. In the event of conflicts between the OSHA standards and these requirements, the most stringent shall apply. Resolution of Department of Labor citations for violations of OSHA standards is a Contractor responsibility and shall provide for no basis of a claim against the Government.
All installation and wiring shall meet the requirements of the National Electrical Code (NEC) the National Electrical Safety Code (ANSI-C2) and the International Building Code (IBC), as a minimum.
GOVERNMENT PROPERTY: The Contractor shall use reasonable care to avoid damaging existing buildings, equipment, and vegetation on the Government installation. If the Contractor fails to use reasonable care and causes damage to any of the property, the Contractor shall replace or repair the damage at no expense to the Government. If the Contractor fails or refuses to make such repair or replacement, the Contractor shall be liable for the cost, which may be deducted from the contract price.
SITE MAINTENANCE & CLEANUP: Work area shall be maintained in a neat, clean, and safe condition and shall, at a minimum, be cleaned at the end of each shift. All area’s in or adjacent to the site shall remain free of project generated trash and debris at all times. Disposal shall be outside the limits of Government property. Disposal shall be by sanitary landfill or other approved methods and shall conform to al local, state, and federal guidelines, criteria, and regulations. Upon completion of the work, the Contractor shall leave the work site and storage area(s) in a clean, neat condition satisfactory to the COR. Contractor to provide own dumpster. Coordinate delivery with COR.
WARRANTY: The Contractor shall identify all items being installed that are guaranteed or under warranty for more than a one-year period, and provide validated copies of the manufacturer’s warranty. All warranty information shall be filed by the Contractor in the Government’s name. All warranties shall be identified by product with a listing of the name and address of the company and the expiration date of the guarantee or warranty.
DELIVERY, STORAGE & PARKING: All equipment and material delivered and stored shall be protected from the weather, humidity and temperature variation, dirt, dust, and any other contaminants. The Contractor may store equipment and material only in areas designated by the Contracting Officer’s Representative. All project storage areas shall be kept free of debris and kept in a neat, clean, and safe condition. Contractor will not be required to provide their own portable toilets and will be allowed to use Government lavatory facilities.
SUBMITTALS: The Contractor shall provide submittals in the form of manufacturer’s data for equipment listed. The Contractor will not be permitted to perform any work on site without approved submittals. These submittals include, but are not limited to:
· Combination Emergency/Exit LED fixture, Red lettering, Directional arrows, battery backup
· Horn/Strobe unit
· LED surface mounted light fixture
· LED style Emergency light, battery backup
· ¾” finished plywood, A/C style
· Metal Doors, 3’ single swing and 6’ double opening, with hardware
· Overhead metal wall supports, brackets and installation procedures.
· Wall- floor anchoring system, Mechanical anchors and fasteners only
· Safety Management Statement – a general acknowledgement of the requirement to work safely and follow the safety guidelines referenced in the documents mentioned herein along with acknowledgement of the contractor’s responsibility to make all of their employees and subcontractors aware of the safety guidelines referenced herein and instruct all personnel working on this contract that safety is paramount and everyone’s responsibility.
· Work Management Plan – an outline of how the work will be performed with an estimate of calendar days to complete from the notice to proceed
PART 2. - PRODUCTS
VERIFICATION OF DIMENSIONS & CONDITIONS: The Contractor shall visit the premises to become thoroughly familiar with the details of the work and working conditions. The Contractor shall field verify all dimensions and quantities and advise the COR of any discrepancies before starting the work.
CONTRACTOR PROVIDED MATERIALS: The Contractor shall provide all equipment, materials and labor necessary to complete the work required.
PART 3. - EXECUTION
GENERAL: All work shall be provided as stated in this STATEMENT OF WORK, and as shown on project documents, in accordance with manufacturer’s recommendation, unless otherwise specified. All dimensions and quantities shown are for information only, as previously mentioned, the Contractor shall field verify all dimensions, quantities and site conditions.
APPLICATION: All work shall be prepared and installed according to manufacturer’s recommendations and in accordance with industry best practices.
1. Wall Framing shall be 18 gauge - 6” metal framing typically used for commercial interior wall partitions and capable of carrying the wall finishes specified. Use standard 16” wall stud spacing.
2. New wall framing shall be secured through the bottom track into the concrete floor with anchors suitable for the application that are drilled into the floor. Power actuated fasteners are not permitted on this project. At the end of the run on both sides the wall framing shall be secured to the existing corrugated steel walls using the appropriate fasteners and/or straps so that no visible mechanical components are visible from the finished side of the new wall. Secure overhead. Keep floor open to alleviate trip hazards. The top remains unfinished. Unless noted.
3. Wall framing shall be connected overhead, to the parallel exterior wall at 8’ intervals to eliminate lateral movement. Secure to top of new walls and to side exterior wall.
4. Walls that extend from existing Airplane Simulators can be secured to the structure with self-tapping screws. New walls to be flush with Metal Airplane Simulators.
5. Wall Framing shall incorporate two 6’ wide metal double door openings and four single 3’ metal doors to be placed in the field, locations and door swings shown on drawing. Support accordingly
6. The side of the new wall that faces the aircraft simulators in the room shall be finished with ¾” A-C grade sanded plywood secured with screws. All seams and screws filled. Finished wall to primed and painted.
7. Unless indicated, one side of the walls shall be finished with 5/8” gypsum. Finish and paint to match existing office area hallways.
8. Install a new 4’ high wall, 25’ long with a 16” side extension. Finish plywood both sides and end extension, sealed and painted. Install a new 8” top cap. Finish and paint to match.
9. All seems to be taped and blended, screw holes to be filled (both sides). Plywood and sheetrock.
10. Both sides of each new walls to be primed and painted. Paint to be “Coronado” acrylic – Tough Walls interior paint & primer – Eggshell Enamel. 34-32. Or approved equal.
11. A new vinyl cove base shall be applied to both sides of each wall. Match Building 360 existing color cove base.
12. Install four new LED 4’ lights with enclosed lenses as located on drawing. Mount on interior wall 7’ above finished floor. All lighting power to be from a 20 ampere circuit from existing power panel. Use spare circuit breaker, unless noted. Install recessed single pole and 3 way light switches to control lighting circuit, as shown on drawing. Inside each door entrance, install a light switch to turn on/off lights. Switches to be ivory with stainless steel device plates.
13. Install Two new LED style combination emergency and exit light fixtures. Letters to be Red. Directional arrows where noted. Battery backup capabilities. Mount above 7’6” on walls where murals are to be installed. For the light located at the Jetway, tie into existing power control box and 120VAC circuit. Extend 12-2 MC inside wiring trough.
14. Install two new emergency battery backup LED light fixtures. Mount above 7’6” on walls where murals are to be installed.
15. Install three new horn/strobe surface mounted units, as located on drawing. Extend circuit from existing horn/strobes. Mount above 7’6” on walls where murals are to be installed. Coordinate with Project Manager/ FAA for tie in.
The work for this project shall be executed in the best and most workmanlike manner, by qualified and efficient mechanics\tradesmen, skilled in their respective trades. Individual trade work for this project shall be performed and quality maintained by the applicable trade only. The Contractor shall assure that all trades coordinate their work with that of other trades. The Contractor shall coordinate and perform all operations in a manner that will result in a professional and expeditiously completed project. The work shall be in strict accordance with prevailing industry standards and manufacturer’s instructions. Work and materials shall comply with this Statement of Work and the editions in effect at the time of this solicitation for applicable criteria, regulations, guidelines, and codes, all of which are make a part thereof. Contractor to be licensed. Provide a work management plan for approval by the Contract Officer’s Representative.
All debris to be disposed and removed. Contractor to provide own dumpster.
WORKMANSHIP:
All work shall be coordinated and scheduled with the Contracting Officer’s Representative (COR) or his/her representatives. The COR, or his/her representatives, have the right to reject any unsatisfactory or unsuitable materials, or workmanship.
All work shall be accomplished in accordance with the best practices of the trade.
All work shall comply with applicable Federal, State and municipal health and safety requirements. Where there is a conflict between applicable regulations, the most stringent will apply.
The contractor shall provide all necessary safety equipment and ensure that such equipment and safety procedures are adequate for the job being performed and utilized properly.
COMPLETION & INSPECTION: The Contractor shall ensure that all work is performed in accordance with the criteria herein and that all requirements contained in this and all other project documents are met.
END OF STATEMENT OF WORK