Amendment0003DeckRepairs.doc

DOC document 67 KB Posted

Attached to
FT WADSWORTH HOUSING DECK REPAIRS & REPLACEMENT, STATEN ISLAND, NY Federal contract opportunity
Solicitation number
HSCGG1-11-B-PRV006
Issued by
Department of Homeland Security US Coast Guard

About this file

Amendment 0003

View the file

Other files for this federal contract opportunity

Other files attached to FT WADSWORTH HOUSING DECK REPAIRS & REPLACEMENT, STATEN ISLAND, NY, newest first.
File Type Posted
Abstract Wadsworth Deck Repair.pdf PDF
Amendment0006DeckRepairs.pdf PDF
Amendment0005DeckRepairs.pdf PDF
Amendment4WageRates.pdf PDF
Amendment0004DeckRepairs.pdf PDF
Amendment0002DeckRepairs.doc DOC document
Drawings.zip ZIP file
P2991695Spc.pdf PDF
DECK REPAIRS FT WADSWORTH.zip ZIP file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

PAGE OF PAGES

1 3

2. AMENDMENT/MODIFICATION NO.

3. EFFECTIVE DATE

06/03/2011

4. REQUISITION/PURCHASE REQ.

2411G11PRV006

5. PROJECT NO. (If applicable)

2991659

6. ISSUED BY CODE
51283
7. ADMINISTERED BY (If other than Item 6) CODE
51283

Contracting Officer USCG Civil Engineering Unit Providence

300 Metro Center Blvd.

Warwick, RI 02886 -1747 Contracting Officer USCG Civil Engineering Unit Providence

300 Metro Center Blvd.

Warwick, RI 02886 -1747

8. name and address of contractor (No., street, county, state and ZIP Code)

TO ALL BIDDERS

(AMENDMENT MUST BE ACKNOWLEDGED)

FORMCHECKBOX

9a. amendment of solicitation no.

HSCGG1-11-B-PRV006

9b. dated (see item 11)

13 MAY 2011

FORMCHECKBOX

10a. modification of contract/order no.

10b. dated (see item 13)

CODE
FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers FORMCHECKBOX is extended, FORMCHECKBOX is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF

OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

FORMCHECKBOX

A.

THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

FORMCHECKBOX

B.

THE ABOVE REFERENCED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

FORMCHECKBOX

C.

THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

FORMCHECKBOX

D.

OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor FORMCHECKBOX is not, FORMCHECKBOX is required to sign this document and return 1 copies to the issuing office.

14. description of amendment/modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The solicitation referenced in Block #9A is hereby amended to provide answers to a second set of technical questions as presented on the following page:

All other terms and conditions remain unchanged. The due date for submission of Bids is NOT extended as a result of this amendment. Bids remain due by 02:00 PM EST on June 13, 2011.

15A. name and title of signer (Type or Print)

16a. name and title of contracting officer (Type or print) Jean Bretz

15b. contractor/offeror

(Signature of person authorized to sign) 15c. date signed

16b united states of america

BY

(Signature of Contracting Officer) 16c. date signed

NSN 7540-01-152-8070

STANDARD FORM 30 (Rev. 10-83)

PREVIOUS EDITION UNUSABLE

Prescribed by GSA

FAR (48 CFR) 53.243

Question #1: Several of the decks have satellite dishes and related cables mounted on the existing deck rails. Who is responsible for removing and remounting these items?

Answer #1: The contractor shall be responsible for removing satellite dishes and related cables. Satellite dishes and cables shall be turned over to the resident(s) of the unit from which the equipment was removed.

Question # 2: Many of the decks have barbeque grills, patio furniture, etc. on the decks. Who is responsible for removing and replacing these items?

Answer #2: The tenants will be responsible for removing personal items from the decks. Any discrepancies or questions should be addressed to Coast Guard Sector New York.

Question #3: Many of the decks have hangers for plants attached to the underside of the deck and/or columns. Will these be removed by others or just disposed of during demolition? Are there any provisions for future plants?

Answer #3: The contractor shall remove plant hangers from the underside of the affected decks and/or columns. The contractor shall not make any special provisions for future plants.

Question #4: The existing concrete bases for the columns are 12” x 12” and sometimes do not appear to be in the proper location to be centered on the new 6” x 6” columns. Our stand, if we were to design the new bases, would be to use an 18” x 18” base for a 6” x 6” post. Given the potential for exerting loads, was this base considered? Please advise how you would like this item addressed.

Answer #4: The 18”x18” base was not specifically considered, but would be acceptable if the contractor selects this size.

Question #5: The drawings call for new splash blocks. In most cases the splash blocks can be reused and are in good condition. Please advise.

Answer #5: For bidding purposes, assume all splash blocks will be replaced. The KO may approve reuse of certain splash blocks.

Question #6: It is assumed a dumpster can be spotted in the areas adjacent to the demolition. This will be coordinated to provide a minimal amount of interference. Please advise.

Answer #6: Coordinate dumpster location with Coast Guard Sector New York. The contractor should be aware that the dumpster location(s) may not be in the exact location desired. Also, the Coast Guard may decide on central locations depending on the sequence and section of housing.

Question #7: It is inevitable that some grass will get damaged during construction. We assume that the damaged areas will be graded, fertilized and mulched but maintenance and cutting is not provided under this contract; since this would be an excessive cost.

Answer #7: See Specification SECTION 01 50 00 paragraph 3.3. Also, the contractor shall be responsible for lawn maintenance during construction and restoration immediately after the buildings are completed.

Question #8: Exterior painting of the front balconies states “exterior painting of the front balconies shall be limited to items exposed to view such as wood rim joists and trim designated for replacement.” Does this mean only that the replaced or new items get painted, or is it intended that all surfaces that are presently painted and the new items get repainted? Please advise.

Answer #8: The intent is to paint all surfaces that are presently painted, in addition to painting the replaced surfaces.

Question #9: On the Type 1 units at the building’s end, rear, it shows to the new 6” x 6” posts into the soffit. These posts are beyond the soffit depth of the soffit (see Elev. 8, B-2).

Answer #9: The posts shall extend to the soffit.

Question #10: We assume the demising walls between the center rear balconies in the Type 1units get removed and replaced in their entirety. Please advise.

Answer #10: The wall shall be removed and not replaced.

Question #11: Buildings 423 and 453 call to have rotted rim joists replaced. Does this mean the whole 22-foot, plus, span? Please advise.

Answer #11: The entire 22-ft +/- shall be replaced.

Question #12: The phasing calls for a maximum of two (2) buildings to be worked on at the same time. Are the tenants going to remain in the units while the decks are being replaced, if so what will be the protocol for securing the existing doors? Is there a swing time between units?

Answer #12: Residents will remain in the apartments, and directed to not open the deck doors. The Contractor shall be required to put "Caution/Danger" signs on and tape across the door. At minimum, a block of wood should be installed in the inside track to prevent the door from opening. A second option is to install a pin through the inside track to prevent the door from opening; this option would require restoration to the track/threshold.