Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION

NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.

IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

A00002 n/a

Guy Galloway Contracting Officer

The purpose of this amendment of solicitation HSTS05-13-Q-ORC014 is to

1) Incorporate Change Page 1 to Attachment C

TSA Office of Acquisition

601 S 12TH STREET

ARLINGTON VA 22202

Mission Essentials 601 S. 12th Street Arlington VA 20598

HSTS05-13-Q-ORC014

HSTS05-13-Q-ORC014

1 2

09/17/2013

09/10/2013

HSTS05-13-Q-ORC014 Attachment C

# Question Response

Do you know which specific model of Sportcoach Elite this RV is (such as 399DS, 401TS, 402TS, 403TS)?

Elite 401TS

2 Do you know the overall exterior length of each slide out?

Front Port Side: 18" Deep, 158" Long Front Starboard Side: 31/5" Deep, 155" Long Rear Starboard Side: 18.5 " Deep, 91 3/4" Long

Do you have an idea for how large of flat screen TV’s you are looking for?

32"

RFQ states “Period of Performance modifications must be completed within 10 days after vehicle delivery to contractor”, is this 10 business days or 10 calendar days?

10 Business Days

Module 1 bed conversion to communications room states the bed must be removed and cover slide mechanism and install workstation according to diagram. Our concern is, will the slide mechanism interfere with the work space, has this been addressed and are pictures available of how the mechanism mounts to the floor in the bedroom slide unit? Most bedroom slides have the slide mechanism that sits on the floor which takes up a large portion of the under bed area.

Slideout floor will need to be raised 1.75 inches to become level with engine compartment.

Measurements are approximate due to unknown thickness of carpet/padding. It is recommended the carpet be removed, and replaced with a flat surface, such as linoleum or vinyl, that will reduce static and provide ease of cleaning.

6 Are interior photos of the areas being modified available? Yes, See Attachment Dfor pictures

7 Will the interior flooring be left “as is” after items are removed?

It is recommended the carpet be removed, and replaced with a flat surface, such as linoleum or vinyl that will reduce static and provide ease of cleaning.

Are there any set asides on this solicitation for “Small Business”, “EDWOSB” or “WOSB”

This is a 100% Small Business set-aside.

HSTS05-13-Q-ORC014 A00002.pdf
HSTS05-13-Q-ORC014 Attachment C.pdf
Sheet1

File details come from the government source that posted it. Updated .