USCGC SPAR FY11 DS.doc

DOC document 49 KB Posted

Attached to
CGC SPAR FY11 DOCKSIDE REPAIRS
Solicitation number
HSCG85-11-Q-P30GC1
Issued by

About this file

Contractor Questions/Coast Guard Responses

View the file

Other files

File Type Posted
SF30 Amendment A00003 .doc DOC document
SF30 Amendment A00002 .doc DOC document
CGC SPAR FY11 DS REVISED SCHEDULE.xls XLS spreadsheet
SF30 Amendment A00001 .doc DOC document
CGC SPAR DS RFQ.doc DOC document
CGC SPAR FY11 DS SCHEDULE.xls XLS spreadsheet
CGC SPAR SPECIFICATION R0.pdf PDF
SF1449.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USCGC SPAR FY11 DS

HSCG85-11-Q-P30GC1

CONTRACTOR QUESTIONS

COAST GUARD RESPONSES

7/13/2011 QUESTION #1: Is the vessel to be located at the “New” CG pier on St Paul Harbor or will it be at CG Station Kodiak at the piers on Woman’s Bay?

RESPONSE #1: Base in Kodiak on Woman’s Bay.

QUESTION #2: Because of the overall small sizes of the tanks in these items, will the government consider preparing the surfaces for paint in Optional Work Items 18, 19, and 21 to SSPC –SP3?

RESPONSE #2: The Government will not waive the requirements for abrasive-SSPC SP-10, to allow for 100% of the designated tanks covered by Work Items 18, 19, and 21, no matter the size of the tanks.

QUESTION #3: What facilities ie: Electrical Power, Hazardous Waste Disposal, Compressed Air, will be available to the contractor at the Coast Guard Base?

RESPONSE #3: The Coast Guard will provide 110V power for Contractor use.

QUESTION #4: Item 13, paragraph 3.5.1 has a 12 week lead time ARO for the Bestweld Deck Drains, basically the project would be over by the time the drains showed up.

RESPONSE #4: Contractors do not have to use the “known source” as long as the fittings comply with the cited NAVSEA drawings.

QUESTION#5: Tank Painting Items: We have concerns that the cold water in Kodiak (40 degree range) will not allow the Tanks against the Hull to get to an acceptable steel temperature condition for paint applications.

RESPONSE #5: Waiting for response from Technical advisor.