Questions-Answers_03.docx
DOCX document 18 KB Posted
- Attached to
- CGC HICKORY FY13 DOCK-SIDE REPAIRS Federal contract opportunity
- Solicitation number
- HSCG85-13-R-P45N13
About this file
Questions and Answers for Amendment 00003 to CGC HICKORY FY13 DS
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 00004_SF30.docx | DOCX document | |
| Questions-Answers_04.docx | DOCX document | |
| IMG_3689.jpg | JPG image | |
| 00003_SF30.docx | DOCX document | |
| IMG_3686.jpg | JPG image | |
| IMG_3583.pdf | ||
| EC078_57300_E-brak_Mod_0512_225_175.pdf | ||
| 00002_SF30.docx | DOCX document | |
| Questions-Answers_02.docx | DOCX document | |
| HICKORY_(WLB_225B)_DS_KDM_13R0.pdf | ||
| Request_for_Clarification_(HICKORY).doc | DOC document | |
| NOTICE_TO_OFFERORS_HICKORY.docx | DOCX document | |
| Cover_Sheet_(Solicitation).docx | DOCX document | |
| GOVERNMENT_PROPERTY_REPORT.docx | DOCX document | |
| SF1449_(P45N13).pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
| Request for Proposal | HSCG85-13-R-P45N13 |
| DOCK-SIDE REPAIRS OF CGC HICKORY (WLB-212) | Amendment 0003 |
A. Questions/Answers to Request for Clarification with regards to dock-side repairs of CGC HICKORY (WLB - 212 )
0001 Question: Will Contractor be given an area on the pier to use for equipment and storage lay down?
Answer: Yes, an area will be provided for this purpose.
0002 Question: Definite Item 09, Temporary Services, Paragraph No. 3.3.8; What are the weight limitations on the pier that the vessel will be moored at?
Answer: Max Pier Deck Loads are as follows:
Uniform Loads – 600 lbs psf Vehicle Axle Load – 32,000 lbs
0003 Question: Solicitation Section 29, Inspection of Cutter Prior to Submission of Proposals, Paragraph a; May the Government provide a different contact and schedule of vessel to Contractor so ship checks can be arranged?
Answer: Please contact the cutter’s EO CWO4 Mike Kimberlin at (907) 738-9944 or at michael.a.kimberlin@uscg.mil
0004 Question: Definite Item 09, Temporary Services, Paragraph No. 3.3.11.3 Cooling Water and 3.3.11.4 Fire main system; What type of services are available on the pier/dock? Is there a fire main presently on the pier/dock? Is the Contractor to provide fire trees for the Cutter?
Answer: There is not a ship hookup for the fire main on the pier, although there is a base system of hydrants that would be used by the local fire department if necessary. The Contractor will be required to provide fire trees because of work item 21and cooling water onboard the Cutter.
0005 Question: Definite Item 16, Potable Water Tank Repair, Paragraph No. 3.3.1; Will Government provide pictures of the tank plate deformation areas?
Answer: Yes, please see attachments 1, 2 and 3.
B. This Solicitation is not extended.
NOTES: ACKNOWLEDGE RECEIPT OF ALL AMENDMENTS IN PROPOSALS.
A. THE SOLICITATION PERIOD IS NOT EXTENDED.
B. ALL OTHER TERMS AND CONDITIONS CITED IN THE ORIGINAL SOLICITATION REMAIN THE SAME.
File details come from the government source that posted it. Updated .