PENDANT.SECTION_B_SERVICE_AND_SUPPLIES_(BLANK).xls

XLS spreadsheet 28 KB Posted

Attached to
CGC PENDANT DRYDOCK REPAIRS
Solicitation number
HSCG85-18-Q-P45L21
Issued by

About this file

SECTION B SUPPLIES AND SERVICES FOR THE CGC PENDANT

View the file

Other files

File Type Posted
PENDANTCOMBINE_SYNOPSIS_SOLICITATION24AUG2017.docx DOCX document
PENDANT_Request_for_Clarification.docx DOCX document
PENDANT.Ombudsman_Notice.doc DOC document
PENDANT.SPEC_(WYTL_65B)_DD_FQ1_AJN_18R0.doc DOC document
PENDANT.Past_Performance_Questionnaire.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

PRICING SCHEDULE FOR:
USCGC PENDANT (WYTL-65B) DRYDOCK AVAILABILITY FY2018
ITEMDESCRIPTIONUNIT PRICEUNITQTYEXTENDED PRICETypeAFC
D-001Hull Plating (U/W Body), Inspect$0.00JOB1$0.00RWI45
D-002Appendages (U/W) - Internal, Preserve$0.00JOB1$0.00RWI45
D-003Propulsion Shafting; Remove, Inspect, and Reinstall$0.00JOB1$0.00RWI45
O-004Propulsion Shafting, Straighten$0.00JOB1$0.00RWI45
D-005Stern Tube, Renew$0.00JOB1$0.00RWI45
D-006Propeller, Remove, Inspect, and Reinstall$0.00JOB1$0.00RWI45
D-007Keel Coolers, Clean, Inspect and Hydro$0.00JOB1$0.00RWI45
D-008Fathometer Transducer, Renew$0.00JOB1$0.00RWI42
D-009Sea Valves and Waster Pieces, Overhaul or Renew$0.00JOB1$0.00RWI45
D-010Sea Strainers (All Sizes), Renew$0.00JOB1$0.00RWI45
D-011Sea Strainers - Duplex (All Sizes), Overhaul$0.00JOB1$0.00RWI45
D-012Hot Water Accumulator Tanks, Clean and Inspect$0.00JOB1$0.00RWI30
D-013Rudder Assembly; Remove, Inspect And Reinstall$0.00JOB1$0.00RWI45
D-014Rudder Stock Bearings Clearances, Check$0.00JOB1$0.00RWI45
D-015U/W Body, Preserve (100%)$0.00JOB1$0.00RWI45
O-016U/W Body, Preserve (Partial - Condition A)$0.00JOB1$0.00RWI45
O-017U/W Body, Preserve (Partial - Condition B)$0.00JOB1$0.00RWI45
O-018U/W Body, Preserve (Partial - Condition C)$0.00JOB1$0.00RWI45
D-019Hull Plating Freeboard, Preserve “100%”$0.00JOB1$0.00RWI30
O-020Main Mast, Preserve (100%)$0.00JOB1$0.00RWI30
D-021Cathodic Protection / Zinc Anodes, Renew$0.00JOB1$0.00RWI45
D-022Drydock$0.00JOB1$0.00RWI45
D-023Sea Trial Performance, Support, Provide$0.00JOB1$0.00RWI45
O-024Sewage Pump (Forward), Upgrade$0.00JOB1$0.00TCTO45
O-025Stack Handrail, Renew$0.00JOB1$0.00CSMP30
O-026Decks- Exterior, Preserve 100%$0.00JOB1$0.00RWI30
D-027Hull Plating Forward Renew$0.00JOB1$0.00CSMP45
D-028Sewage and Grey Water tanks, Commercial Clean$0.00JOB1$0.00RWI45
D-029Bulwark Stifeners, Repair$0.00JOB1$0.00RWI45
O-030Hull and Structural Plating (General) -10.2-Pound Steel, Renew$0.00SQ FT1$0.00RWI45
O-031Hull and Structural Plating (General) - 12.75-Pound Steel Plate, Renew$0.00SQ FT1$0.00RWI45
O-032Hull and Structural Plating (General) - 15.3-Pound Steel Plate, Renew$0.00SQ FT1$0.00RWI45
O-033Hull and Structural Plating (General) - 7.65- Pound Steel Plate, Renew$0.00SQ FT1$0.00RWI45
D-034Temporary Services, Provide - Tender$0.00JOB1$0.00RWI45
D-035Sewage Piping, Clean and Flush$0.00JOB1$0.00RWI45
O-00AComposite Labor Rate0Hour3100
D-00BGFP ReportNSPEANSP
O-00ZLaydays$0.00Day5$0.00
Total Price of Definite Items$0.00
Total Price of Option Items$0.00
Total Price of Definite and Optional Items$0.00

Sheet2

Sheet3

File details come from the government source that posted it. Updated .