SENECA RFQ.doc
DOC document 1 MB Posted
- Attached to
- USCGC SENECA DOCKSIDE REPAIRS
- Solicitation number
- HSCG80-11-Q-P45610
About this file
RFQ/Specification/Price Schedule B
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions and Answers 3.doc | DOC document | |
| Amendment 3.pdf | ||
| SENECA | — | |
| Amendment 2.pdf | ||
| SENECA | — | |
| Questions and Answers 2.doc | DOC document | |
| SENECA | — | |
| SENECA | — | |
| SENECA | — | |
| Amendment.pdf | ||
| CGC SENECA DS 2011.doc | DOC document | |
| SENECA | — |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HSCG80-11-X-XXXXXX PAGE 5 OF 42
USCGC NAME OF VESSEL
DRYDOCK/DOCKSIDE REPAIRS
NOTICE FOR FILING AGENCY PROTESTS
It is the policy of the Coast Guard to issue solicitations and make contract awards in a fair and timely manner. The Ombudsman Program for Agency Protests (OPAP) was established to investigate agency protest issues and resolve them without expensive and time-consuming litigation. OPAP is an independent reviewing authority that is empowered to grant a prevailing protester essentially the same relief as the General Accounting Office (GAO).
Interested parties are encouraged to seek resolution of their concerns within the Coast Guard as an Alternative Dispute Resolution (ADR) forum, rather than filing a protest with the GAO or some external forum. Interested parties may seek resolution of their concerns informally or opt to file a formal agency protest with the contracting officer or Ombudsman.
Informal forum with the Ombudsman. Interested parties who believe that a Coast Guard procurement is unfair or otherwise defective should first direct their concerns to the cognizant contracting officer. If the contracting officer is unable to satisfy the concerns, the interested party is encouraged to contact the Coast Guard Ombudsman for Agency Protests. Under this informal process, the agency is not required to suspend contract award performance. Use of an informal forum does not suspend any time requirement for filing a protest with the agency or other forum. In order to ensure a timely response, interested parties should provide the following information to the Ombudsman: solicitation/contract number, contracting office, contracting officer, and solicitation closing date (if applicable).
Formal Agency Protest with the Ombudsman. Prior to submitting a formal agency protest, protesters must first use their best efforts to resolve their concerns with the contracting officer through open and frank discussions. If the protester’s concerns are unresolved, an independent review is available by the Ombudsman. The protester may file a formal agency protest to either the contracting officer or as an alternative to that, the Ombudsman under the OPAP program. Contract award or performance will be suspended during the protest period unless contract award or performance is justified, in writing, for urgent and compelling reasons or is determined in writing to be in the best interest of the Government. The agency’s goal is to resolve protests in less than 35 calendar days from the date of filing. Protests shall include the information set forth at FAR 33.103(d)(2). If the protester fails to submit the required information, resolution of the protest may be delayed or the protest may be dismissed. This will not preclude re-filing of the protest to meet the requirement. To be timely, protests must be filed within the period specified in FAR 33.103(e). Formal protests filed under the OPAP program should be forwarded to the address below:
Commandant (CG-9131) U.S. Coast Guard Headquarters Procurement Planning & Oversight Division 1900 Half St. SW, JR11-0203 Washington, DC 20593 Telephone: (202) 372-3692
Fax: (202) 475-3904
Commander
U.S. Coast Guard
Surface Forces Logistics Center
CPD-C&P1-MECPL
300 East Main Street, Suite 550 Norfolk, VA 23510
REQUEST FOR QUOTATION
HSCG80-11-Q-P45610
USCGC SENECA DOCKSIDE REPAIRS
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
1. REQUISITION NUMBER
2. CONTRACT NO.
3. AWARD/EFFECTIVE
DATE
4. ORDER NUMBER
5. SOLICITATION NUMBER
HSCG80-11-Q-P45610
6. SOLICITATION
ISSUE DATE
17FEB11
| 7. FOR SOLICITATION INFORMATION CALL: |
| a. NAME |
Chas Hartley
b. TELEPHONE NUMBER (no collect calls)
(757) 628-4657
8. OFFER DUE DATE/ LOCAL TIME
1MAR11/3:00p.m. est
9. ISSUED BY CODE 75174
USCG Surface Forces Logistics Center Attn: Chas Hartley 300 E Main Street, Suite 550
Norfolk, VA 23510
E-mail: chas.f.hartley@uscg.mil
10. THIS ACQUISITION IS
FORMCHECKBOX
UNRESTRICTED OR
FORMCHECKBOX
SET ASIDE 100% FOR:
SMALL BUSINESS
FORMCHECKBOX
EMERGING SMALL
FORMCHECKBOX
HUBZONE SMALL
BUSINESS
BUSINESS
SERVICE DISABLED VETERAN-
8(A)
OWNED SMALL BUSINESS
NAICS: 336611
SIZE STANDARD 1,000
11. DELIVERY FOR FOB DESTINATION UNLESS BLOCK IS MARKED
SEE SCHEDULE
12. DISCOUNT
TERMS
FORMCHECKBOX
13a. THIS CONTRACT IS A RATED ORDER UNDER DPAS (15 CFR 700) 13b. RATING DO-A3
14. METHOD OF SOLICITATION
RFQ FORMCHECKBOX
IFB FORMCHECKBOX
RFP
15. DELIVER TO CODE
USCGC SENECA
16. ADMINISTERED BY CODE
Same as block 9
17a. CONTRACTOR/ CAGE CODE FACILITY
OFFEROR CODE
DUNS No.
TELEPHONE NO:
FAX NO:
18a. PAYMENT WILL BE MADE BY CODE USCG Finance Center
1430A Kristina Way
Chesapeake, VA 23326
FORMCHECKBOX
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER 18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS CHECKED FORMCHECKBOX
SEE ADDENDUM
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
26 work items in accordance with this solicitation and attached specification
25. ACCOUNTING AND APPROPRIATION DATA
26. TOTAL AWARD AMOUNT (FOR GOVT USE ONLY)
FORMCHECKBOX
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 & 52.212-5 ARE ATTACHED. ADDENDA FORMCHECKBOX
ARE FORMCHECKBOX
ARE NOT ATTACHED.
FORMCHECKBOX
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4, FAR 52.212-5 IS ATTACHED. ADDENDA FORMCHECKBOX
ARE FORMCHECKBOX
ARE NOT ATTACHED.
FORMCHECKBOX
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED HEREIN.
FORMCHECKBOX
29. AWARD OF CONTRACT: REFERENCE
OFFER DATED . YOUR OFFER ON SOLICITATION (BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR
31a. UNITED STATES OF AMERICA (SINGATURE OF CONTRACTING OFFICER)
30b. NAME AND TITLE OF SIGNER
30c. DATE SIGNED
31b. NAME OF CONTRACTING OFFICER
31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION
STANDARD FORM 1449 (Rev. 3/2005)
PREVIOUS EDITION IS NOT USABLE
Prescribed by GSA – FAR (48 CFR) 53.212
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
SEE PAGES X-XX
32a. QUANTITY IN COLUMN 21 HAS BEEN
FORMCHECKBOX
RECEIVED
FORMCHECKBOX
INSPECTED
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE
32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
33. SHIP NUMBER
34. VOUCHER NUMBER
35. AMOUNT VERIFIED CORRECT FOR
36. PAYMENT
FORMCHECKBOX
COMPLETE
FORMCHECKBOX
PARTIAL
FORMCHECKBOX
FINAL
37. CHECK NUMBER
FORMCHECKBOX
PARTIAL FORMCHECKBOX
FINAL
38. S/R ACCOUNT NUMBER
39. S/R VOUCHER NUMBER
40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
42 a. RECEIVED BY (Print)
| 41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER |
| 41c. DATE |
42b. RECEIVED AT (Location)
42c. DATE REC’D (YY/MM/DD)
42d. TOTAL CONTAINERS
STANDARD FROM 1449 (REV. 3/2005) BACK
CONTINUATION OF SF 1449 – BLOCKS 17a - 25
(1) Block 17a: Contractor shall include DUNS number.
(2) Block 17b: REMITTANCE ADDRESS: Payment will be made to the Financial Institution listed in Central Contractor Registration (CCR). To receive award Contractor must be registered in Central Contract Registration (CCR) http://www.ccr.gov.
(3) Block 19 through 24: SEE SCHEDULE OF SUPPLIES/SERVICES BELOW.
(4) Block 25: ACCOUNTING AND APPROPRIATION DATA: To be included on contract award document.
All offers to this RFQ must respond no later than 1 March 2011 @ 3:00 pm Eastern Standard Time.
DESCRIPTION OF WORK:(a) The Contractor shall furnish all necessary labor, material, services, equipment, supplies, power, accessories, facilities and such other things as are necessary, except as otherwise specified, to perform dockside repairs, and alterations to the vessel, in accordance with this solicitation and attached specifications.
(b) Failure to read the specifications in their entirety will not relieve the quoter from the responsibility for properly estimating the difficulty or price of successfully performing the work. Failure to do so will be at the quoter 's risk.
REQUIRED DOCUMENTS:
Each quoter shall furnish the information required by the solicitation, which includes:
1. Signed 1449 with offeror’s address, DUNS and other information completed.
2. Price Schedule filled out with a cost associated with each CLIN
3. Past Performance Documentation
4. Small Business Self Certification for applicable set-asides
5. Welding Certifications and Procedures
6. Drydock Certification
7. Proof of Insurance (Statement of Coverage from current Insurance carrier)
PLEASE NOTE: QUOTES THAT DO NOT INCLUDE ALL REQUIRED DOCUMENTS MAY BE CONSIDERED INCOMPLETE AND MAY NOT BE CONSIDERED
There is not a Geographic Restriction on this solicitation. All work will be performed at the vessels home pier.
ANTICIPATED AWARD DATE: The contract is expected to be awarded on or about March 8, 2011. Work covered by this solicitation shall be completed within 57 calendar days from the date the vessel becomes available to the Contractor. The availability is scheduled to start on or about March 21,2011. An arrival conference normally will be held within 48 hours of the scheduled start date.
TRAVEL AND PER DIEM: (DOCKSIDES ONLY)CLIN C, “Travel and Per Diem”, is applicable only to Contractors not within the local commuting area ( miles) of the vessels location. It is anticipated that any Contractors within the 50 mile commuting area will enter “zero” (0) or “N/A” for the unit and extended price for this CLIN, on the Schedule of Supplies or Services. The place of performance will be located at
CGC SENECA
c/o CG Integrated Support Command
427 Commercial St.
Boston, MA 02109-1094
SCHEDULE OF SUPPLIES/SERVICES: SCHEDULE OF SUPPLIES/SERVICES: See Schedule of Supplies and Services. Base Contract Line Item Numbers (CLINs) are marked as “D” for Definitive. Optional CLINS are marked “O” for Optional. Insert unit prices in all CLINs listed in the Schedule unless “NSP” is printed in the Unit Price column for any CLIN. “NSP” in the section means “Not Separately Priced.”
| ITEM |
| DESCRIPTION |
| UNIT |
| QTY |
| EXTENDED PRICE |
| D-001 |
| Tanks (Dirty Oil and Waste), Clean |
| JOB |
| 1 |
| D-002 |
| Tanks (Potable Water), Inspect |
| JOB |
| 1 |
| D-003 |
| Tanks (Ballast), Clean and Inspect |
| JOB |
| 1 |
| D-004 |
| Sewage Holding Tanks, Clean and Inspect |
| JOB |
| 1 |
| D-005 |
| Sewage Piping, Clean and Flush |
| JOB |
| 1 |
| O-006 |
| Tanks (Sewage Holding), Preserve “ Partial ” |
| JOB |
| 1 |
| D-007 |
| Watertight Doors and Scuttles (External), Renew |
| JOB |
| 1 |
| O-008 |
| Tanks (Ballast), Preserve “ Partial ” |
| JOB |
| 1 |
| O-009 |
| Tanks (Potable Water), Preserve “ Partial ” |
| JOB |
| 1 |
| O-010 |
| Tanks (Dirty Oil and Waste), Preserve “ Partial ” |
| JOB |
| 1 |
| D-011 |
| Deck Panels, Renew |
| JOB |
| 1 |
| D-012 |
| Controllable Pitch Propeller (CPP) System, Renew Attached Pumps and Overhaul Suction Strainers |
| JOB |
| 1 |
| D-013 |
| Dumbwaiter Door Assembly, Renew |
| JOB |
| 1 |
| D-014 |
| Deck Covering (Electrical Matting), Renew |
| JOB |
| 1 |
| D-015 |
| Hangar Door Curtin Barrel Assembly, Overhaul |
| JOB |
| 1 |
| D-016 |
| JP-5 Tank Vent, Renew |
| JOB |
| 1 |
| D-017 |
| Oily Water Separator, Overhaul |
| JOB |
| 1 |
| D-018 |
| Sewage Piping, Renew |
| JOB |
| 1 |
| D-019 |
| Air Overflow Vent Terminations, Renew |
| JOB |
| 1 |
| D-020 |
| JP-5 Tank Cover, Repair |
| JOB |
| 1 |
| D-021 |
| Potable Hot Water Tank, Renew |
| JOB |
| 1 |
| D-022 |
| Binoculars Foundation, Renew |
| JOB |
| 1 |
| D-023 |
| Twin Pivot Arm, Level 2 Inspect and Repair |
| JOB |
| 1 |
| D-24 |
| Articulating Crane, Level 2 Inspect and Repair |
| JOB |
| 1 |
| D-25 |
| Anchor Windlass, level 2 Inspect and Repair |
| JOB |
| 1 |
| D-26 |
| Cooling Coils, Renew |
| JOB |
| 1 |
| O-00A |
| Composite Labor Rate |
Hour
| D-00B |
| GFP Report |
| NSP |
| EA |
| 1 |
| NSP |
| O-00Z |
| Travel and PerDiem |
| JOB |
| 1 |
Total Price of Definite Items
Total Price of Option Items
Total Price of Definite and Optional Items
USCGC SENECA (WMEC 906)
270 FOOT "B CLASS" MEDIUM ENDURANCE CUTTER
SPECIFICATION FOR DOCKSIDE REPAIRS
Developed By: Mr. Pete Pilla (Rev-0, 20 October 2010)
TABLE OF CONTENTS
iiiRevisions Record ivConsolidated List of References viiiConsolidated List of Government-furnished Property ixConsolidated List of Critical Inspection Items xPrincipal Characteristics
1General Requirements
9WORK ITEM 1: Tanks (Dirty Oil and Waste), Clean
11WORK ITEM 2: Tanks (Potable Water), Inspect
13WORK ITEM 3: Tanks (Ballast), Clean and Inspect
15WORK ITEM 4: Sewage Holding Tanks, Clean and Inspect
18WORK ITEM 5: Sewage Piping, Clean and Flush
21WORK ITEM 6: Tanks ( Sewage Holding ) , Preserve “ Partial ”
23WORK ITEM 7: Watertight Doors and Scuttles (External), Renew
27WORK ITEM 8: Tanks (Ballast), Preserve “Partial”
30WORK ITEM 9: Tanks ( Potable Water ), Preserve “Partial”
33WORK ITEM 10: Tanks (Dirty Oil and Waste), Preserve “Partial”
36WORK ITEM 11: Deck Panels, Renew
38WORK ITEM 12: Controllable Pitch Propeller (CPP) Systems, Renew Attached Pumps and Overhaul Suction Strainers
42WORK ITEM 13: Dumbwaiter Door Assembly, Renew
45WORK ITEM 14: Deck Covering (Electrical Matting), Renew
47WORK ITEM 15: Hangar Door Curtin Barrel Assembly, Overhaul
52WORK ITEM 16: JP-5 Tank Vent , Renew
54WORK ITEM 17: Oily Water Separator, Overhaul
57WORK ITEM 18: Sewage Piping , Renew
59WORK ITEM 19: Air Overflow Vent Terminations, Renew
62WORK ITEM 20: JP-5 Tank Cover, Repair
64WORK ITEM 21: Potable Hot Water Tank, Renew
67WORK ITEM 22: Binoculars Foundation, Renew
69WORK ITEM 23: Twin Pivot Arm Davit, Level 2 Inspect and Repair
74WORK ITEM 24: Articulating Crane, Level 2 Inspect and Repair
77WORK ITEM 25: Anchor Windlass, Level 2 Inspect and Repair
80WORK ITEM 26: Cooling Coils, Renew
Revisions Record This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.
| DATE |
| REV# |
| WORK ITEM# |
| CHANGES MADE |
NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.
Consolidated List of ReferencesThe below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at time of specification writing and during contract execution.
All Coast Guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free or charge. Other Government documents may be accessed – free of charge – as follows:
· MIL/DOD/CID Specifications: http://www.assistdocs.com/search/search_basic.cfm
· Commandant Instruction Manuals: http://www.uscg.mil/directives/default.asp
· Public Laws, Code of Federal Regulations, U.S Codes, and other Federal Government laws:: www.gpoaccess.gov The Government is aware of the following internet web links where contractors may procure commercial specifications:
· American Welding Society (AWS): http://www.awspubs.com/index.php
· ANSI, ASTM, IEEEE, NFPA, ASME, SAE Standards: http://www.techstreet.com/
· NFPA: http://www.nfpa.org
· SSPC Standards and pictorial guides: http://shopping.netsuite.com/sspcmarketplace
COAST GUARD DRAWINGS
Coast Guard Drawing 905 WMEC 111-001, Rev D, Shell Expansion Fwd 101 Coast Guard Drawing 905 WMEC 113-002, Rev A, Tank Top Plating & Framing Aft 182 Coast Guard Drawing 905 WMEC 123-001, Rev E, Dumbwaiter Trunk & FDN FR 165 Coast Guard Drawing 905 WMEC 154-001, Rev E, Pilot House Lvl & Top Coast Guard Drawing 905 WMEC 167-001, Rev K, List of Structures and Closures (Sheets 1-10 & Sheet 20, 30, 34) Coast Guard Drawing 905-WMEC 233-5, Rev A, Prop Diesel Fuel Oil Sys Diag Coast Guard Drawing 905 WMEC 241-002, Rev A, Stbd Red Gear A&D Coast Guard Drawing 905 WMEC 241-005, Rev A, Port Red Gear A&D Coast Guard Drawing 905 WMEC 506-001, Rev H, Overflow Air Escape and Sounding Tube System Diagram Coast Guard Drawing 905 WMEC 529-001, Rev J, Ballasting & Emergency Bilge Drainage Sys Coast Guard Drawing 905 WMEC 533-003, Rev F, Pot Wtr Brominator Sys Diag Coast Guard Drawing 905 WMEC 533-004, Rev A, Pot Wtr Brominator Sys A & D Coast Guard Drawing 905 WMEC 533-005, Rev B, H&C Potable Water System Main Deck A&D Coast Guard Drawing 905 WMEC 533-006, Rev A, H&C Potable Water System 01 Level and Above A&D Coast Guard Drawing 905 WMEC 533-007, Rev A, H&C Potable Water Below Main Deck -OMS Coast Guard Drawing 905 WMEC 541-001, Rev G, Fuel Oil & Xfer System Diagram Coast Guard Drawing 905 WMEC 581-1, Rev D, Anchor Handling A & D Coast Guard Drawing 905 WMEC 581-4, Rev D, Anchor Windlass A & D Coast Guard Drawing 905 WMEC 583-6, Rev C, Articulating Crane A & D Coast Guard Drawing 905 WMEC 583-7, Rev D, Articulating Crane Hydraulic Sys Diag Coast Guard Drawing 905 WMEC 583-8, Rev B, Articulating Crane Hydraulic Sys – A & D Coast Guard Drawing 905 WMEC 588-10, Rev C, Hangar A & D Coast Guard Drawing 905 WMEC 588-11, Rev C, Hangar Electr Wiring Assy Coast Guard Drawing 905 WMEC 593-001, Rev C, Vacuum Flush Collection System Electrical Schematic Diagram Coast Guard Drawing 905 WMEC 593-002, Rev A, Vacuum Sewage System Comp Installation A&D Coast Guard Drawing 905 WMEC 593-003, Rev D, Sewage Transfer System Diagram Coast Guard Drawing 905 WMEC 593-004, Rev D, Sewage Transfer System A&D Coast Guard Drawing 905 WMEC 593-005, Rev B, Sewage Vacuum System Diagram Coast Guard Drawing 905 WMEC 593-006, Rev F, Sewage Vacuum System Below Main Deck Coast Guard Drawing 905 WMEC 593-007, Rev D, Sewage Vacuum System, Main Deck and Above – A&D Coast Guard Drawing 905 WMEC 593-008, Rev J, Oily Bilge System Diag Coast Guard Drawing 905 WMEC 593-009, Rev B, Oily Bilge A & D Coast Guard Drawing 905 WMEC 593-010, Rev B, Auto Oily Wtr Sep – A & D Coast Guard Drawing 905 WMEC 593-011, Rev D, Auto Oily Water Sep Elect Schem Coast Guard Drawing 905 WMEC 593-012, Rev D, Piping Sys Mods Incid to OWS Install Coast Guard Drawing 905 WMEC 801-003, Rev F, General Arrangement – 02/Pilot House & Abv
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Jan 2009, General Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), Jan 2009, Welding and Allied Processes Surface Forces Logistics Center Standard Specification 2351 (SFLC Std Spec 2351), Jan 2009, Overhaul DC Generators and Motors In-Shop Surface Forces Logistics Center Standard Specification 3020 (SFLC Std Spec 3020), Jan 2009, Overhaul AC Electrical Motors In-Shop Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), Jan 2009, Auxiliary Machine Systems Surface Forces Logistics Center Standard Specification 6341 (SFLC Std Spec 6341), Jan 2009, Install New Deck Covering Systems Surface Forces Logistics Center Standard Specification 8636 (SFLC Std Spec 8636), Jan 2009, Temporary Hull Accesses Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual Coast Guard Technical Publication (TP) 2817, Oct 1991, Technical Manual for the Controllable-Pitch Propeller Coast Guard Technical Publication (TP) 2837, Section 581-A, Jul 1998, Capstan-Windlass Model X-1836 Coast Guard Technical Publication (TP) 2837, Section 583-D, Dec 2007, Technical Manual for Iowa Tooling Co. Articulating Boat Crane Coast Guard Technical Publication (TP) 2839, Jun 2007, Manufacturer’s Instruction Book, SWBS Group(s) 588-593, SWBS 588, Section A, Telescope Aluminum Helicopter Hangar Model No. 1230-5 Coast Guard Technical Publication (TP) 3940, Jan 2007, Twin Pivot Arm Davit – Type TW. PIV 5.0B-Ref No 5472-2 thru 5472-5 Coast Guard Technical Publication (TP) 3956A, July 2008, Oily Water Separator System - Model 2000-OCD
OTHER REFERENCES
American National Standards Institute/NSF International (ANSI/NSF) 61, 2008, Drinking Water System Components - Health Effects American National Standards Institute/American Water Works Association (ANSI/AWWA) C652, 2002, Disinfection of Water-Storage Facilities ASTM International (ASTM) B633, Nov 1998, Standard Specification for Electrodeposited Coating of Zinc on iron and Steel ASTM International (ASTM) D1330, 2004, Standard Specification for Rubber Sheet Gaskets ASTM International (ASTM) D4174, Re-approved 1999, Standard Practice for Cleaning, Flushing, and Purification of Petroleum Fluid Hydraulic Systems ASTM International (ASTM) E797, 2001, Standard Practice for Measuring Thickness by Manual Ultrasonic Pulse-Echo Contact Method Commercial Item Description (CID) A-A-59316, Nov 2003, Abrasive Materials for Blasting International Standard Organization (ISO) 4406, 1999, Hydraulic Fluid Power – Fluids – Method for Coding Level of Contamination by Solid Particles MIL-PRF-17672, May 1995, Hydraulic Fluid, Petroleum, Inhibited Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) C6183, 2007, Cork and Rubber Composition Sheet; For Aromatic Fuel And Oil Resistant Gaskets The Society for Protective Coatings (SSPC)/NACE International (NACE) 2004, Joint Surface Preparation Standard SSPC-SP 10/NACE No.2, Near-White Blast Cleaning The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2004, Power Tool Cleaning to Bare Metal Consolidated List of Government-furnished Property
The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.
| WORK ITEM |
| MTI |
| ITEM DESCRIPTION |
| NSN/PN |
| QTY |
| ESTIMATED COST |
($/Unit)
| 7 |
| Y |
| Watertight door,Aluminum, 2-Dog, Fwd left-Hinge, with window. |
| N/A |
| 1 ea. |
| $ 3,500.00 |
| 7 |
| Y |
| Watertight door,Aluminum, 2-Dog, Fwd right-Hinge, with window |
| N/A |
| 1 ea. |
| $ 3,500.00 |
| 7 |
| Y |
| Watertight door, steel,2-dog, right-hinged |
| N/A |
| 1 ea. |
| $ 3,500.00 |
| 7 |
| Y |
| Watertight door, steel, 2-dog, left-hinged, fixed 10” portlight, w/battle cover |
| N/A |
| 1 ea. |
| $ 3,500.00 |
| 12 |
| Y |
| Rotary pump (port) |
| 4320-01-131-6913/ |
S418L-2664
| 1 ea. |
| $ 973.96 |
| 12 |
| Y |
| Rotary pump (starboard) |
| 4320-01-130-6252/ |
S418-2663
| I ea. |
| $ 973.96 |
| 12 |
| N |
| Strainer elements |
| 200-DC-74W-MC-3A3 |
| 2 ea. |
| $ 500 |
| 15 |
| N |
| Horizontal Torsion Shaft |
| PN: N1203-90-1 |
| 1 ea. |
| $ 410.00 |
| 15 |
| N |
| U-joint (Horizontal torsion shaft) |
| NSN: 3010-01-472-4877 |
| 1 ea. |
| $ 135.00 |
| 15 |
| N |
| U-joint (Vertical drive shaft) |
| NSN: 3010-01-472-1596 |
| 1 ea. |
| $ 195.00 |
| 15 |
| N |
| Rotary Limit Switch Assembly |
| PN: 1205-297-2 |
| 1 ea. |
| $ 758.00 |
| 15 |
| N |
| Torque Control Coupling |
| PN: TT3 |
| 1 ea. |
| $ 410.00 |
| 15 |
| N |
| Slat, Door, Stainless |
| PN: N1237-151-RAW |
| 12 ea. |
| $ 115.00 |
| 15 |
| N |
| Pillow Block Bearing Kit |
| NSN: 3130-01-472-1611 |
| 4 ea. |
| $ 178.00 |
| 21 |
| N |
| 400 Gallon Potable Hot Water Accumulator Tank |
| Ace Buehler Inc. |
PVG48-3 C3 2 642 “30 KW”
| 1 ea. |
| $800.00 |
*Government-loaned property, which shall be returned to the vessel upon completion of the availability.
**New or refurbished equipment that the Government may provide for installation in place of existing equipment.
***Government-furnished property, which is to be supplied by either the vessel or the C4IT ServiceCenter
Consolidated List of Critical Inspection Items The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000_STD, paragraph 3.2.6.5 (Inspection report particulars)):
Work Item Title Twin Pivot Arm Davit, Level 2 Inspect and Repair
Articulating Crane, Level 2 Inspect and Repair
Anchor Windlass, Level 2 Inspect and Repair
PC_225B_WLB_1109
Principal Characteristics
225' WLB (B-CLASS)
Physical Characteristics
| Length Overall |
| 225' 0" |
| Length between Perpendiculars |
| 206' 0" |
| Maximum Beam |
| 46' |
| Designed Draft |
| 13' 0" |
| Full Load Displacement |
| 2000 long tons |
| Light Ship Displacement |
| 1523 long tons |
| Minimum Operating Displacement |
| 1800 long tons |
| Mast Height (Above 12' Waterline) |
| 67' 5" |
| Anchor |
| Two 4000 lb standard Navy stockless anchors, 8 shots each, port and starboard, 1-3/8 die lock chain |
Hull Characteristics
| Bilge Keels (Port & Starboard) |
| Frames 42-79 |
Frame Spacing
| FR 0 to 12 |
| 21" |
| FR 12 to 30 |
| 22" |
| FR 30 to 102 |
| 24" |
Machinery Characteristics
| Main Propulsion |
| Diesel Reduction |
| Diesel Engines |
| Two Caterpillar 3608, TA, 3100 BHP each @ 900 RPM |
| Number of Propellers |
| 1 |
| Number of Blades |
| 4 |
| Diameter |
| 10' |
| Pitch |
| Controllable |
| RPM |
| 254 |
| Ship's Service Diesel Generators |
| Two Caterpillar 3508 TA, 450 kW |
| Emergency Diesel Generator |
| One Caterpillar 3406 DITA, 280 kW |
| Shore Tie |
| Two 450 VAC, 400 Amp, 3-wire |
| Shaft Bearing, Forward |
| Cooper Bearing 01-BCP-1400-EX-TL |
| Shaft Bearing, Aft |
| Water Lubricated Cutless Bearing |
Tank CAPACITIES
| Diesel Oil |
| 76,498 gal |
| Fresh Water Capacity |
| 8056 gal |
| Hydraulic Oil Capacity |
| 2785 gal |
| Lube Oil Storage |
| 764 gal |
| Grey Water Tank |
| 2700 gal |
| Sewage Holding Tank |
| 1700 gal |
00000_0310_FLT
REC_0000_FLT_ Commercial Project @ CG Facility (1209) General Requirements
1. SCOPE
1.1 Intent. This item describes the general requirements to be followed by the Contractor while conducting this availability.
2. REFERENCES
Coast Guard Drawings None.
Coast Guard Publications Coast Guard Commandant Instruction (COMDTINST) M10360.3C, Change 1, Jun 2006, Coatings and Color Manual Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Jan 2009, General Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), Jan 2009, Welding and Allied Processes Other References Code of Federal Regulations (CFR) Title 33 CFR, 2008, Navigation and Navigable Waters Code of Federal Regulations (CFR) Title 40, Chapter I, 2008, Environmental Protection Agency Code of Federal Regulations (CFR) Title 49, Chapter I, 2008, Pipeline and Hazardous Materials Safety Administration, Department Of Transportation
3. REQUIREMENTS
3.1 General. The Contractor shall conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability.
NOTE
The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and also to all other work subsequently authorized by changes, modifications, or extensions to the contract.
3.2 Fire watch requirements. The Contractor shall refer to 3.3.1.3 (Fire watch requirements) of SFLC Std Spec 0000, in accomplishing the following task:
· Provide portable fire extinguishers for Coast Guard fire watch personnel. Coast Guard fire watch is in lieu of contractor personnel during the hours of 0800-1600, Monday through Friday, and limited to eight Coast Guard fire watch personnel.
· Provide fire watch personnel and fire extinguishers for the duration of the availability period, during and beyond noted Coast Guard fire watch support.
3.3 Welding and brazing requirements. The Contractor shall perform all welding and allied processes, and NDI in accordance with SFLC Std Spec 0740.
3.4 HW disposal. The Contractor shall be responsible for all hazardous wastes generated by work under this contract. Label and package all hazard wastes in 49 CFR-approved containers, and in accordance with all other applicable Federal, state, and local laws and regulations. In addition, comply with applicable parts of 40 CFR 262, applicable to handling of hazardous wastes.
3.4.1 Along with the Government, the Contractor shall be contractually considered the co-generator of all hazardous wastes; be aware that the Government will make available its facility’s EPA Generator Identification (ID) Number for manifesting of hazardous wastes.
3.4.2 The Contractor shall identify, arrange, and be responsible for the turnover of all hazardous wastes, within the confines of the Coast Guard shore facility, to the facility’s HM/HW Coordinator. Notify the ship’s HW Coordinator prior to any transfers of HW from ship to shore.
3.4.3 The Contractor shall prepare a manifest of hazardous waste to be reviewed and signed by the HM/HW Coordinator. Contact the HM/HW Coordinator for turnover of any hazardous waste; in addition, notify the COTR 24 hours prior to any waste removals, and ensure that waste removals are conducted during normal business hours (0800-1600) on Monday through Friday (excluding holidays).
3.4.4 The Contractor shall be aware of the following:
3.4.4.1 No Contractor or Subcontractor shall have the authority to sign a Hazardous Waste Manifest using the Coast Guard facility’s EPA Generator ID Number or remove contract generated hazardous waste from the Coast Guard facility without COTR or KO-approval.
3.4.4.3 Local environmental regulations at the Government facilities may be more stringent than in many jurisdictions. As with all environmental regulations, it is the Contractor's responsibility to research, prepare for, and comply with, the local and state regulations.
3.4.4.4 Coast Guard facilities do not have Facilities Response Plans (see 33 CFR 154 Subpart F). It is the Contractor’s responsibility to furnish the Facility Response Plan (FRP) when required for over-the-water liquids transfers to and from vessels. This requirement is applicable to transfers to/from vessels with an oil/fuel capacity of 250 barrels or more.
4. NOTES
4.1 Access to COMDTINST M10360.3. The COMDTINST M10360.3 may be accessed at the following URL address: http://www.uscg.mil/directives/cim.asp
4.2 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 0000 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.
QA-1 - QUALITY ASSURANCE INSPECTION FORM
(PRESERVATION CHECKLIST)
Vessel Name: _______________________ Hull Number: ______________ CLIN No.: _____________ Work Item Title: ________________________________________________ Specific Area Being Preserved: ___________________________________________________________
CHECKPOINT 1 – COATING SYSTEM COMPLIANCE
Ensure all coatings are in compliance with COMDTINST M10360.3, Appendix C.
CHECKPOINT 2 - PAINT STORAGE
Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating manufacturer(s).
CHECKPOINT 3 - AMBIENT CONDITIONS
Ensure surface and surrounding temperatures are each between 50 and 90°F for water-based coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).
Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).
Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating manufacturer(s).
CHECKPOINT 4 - PRE-SURFACE PREPARATION
Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.
CHECKPOINT 5 - SURFACE PREPARATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-12, SP-11, SP-10…).
Verify surface anchor profile (1.5-3.5 mils for abrasive-blasted steel surfaces; 1.0 mil (minimum) for power-tool cleaned surfaces; 1.0-1.5 mils for abrasive-blasted aluminum surfaces); and 1.5 –2.5 for surfaces to be coated w/single coat of inorganic zinc). Conduct 5 sets of 3 readings for the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.
Measure soluble salt conductivity (5 measurements per 1000 sqft) – maximum threshold: 70 microsiemens/cm for non-submerged surfaces and 30 microsiemens/cm for submerged surfaces.
CHECKPOINT 6 - PRIMER COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Verify proper mixing and stand-in (induction) times.
Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.
Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).
Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.
Brush out all runs, sags, drips, and puddles.
Perform visual inspection for holidays and other defects.
CHECKPOINT 7 – STRIPE COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).
CHECKPOINT 8 – TOP COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
Verify proper mixing and stand-in (induction) times, as applicable.
Verify wet film thickness at random, to prevent under or over application.
Brush out all runs, sags, drips, and puddles.
CHECKPOINT 9 – FINAL INSPECTION
Verify final system dry film thickness.
Ensure that system cure is in accordance with manufacturer's recommendation for intended service.
Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.
For immersion coatings (including tank U/W body), record date and time of the following events:
Final coat application:_________/_________; Return to service or removal from environment controls: _______/_______
CHECKPOINT 10 – RECORD KEEPING
Complete, sign, and submit all provided QA Inspection Forms.
Name of QP-1 or NACE-Certified Inspector: __________________________________________ Cert. No.: ____________ Signature of Inspector: _______________________________________ Date:_______________ Time: _________
QA-2 - QUALITY ASSURANCE INSPECTION FORM
(ENVIRONMENTAL READINGS)
Vessel Name: _______________________ Hull Number: ______________ CLIN No.: _____________ Work Item Title: ________________________________________________ (Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat)
| DATE & TIME |
| ENTER ACTIVITY (Surface preparation, primer coat, barrier coat, top coat, etc…) |
| LOCATION |
| TEMPERATURE |
| % REL. HUMIDITY |
| SIGNATURE OF INSPECTOR |
| DEW POINT |
| SURFACE |
| AMBIENT |
| ΔT |
(DP – Surface)
Name of QP-1 or NACE-Certified Inspector: __________________________________________ Cert. No.: ____________ Signature of Inspector: _______________________________________ Date:_______________ Time: _________
QA-3 - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG)
Vessel Name: _______________________ Hull Number: ______________ CLIN No.: _____________ Work Item Title: ________________________________________________ Location of Surface Profile Measurements: ___________________________________________________________
| SURFACE PREPARATION METHOD |
| PROFILE |
(mils)
| Min |
| Max |
| Avg. |
SSPC-SP-10/NACE No. 2
SSPC-SP-12/NACE No. 5
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area)
Brush-blasting (non-metallic substrate)
Abrasive Manufacturer and Sieve Size: _________________________________ Place Surface Profile Replica Tapes In The Spaces Provided Below, To Serve As Permanent QA record. Maintain separate log for each area/location. When an Area Is Divided Into Separate Sections, Maintain A Separate Log for Each Section.
Place Surface Profile Replica Tape Here Reading:__________ mils Place Surface Profile Replica Tape Here Reading:__________ mils Place Surface Profile Replica Tape Here Reading:__________ mils
Place Surface Profile Replica Tape Here Reading:__________ mils Place Surface Profile Replica Tape Here Reading:__________ mils Place Surface Profile Replica Tape Here Reading:__________ mils
Place Surface Profile Replica Tape Here Reading:__________ mils Place Surface Profile Replica Tape Here Reading:__________ mils Place Surface Profile Replica Tape Here Reading:__________ mils
Place Surface Profile Replica Tape Here Reading:__________ mils Place Surface Profile Replica Tape Here Reading:__________ mils Place Surface Profile Replica Tape Here Reading:__________ mils
Average Mil Reading (IAW ASTM D4417-Method C) for above 15 readings: ______________
Name of QP-1 or NACE-Certified Inspector: __________________________________________ Cert. No.: ____________ Signature of Inspector: _______________________________________ Date:_______________ Time: _________
QA-4 - QUALITY ASSURANCE INSPECTION FORM
(SURFACE SOLUBLE SALT CONDUCTIVITY LOG)
Vessel Name: _______________________ Hull Number: ______________ CLIN No.: _____________ Work Item Title: ________________________________________________ Location of Work (including frame numbers): _______________________________________ Area (square feet): ____________
| DATE |
| TEST LOCATIONS |
| CONDUCTIVITY |
(microsiemens/cm)
Name of QP-1 or NACE-Certified Inspector: __________________________________________ Cert. No.: ____________ Signature of Inspector: _______________________________________ Date:_______________ Time: _________
QA-5 - QUALITY ASSURANCE DATA FORM
(COATING THICKNESS)
(Use one sheet for each sequence) Vessel Name: _______________________ Hull Number: ______________ CLIN No.: _____________ Work Item Title: ________________________________________________ Coating Manufacturer: ___________________Product Name: _______________________Batch Number: ____________ Induction Time: _______________________________________________________________ Coating System Sequence (Indicate Whether: Primer, Touch-Up Primer, Barrier Coat, 3rd Coat…): __________________ Dry Film Thickness (DFT) Measurements IAW SSPC PA-2
| SPOT |
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
| AVERAGE VALUE |
*BASE METAL READING (BMR)
*Required, If Magnetic Pull-Of (Type I/Banana) Gauge Is Used.
Location (Frame Reference): ___________________
| SPOT |
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
Overall Avg. DFT
ADJUSTMENTS
| Avg. BMR |
| Deviation |
| Before Adjustments |
| After Adjustments |
Avg.
| SPOT |
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
Overall Avg. DFT
ADJUSTMENTS
| Avg. BMR |
| Deviation |
| Before Adjustments |
| After Adjustments |
Avg.
| SPOT |
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
Overall Avg. DFT
ADJUSTMENTS
| Avg. BMR |
| Deviation |
| Before Adjustments |
| After Adjustments |
Avg.
Application Method (Airless, Conventional Spray, Rolled):____________________ Average DFT: __________________________________________________________ Name of QP-1 or NACE-Certified Inspector: __________________________________________ Cert. No.: ____________ Signature of Inspector: _______________________________________ Date:_______________ Time: _________
12300_DO_0310_FLT
REC_12310_FLT_270’ WMEC ‘B’ Class (ALL) (0310)
WORK ITEM 1: Tanks (Dirty Oil and Waste), Clean
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to clean the following tank(s):
| TYPE OF TANK |
| LOCATION |
| *CAPACITY - 95% |
(gallons) LOW SUCTION (gallons)
| Oily Waste Storage |
| 4-165-1-F |
| 1,450 |
| 100 |
| Oily Waste Storage |
| 4-169-1-F |
| 1,574 |
| 100 |
*(Note: Tank CAPACITY - 95% at 95%)
1.2 Government-furnished property.
None.
2. REFERENCES
Coast Guard Drawings None.
Coast Guard Publications None.
Other References Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) C6183, 2007, Cork and Rubber Composition Sheet; For Aromatic Fuel And Oil Resistant Gaskets
3. REQUIREMENTS
3.1 General. The Contractor shall accomplish the following for all designated tanks in paragraph 1.1 (Intent).
3.1.1 Operational test - initial. Prior to commencement of work, the Contractor shall witness an operational pre-test (by Coast Guard personnel) of all designated tank TLI'S and valves (including foot valves), to demonstrate existing operational condition. Submit a CFR.
3.1.2 Tank content removal. The Contractor shall remove and dispose of up to a total of 1,000 gallons of dirty oil and oily waste.
NOTE
Vessel may come in with less tank fluid contents than specified above.
.3 Cleaning requirements. The Contractor shall remove tank cover(s) and clean tank interior surfaces free of all foreign materials, such as sediment or sludge, taking care not to damage the coating system (if applicable). Remove cleaning media and residues continuously during the washing process. Remove any residual wash media; and wipe up residual moisture with clean lint-free cloths.
3.3 Tank content and waste disposal. The Contractor shall dispose of tank contents and all cleaning fluids in compliance with all applicable Federal, state, and local laws, ordinances and regulations. Document a complete chain of custody record of the removed tank contents and generated wastes, from the vessel to the point of final destination or delivery. Submit document to the COTR upon completion of work.
3.4 Tank closing. The Contractor shall ensure that the tank(s) remain open for at least 24 hours after completion of all authorized repair and preservation procedures. Notify the COTR at least 24 hours prior to closing the tank(s). After satisfactory inspection by the Coast Guard Inspector and completion of all authorized repairs, close tank manhole cover(s) with new gasket material conforming to AMS-C-6183.
3.5 Operational test – post repairs. After completion of work, the Contractor shall witness an operational test (by Coast Guard personnel) of all designated tank TLIs to prove satisfactory operating condition. Submit a CFR.
4. NOTES
This section is not applicable to this work item.
12301_POTWTR_DLA_1209_FLT
REC_12314_FLT_270’ WMEC ‘B’ Class (ALL) (0310)
WORK ITEM 2: Tanks (Potable Water), Inspect
1.1 Intent. This work item describes the requirements for the Contractor to inspect the following tank(s):
| TYPE OF TANK |
| LOCATION |
| CAPACITY - 95% |
(gallons)
LOW SUCTION
(gallons)
| Potable Water |
| 4-78-1-W |
| 3,918 |
| 100 |
| Potable Water |
| 4-78-2-W |
| 3,918 |
| 100 |
| Potable Water |
| 4-94-1-W |
| 291 |
| 6 |
None.
2. REFERENCES
Coast Guard Drawings Coast Guard Drawing 905 WMEC 533-005, Rev B, H&C Potable Water System Main Deck A&D Coast Guard Drawing 905 WMEC 533-006, Rev A, H&C Potable Water System 01 Level and Above A&D Coast Guard Drawing 905 WMEC 533-007, Rev A, H&C Potable Water Below Main Deck -OMS Coast Guard Publications None.
Other References American National Standards Institute/NSF International (ANSI/NSF) 61, 2008, Drinking Water System Components - Health Effects American National Standards Institute/American Water Works Association (ANSI/AWWA) C652, 2002, Disinfection of Water-Storage Facilities
3. REQUIREMENTS
3.1 General. The Contractor shall refer to Coast Guard drawings 905 WMEC 533-005, 905 WMEC 533-006, and 905 WMEC 533-007 for guidance. The Contractor shall notify the Dockmaster prior to filling or draining the potable water tank(s), when this item is being executed in a drydock availability. The Contractor shall accomplish the following for the tank(s) designated in paragraph 1.1 (Intent):
3.1.1 Operational test - initial. Prior to commencement of work, the Contractor shall witness an operational pre-test (by Coast Guard personnel) of all tank TLIs for tanks listed in paragraph 1.1 (Intent), to demonstrate existing operational condition. Submit a CFR.
3.1.2 Tank content removal. Remove and dispose of all fluids and/or residues in accordance with all applicable Federal, state, and local regulations.
3.1.3 Inspection. Remove manhole cover(s); and visually inspect all tank interior surfaces, including, but not limited to bulkheads, floor and overhead plating, structural members, manhole cover surfaces, fasteners and gasket seating surfaces. Submit a CFR including the following, as applicable:
· Tank structural condition.
· Inaccessible areas, if any.
· Condition of tank coating, including measurements taken, percentage, location, and type of coating failure.
· Tank level indicator (TLI) and/or float switch condition (if applicable).
· Sounding tube and striker plate condition.
· Suction and discharge piping condition.
· Fastener material and condition (correct fastener material is stainless steel).
3.2 Tank closing. The Contractor shall notify the COTR at least 24 hours prior to closing the tank(s). After satisfactory inspection by the Coast Guard Inspector, and completion of all authorized repairs, close tank manhole cover(s) with new gasket material conforming to ANSI/NSF 61. Renew all stud cotton grommets (as applicable) upon reinstallation of manhole cover(s).
3.3 Tank disinfecting. After all other authorized work involving the potable water system and tank closing have been completed, the Contractor shall disinfect and treat the affected potable water tank(s) and associated disturbed piping and components, as necessary, to meet or exceed the requirements of AWWA C652. After tank disinfecting; remove and dispose of all treated water in accordance with all Federal, state and local regulations.
NOTE
Ensure that no one enters the tanks once disinfection is completed.
3.4 Operational test – post repairs. After completion of work, the Contractor shall witness an operational test (by Coast Guard personnel) of all disturbed tank TLIs to prove satisfactory operating condition. Submit a CFR.
4. NOTES
This section is not applicable to this work item.
12316_DLA_0209_FLT
REC_12316_FLT: 270’ WMEC ‘B’ Class (ALL) (0809)
WORK ITEM 3: Tanks (Ballast), Clean and Inspect
1.1 Intent. This work item describes the requirements for the Contractor to clean and inspect the following tank(s):
| TYPE OF STRUCTURE |
| LOCATION |
| CAPACITY - 95% |
(gallons)
LOW SUCTION
(gallons)
| Ballast |
| 3-B-0-W |
| 5,991 |
| 900 |
| Ballast |
| 4-75-1-W |
| 1,811 |
| 420 |
| Ballast |
| 4-75-2-W |
| 1,181 |
| 420 |
| Ballast |
| 4-103-1-W |
| 8,378 |
| 400 |
| Ballast |
| 4-103-2-W |
| 8,378 |
| 400 |
| Ballast |
| 4-169-0-W |
| 4,943 |
| 250 |
| Ballast |
| 4-228-1-W |
| 3,521 |
| 100 |
| Ballast |
| 4-228-2-W |
| 3,521 |
| 100 |
| Ballast |
| 4-242-0-W |
| 2,989 |
| 120 |
Note: Tanks also used as for storing grey water – considered immediately dangerous to life and health (IDLH).
None.
2. REFERENCES
Coast Guard Drawings Coast Guard Drawing 905 WMEC 529-1, Rev J, Ballasting & Emergency Bilge Drainage System Diagram Coast Guard Publications None.
Other References ASTM International (ASTM) D1330, 2004, Standard Specification for Rubber Sheet Gaskets
3. REQUIREMENTS
3.1 General. The Contractor shall refer to Coast Guard Drawing 905 WMEC 529-1 for guidance. The Contractor shall do the following for the structure(s) designated in paragraph 1.1 (Intent):
3.1.1 Operational test – initial. Prior to commencement of work, the Contractor shall witness an operational pre-test (by Coast Guard personnel) of all designated tank TLIs to demonstrate existing operational condition. Submit a CFR.
3.1.2 Content removal. Remove and dispose of all fluids and/or residues in accordance with all applicable Federal, state, and local regulations. Plug all inlet and outlet piping in the tank to prevent contaminants from entering the tank. Use plugs with an attached lanyard, ring or other system that will ensure plugs are not lost in the pipe openings. Maintain a plug accountability log outside the tank(s) to prevent any of the installed temporary plugs from being lost inside the tank or forgotten inside at tank closure.
3.1.3 Cleaning. Remove access cover(s). Clean the designated structure’s interior surfaces free of all foreign materials, such as sediment, sludge and fungus growth. Remove all persistent residues, taking care not to damage the tank coating system. Remove cleaning media and residues continuously from the compartment during the washing process. Remove any residual wash media and wipe up residual moisture with clean lint-free cloths. Collect, contain, and dispose of all wash media, residues, and cleaning materials in accordance with all Federal, state, and local regulations.
3.1.4 Inspection. Visually inspect all interior surfaces, including, but not limited to bulkheads, floor and overhead plating, structural members, manhole cover surfaces, fasteners and gasket seating surfaces. Submit a CIR including the following, as applicable:
· Structural condition.
· Inaccessible areas, if any.
· Condition of coating, including measurements taken, percentage, location, and type of coating failure.
· Tank level indicator (TLI) and/or float switch condition.
· Sounding tube and striker plate condition.
· Suction and discharge piping condition.
· Fastener material and condition.
3.2 Closing. The Contractor shall ensure that the compartment(s) remain open for approximately 24 hours after completion of the tasks specified above. Notify the COTR at least 24 hours prior to closing the compartment(s). After satisfactory inspection by the Coast Guard Inspector, and completion of all authorized repairs, close the manhole cover(s) with new gasket material conforming to ASTM D1330 and new cotton grommets on each stud (as applicable). The Contractor shall renew up to 10% of missing or damaged nuts and washers.
3.3 Operational test – post repairs. After completion of work, the Contractor shall witness an operational test (by Coast Guard personnel) of all designated tank TLIs to prove satisfactory operating condition. Submit a CFR.
4. NOTES
This section is not applicable to this work item.
59302_DLA_1209_FLT
REC_59301_FLT_270’ WMEC ‘B’ Class (ALL) (1209)
WORK ITEM 4: Sewage Holding Tanks, Clean and Inspect
1.1 Intent. This work item describes the requirements for the Contractor to clean and inspect the following tank(s):
| TYPE OF TANK |
| LOCATION |
| CAPACITY - 95% |
(Gallons) LOW SUCTION (Gallons)
| Sewage Tank |
| 3-82-0-E |
| 1,500 |
| Vacuum Collection Tank |
| 2-82-0-E |
| 360 |
| Seal Tank |
| 2-82-0-E |
| 25 |
2. REFERENCES
Coast Guard Drawings Coast Guard Drawing 905 WMEC 593-001, Rev C, Vacuum Flush Collection System Electrical Schematic Diagram Coast Guard Drawing 905 WMEC 593-002, Rev A, Vacuum Sewage System Comp Installation A&D Coast Guard Drawing 905 WMEC 593-003, Rev D, Sewage Transfer System Diagram Coast Guard Drawing 905 WMEC 593-004, Rev D, Sewage Transfer System A&D Coast Guard Drawing 905 WMEC 593-005, Rev B, Sewage Vacuum System Diagram Coast Guard Drawing 905 WMEC 593-006, Rev F, Sewage Vacuum System Below Main Deck Coast Guard Drawing 905 WMEC 593-007, Rev D, Sewage Vacuum System, Main Deck and Above – A&D Coast Guard Publications Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Jan 2009, General Requirements Other References ASTM International (ASTM) D1330, 2004, Standard Specification for Rubber Sheet Gaskets
3. REQUIREMENTS
3.1 General. The Contractor shall refer to Coast Guard drawings 905 WMEC 593-001, 905 WMEC 593-002, 905 WMEC 593-003, 905 WMEC 593-004, 905 WMEC 593-005, 905 WMEC 593-006 and 905 WMEC 593-007 for guidance.
3.1.1 Interferences. The Contractor shall be aware that interferences in way of work include, but are not limited to the below-listed.