USCGC SPAR FY11 DS.doc
DOC document 49 KB Posted
- Attached to
- CGC SPAR FY11 DOCKSIDE REPAIRS
- Solicitation number
- HSCG85-11-Q-P30GC1
About this file
Contractor Questions/Coast Guard Responses
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF30 Amendment A00003 .doc | DOC document | |
| SF30 Amendment A00002 .doc | DOC document | |
| CGC SPAR FY11 DS REVISED SCHEDULE.xls | XLS spreadsheet | |
| SF30 Amendment A00001 .doc | DOC document | |
| CGC SPAR DS RFQ.doc | DOC document | |
| CGC SPAR FY11 DS SCHEDULE.xls | XLS spreadsheet | |
| CGC SPAR SPECIFICATION R0.pdf | ||
| SF1449.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USCGC SPAR FY11 DS
HSCG85-11-Q-P30GC1
CONTRACTOR QUESTIONS
COAST GUARD RESPONSES
7/13/2011 QUESTION #1: Is the vessel to be located at the “New” CG pier on St Paul Harbor or will it be at CG Station Kodiak at the piers on Woman’s Bay?
RESPONSE #1: Base in Kodiak on Woman’s Bay.
QUESTION #2: Because of the overall small sizes of the tanks in these items, will the government consider preparing the surfaces for paint in Optional Work Items 18, 19, and 21 to SSPC –SP3?
RESPONSE #2: The Government will not waive the requirements for abrasive-SSPC SP-10, to allow for 100% of the designated tanks covered by Work Items 18, 19, and 21, no matter the size of the tanks.
QUESTION #3: What facilities ie: Electrical Power, Hazardous Waste Disposal, Compressed Air, will be available to the contractor at the Coast Guard Base?
RESPONSE #3: The Coast Guard will provide 110V power for Contractor use.
QUESTION #4: Item 13, paragraph 3.5.1 has a 12 week lead time ARO for the Bestweld Deck Drains, basically the project would be over by the time the drains showed up.
RESPONSE #4: Contractors do not have to use the “known source” as long as the fittings comply with the cited NAVSEA drawings.
QUESTION#5: Tank Painting Items: We have concerns that the cold water in Kodiak (40 degree range) will not allow the Tanks against the Hull to get to an acceptable steel temperature condition for paint applications.
RESPONSE #5: Waiting for response from Technical advisor.