RESOLUTE_(WMEC_210B)_DD_FQ3_PDP_17ED2_BLANK.xls
XLS spreadsheet 35 KB Posted
- Attached to
- Drydock Repairs on CGC RESOLUTE
- Solicitation number
- HSCG80-17-Q-P45B31
About this file
Schedule B
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 618-WMEC_801_8_1_-_-.pdf | ||
| Amendment_0003(04-20-17).pdf | ||
| Amendment_0002(04-18-17).pdf | ||
| Amendment_0001(04-17-17).pdf | ||
| Solicitation.pdf | ||
| Specifications_RESOLUTE_DD.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
| PRICING SCHEDULE FOR: | |||||
| USCGC RESOLUTE (WMEC-210B) DRYDOCK AVAILABILITY FY2017 | |||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | Hull Plating (U/W Body), Ultrasonic Testing | JOB | 1 | $0.00 | |
| D-002 | Appendages (U/W), Leak Test | JOB | 1 | $0.00 | |
| D-003 | Propulsion Shaft Fairwaters and Rope Guards, Inspect | JOB | 1 | $0.00 | |
| D-004 | Appendages (U/W) - Internal, Preserve | JOB | 1 | $0.00 | |
| D-005 | Voids (Non-Accessible), Leak Test | JOB | 1 | $0.00 | |
| D-006 | Voids (Non-Accessible), Internal Surfaces, Preserve | JOB | 1 | $0.00 | |
| D-007 | Propulsion Shafting, Strain Gage Alignment, Inspect | JOB | 1 | $0.00 | |
| D-008 | Propulsion Shaft Seal (Mechanical And Inflatable) Assemblies, Inspect And Repair Or Renew | JOB | 1 | $0.00 | |
| D-009 | Propulsion Shaft Bearings (External), Check Clearances | JOB | 1 | $0.00 | |
| D-010 | Propulsion Stern Tube Bearings, Check Clearances | JOB | 1 | $0.00 | |
| D-011 | Controllable Pitch Propeller (CPP) System, Inspect and Service | JOB | 1 | $0.00 | |
| D-012 | Fathometer Transducer, General Maintenance | JOB | 1 | $0.00 | |
| D-013 | Underwater (Speed) Log Transducer(s), Renew | JOB | 1 | $0.00 | |
| D-014 | Sea Valves and Waster Pieces, Overhaul or Renew | JOB | 1 | $0.00 | |
| D-015 | Sea Strainers - Duplex (All Sizes), Overhaul | JOB | 1 | $0.00 | |
| D-016 | Rudder Stock Bearings Clearances, Check | JOB | 1 | $0.00 | |
| D-017 | U/W Body, Preserve (100%) | JOB | 1 | $0.00 | |
| D-018 | Hull Plating Freeboard, Preserve “100%” | JOB | 1 | $0.00 | |
| D-019 | Main Mast, Preserve, 100% | JOB | 1 | $0.00 | |
| D-020 | Superstructure, Preserve “100%” | JOB | 1 | $0.00 | |
| D-021 | Cathodic Protection / Zinc Anodes, Renew | JOB | 1 | $0.00 | |
| D-022 | Drydock | JOB | 1 | $0.00 | |
| D-023 | Temporary Services, Provide - Cutter | JOB | 1 | $0.00 | |
| D-024 | Helo Light, Renew (CSMP 20160027) | JOB | 1 | $0.00 | |
| D-025 | Engine Room Gusset, Renew (CSMP 20160033) | JOB | 1 | $0.00 | |
| D-026 | Handrails, Renew (CSMP 20160034) | JOB | 1 | $0.00 | |
| D-027 | Fan Room Forward Bulkhead, Renew (CSMP 20160035) | JOB | 1 | $0.00 | |
| D-028 | Deck Plating (Aft Repair, Electric Shop, and Passage), Renew and Preserve (CSMP 20160036) | JOB | 1 | $0.00 | |
| D-029 | Fuel Oil Return Piping, Renew (CSMP 20160037) | JOB | 1 | $0.00 | |
| D-030 | Fuel Oil Gooseneck and Deck Riser, Renew (CSMP 20160038) | JOB | 1 | $0.00 | |
| D-031 | Lead Dust, Clean | JOB | 1 | ||
| D-032 | Fixed Ballast (Lead Ingots), Remove and Reinstall (TCTO | JOB | 1 | ||
| D-033 | Reefer Drain Piping and Deck Plating, Renew (CSMP 20160028) | JOB | 1 | ||
| D-034 | Propulsion Shaft Coating, Inspect and Test | JOB | 1 | ||
| O-00A | Composite Labor Rate | Hour | |||
| D-00B | GFP Report | NSP | EA | NSP | |
| D-00C | Travel and Perdiem | $0.00 | JOB | $0.00 | |
| O-00Z | Laydays | Day | 0 | ||
| Total Price of Definite Items | |||||
| Total Price of Option Items | |||||
| Total Price of Definite and Optional Items |
&C(2/9/2017) Draft-2 - Page &P of &N
Sheet1
File details come from the government source that posted it. Updated .