PENDANT.SECTION_B_SERVICE_AND_SUPPLIES_(BLANK).xls
XLS spreadsheet 28 KB Posted
- Attached to
- CGC PENDANT DRYDOCK REPAIRS
- Solicitation number
- HSCG85-18-Q-P45L21
About this file
SECTION B SUPPLIES AND SERVICES FOR THE CGC PENDANT
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PENDANTCOMBINE_SYNOPSIS_SOLICITATION24AUG2017.docx | DOCX document | |
| PENDANT_Request_for_Clarification.docx | DOCX document | |
| PENDANT.Ombudsman_Notice.doc | DOC document | |
| PENDANT.SPEC_(WYTL_65B)_DD_FQ1_AJN_18R0.doc | DOC document | |
| PENDANT.Past_Performance_Questionnaire.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| PRICING SCHEDULE FOR: | |||||||
| USCGC PENDANT (WYTL-65B) DRYDOCK AVAILABILITY FY2018 | |||||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE | Type | AFC |
| D-001 | Hull Plating (U/W Body), Inspect | $0.00 | JOB | 1 | $0.00 | RWI | 45 |
| D-002 | Appendages (U/W) - Internal, Preserve | $0.00 | JOB | 1 | $0.00 | RWI | 45 |
| D-003 | Propulsion Shafting; Remove, Inspect, and Reinstall | $0.00 | JOB | 1 | $0.00 | RWI | 45 |
| O-004 | Propulsion Shafting, Straighten | $0.00 | JOB | 1 | $0.00 | RWI | 45 |
| D-005 | Stern Tube, Renew | $0.00 | JOB | 1 | $0.00 | RWI | 45 |
| D-006 | Propeller, Remove, Inspect, and Reinstall | $0.00 | JOB | 1 | $0.00 | RWI | 45 |
| D-007 | Keel Coolers, Clean, Inspect and Hydro | $0.00 | JOB | 1 | $0.00 | RWI | 45 |
| D-008 | Fathometer Transducer, Renew | $0.00 | JOB | 1 | $0.00 | RWI | 42 |
| D-009 | Sea Valves and Waster Pieces, Overhaul or Renew | $0.00 | JOB | 1 | $0.00 | RWI | 45 |
| D-010 | Sea Strainers (All Sizes), Renew | $0.00 | JOB | 1 | $0.00 | RWI | 45 |
| D-011 | Sea Strainers - Duplex (All Sizes), Overhaul | $0.00 | JOB | 1 | $0.00 | RWI | 45 |
| D-012 | Hot Water Accumulator Tanks, Clean and Inspect | $0.00 | JOB | 1 | $0.00 | RWI | 30 |
| D-013 | Rudder Assembly; Remove, Inspect And Reinstall | $0.00 | JOB | 1 | $0.00 | RWI | 45 |
| D-014 | Rudder Stock Bearings Clearances, Check | $0.00 | JOB | 1 | $0.00 | RWI | 45 |
| D-015 | U/W Body, Preserve (100%) | $0.00 | JOB | 1 | $0.00 | RWI | 45 |
| O-016 | U/W Body, Preserve (Partial - Condition A) | $0.00 | JOB | 1 | $0.00 | RWI | 45 |
| O-017 | U/W Body, Preserve (Partial - Condition B) | $0.00 | JOB | 1 | $0.00 | RWI | 45 |
| O-018 | U/W Body, Preserve (Partial - Condition C) | $0.00 | JOB | 1 | $0.00 | RWI | 45 |
| D-019 | Hull Plating Freeboard, Preserve “100%” | $0.00 | JOB | 1 | $0.00 | RWI | 30 |
| O-020 | Main Mast, Preserve (100%) | $0.00 | JOB | 1 | $0.00 | RWI | 30 |
| D-021 | Cathodic Protection / Zinc Anodes, Renew | $0.00 | JOB | 1 | $0.00 | RWI | 45 |
| D-022 | Drydock | $0.00 | JOB | 1 | $0.00 | RWI | 45 |
| D-023 | Sea Trial Performance, Support, Provide | $0.00 | JOB | 1 | $0.00 | RWI | 45 |
| O-024 | Sewage Pump (Forward), Upgrade | $0.00 | JOB | 1 | $0.00 | TCTO | 45 |
| O-025 | Stack Handrail, Renew | $0.00 | JOB | 1 | $0.00 | CSMP | 30 |
| O-026 | Decks- Exterior, Preserve 100% | $0.00 | JOB | 1 | $0.00 | RWI | 30 |
| D-027 | Hull Plating Forward Renew | $0.00 | JOB | 1 | $0.00 | CSMP | 45 |
| D-028 | Sewage and Grey Water tanks, Commercial Clean | $0.00 | JOB | 1 | $0.00 | RWI | 45 |
| D-029 | Bulwark Stifeners, Repair | $0.00 | JOB | 1 | $0.00 | RWI | 45 |
| O-030 | Hull and Structural Plating (General) -10.2-Pound Steel, Renew | $0.00 | SQ FT | 1 | $0.00 | RWI | 45 |
| O-031 | Hull and Structural Plating (General) - 12.75-Pound Steel Plate, Renew | $0.00 | SQ FT | 1 | $0.00 | RWI | 45 |
| O-032 | Hull and Structural Plating (General) - 15.3-Pound Steel Plate, Renew | $0.00 | SQ FT | 1 | $0.00 | RWI | 45 |
| O-033 | Hull and Structural Plating (General) - 7.65- Pound Steel Plate, Renew | $0.00 | SQ FT | 1 | $0.00 | RWI | 45 |
| D-034 | Temporary Services, Provide - Tender | $0.00 | JOB | 1 | $0.00 | RWI | 45 |
| D-035 | Sewage Piping, Clean and Flush | $0.00 | JOB | 1 | $0.00 | RWI | 45 |
| O-00A | Composite Labor Rate | 0 | Hour | 310 | 0 | ||
| D-00B | GFP Report | NSP | EA | NSP | |||
| O-00Z | Laydays | $0.00 | Day | 5 | $0.00 | ||
| Total Price of Definite Items | $0.00 | ||||||
| Total Price of Option Items | $0.00 | ||||||
| Total Price of Definite and Optional Items | $0.00 |
Sheet2
Sheet3
File details come from the government source that posted it. Updated .