QA_-_SF30-Amendment-1.doc
DOC document 48 KB Posted
- Attached to
- Shuttle Services
- Solicitation number
- HSCG84-16-Q-B11096
About this file
Amendment 00001 - Questions and Answers
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2_-_Past_Performance_Questionnaire_SHUTTLE_SVCS.doc | DOC document | |
| SF30-Amendment-4-WJC.doc | DOC document | |
| RevSolicitation-Amend4_WJC.doc | DOC document | |
| Attach1toAmend00003.pdf | ||
| SF30-Amendment-3.doc | DOC document | |
| SF30-Amendment-2.doc | DOC document | |
| 3_-_Shuttle-PRS.DOC | DOC document | |
| 2_-_Past_Performance_Questionnaire_SHUTTLE_SVCS.doc | DOC document | |
| 6_-_Shuttle_Schedule_-_OPTIONAL_MID-DAY.doc | DOC document | |
| 4_-_Shuttle-QASP.DOC | DOC document | |
| 5_-_Shuttle_Schedule_.doc | DOC document | |
| 1_-_05-2051.txt | TXT text file | |
| Solicitation-Shuttle_Bus_Coast_Guard_Island_final.doc | DOC document |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1.CONTRACT ID CODE
PAGE OF PAGES
1 2
2. AMENDMENT/MODIFICATION NO.
AMENDMENT 00001
3. EFFECTIVE DATE
04/28/2016
4. REQUISITION/PURCHASE REQ. NO.
5. PROJECT NO. (If applicable)
6 . ISSUED BY CODE|____________
USCG SILC
Coast Guard Island Bldg. 54-C
Alameda, CA 94501-5100
7. ADMINISTERED BY (If other than Item 6) CODE|__________________
Same as Issued By
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) To all interested Parties
| (() |
| 9a. AMENDMENT OF SOLICITATION NO. |
9.
10.
9b. DATED (SEE ITEM 11)
11.
10a. MODIFICATION OF CONTRACT/ORDER
NO.
HSCG84-16-Q-B11096
12.
10b. DATED (SEE ITEM 13) 04/15/2016
| CODE |
| FACILITY CODE |
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITAITONS
FORMCHECKBOX
The above numbered solicitation is amended as set forth in item 14. The hour and date for receipt of Offers FORMCHECKBOX is extended, FORMCHECKBOX is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a). By completing Items 8 and 15, and returning __1___ copies of the amendment, (b) By acknowledging receipt of this amendment on your copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF ACKNOWLEGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM AP[LIES ONLY TO MODIFICATION OF CONTRACTS/ORDERS
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
| (() |
| A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A. |
B.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, ect.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.
C.. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D.. OTHER (Specify type of modification and authority)
E. IMPORTANT: CONTRACTOR ( is not ( is required to sign this document and return _____copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
TITLE: Shuttle Services – Alameda, CA
The purpose of this amendment is to answer questions received and extend the offer due date.
Questions received prior to the deadline, 25 April 2016 as indicated in the subject solicitation, page 1, Notice to Offerors.
Question 1: Who is the incumbent?
Answer: CITI CONCEPTS, INC DBA BARON TOURS
Continued on page 2 Except as provided herein, all terms and conditions of the document referenced in item 9A or 10a, as heretofore changed, remains unchanged and in full force and effect
15A. NAME AND TITLE OF SIGNER (Type or print)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
Wendy J. Culbreth
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
| 15C. DATE SIGNED |
| 16B. UNITED STATES OF AMERICA |
BY ________________________________________
(Signature of Contracting Officer) 16c. DATE SIGNED
NSN 7540-01-152-8070
STANDARD FORM 30 (rev. 10-83)
PREVIOUS EDITION UNUSABLE
Prescribed by GSA
FAR (48 CFR) 52.243
HSCG84-16-Q-B11096
Amendment 00001
Continuation page 2 of 2 Question 2: What was the total payout to the contractor for services performed in the last 12 months including any optional routes and unscheduled services?
Answer: Total Base Award plus 4 options, all of which were exercised totaled $1,007,511.15.
Question 3: Was the optional and unscheduled shuttle route part of the existing services? If so, please indicate the total number of units exercised for both.
Answer: The optional (or mid day) portion was not considered "optional services" on the existing contract; rather, it was part of the normal route. Unscheduled services were a part of the existing contract but never utilized.
Question 4 Where there any changes to the previous contract?
Answer: Schedules were modified to reflect accurate schedule drive times between stops.
Question 5: Is the solicitation due date May 2nd @ 12:30PM Pacific as indicated on SF1449 or May 11 @ 3PM Pacific as indicated on fbo.gov?
Answer: Solicitation takes precedence; however this amendment extends the current due date to May 11, 2016 at 12:30 PM Pacific Time.
Question 6: Section 2.2 of the POW states that “Evidence of California Public Utilities Commission “Z” Permit shall be submitted to the contracting officer at least five (5) business days prior to commencement of performance.” When contacting the CPUC, we were instructed that there are multiple steps to receiving a “Z” permit and the total process could take anywhere from 60 to 125 days from the day of receiving the application. This process puts many contractors at an unfair disadvantage when bidding on this solicitation. The need to show evidence of having a “Z” permit within 5 business days prior to commencement (June 1, 2016), limits most out-of-state contractors and allows only those who have the permit already on hand to compete.
Could the government accept proof of submitting the application, 5 days prior to commencement instead of actually having it on hand?
Answer: No. A “Z” Permit requires the contractor to meet all applicable California Public Utilities Commission permitting, licensing, insurance, safety, registration and identification required by State, Federal and local law and is required prior to operation in California. However, to avoid limiting competition, the date for receipt of proposals will be extended to allow the Government additional time to reach a resolution.
As a result of this amendment, the due date of offers for this solicitation has been extended through 11 May 2016 @ 12:30PM Pacific Time.