Amendment 0004
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Abstract Wadsworth Deck Repair.pdf | ||
| Amendment0006DeckRepairs.pdf | ||
| Amendment0005DeckRepairs.pdf | ||
| Amendment4WageRates.pdf | ||
| Amendment0003DeckRepairs.doc | DOC document | |
| Amendment0002DeckRepairs.doc | DOC document | |
| Drawings.zip | ZIP file | |
| P2991695Spc.pdf | ||
| DECK REPAIRS FT WADSWORTH.zip | ZIP file |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
PAGE OF PAGES
1 2
2. AMENDMENT/MODIFICATION NO.
3. EFFECTIVE DATE
06/06/2011
4. REQUISITION/PURCHASE REQ.
2411G11PRV006
5. PROJECT NO. (If applicable)
2991659
6. ISSUED BY CODE 51283 7. ADMINISTERED BY (If other than Item 6) CODE 51283
Contracting Officer USCG Civil Engineering Unit Providence 300 Metro Center Blvd.
Warwick, RI 02886-1747
Contracting Officer USCG Civil Engineering Unit Providence 300 Metro Center Blvd.
Warwick, RI 02886-1747
8. NAME AND ADDRESS OF CONTRACTOR (NO., STREET, COUNTY, STATE AND ZIP CODE)
TO ALL BIDDERS
(AMENDMENT MUST BE ACKNOWLEDGED)
9A. AMENDMENT OF SOLICITATION NO.
HSCGG1-11-B-PRV006
9B. DATED (SEE ITEM 11)
13 MAY 2011
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE REFERENCED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET
FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (SPECIFY TYPE OF MODIFICATION AND AUTHORITY)
E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The solicitation referenced in Block #9A is hereby amended to provide amended wage rates and to provide answers to a third set of technical questions as presented on the following page:
ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED. The due date for submission of Bids is extended by one week as a result of this amendment. Bids are due by 02:00 PM EST on June 20, 2011.
15A. NAME AND TITLE OF SIGNER (Type or Print)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
Jean Bretz
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED
16B UNITED STATES OF AMERICA
BY
(Signature of Contracting Officer)
16C. DATE SIGNED
NSN 7540-01-152-8070 STANDARD FORM 30 (Rev. 10-83) PREVIOUS EDITION UNUSABLE Prescribed by GSA
FAR (48 CFR) 53.243
Question #1: Bldg 446 has a severe problem on the decks on the rear on the North side. It appears the existing decks are tilted to the north due to bldg movement. If we attach new decks how can we be certain the movement will not cause damage to the new decks?
Answer #1: The Contractor shall construct new decks in accordance with the drawings and specifications, while assuming that primary settling is complete.
Question # 2: Building 455 and 443 are only two story buildings. Please note that on a mod to provide a fair bidding advantage.
Answer #2: Bldg 455 is a two story building. Bldg 443 is a partially two story and partially three story building.
Question #3: Is it possible to renovate three buildings at the same time. The specification suggests two but due to schedule constraints and winter it would help if doing three was possible.
Answer #3: It is possible to renovate three buildings at the same time, so long as the contractor uses three independent work crews. Work on the three buildings must be completed before moving on to the next buildings.
Question #4: Detail A4 on Dwg. A401 shows to use 5/4 by 6 decking on decks. There is plastic deck boards on some existing decks. Is detail A4 correct?
Answer #4: For bidding purposes assume that detail A4 is correct. Minor alterations may exist on some buildings, and this would be addressed during construction.
Question #5: The dwgs. refer to Base Bid, Option 1 and Option 2 but the solicitation has no place to insert the pricing in that format, please clarify.
Answer #5: The 1st paragraph of Section B of the IFB states in Bold Capital lettering: NOTE: ALL REFERENCE TO OPTIONS WILL
BE IGNORED. THIS PROJECT EFFORT IS ALL INCLUSIVE.
Question #6: Please note when demo and replace rear decks, the CG will have to provide access to the contractor to allow temp barriers to be put in front of slider doors. How will this occur?
Answer #6: Arrangements can be made with Housing to notify the residents.
Review SECTION 01 14 00, paragraph 1.1.1 and 1.1.4 for work restrictions on occupied buildings.
Amended Wage rates are included as attachment (Amendment4WageRates).