EC078_57300_E-brak_Mod_0512_225_175.pdf
PDF 71 KB Posted
- Attached to
- CGC HICKORY FY13 DOCK-SIDE REPAIRS Federal contract opportunity
- Solicitation number
- HSCG85-13-R-P45N13
About this file
Work Item 06 for CGC HICKORY FY13 DS
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 00004_SF30.docx | DOCX document | |
| Questions-Answers_04.docx | DOCX document | |
| Questions-Answers_03.docx | DOCX document | |
| 00003_SF30.docx | DOCX document | |
| IMG_3686.jpg | JPG image | |
| IMG_3689.jpg | JPG image | |
| IMG_3583.pdf | ||
| 00002_SF30.docx | DOCX document | |
| Questions-Answers_02.docx | DOCX document | |
| HICKORY_(WLB_225B)_DS_KDM_13R0.pdf | ||
| Request_for_Clarification_(HICKORY).doc | DOC document | |
| Cover_Sheet_(Solicitation).docx | DOCX document | |
| GOVERNMENT_PROPERTY_REPORT.docx | DOCX document | |
| SF1449_(P45N13).pdf | ||
| NOTICE_TO_OFFERORS_HICKORY.docx | DOCX document |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EC078_57300_ANK_0812_225/175
WORK ITEM 6: Buoy Chain Winch and Cross deck winch Emergency
Brake Release Hand Pump Modifications
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to convert the emergency brake release hand pump and piping fittings from a fixed mount to a portable unit on the buoy chain winch and four cross deck winches.
1.2 Government-furnished property.
MTI ITEM DESCRIPTION NSN/PN QTY ESTIMATED
COST ($/UNIT)
N P-392 Hand Pump 4320-01-286-4065/P-392 1 ea. 368
N Dust Plug 5340-01-172-2794/FD45-
1041-06
1 ea. 5
N Dust Cap 5340-01-172-3737/FD45-
1040-06
5 ea. 2
N QD Coupling (F) 4730-01-219-4962/FD45-
1005-06-06
1 5
N QD Coupling (M) 4730-00-247-9189/FD45-
1004-06-06
5 12
N Hose Assembly 4720-01-519-8155/H-7203 1 98
N Gauge, 0-10000 6685-00-964-7773/GP-105 1 91
N Adapter 4730-00-336-0721/GA-2 1 50
2. REFERENCES
COAST GUARD DRAWINGS
None.
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Jan 2009, General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std 0740), Jan 2009, Welding and Allied Processes
Coast Guard Technical Publication (TP) 3498, 30-OCT-02, Buoy Chain Winch
Coast Guard Technical Publication (TP) 3558, JAN 2003, Manufacturer's Instruction Book -
SWBS Group(s) 573, Section 573-A (Winch, Cross Deck - Model Bmd 390), Section 573-
B, (Winch, Cross Deck - Model Bmd 471)
Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 5000, Jan 2009, Inspect, Repair, And Test Auxiliary Machine Systems
OTHER REFERENCES
None.
3. REQUIREMENTS
3.1 General.
3.1.1 CIR.
None.
3.1.2 Technical Representative.
Not applicable.
3.1.3 Protective measures.
Not applicable.
3.1.4 Interferences.
None.
3.1.5 Work coordination. The Contractor shall coordinate this work item with all other Buoy Deck equipment-associated jobs that are included in this specification package.
3.2 Convert Emergency Brake Release. The Contractor shall installs five stainless steel quick disconnect couplings in the piping and hand pump so that the hand pump can be removed from the elements and stowed in a dry environment.
3.2.1 Piping and Fittings Removal. The Contractor shall remove existing fittings to allow for installation of new SS quick disconnect couplings in accordance with SFLC Std Spec 0000 and SFLC Std 0740.
3.2.2 Installation. The Contractor shall install all GFP in accordance with attached figure 7-14 (portable hand pump/piping fittings) and SFLC Std Spec 0000 and SFLC Std 0740,
3.2.3 Operational Test and Inspect. After all authorized repairs of mechanical joints, the Contractor shall perform an operational test of the E-brake piping system using the system fluid at normal operating pressure. No visible leakage or deformation is acceptable. Repair all leaks and discrepancies found.
Submit a CFR.
3.2.1.6 Final Operational Test . After completion of all other work, perform the operational testing of each cross deck winch and chain winch emergency brake release in accordance with CG Tech Pub 3498 and 3558. Submit a CFR.
4. NOTES
This section is not applicable to this work item.
File details come from the government source that posted it. Updated .