CGC SPAR FY11 DS REVISED SCHEDULE.xls
XLS spreadsheet 35 KB Posted
- Attached to
- CGC SPAR FY11 DOCKSIDE REPAIRS
- Solicitation number
- HSCG85-11-Q-P30GC1
About this file
REVISED SCHEDULE
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF30 Amendment A00003 .doc | DOC document | |
| SF30 Amendment A00002 .doc | DOC document | |
| USCGC SPAR FY11 DS.doc | DOC document | |
| SF30 Amendment A00001 .doc | DOC document | |
| CGC SPAR DS RFQ.doc | DOC document | |
| CGC SPAR FY11 DS SCHEDULE.xls | XLS spreadsheet | |
| CGC SPAR SPECIFICATION R0.pdf | ||
| SF1449.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
| PRICING SCHEDULE FOR: | |||||
| USCGC SPAR (WLB-225B) DOCKSIDE AVAILABILITY 2011 | |||||
| HSCG85-11-Q-P30GC1 | |||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | Ship Service Diesel Generator, Engine Top End Overhaul | JOB | 1 | $0.00 | |
| D-002 | Circuit Breakers (60 Hz), Inspect and Test | JOB | 1 | $0.00 | |
| D-003 | Potable Water Pneumatic Tanks, Clean and Inspect | JOB | 1 | $0.00 | |
| D-004 | Potable Water System Relief Valve, Renew | JOB | 1 | $0.00 | |
| D-005 | Compressed Air Receivers, Clean, Inspect, and Test | JOB | 1 | $0.00 | |
| D-006 | Compressed Air System Valves, Inspect and Test | JOB | 1 | $0.00 | |
| D-007 | Grey Water Holding Tanks, Clean and Inspect | JOB | 1 | $0.00 | |
| D-008 | Sewage Holding Tanks, Clean and Inspect | JOB | 1 | $0.00 | |
| D-009 | Sewage Piping, Clean and Flush | JOB | 1 | $0.00 | |
| O-010 | Tanks ( Grey Water Holding ), Preserve “ Partial ” | JOB | 1 | $0.00 | |
| O-011 | Tanks ( Sewage Holding ), Preserve “ Partial ” | JOB | 1 | $0.00 | |
| D-012 | Temporary Services, Provide | JOB | 1 | $0.00 | |
| D-013 | Shower Deck Drain, Modification | JOB | 1 | $0.00 | |
| D-014 | Deck Covering (Interior Wet/Dry) , Renew | JOB | 1 | $0.00 | |
| D-015 | Fuel Transfer Pumps, Align | JOB | 1 | $0.00 | |
| D-016 | Tanks (Potable Water), Clean | JOB | 1 | $0.00 | |
| D-017 | Tanks (Potable Water), Inspect | JOB | 1 | $0.00 | |
| O-018 | Tanks ( Grey Water Holding ) , Preserve “ 100% ” | JOB | 1 | $0.00 | |
| O-019 | Tanks (Potable Water), Preserve “ 100% ” | JOB | 1 | $0.00 | |
| D-020 | Tanks ( Potable Water ), Preserve “ Partial ” | JOB | 1 | $0.00 | |
| O-021 | Tanks ( Sewage Holding ) , Preserve “ 100% ” | JOB | 1 | $0.00 | |
| D-022 | Deck Covering (Wet/Dry), Seal | JOB | 1 | $0.00 | |
| D-023 | Travel and Perdiem | JOB | 1 | ||
| O-00A | Composite Labor Rate | Hour | 380 | $0.00 | |
| D-00B | GFP Report | NSP | NSP | NSP | |
| O-00Z | Laydays | Day | 5 | ||
| Total Price of Definite Items | |||||
| Total Price of Option Items | |||||
| Total Price of Definite and Optional Items |
&C(5/19/2011)
Rev-0 - Page &P of &N
File details come from the government source that posted it. Updated .