Base Year

CLIN TableTitleShort DescriptionQuantity RangeUnit Price
0001Work in Selma, Alabama
0001AARetrofit MHU in Selma ALRetrofit an MHU with a residential fire sprinkler system as described in the requirements and meeting the contractor's design approved by FEMA. Provide all labor and material including piping (including the riser), mounting hardware, sprinkler heads and concealment within a manufactured home.1 to 50
0001ABRetrofit TPS Electrical Subsystem Selma ALRetrofit the electrical subsystem that is required to provide power to the FEMA external TPS including all wiring, connections terminals breakers and the IC 60 309 mechanical interlock1 to 50
0001ACRetrofit MHU in Selma ALRetrofit an MHU with a residential fire sprinkler system as described in the requirements and meeting the contractor's design approved by FEMA. Provide all labor and material including piping (including the riser), mounting hardware, sprinkler heads and concealment within a manufactured home.51 to 100
0001ADRetrofit TPS Electrical Subsystem Selma ALRetrofit the electrical subsystem that is required to provide power to the FEMA external TPS including all wiring, connections terminals breakers and the IC 60 309 mechanical interlock51 to 100
0001AERetrofit MHU in Selma ALRetrofit an MHU with a residential fire sprinkler system as described in the requirements and meeting the contractor's design approved by FEMA. Provide all labor and material including piping (including the riser), mounting hardware, sprinkler heads and concealment within a manufactured home.101 to 200
0001AFRetrofit TPS Electrical Subsystem Selma ALRetrofit the electrical subsystem that is required to provide power to the FEMA external TPS including all wiring, connections terminals breakers and the IC 60 309 mechanical interlock101 to 200
0001AGRetrofit MHU in Selma ALRetrofit an MHU with a residential fire sprinkler system as described in the requirements and meeting the contractor's design approved by FEMA. Provide all labor and material including piping (including the riser), mounting hardware, sprinkler heads and concealment within a manufactured home.201 to 400
0001AHRetrofit TPS Electrical Subsystem Selma ALRetrofit the electrical subsystem that is required to provide power to the FEMA external TPS including all wiring, connections terminals breakers and the IC 60 309 mechanical interlock201 to 400
0001AIRetrofit MHU in Selma ALRetrofit an MHU with a residential fire sprinkler system as described in the requirements and meeting the contractor's design approved by FEMA. Provide all labor and material including piping (including the riser), mounting hardware, sprinkler heads and concealment within a manufactured home.over 400
0001AJRetrofit TPS Electrical Subsystem Selma ALRetrofit the electrical subsystem that is required to provide power to the FEMA external TPS including all wiring, connections terminals breakers and the IC 60 309 mechanical interlockover 400
0002Work in Cumberland Maryland
0002AARetrofit MHU in Cumberland MDRetrofit an MHU with a residential fire sprinkler system as described in the requirements and meeting the contractor's design approved by FEMA. Provide all labor and material including piping (including the riser), mounting hardware, sprinkler heads and concealment within a manufactured home.1 to 50
0002ABRetrofit TPS Electrical Subsystem Cumberland MDRetrofit the electrical subsystem that is required to provide power to the FEMA external TPS including all wiring, connections terminals breakers and the IC 60 309 mechanical interlock1 to 50
0002ACRetrofit MHU in Cumberland MDRetrofit an MHU with a residential fire sprinkler system as described in the requirements and meeting the contractor's design approved by FEMA. Provide all labor and material including piping (including the riser), mounting hardware, sprinkler heads and concealment within a manufactured home.51 to 100
0002ADRetrofit TPS Electrical Subsystem Cumberland MDRetrofit the electrical subsystem that is required to provide power to the FEMA external TPS including all wiring, connections terminals breakers and the IC 60 309 mechanical interlock51 to 100
0002AERetrofit MHU in Cumberland MDRetrofit an MHU with a residential fire sprinkler system as described in the requirements and meeting the contractor's design approved by FEMA. Provide all labor and material including piping (including the riser), mounting hardware, sprinkler heads and concealment within a manufactured home.101 to 200
0002AFRetrofit TPS Electrical Subsystem Cumberland MDRetrofit the electrical subsystem that is required to provide power to the FEMA external TPS including all wiring, connections terminals breakers and the IC 60 309 mechanical interlock101 to 200
0002AGRetrofit MHU in Cumberland MDRetrofit an MHU with a residential fire sprinkler system as described in the requirements and meeting the contractor's design approved by FEMA. Provide all labor and material including piping (including the riser), mounting hardware, sprinkler heads and concealment within a manufactured home.201 to 400
0002AHRetrofit TPS Electrical Subsystem Cumberland MDRetrofit the electrical subsystem that is required to provide power to the FEMA external TPS including all wiring, connections terminals breakers and the IC 60 309 mechanical interlock201 to 400
0002AIRetrofit MHU in Cumberland MDRetrofit an MHU with a residential fire sprinkler system as described in the requirements and meeting the contractor's design approved by FEMA. Provide all labor and material including piping (including the riser), mounting hardware, sprinkler heads and concealment within a manufactured home.over 400
0002AJRetrofit TPS Electrical Subsystem Cumberland MDRetrofit the electrical subsystem that is required to provide power to the FEMA external TPS including all wiring, connections terminals breakers and the IC 60 309 mechanical interlockover 400
0003Work in Other Locations within the Contiguous United States (CONUS)
0003AARetrofit MHU CONUSRetrofit an MHU with a residential fire sprinkler system as described in the requirements and meeting the contractor's design approved by FEMA. Provide all labor and material including piping (including the riser), mounting hardware, sprinkler heads and concealment within a manufactured home.1 to 50Negotiated during task order
0003ABRetrofit TPS Electrical Subsystem CONUSRetrofit the electrical subsystem that is required to provide power to the FEMA external TPS including all wiring, connections terminals breakers and the IC 60 309 mechanical interlock1 to 50Negotiated during task order
0003ACRetrofit MHU CONUSRetrofit an MHU with a residential fire sprinkler system as described in the requirements and meeting the contractor's design approved by FEMA. Provide all labor and material including piping (including the riser), mounting hardware, sprinkler heads and concealment within a manufactured home.51 to 100Negotiated during task order
0003ADRetrofit TPS Electrical Subsystem CONUSRetrofit the electrical subsystem that is required to provide power to the FEMA external TPS including all wiring, connections terminals breakers and the IC 60 309 mechanical interlock51 to 100Negotiated during task order
0003AERetrofit MHU CONUSRetrofit an MHU with a residential fire sprinkler system as described in the requirements and meeting the contractor's design approved by FEMA. Provide all labor and material including piping (including the riser), mounting hardware, sprinkler heads and concealment within a manufactured home.101 to 200Negotiated during task order
0003AFRetrofit TPS Electrical Subsystem CONUSRetrofit the electrical subsystem that is required to provide power to the FEMA external TPS including all wiring, connections terminals breakers and the IC 60 309 mechanical interlock101 to 200Negotiated during task order
0003AGRetrofit MHU CONUSRetrofit an MHU with a residential fire sprinkler system as described in the requirements and meeting the contractor's design approved by FEMA. Provide all labor and material including piping (including the riser), mounting hardware, sprinkler heads and concealment within a manufactured home.201 to 400Negotiated during task order
0003AHRetrofit TPS Electrical Subsystem CONUSRetrofit the electrical subsystem that is required to provide power to the FEMA external TPS including all wiring, connections terminals breakers and the IC 60 309 mechanical interlock201 to 400Negotiated during task order
0003AIRetrofit MHU CONUSRetrofit an MHU with a residential fire sprinkler system as described in the requirements and meeting the contractor's design approved by FEMA. Provide all labor and material including piping (including the riser), mounting hardware, sprinkler heads and concealment within a manufactured home.over 400Negotiated during task order
0003AJRetrofit TPS Electrical Subsystem CONUSRetrofit the electrical subsystem that is required to provide power to the FEMA external TPS including all wiring, connections terminals breakers and the IC 60 309 mechanical interlockover 400Negotiated during task order
0004Miscellaneous and other direct expenses
0004AATravelTravel is a direct reimbursable expense using the Federal Travel Regulations (FTR). Any costs above FTR must be approved in advance.
0004ABMiscellaneousOther expenses that are approved in advance.
0005Modification to heat trace for MHUs with existing sprinkler systems
0005AAModification to heat trace for MHUs with existing sprinkler systems in Selma, ALFEMA's original design for the MHU residential fire sprinkler system included having the MHU manufacturer install heat trace from the base of the riser into he MHU. FEMA has changed the design so that the TPS vendor provides the entire length of heat trace and the MHU vendor installs pull tape in the MHU to pull the heat trace up into the MHU. This CLIN has the contractor changing the existing heat trace for pull tape as described in the requirements in Selma, AL.
0005ABModification to heat trace for MHUs with existing sprinkler systems in Cumberland, MDFEMA's original design for the MHU residential fire sprinkler system included having the MHU manufacturer install heat trace from the base of the riser into he MHU. FEMA has changed the design so that the TPS vendor provides the entire length of heat trace and the MHU vendor installs pull tape in the MHU to pull the heat trace up into the MHU. This CLIN has the contractor changing the existing heat trace for pull tape as described in the requirements in Cumberland, MD.

Option Year 1

CLIN TableTitleShort DescriptionQuantity RangeUnit Price
1001Work in Selma, Alabama
1001AARetrofit MHU in Selma ALRetrofit an MHU with a residential fire sprinkler system as described in the requirements and meeting the contractor's design approved by FEMA. Provide all labor and material including piping (including the riser), mounting hardware, sprinkler heads and concealment within a manufactured home.1 to 50
1001ABRetrofit TPS Electrical Subsystem Selma ALRetrofit the electrical subsystem that is required to provide power to the FEMA external TPS including all wiring, connections terminals breakers and the IC 60 309 mechanical interlock1 to 50
1001ACRetrofit MHU in Selma ALRetrofit an MHU with a residential fire sprinkler system as described in the requirements and meeting the contractor's design approved by FEMA. Provide all labor and material including piping (including the riser), mounting hardware, sprinkler heads and concealment within a manufactured home.51 to 100
1001ADRetrofit TPS Electrical Subsystem Selma ALRetrofit the electrical subsystem that is required to provide power to the FEMA external TPS including all wiring, connections terminals breakers and the IC 60 309 mechanical interlock51 to 100
1001AERetrofit MHU in Selma ALRetrofit an MHU with a residential fire sprinkler system as described in the requirements and meeting the contractor's design approved by FEMA. Provide all labor and material including piping (including the riser), mounting hardware, sprinkler heads and concealment within a manufactured home.101 to 200
1001AFRetrofit TPS Electrical Subsystem Selma ALRetrofit the electrical subsystem that is required to provide power to the FEMA external TPS including all wiring, connections terminals breakers and the IC 60 309 mechanical interlock101 to 200
1001AGRetrofit MHU in Selma ALRetrofit an MHU with a residential fire sprinkler system as described in the requirements and meeting the contractor's design approved by FEMA. Provide all labor and material including piping (including the riser), mounting hardware, sprinkler heads and concealment within a manufactured home.201 to 400
1001AHRetrofit TPS Electrical Subsystem Selma ALRetrofit the electrical subsystem that is required to provide power to the FEMA external TPS including all wiring, connections terminals breakers and the IC 60 309 mechanical interlock201 to 400
1001AIRetrofit MHU in Selma ALRetrofit an MHU with a residential fire sprinkler system as described in the requirements and meeting the contractor's design approved by FEMA. Provide all labor and material including piping (including the riser), mounting hardware, sprinkler heads and concealment within a manufactured home.over 400
1001AJRetrofit TPS Electrical Subsystem Selma ALRetrofit the electrical subsystem that is required to provide power to the FEMA external TPS including all wiring, connections terminals breakers and the IC 60 309 mechanical interlockover 400
1002Work in Cumberland Maryland
1002AARetrofit MHU in Cumberland MDRetrofit an MHU with a residential fire sprinkler system as described in the requirements and meeting the contractor's design approved by FEMA. Provide all labor and material including piping (including the riser), mounting hardware, sprinkler heads and concealment within a manufactured home.1 to 50
1002ABRetrofit TPS Electrical Subsystem Cumberland MDRetrofit the electrical subsystem that is required to provide power to the FEMA external TPS including all wiring, connections terminals breakers and the IC 60 309 mechanical interlock1 to 50
1002ACRetrofit MHU in Cumberland MDRetrofit an MHU with a residential fire sprinkler system as described in the requirements and meeting the contractor's design approved by FEMA. Provide all labor and material including piping (including the riser), mounting hardware, sprinkler heads and concealment within a manufactured home.51 to 100
1002ADRetrofit TPS Electrical Subsystem Cumberland MDRetrofit the electrical subsystem that is required to provide power to the FEMA external TPS including all wiring, connections terminals breakers and the IC 60 309 mechanical interlock51 to 100
1002AERetrofit MHU in Cumberland MDRetrofit an MHU with a residential fire sprinkler system as described in the requirements and meeting the contractor's design approved by FEMA. Provide all labor and material including piping (including the riser), mounting hardware, sprinkler heads and concealment within a manufactured home.101 to 200
1002AFRetrofit TPS Electrical Subsystem Cumberland MDRetrofit the electrical subsystem that is required to provide power to the FEMA external TPS including all wiring, connections terminals breakers and the IC 60 309 mechanical interlock101 to 200
1002AGRetrofit MHU in Cumberland MDRetrofit an MHU with a residential fire sprinkler system as described in the requirements and meeting the contractor's design approved by FEMA. Provide all labor and material including piping (including the riser), mounting hardware, sprinkler heads and concealment within a manufactured home.201 to 400
1002AHRetrofit TPS Electrical Subsystem Cumberland MDRetrofit the electrical subsystem that is required to provide power to the FEMA external TPS including all wiring, connections terminals breakers and the IC 60 309 mechanical interlock201 to 400
1002AIRetrofit MHU in Cumberland MDRetrofit an MHU with a residential fire sprinkler system as described in the requirements and meeting the contractor's design approved by FEMA. Provide all labor and material including piping (including the riser), mounting hardware, sprinkler heads and concealment within a manufactured home.over 400
1002AJRetrofit TPS Electrical Subsystem Cumberland MDRetrofit the electrical subsystem that is required to provide power to the FEMA external TPS including all wiring, connections terminals breakers and the IC 60 309 mechanical interlockover 400
1003Work in Other Locations within the Contiguous United States (CONUS)
1003AARetrofit MHU CONUSRetrofit an MHU with a residential fire sprinkler system as described in the requirements and meeting the contractor's design approved by FEMA. Provide all labor and material including piping (including the riser), mounting hardware, sprinkler heads and concealment within a manufactured home.1 to 50Negotiated during task order
1003ABRetrofit TPS Electrical Subsystem CONUSRetrofit the electrical subsystem that is required to provide power to the FEMA external TPS including all wiring, connections terminals breakers and the IC 60 309 mechanical interlock1 to 50Negotiated during task order
1003ACRetrofit MHU CONUSRetrofit an MHU with a residential fire sprinkler system as described in the requirements and meeting the contractor's design approved by FEMA. Provide all labor and material including piping (including the riser), mounting hardware, sprinkler heads and concealment within a manufactured home.51 to 100Negotiated during task order
1003ADRetrofit TPS Electrical Subsystem CONUSRetrofit the electrical subsystem that is required to provide power to the FEMA external TPS including all wiring, connections terminals breakers and the IC 60 309 mechanical interlock51 to 100Negotiated during task order
1003AERetrofit MHU CONUSRetrofit an MHU with a residential fire sprinkler system as described in the requirements and meeting the contractor's design approved by FEMA. Provide all labor and material including piping (including the riser), mounting hardware, sprinkler heads and concealment within a manufactured home.101 to 200Negotiated during task order
1003AFRetrofit TPS Electrical Subsystem CONUSRetrofit the electrical subsystem that is required to provide power to the FEMA external TPS including all wiring, connections terminals breakers and the IC 60 309 mechanical interlock101 to 200Negotiated during task order
1003AGRetrofit MHU CONUSRetrofit an MHU with a residential fire sprinkler system as described in the requirements and meeting the contractor's design approved by FEMA. Provide all labor and material including piping (including the riser), mounting hardware, sprinkler heads and concealment within a manufactured home.201 to 400Negotiated during task order
1003AHRetrofit TPS Electrical Subsystem CONUSRetrofit the electrical subsystem that is required to provide power to the FEMA external TPS including all wiring, connections terminals breakers and the IC 60 309 mechanical interlock201 to 400Negotiated during task order
1003AIRetrofit MHU CONUSRetrofit an MHU with a residential fire sprinkler system as described in the requirements and meeting the contractor's design approved by FEMA. Provide all labor and material including piping (including the riser), mounting hardware, sprinkler heads and concealment within a manufactured home.over 400Negotiated during task order
1003AJRetrofit TPS Electrical Subsystem CONUSRetrofit the electrical subsystem that is required to provide power to the FEMA external TPS including all wiring, connections terminals breakers and the IC 60 309 mechanical interlockover 400Negotiated during task order
1004Miscellaneous and other direct expenses
1004AATravelTravel is a direct reimbursable expense using the Federal Travel Regulations (FTR). Any costs above FTR must be approved in advance.
1004ABMiscellaneousOther expenses that are approved in advance.
1005CLIN 1005 discontinued after Base Year

Option Year 2

CLIN TableTitleShort DescriptionQuantity RangeUnit Price
2001Work in Selma, Alabama
2001AARetrofit MHU in Selma ALRetrofit an MHU with a residential fire sprinkler system as described in the requirements and meeting the contractor's design approved by FEMA. Provide all labor and material including piping (including the riser), mounting hardware, sprinkler heads and concealment within a manufactured home.1 to 50
2001ABRetrofit TPS Electrical Subsystem Selma ALRetrofit the electrical subsystem that is required to provide power to the FEMA external TPS including all wiring, connections terminals breakers and the IC 60 309 mechanical interlock1 to 50
2001ACRetrofit MHU in Selma ALRetrofit an MHU with a residential fire sprinkler system as described in the requirements and meeting the contractor's design approved by FEMA. Provide all labor and material including piping (including the riser), mounting hardware, sprinkler heads and concealment within a manufactured home.51 to 100
2001ADRetrofit TPS Electrical Subsystem Selma ALRetrofit the electrical subsystem that is required to provide power to the FEMA external TPS including all wiring, connections terminals breakers and the IC 60 309 mechanical interlock51 to 100
2001AERetrofit MHU in Selma ALRetrofit an MHU with a residential fire sprinkler system as described in the requirements and meeting the contractor's design approved by FEMA. Provide all labor and material including piping (including the riser), mounting hardware, sprinkler heads and concealment within a manufactured home.101 to 200
2001AFRetrofit TPS Electrical Subsystem Selma ALRetrofit the electrical subsystem that is required to provide power to the FEMA external TPS including all wiring, connections terminals breakers and the IC 60 309 mechanical interlock101 to 200
2001AGRetrofit MHU in Selma ALRetrofit an MHU with a residential fire sprinkler system as described in the requirements and meeting the contractor's design approved by FEMA. Provide all labor and material including piping (including the riser), mounting hardware, sprinkler heads and concealment within a manufactured home.201 to 400
2001AHRetrofit TPS Electrical Subsystem Selma ALRetrofit the electrical subsystem that is required to provide power to the FEMA external TPS including all wiring, connections terminals breakers and the IC 60 309 mechanical interlock201 to 400
2001AIRetrofit MHU in Selma ALRetrofit an MHU with a residential fire sprinkler system as described in the requirements and meeting the contractor's design approved by FEMA. Provide all labor and material including piping (including the riser), mounting hardware, sprinkler heads and concealment within a manufactured home.over 400
2001AJRetrofit TPS Electrical Subsystem Selma ALRetrofit the electrical subsystem that is required to provide power to the FEMA external TPS including all wiring, connections terminals breakers and the IC 60 309 mechanical interlockover 400
2002Work in Cumberland Maryland
2002AARetrofit MHU in Cumberland MDRetrofit an MHU with a residential fire sprinkler system as described in the requirements and meeting the contractor's design approved by FEMA. Provide all labor and material including piping (including the riser), mounting hardware, sprinkler heads and concealment within a manufactured home.1 to 50
2002ABRetrofit TPS Electrical Subsystem Cumberland MDRetrofit the electrical subsystem that is required to provide power to the FEMA external TPS including all wiring, connections terminals breakers and the IC 60 309 mechanical interlock1 to 50
2002ACRetrofit MHU in Cumberland MDRetrofit an MHU with a residential fire sprinkler system as described in the requirements and meeting the contractor's design approved by FEMA. Provide all labor and material including piping (including the riser), mounting hardware, sprinkler heads and concealment within a manufactured home.51 to 100
2002ADRetrofit TPS Electrical Subsystem Cumberland MDRetrofit the electrical subsystem that is required to provide power to the FEMA external TPS including all wiring, connections terminals breakers and the IC 60 309 mechanical interlock51 to 100
2002AERetrofit MHU in Cumberland MDRetrofit an MHU with a residential fire sprinkler system as described in the requirements and meeting the contractor's design approved by FEMA. Provide all labor and material including piping (including the riser), mounting hardware, sprinkler heads and concealment within a manufactured home.101 to 200
2002AFRetrofit TPS Electrical Subsystem Cumberland MDRetrofit the electrical subsystem that is required to provide power to the FEMA external TPS including all wiring, connections terminals breakers and the IC 60 309 mechanical interlock101 to 200
2002AGRetrofit MHU in Cumberland MDRetrofit an MHU with a residential fire sprinkler system as described in the requirements and meeting the contractor's design approved by FEMA. Provide all labor and material including piping (including the riser), mounting hardware, sprinkler heads and concealment within a manufactured home.201 to 400
2002AHRetrofit TPS Electrical Subsystem Cumberland MDRetrofit the electrical subsystem that is required to provide power to the FEMA external TPS including all wiring, connections terminals breakers and the IC 60 309 mechanical interlock201 to 400
2002AIRetrofit MHU in Cumberland MDRetrofit an MHU with a residential fire sprinkler system as described in the requirements and meeting the contractor's design approved by FEMA. Provide all labor and material including piping (including the riser), mounting hardware, sprinkler heads and concealment within a manufactured home.over 400
2002AJRetrofit TPS Electrical Subsystem Cumberland MDRetrofit the electrical subsystem that is required to provide power to the FEMA external TPS including all wiring, connections terminals breakers and the IC 60 309 mechanical interlockover 400
2003Work in Other Locations within the Contiguous United States (CONUS)
2003AARetrofit MHU CONUSRetrofit an MHU with a residential fire sprinkler system as described in the requirements and meeting the contractor's design approved by FEMA. Provide all labor and material including piping (including the riser), mounting hardware, sprinkler heads and concealment within a manufactured home.1 to 50Negotiated during task order
2003ABRetrofit TPS Electrical Subsystem CONUSRetrofit the electrical subsystem that is required to provide power to the FEMA external TPS including all wiring, connections terminals breakers and the IC 60 309 mechanical interlock1 to 50Negotiated during task order
2003ACRetrofit MHU CONUSRetrofit an MHU with a residential fire sprinkler system as described in the requirements and meeting the contractor's design approved by FEMA. Provide all labor and material including piping (including the riser), mounting hardware, sprinkler heads and concealment within a manufactured home.51 to 100Negotiated during task order
2003ADRetrofit TPS Electrical Subsystem CONUSRetrofit the electrical subsystem that is required to provide power to the FEMA external TPS including all wiring, connections terminals breakers and the IC 60 309 mechanical interlock51 to 100Negotiated during task order
2003AERetrofit MHU CONUSRetrofit an MHU with a residential fire sprinkler system as described in the requirements and meeting the contractor's design approved by FEMA. Provide all labor and material including piping (including the riser), mounting hardware, sprinkler heads and concealment within a manufactured home.101 to 200Negotiated during task order
2003AFRetrofit TPS Electrical Subsystem CONUSRetrofit the electrical subsystem that is required to provide power to the FEMA external TPS including all wiring, connections terminals breakers and the IC 60 309 mechanical interlock101 to 200Negotiated during task order
2003AGRetrofit MHU CONUSRetrofit an MHU with a residential fire sprinkler system as described in the requirements and meeting the contractor's design approved by FEMA. Provide all labor and material including piping (including the riser), mounting hardware, sprinkler heads and concealment within a manufactured home.201 to 400Negotiated during task order
2003AHRetrofit TPS Electrical Subsystem CONUSRetrofit the electrical subsystem that is required to provide power to the FEMA external TPS including all wiring, connections terminals breakers and the IC 60 309 mechanical interlock201 to 400Negotiated during task order
2003AIRetrofit MHU CONUSRetrofit an MHU with a residential fire sprinkler system as described in the requirements and meeting the contractor's design approved by FEMA. Provide all labor and material including piping (including the riser), mounting hardware, sprinkler heads and concealment within a manufactured home.over 400Negotiated during task order
2003AJRetrofit TPS Electrical Subsystem CONUSRetrofit the electrical subsystem that is required to provide power to the FEMA external TPS including all wiring, connections terminals breakers and the IC 60 309 mechanical interlockover 400Negotiated during task order
2004Miscellaneous and other direct expenses
2004AATravelTravel is a direct reimbursable expense using the Federal Travel Regulations (FTR). Any costs above FTR must be approved in advance.
2004ABMiscellaneousOther expenses that are approved in advance.
2005CLIN 2005 Discontinued After Base Year

Option Year 3

CLIN TableTitleShort DescriptionQuantity RangeUnit Price
3001Work in Selma, Alabama
3001AARetrofit MHU in Selma ALRetrofit an MHU with a residential fire sprinkler system as described in the requirements and meeting the contractor's design approved by FEMA. Provide all labor and material including piping (including the riser), mounting hardware, sprinkler heads and concealment within a manufactured home.1 to 50
3001ABRetrofit TPS Electrical Subsystem Selma ALRetrofit the electrical subsystem that is required to provide power to the FEMA external TPS including all wiring, connections terminals breakers and the IC 60 309 mechanical interlock1 to 50
3001ACRetrofit MHU in Selma ALRetrofit an MHU with a residential fire sprinkler system as described in the requirements and meeting the contractor's design approved by FEMA. Provide all labor and material including piping (including the riser), mounting hardware, sprinkler heads and concealment within a manufactured home.51 to 100
3001ADRetrofit TPS Electrical Subsystem Selma ALRetrofit the electrical subsystem that is required to provide power to the FEMA external TPS including all wiring, connections terminals breakers and the IC 60 309 mechanical interlock51 to 100
3001AERetrofit MHU in Selma ALRetrofit an MHU with a residential fire sprinkler system as described in the requirements and meeting the contractor's design approved by FEMA. Provide all labor and material including piping (including the riser), mounting hardware, sprinkler heads and concealment within a manufactured home.101 to 200
3001AFRetrofit TPS Electrical Subsystem Selma ALRetrofit the electrical subsystem that is required to provide power to the FEMA external TPS including all wiring, connections terminals breakers and the IC 60 309 mechanical interlock101 to 200
3001AGRetrofit MHU in Selma ALRetrofit an MHU with a residential fire sprinkler system as described in the requirements and meeting the contractor's design approved by FEMA. Provide all labor and material including piping (including the riser), mounting hardware, sprinkler heads and concealment within a manufactured home.201 to 400
3001AHRetrofit TPS Electrical Subsystem Selma ALRetrofit the electrical subsystem that is required to provide power to the FEMA external TPS including all wiring, connections terminals breakers and the IC 60 309 mechanical interlock201 to 400
3001AIRetrofit MHU in Selma ALRetrofit an MHU with a residential fire sprinkler system as described in the requirements and meeting the contractor's design approved by FEMA. Provide all labor and material including piping (including the riser), mounting hardware, sprinkler heads and concealment within a manufactured home.over 400
3001AJRetrofit TPS Electrical Subsystem Selma ALRetrofit the electrical subsystem that is required to provide power to the FEMA external TPS including all wiring, connections terminals breakers and the IC 60 309 mechanical interlockover 400
3002Work in Cumberland Maryland
3002AARetrofit MHU in Cumberland MDRetrofit an MHU with a residential fire sprinkler system as described in the requirements and meeting the contractor's design approved by FEMA. Provide all labor and material including piping (including the riser), mounting hardware, sprinkler heads and concealment within a manufactured home.1 to 50
3002ABRetrofit TPS Electrical Subsystem Cumberland MDRetrofit the electrical subsystem that is required to provide power to the FEMA external TPS including all wiring, connections terminals breakers and the IC 60 309 mechanical interlock1 to 50
3002ACRetrofit MHU in Cumberland MDRetrofit an MHU with a residential fire sprinkler system as described in the requirements and meeting the contractor's design approved by FEMA. Provide all labor and material including piping (including the riser), mounting hardware, sprinkler heads and concealment within a manufactured home.51 to 100
3002ADRetrofit TPS Electrical Subsystem Cumberland MDRetrofit the electrical subsystem that is required to provide power to the FEMA external TPS including all wiring, connections terminals breakers and the IC 60 309 mechanical interlock51 to 100
3002AERetrofit MHU in Cumberland MDRetrofit an MHU with a residential fire sprinkler system as described in the requirements and meeting the contractor's design approved by FEMA. Provide all labor and material including piping (including the riser), mounting hardware, sprinkler heads and concealment within a manufactured home.101 to 200
3002AFRetrofit TPS Electrical Subsystem Cumberland MDRetrofit the electrical subsystem that is required to provide power to the FEMA external TPS including all wiring, connections terminals breakers and the IC 60 309 mechanical interlock101 to 200
3002AGRetrofit MHU in Cumberland MDRetrofit an MHU with a residential fire sprinkler system as described in the requirements and meeting the contractor's design approved by FEMA. Provide all labor and material including piping (including the riser), mounting hardware, sprinkler heads and concealment within a manufactured home.201 to 400
3002AHRetrofit TPS Electrical Subsystem Cumberland MDRetrofit the electrical subsystem that is required to provide power to the FEMA external TPS including all wiring, connections terminals breakers and the IC 60 309 mechanical interlock201 to 400
3002AIRetrofit MHU in Cumberland MDRetrofit an MHU with a residential fire sprinkler system as described in the requirements and meeting the contractor's design approved by FEMA. Provide all labor and material including piping (including the riser), mounting hardware, sprinkler heads and concealment within a manufactured home.over 400
3002AJRetrofit TPS Electrical Subsystem Cumberland MDRetrofit the electrical subsystem that is required to provide power to the FEMA external TPS including all wiring, connections terminals breakers and the IC 60 309 mechanical interlockover 400
3003Work in Other Locations within the Contiguous United States (CONUS)
3003AARetrofit MHU CONUSRetrofit an MHU with a residential fire sprinkler system as described in the requirements and meeting the contractor's design approved by FEMA. Provide all labor and material including piping (including the riser), mounting hardware, sprinkler heads and concealment within a manufactured home.1 to 50Negotiated during task order
3003ABRetrofit TPS Electrical Subsystem CONUSRetrofit the electrical subsystem that is required to provide power to the FEMA external TPS including all wiring, connections terminals breakers and the IC 60 309 mechanical interlock1 to 50Negotiated during task order
3003ACRetrofit MHU CONUSRetrofit an MHU with a residential fire sprinkler system as described in the requirements and meeting the contractor's design approved by FEMA. Provide all labor and material including piping (including the riser), mounting hardware, sprinkler heads and concealment within a manufactured home.51 to 100Negotiated during task order
3003ADRetrofit TPS Electrical Subsystem CONUSRetrofit the electrical subsystem that is required to provide power to the FEMA external TPS including all wiring, connections terminals breakers and the IC 60 309 mechanical interlock51 to 100Negotiated during task order
3003AERetrofit MHU CONUSRetrofit an MHU with a residential fire sprinkler system as described in the requirements and meeting the contractor's design approved by FEMA. Provide all labor and material including piping (including the riser), mounting hardware, sprinkler heads and concealment within a manufactured home.101 to 200Negotiated during task order
3003AFRetrofit TPS Electrical Subsystem CONUSRetrofit the electrical subsystem that is required to provide power to the FEMA external TPS including all wiring, connections terminals breakers and the IC 60 309 mechanical interlock101 to 200Negotiated during task order
3003AGRetrofit MHU CONUSRetrofit an MHU with a residential fire sprinkler system as described in the requirements and meeting the contractor's design approved by FEMA. Provide all labor and material including piping (including the riser), mounting hardware, sprinkler heads and concealment within a manufactured home.201 to 400Negotiated during task order
3003AHRetrofit TPS Electrical Subsystem CONUSRetrofit the electrical subsystem that is required to provide power to the FEMA external TPS including all wiring, connections terminals breakers and the IC 60 309 mechanical interlock201 to 400Negotiated during task order
3003AIRetrofit MHU CONUSRetrofit an MHU with a residential fire sprinkler system as described in the requirements and meeting the contractor's design approved by FEMA. Provide all labor and material including piping (including the riser), mounting hardware, sprinkler heads and concealment within a manufactured home.over 400Negotiated during task order
3003AJRetrofit TPS Electrical Subsystem CONUSRetrofit the electrical subsystem that is required to provide power to the FEMA external TPS including all wiring, connections terminals breakers and the IC 60 309 mechanical interlockover 400Negotiated during task order
3004Miscellaneous and other direct expenses
3004AATravelTravel is a direct reimbursable expense using the Federal Travel Regulations (FTR). Any costs above FTR must be approved in advance.
3004ABMiscellaneousOther expenses that are approved in advance.
3005CLIN 3005 Discontinued After Base Year

Option Year 4

CLIN TableTitleShort DescriptionQuantity RangeUnit Price
4001Work in Selma, Alabama
4001AARetrofit MHU in Selma ALRetrofit an MHU with a residential fire sprinkler system as described in the requirements and meeting the contractor's design approved by FEMA. Provide all labor and material including piping (including the riser), mounting hardware, sprinkler heads and concealment within a manufactured home.1 to 50
4001ABRetrofit TPS Electrical Subsystem Selma ALRetrofit the electrical subsystem that is required to provide power to the FEMA external TPS including all wiring, connections terminals breakers and the IC 60 309 mechanical interlock1 to 50
4001ACRetrofit MHU in Selma ALRetrofit an MHU with a residential fire sprinkler system as described in the requirements and meeting the contractor's design approved by FEMA. Provide all labor and material including piping (including the riser), mounting hardware, sprinkler heads and concealment within a manufactured home.51 to 100
4001ADRetrofit TPS Electrical Subsystem Selma ALRetrofit the electrical subsystem that is required to provide power to the FEMA external TPS including all wiring, connections terminals breakers and the IC 60 309 mechanical interlock51 to 100
4001AERetrofit MHU in Selma ALRetrofit an MHU with a residential fire sprinkler system as described in the requirements and meeting the contractor's design approved by FEMA. Provide all labor and material including piping (including the riser), mounting hardware, sprinkler heads and concealment within a manufactured home.101 to 200
4001AFRetrofit TPS Electrical Subsystem Selma ALRetrofit the electrical subsystem that is required to provide power to the FEMA external TPS including all wiring, connections terminals breakers and the IC 60 309 mechanical interlock101 to 200
4001AGRetrofit MHU in Selma ALRetrofit an MHU with a residential fire sprinkler system as described in the requirements and meeting the contractor's design approved by FEMA. Provide all labor and material including piping (including the riser), mounting hardware, sprinkler heads and concealment within a manufactured home.201 to 400
4001AHRetrofit TPS Electrical Subsystem Selma ALRetrofit the electrical subsystem that is required to provide power to the FEMA external TPS including all wiring, connections terminals breakers and the IC 60 309 mechanical interlock201 to 400
4001AIRetrofit MHU in Selma ALRetrofit an MHU with a residential fire sprinkler system as described in the requirements and meeting the contractor's design approved by FEMA. Provide all labor and material including piping (including the riser), mounting hardware, sprinkler heads and concealment within a manufactured home.over 400
4001AJRetrofit TPS Electrical Subsystem Selma ALRetrofit the electrical subsystem that is required to provide power to the FEMA external TPS including all wiring, connections terminals breakers and the IC 60 309 mechanical interlockover 400
4002Work in Cumberland Maryland
4002AARetrofit MHU in Cumberland MDRetrofit an MHU with a residential fire sprinkler system as described in the requirements and meeting the contractor's design approved by FEMA. Provide all labor and material including piping (including the riser), mounting hardware, sprinkler heads and concealment within a manufactured home.1 to 50
4002ABRetrofit TPS Electrical Subsystem Cumberland MDRetrofit the electrical subsystem that is required to provide power to the FEMA external TPS including all wiring, connections terminals breakers and the IC 60 309 mechanical interlock1 to 50
4002ACRetrofit MHU in Cumberland MDRetrofit an MHU with a residential fire sprinkler system as described in the requirements and meeting the contractor's design approved by FEMA. Provide all labor and material including piping (including the riser), mounting hardware, sprinkler heads and concealment within a manufactured home.51 to 100
4002ADRetrofit TPS Electrical Subsystem Cumberland MDRetrofit the electrical subsystem that is required to provide power to the FEMA external TPS including all wiring, connections terminals breakers and the IC 60 309 mechanical interlock51 to 100
4002AERetrofit MHU in Cumberland MDRetrofit an MHU with a residential fire sprinkler system as described in the requirements and meeting the contractor's design approved by FEMA. Provide all labor and material including piping (including the riser), mounting hardware, sprinkler heads and concealment within a manufactured home.101 to 200
4002AFRetrofit TPS Electrical Subsystem Cumberland MDRetrofit the electrical subsystem that is required to provide power to the FEMA external TPS including all wiring, connections terminals breakers and the IC 60 309 mechanical interlock101 to 200
4002AGRetrofit MHU in Cumberland MDRetrofit an MHU with a residential fire sprinkler system as described in the requirements and meeting the contractor's design approved by FEMA. Provide all labor and material including piping (including the riser), mounting hardware, sprinkler heads and concealment within a manufactured home.201 to 400
4002AHRetrofit TPS Electrical Subsystem Cumberland MDRetrofit the electrical subsystem that is required to provide power to the FEMA external TPS including all wiring, connections terminals breakers and the IC 60 309 mechanical interlock201 to 400
4002AIRetrofit MHU in Cumberland MDRetrofit an MHU with a residential fire sprinkler system as described in the requirements and meeting the contractor's design approved by FEMA. Provide all labor and material including piping (including the riser), mounting hardware, sprinkler heads and concealment within a manufactured home.over 400
4002AJRetrofit TPS Electrical Subsystem Cumberland MDRetrofit the electrical subsystem that is required to provide power to the FEMA external TPS including all wiring, connections terminals breakers and the IC 60 309 mechanical interlockover 400
4003Work in Other Locations within the Contiguous United States (CONUS)
4003AARetrofit MHU CONUSRetrofit an MHU with a residential fire sprinkler system as described in the requirements and meeting the contractor's design approved by FEMA. Provide all labor and material including piping (including the riser), mounting hardware, sprinkler heads and concealment within a manufactured home.1 to 50Negotiated during task order
4003ABRetrofit TPS Electrical Subsystem CONUSRetrofit the electrical subsystem that is required to provide power to the FEMA external TPS including all wiring, connections terminals breakers and the IC 60 309 mechanical interlock1 to 50Negotiated during task order
4003ACRetrofit MHU CONUSRetrofit an MHU with a residential fire sprinkler system as described in the requirements and meeting the contractor's design approved by FEMA. Provide all labor and material including piping (including the riser), mounting hardware, sprinkler heads and concealment within a manufactured home.51 to 100Negotiated during task order
4003ADRetrofit TPS Electrical Subsystem CONUSRetrofit the electrical subsystem that is required to provide power to the FEMA external TPS including all wiring, connections terminals breakers and the IC 60 309 mechanical interlock51 to 100Negotiated during task order
4003AERetrofit MHU CONUSRetrofit an MHU with a residential fire sprinkler system as described in the requirements and meeting the contractor's design approved by FEMA. Provide all labor and material including piping (including the riser), mounting hardware, sprinkler heads and concealment within a manufactured home.101 to 200Negotiated during task order
4003AFRetrofit TPS Electrical Subsystem CONUSRetrofit the electrical subsystem that is required to provide power to the FEMA external TPS including all wiring, connections terminals breakers and the IC 60 309 mechanical interlock101 to 200Negotiated during task order
4003AGRetrofit MHU CONUSRetrofit an MHU with a residential fire sprinkler system as described in the requirements and meeting the contractor's design approved by FEMA. Provide all labor and material including piping (including the riser), mounting hardware, sprinkler heads and concealment within a manufactured home.201 to 400Negotiated during task order
4003AHRetrofit TPS Electrical Subsystem CONUSRetrofit the electrical subsystem that is required to provide power to the FEMA external TPS including all wiring, connections terminals breakers and the IC 60 309 mechanical interlock201 to 400Negotiated during task order
4003AIRetrofit MHU CONUSRetrofit an MHU with a residential fire sprinkler system as described in the requirements and meeting the contractor's design approved by FEMA. Provide all labor and material including piping (including the riser), mounting hardware, sprinkler heads and concealment within a manufactured home.over 400Negotiated during task order
4003AJRetrofit TPS Electrical Subsystem CONUSRetrofit the electrical subsystem that is required to provide power to the FEMA external TPS including all wiring, connections terminals breakers and the IC 60 309 mechanical interlockover 400Negotiated during task order
4004Miscellaneous and other direct expenses
4004AATravelTravel is a direct reimbursable expense using the Federal Travel Regulations (FTR). Any costs above FTR must be approved in advance.
4004ABMiscellaneousOther expenses that are approved in advance.
4005CLIN 4005 Discontinued After Base Year

File details come from the government source that posted it. Updated .