HSFE08-16-Q-0001_Amd_0002.pdf

PDF 158 KB Posted

Attached to
DR-4237-OST RESIDENTIAL HOUSING MISSION (2)
Solicitation number
HSFE08-16-Q-0001
Issued by

About this file

Amendment 0002

View the file

Other files

File Type Posted
Attachment_A_Pricing_Schedule.pdf PDF
HSFE08-16-Q-0001.pdf PDF
Attachment_B_-_SOW.pdf PDF
Attachment_C_-_Wage_Determination.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

HSFE08-16-Q-0001

x x

0 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

HOT SPRINGS SD 57747

FEMA

145 N CHICAGO

REGION 08

ATTN CONTRACTING OFFICE

FEDERAL EMERGENCY MANAGEMENT AGENCY

FEMA

WASHINGTON DC 20472

500 C STREET SW

FEDERAL EMERGENCYMANAGEMENT AGENCY

DR-4237-OST04/07/20160002

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

03/24/2016

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Title: Residential Housing Mission DR-4237-Oglala Sioux Tribe (OST)

This Amendment 0002 incorporates the following document:

1) Questions and Answers (See Attachment)

2) All amendments must be acknowledged. Sign, date and return SF30 with Proposal.

Receipt of Proposal remains 2:00 p.m. (MST) on Monday, 11 April 2016

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Daisy Joseph

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

Q: Item 0001AA – Jack and Level: Would this item be for conventional homes, mobile homes, or both.

A: Both

Q: Item 0001AB – Finish Grade: This has a unit of measure as EACH. Is there a way to get the average area that is to be graded?

A: A rough estimate is 50 – 100 SF.

Q: Item 0008AB – Steps, FEMA Specification: This has a unit measure as EACH. Need to know how long of a flight of stairs there would be, or are you wanting a price per step/riser?

A: Each step varies according to the height of the home from grade and the grade itself; but for the purposes of unit pricing we assumed 31” finish floor to grade height.

Q: Item 0008AC – Ramps and Landings: This has a unit measure of EACH. Need to know an average SF size, our we could give you a SF price.

A: Each ramp varies according to the height of the home from grade and the grade itself; so due to requirements of a maximum of 30’ ramp without a landing, the contractor usually gives a per each cost for the first 30’ ramp which includes a landing and ground‐transition, and then prices the per

LF cost for the remaining length of ramp which would include any landings (after the first landing mentioned above) and the ground‐transition.

File details come from the government source that posted it. Updated .