Attachment_1-Section_B_Pricing-REv1-07DEC2016.xls
XLS spreadsheet 52 KB Posted
- Attached to
- USCGC SEQUOIA DRYDOCK REPAIRS
- Solicitation number
- HSCG85-17-Q-P45025
About this file
Attachment 1- Section B Schedule of Supplies and Services
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
| PRICING SCHEDULE FOR: | |||||
| USCGC SEQUOIA (WLB-225B) DRYDOCK AVAILABILITY FY2017 | |||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | Hull Plating (U/W Body), Inspect | JOB | 1 | $ - 0 | |
| D-002 | Hull Plating (U/W Body), Ultrasonic Testing | JOB | 1 | $ - 0 | |
| D-003 | Appendages (U/W), Leak Test | JOB | 1 | $ - 0 | |
| D-004 | Propulsion Shaft Fairwaters and Rope Guards, Inspect | JOB | 1 | $ - 0 | |
| O-005 | Appendages (U/W) - Internal, Preserve | JOB | 1 | $ - 0 | |
| D-006 | Chain Locker(s), Clean and Inspect | JOB | 1 | $ - 0 | |
| D-007 | Voids (Non-Accessible), Leak Test | JOB | 1 | $ - 0 | |
| D-008 | Tanks (Potable Water), Clean and Inspect | JOB | 1 | $ - 0 | |
| D-009 | Tanks (Ballast), Clean and Inspect | JOB | 1 | $ - 0 | |
| O-010 | Propulsion Shafting; Remove, Inspect, and Reinstall | JOB | 1 | $ - 0 | |
| D-011 | Propulsion Shaft Seals, Mechanical Overhaul And Inflatable Renewal | JOB | 1 | $ - 0 | |
| D-012 | Propulsion Shaft Seals (Bulkhead), Overhaul | JOB | 1 | $ - 0 | |
| D-013 | Strain Gage Alignment, Check | JOB | 1 | $ - 0 | |
| O-014 | Propulsion Shafting, Optical Or Laser Alignment Check | JOB | 1 | $ - 0 | |
| D-015 | Propulsion Stern Tube Bearings, Check Clearances | JOB | 1 | $ - 0 | |
| D-016 | Propulsion Shaft Bearings (External), Check Clearances | JOB | 1 | $ - 0 | |
| O-017 | Propulsion Tail Shaft Sleeve, Skim Cut | JOB | 1 | $ - 0 | |
| O-018 | Propulsion Shaft Bearing, Stave Renewal | JOB | 1 | $ - 0 | |
| D-019 | Controllable Pitch Propellers, Clean and Inspect | JOB | 1 | $ - 0 | |
| D-020 | Controllable Pitch Propeller, System Maintenance | JOB | 1 | $ - 0 | |
| D-021 | Controllable Pitch Propeller Hub, General Maintenance, Perform | JOB | 1 | $ - 0 | |
| O-022 | Controllable Pitch Propeller Hub, Remove and Reinstall | JOB | 1 | $ - 0 | |
| D-023 | Fathometer Transducer, General Maintenance | JOB | 1 | $ - 0 | |
| D-024 | Underwater (Speed) Log Transducer(s), Renew | JOB | 1 | $ - 0 | |
| D-025 | Fwd Scan Sonar Transducer, General Maintenance, Perform | JOB | 1 | $ - 0 | |
| D-026 | Vent Ducts (Laundry Exhaust), Commercial Cleaning | JOB | 1 | $ - 0 | |
| D-027 | Sea Valves and Waster Pieces, Overhaul or Renew | JOB | 1 | $ - 0 | |
| O-028 | Sea Bay, Preserve - Partial | JOB | 1 | $ - 0 | |
| D-029 | Sea Bay, Clean and Inspect | JOB | 1 | $ - 0 | |
| O-030 | Sea Bay, Preserve 100% | JOB | 1 | $ - 0 | |
| D-031 | Rudder(s), Preserve (“100%”) | JOB | 1 | $ - 0 | |
| D-032 | Rudder Stock Bearings, Check Clearances | JOB | 1 | $ - 0 | |
| D-033 | Rudder, Inspect and Repair | JOB | 1 | $ - 0 | |
| O-034 | Rudder and Rudder Stock, Remove and Inspect | JOB | 1 | $ - 0 | |
| D-035 | Thruster Units (Bow And Stern), Overhaul | JOB | 1 | $ - 0 | |
| D-036 | Anchor Chain(s) and Ground Tackle, Inspect and Repair | JOB | 1 | $ - 0 | |
| O-037 | Anchor Chain and Ground Tackle, Preserve | JOB | 1 | $ - 0 | |
| O-038 | Anchor(s), Preserve | JOB | 1 | $ - 0 | |
| O-039 | Hawse Pipes, Preserve | JOB | 1 | $ - 0 | |
| D-040 | Warping Capstan, Inspect and Service | JOB | 1 | $ - 0 | |
| D-041 | Buoy Crane, Appleton Eb4806040, Inspect And Service | JOB | 1 | $ - 0 | |
| O-042 | Tanks (Ballast), Preserve “100%” | JOB | 1 | $ - 0 | |
| O-043 | Tanks (Ballast), Preserve “Partial” | JOB | 1 | $ - 0 | |
| O-044 | Chain Locker, Preserve 100% | JOB | 1 | $ - 0 | |
| O-045 | Chain Lockers, Preserve - Partial | JOB | 1 | $ - 0 | |
| O-046 | Tanks (Potable Water), Preserve “100%” | JOB | 1 | $ - 0 | |
| O-047 | Tanks (Potable Water), Preserve “Partial” | JOB | 1 | $ - 0 | |
| O-048 | U/W Body, Preserve (100%) | JOB | 1 | $ - 0 | |
| O-049 | U/W Body, Preserve (Partial - Condition A) | JOB | 1 | $ - 0 | |
| O-050 | U/W Body, Preserve (Partial - Condition B) | JOB | 1 | $ - 0 | |
| O-051 | U/W Body, Preserve (Partial - Condition C) | JOB | 1 | $ - 0 | |
| O-052 | Stern Tube Interior Surfaces, Preserve 100% | JOB | 1 | $ - 0 | |
| O-053 | Hull Plating Freeboard (Buoy Port Areas), Preserve | JOB | 1 | $ - 0 | |
| D-054 | Hull Plating Freeboard, Preserve “100%” | JOB | 1 | $ - 0 | |
| D-055 | Cathodic Protection / Zinc Anodes, Renew | JOB | 1 | $ - 0 | |
| D-056 | Impressed Current Cathodic Protection System, Inspect and Maintain | JOB | 1 | $ - 0 | |
| O-057 | Impressed Current Cathodic Protection System Anodes, Renew | JOB | 1 | $ - 0 | |
| O-058 | Impressed Current Cathodic Protection System Reference Cells, Renew | JOB | 1 | $ - 0 | |
| O-059 | Impressed Current Cathodic Protection System Dielectric Shield, Repair | JOB | 1 | $ - 0 | |
| O-060 | Impressed Current Cathodic Protection System Dielectric Shield (Capastic Fairing), Renew | JOB | 1 | $ - 0 | |
| D-061 | Drydock | JOB | 1 | $ - 0 | |
| D-062 | Temporary Services, Provide - Cutter | JOB | 1 | $ - 0 | |
| O-063 | Temporary Messing, Provide | JOB | 1 | $ - 0 | |
| O-064 | Temporary Berthing, Provide | JOB | 1 | $ - 0 | |
| D-065 | Sea Trial Performance, Support, Provide | JOB | 1 | $ - 0 | |
| O-066 | Watertight Doors and Scuttles (Internal, DC Deck and Below), Renew | JOB | 1 | $ - 0 | |
| O-067 | Bilges (Machinery Spaces), Preserve | JOB | 1 | $ - 0 | |
| O-068 | SORS Cargo Hold Deck and Bilges, Preserve | JOB | 1 | $ - 0 | |
| D-069 | Deck Covering, Wet/ Dry, Seal | JOB | 1 | $ - 0 | |
| O-070 | Deck Covering (Interior Wet/Dry), Renew | JOB | 1 | $ - 0 | |
| D-071 | Compartment Insulation (General), Renew | JOB | 1 | $ - 0 | |
| O-072 | SSDG Isolation Mount, Renew | JOB | 1 | $ - 0 | |
| O-073 | Hull and Structural Plating (General) - 15.3-Pound Steel Plate, Renew | SQ FT | 1 | $ - 0 | |
| O-074 | Hull And Structural Plating (General) - 20.4-Pound Steel Plate, Renew | SQ FT | 1 | $ - 0 | |
| D-075 | Circuit Breakers (60 Hz), Inspect and Test | JOB | 1 | $ - 0 | |
| D-076 | Sewage Holding Tank(s), Clean and Inspect | JOB | 1 | $ - 0 | |
| D-077 | Sewage Piping, Clean And Flush | JOB | 1 | $ - 0 | |
| O-078 | Tanks (Sewage Holding), Preserve “100%” | JOB | 1 | $ - 0 | |
| O-079 | Tanks (Sewage Holding), Preserve “Partial” | JOB | 1 | $ - 0 | |
| D-080 | Decks – Exterior (Buoy or Construction Deck), Preserve 100% | JOB | 1 | $ - 0 | |
| O-081 | Superstructure, Preserve “100%” | JOB | 1 | $ - 0 | |
| O-082 | Superstructure, Preserve “Partial” | JOB | 1 | $ - 0 | |
| O-083 | Main Diesel Engine, Mount Upgrade | JOB | 1 | $ - 0 | |
| O-084 | Watertight Hatches (External DC Deck and Below), Renew | JOB | 1 | $ - 0 | |
| O-085 | Watertight Doors and Scuttles (External), Renew | JOB | 1 | $ - 0 | |
| D-086 | Fuel Oil System Piping, Repair | JOB | 1 | $ - 0 | |
| O-087 | Boat Lockers, Preserve | JOB | 1 | $ - 0 | |
| D-088 | Life Raft Cradles. Preserve | JOB | 1 | $ - 0 | |
| D-089 | Exhaust System Mounts, Renew | JOB | 1 | $ - 0 | |
| D-090 | Cutter Boat, Large (CBL) Cradle, Renew | JOB | 1 | $ - 0 | |
| D-091 | Grabrails and Footrails, Renew | JOB | 1 | $ - 0 | |
| D-092 | Emergency Diesel Generator (EDG) Radiator, Renew | JOB | 1 | $ - 0 | |
| D-093 | Air Castles and Fantail Hangers and Securing Points, Renew | JOB | 1 | $ - 0 | |
| D-094 | EDG Louver, Renewal | JOB | 1 | $ - 0 | |
| D-095 | Line Shaft Bearing Foundation, Repair | JOB | 1 | $ - 0 | |
| D-096 | Lube Oil Piping, Renew | JOB | 1 | $ - 0 | |
| D-097 | Reduction Gear Seal, Renew | JOB | 1 | $ - 0 | |
| D-098 | Gooseneck Vent and Closures, Renew | JOB | 1 | $ - 0 | |
| O-099 | Bilges (Bow Thruster Room), Preserve | JOB | 1 | $ - 0 | |
| D-100 | Vent Duct Systems, Renew | JOB | 1 | $ - 0 | |
| D-101 | AMR/MMR Natural Exhaust Louver, Renewal | JOB | 1 | $ - 0 | |
| O-102 | Fantail Shore Tie Enclosure, Preserve | JOB | 1 | $ - 0 | |
| O-103 | Main Mast Interior Deck, Preserve | JOB | 1 | $ - 0 | |
| O-104 | Decks Exterior, Preserve (“Non-Skid Broadcast Grit” System) Partial | JOB | 1 | $ - 0 | |
| D-105 | CPP Hydraulic Oil Power Module (HOPM) Foundation, Repair | JOB | 1 | $ - 0 | |
| D-106 | Air Handler Unit, Renew | JOB | 1 | $ - 0 | |
| D-107 | Firemain Isolation Valves, Renew | JOB | 1 | $ - 0 | |
| O-108 | Incinerator Room Deck, Preserve | JOB | 1 | $ - 0 | |
| D-109 | Air System Aftercooler, Maintenance | JOB | 1 | $ - 0 | |
| D-110 | Crane and Buoy Deck HPU’s Coolers hydraulic and ASW piping, Renew | JOB | 1 | $ - 0 | |
| D-111 | Walk-In Reefer and Freezer, Repair and Renew | JOB | 1 | $ - 0 | |
| O-112 | Stack Lighting, Install | JOB | 1 | $ - 0 | |
| D-113 | Cross Deck Winch, Renew | JOB | 1 | $ - 0 | |
| D-114 | Hydraulic Chain Stopper, Renew | JOB | 1 | $ - 0 | |
| D-115 | Anchor Windlass, Renew | JOB | 1 | $ - 0 | |
| O-116 | Sea Bay, Repair | JOB | 1 | $ - 0 | |
| D-117 | AC Foundation Resilient Mounts, Renew | JOB | 1 | $ - 0 | |
| D-118 | Life Rails and Stanchions Renew | JOB | 1 | $ - 0 | |
| D-119 | SORS Cargo Hatch, Repair | JOB | 1 | $ - 0 | |
| D-120 | Cargo Hatch Repair | JOB | 1 | $ - 0 | |
| D-121 | Thruster Generator Clean & Inspect | JOB | 1 | $ - 0 | |
| D-122 | Incinerator, Overhaul and Repair | JOB | 1 | $ - 0 | |
| D-123 | Hull Fittings (Weight Handling Rigging Hardware), Inspect and Test | JOB | 1 | $ - 0 | |
| O-00A | Composite Labor Rate | Hour | 2300 | 0 | |
| O-00B | Laydays | Day | 5 | $ - 0 | |
| O-00C | Loading Rates | Percentage | $ 200,000.00 | $ - 0 | |
| O-00D | Temporary Services during Lay Days | Day | 10 | $ - 0 | |
| O-00E | Crane | Hour | 50 | $ - 0 | |
| O-00F | Forklift | Hour | 50 | $ - 0 | |
| O-00G | Oily Waste Offload | Gallon | 100 | $ - 0 | |
| O-00H | Paint Thinner | Gallon | 50 | $ - 0 | |
| Total Price of Definite Items | $ - 0 | ||||
| Total Price of Option Items | $ - 0 | ||||
| Total Price of Definite and Optional Items | $ - 0 |
&C
Draft-3 - Page &P of &N
File details come from the government source that posted it. Updated .