Questions-Answers_02.docx

DOCX document 17 KB Posted

Attached to
CGC HICKORY FY13 DOCK-SIDE REPAIRS Federal contract opportunity
Solicitation number
HSCG85-13-R-P45N13
Issued by
Department of Homeland Security US Coast Guard

About this file

Questions and Answers for Amendment 00002 to CGC HICKORY FY13 DS

View the file

Other files for this federal contract opportunity

Other files attached to CGC HICKORY FY13 DOCK-SIDE REPAIRS, newest first.
File Type Posted
00004_SF30.docx DOCX document
Questions-Answers_04.docx DOCX document
Questions-Answers_03.docx DOCX document
00003_SF30.docx DOCX document
IMG_3686.jpg JPG image
IMG_3689.jpg JPG image
IMG_3583.pdf PDF
00002_SF30.docx DOCX document
EC078_57300_E-brak_Mod_0512_225_175.pdf PDF
HICKORY_(WLB_225B)_DS_KDM_13R0.pdf PDF
Request_for_Clarification_(HICKORY).doc DOC document
Cover_Sheet_(Solicitation).docx DOCX document
GOVERNMENT_PROPERTY_REPORT.docx DOCX document
SF1449_(P45N13).pdf PDF
NOTICE_TO_OFFERORS_HICKORY.docx DOCX document
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Request for ProposalHSCG85-13-R-P45N13
DOCK-SIDE REPAIRS OF CGC HICKORY (WLB-212)Amendment 0002

A. Questions/Answers to Request for Clarification with regards to dock-side repairs of CGC HICKORY (WLB - 212 )

0001 Question: Definite Item No. D-09 (Temporary Services, Provide) paragraph 3.2 and 3.3 are about the need or no need for Electrical Power requirements, please advise?

Answer: Please disregard paragraph 3.3 Electrical shore-tie. The Contractor shall provide 450 VAC, 2 cables rated at 400 Amp, 3-Phase, 60Hz power to vessel. Base LA/LB will be providing the Cutter with power and the Cutter will be bringing their own shore-tie cables.

0002 Question: Option Item No. O-06 (Buoy Deck Equipment Emergency Brake Release Hand Pump, Modify) not sure the correct parts list for this repair?

Answer: Please remove entirely old Option Item O-06 and replace it with the new attached Option Item O-06.

B. This Solicitation is not extended.

NOTES: ACKNOWLEDGE RECEIPT OF ALL AMENDMENTS IN PROPOSALS.

A. THE SOLICITATION PERIOD IS NOT EXTENDED.

B. ALL OTHER TERMS AND CONDITIONS CITED IN THE ORIGINAL SOLICITATION REMAIN THE SAME.